Overall Case Outcomes
Ansal Housing and Construction Limited, a prominent player in the real estate sector, particularly in states such as Haryana, Madhya Pradesh, Rajasthan, and Punjab, has recently come under scrutiny due to the significant number of complaints filed against it. Despite its widespread operations, the builder has been embroiled in legal disputes that shed light on its business practices and customer relations. In this blog, we delve into the issues faced by Ansal Housing, analyze the outcomes of various cases, and offer insights for potential buyers.
According to the data, Ansal Housing has faced a staggering total of 325 complaints. Out of these, the builder has won only 38 cases, while a concerning 287 cases have resulted in losses. This statistic highlights a troubling trend where the builder is often on the losing end of legal disputes, raising questions about its compliance with commitments made to buyers.
A close examination of the cases lost reveals common factors that consistently place Ansal Housing in a difficult situation:
The cases that Ansal Housing has successfully defended showcase a different narrative:
The assessment of Ansal Housing and Construction Limited reveals a builder grappling with significant challenges concerning customer satisfaction and legal accountability. With 287 losses heightening scrutiny, potential buyers must tread carefully when considering this builder for investment.
In conclusion, while Ansal Housing and Construction Limited has potential projects, navigating their history of complaints and legal challenges is paramount for buyer security.
Yearly Trend for these Cases
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
2018-24712018-2471 | RajasthanRajasthan | The applicant's plot area was increased without c…The applicant's plot area was increased without consent, and they were charged extra. The authority ordered the respondent to pay interest on the deposit and compensation for the increase in plot area. | ["Increased plot ar…["Increased plot area without consent", "Interest on deposit", "Compensation"] | {"appellant_claim": "The applicant's plot area wa…{"appellant_claim": "The applicant's plot area was increased without their consent, and they were charged extra. They claimed interest on their deposit and compensation for the increase in plot area.", "respondent_claim": "The respondent claimed that the increase in plot area was not a major change and that the applicant was not entitled to compensation.", "final_verdict": "The authority ordered the respondent to pay interest on the deposit at the rate of 7.5% + 2% per annum and compensation for the increase in plot area at the rate of 3% per annum.", "in_favor_of_respondent": "no"} | Arun Kumar YadavArun Kumar Yadav | Anshal Housing & Co…Anshal Housing & Construction Limited | Link |
3042 of 20243042 of 2024 | HaryanaHaryana | The complainants, Mrs. Sangitta Ghuliani and Mr. …The complainants, Mrs. Sangitta Ghuliani and Mr. Girish Kumar Ghuliani, filed a complaint against Ansal Housing & Infrastructure Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for the delay in handing over possession. | ["Delay in possessi…["Delay in possession", "Interest rate"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to hand over possession of the shop within the stipulated period of 42 months and demanded interest at the rate of 24% per annum.", "respondent_claim": "The respondent claimed that the delay was due to force majeure circumstances and that they had diligently developed the project.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for the delay in handing over possession.", "in_favor_of_respondent": "no"} | Mr. Girish Kumar Gh…Mr. Girish Kumar Ghuliani | Ansal Housing & Inf…Ansal Housing & Infrastructure Limited | Link |
2400 of 20182400 of 2018 | HaryanaHaryana | Complainant filed a case against the respondent f…Complainant filed a case against the respondent for not delivering the possession of a flat despite receiving full payment. The adjudicating officer directed the respondent to refund the amount paid by the complainant with interest and litigation cost. | ["Non-delivery of p…["Non-delivery of possession", "Refund of payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid full payment for the flat but the respondent had not delivered the possession of the flat.", "respondent_claim": "The respondent claimed that the delay in delivery of possession was due to various reasons including force majeure circumstances and that the project was not complete till date.", "final_verdict": "The adjudicating officer directed the respondent to refund the amount paid by the complainant with interest and litigation cost.", "in_favor_of_respondent": "no"} | Mukesh KumawatMukesh Kumawat | Ansal Properties an…Ansal Properties and Constructions | Link |
2394 of 20182394 of 2018 | HaryanaHaryana | The complainants sought delay possession charges …The complainants sought delay possession charges and interest for the period calculated from the time they paid the money to the respondent. The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver possession of the apartment within the agreed-upon time and sought delay possession charges and interest for the period calculated from the time they paid the money to the respondent.", "respondent_claim": "The respondent claimed that the delay was due to force majeure circumstances beyond their control and sought an extension of time to complete the project.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for every month of delay.", "in_favor_of_respondent": "no"} | Shri Rajan AroraShri Rajan Arora | Ansal Housing and C…Ansal Housing and Constructions Limited | Link |
3140f20203140f2020 | HaryanaHaryana | The complainants, Mr. Balvir Singh and Mrs. Sunit…The complainants, Mr. Balvir Singh and Mrs. Sunita Rani, filed a complaint against Ansal Housing and Constructions Limited for delay in possession of a shop in the project 'Ansals Townwalk'. The authority directed the respondent to pay delay possession charges at the prescribed rate of 9.30% per annum. | ["Delay in possessi…["Delay in possession", "Possession charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the shop in the project 'Ansals Townwalk' and sought delay possession charges at the prescribed rate.", "respondent_claim": "The respondent claimed that the delay was due to force majeure circumstances and sought a further extension of time.", "final_verdict": "The authority directed the respondent to pay delay possession charges at the prescribed rate of 9.30% per annum.", "in_favor_of_respondent": "no"} | Mrs. Sunita RaniMrs. Sunita Rani | Ansal Housing and C…Ansal Housing and Constructions Limited | Link |
4410 of 20214410 of 2021 | HaryanaHaryana | The complainants sought compensation for delayed …The complainants sought compensation for delayed possession of a shop in the 'Ansal Hub' project. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | Delayed PossessionDelayed Possession | {"appellant_claim": "The complainants claimed com…{"appellant_claim": "The complainants claimed compensation for delayed possession of a shop in the 'Ansal Hub' project.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Pooja GuptaPooja Gupta | Ansal Properties Li…Ansal Properties Limited | Link |
987 of 2019987 of 2019 | HaryanaHaryana | Complainant Rupesh Goyal filed a complaint agains…Complainant Rupesh Goyal filed a complaint against M/S Ansal Properties and Construction Ltd. for not delivering possession of a flat despite full payment. The authority directed the respondent to refund the amount with interest and imposed a cost. | ["Non-delivery of p…["Non-delivery of possession", "Refund of payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid full payment for the flat but the respondent did not deliver possession of the flat.", "respondent_claim": "The respondent claimed that the project was not complete and that the complainant had not deposited instalments in time.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest and imposed a cost.", "in_favor_of_respondent": "no"} | Rupesh GoyalRupesh Goyal | Ansal Properties an…Ansal Properties and Construction Limited | Link |
4960 of 20214960 of 2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid with interest for delay in possession of a flat. The authority directed the respondent to refund the amount with interest. | ["Delay in possessi…["Delay in possession", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought refund of the amount paid with interest.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the complainant was not entitled to refund.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 10.70% per annum.", "in_favor_of_respondent": "no"} | Amitabh SandujaAmitabh Sanduja | Ansal Builders and …Ansal Builders and Construction Limited | Link |
RAJRERA-C-2018-2471RAJRERA-C-2018-2471 | RajasthanRajasthan | The complainant, Arun Kumar Yadav, filed a compla…The complainant, Arun Kumar Yadav, filed a complaint against Ansal Housing and Construction Ltd. The Authority directed the complaint to be transferred to the Adjudicating Officer for disposal. | ["Transfer of compl…["Transfer of complaint"] | {"appellant_claim": "The complainant prayed that …{"appellant_claim": "The complainant prayed that the complaint may be transferred to the Adjudicating Officer.", "respondent_claim": "The non-complainant replied that the complaint is required to be adjudicated upon by the Adjudicating Officer.", "final_verdict": "The Authority directed the complaint to be transferred to the Adjudicating Officer for disposal.", "in_favor_of_respondent": "no"} | Arun Kumar YadavArun Kumar Yadav | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
RAJ-RERA-C-2019-3370RAJ-RERA-C-2019-3370 | RajasthanRajasthan | The complainants booked plots in Ansal Town Ajmer…The complainants booked plots in Ansal Town Ajmer project developed by Ansal Housing and Construction Ltd. The respondents failed to complete construction and hand over possession. The authority directed the respondents to pay interest on deposited money and complete development work. | ["Delay in possessi…["Delay in possession", "Non-completion of development work"] | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that the respondents failed to complete construction and hand over possession of their plots despite receiving payment.", "respondent_claim": "The respondents claimed that the delay in possession was due to unforeseen circumstances and that they were making efforts to complete the development work.", "final_verdict": "The authority directed the respondents to pay interest on deposited money at the rate applicable under Rule 17 of the Rajasthan Real Estate (Regulation and Development) Rules, 2017, and to complete the development work.", "in_favor_of_respondent": "no"} | Pranav NaharPranav Nahar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
F. ३ (३६९)RJ/RERA P…F. ३ (३६९)RJ/RERA PI2O17 | RajasthanRajasthan | The case involves a notice issued against the pro…The case involves a notice issued against the promoter for non-submission of completion certificate and seeking an extension for the project. The promoter was found to have violated statutory provisions and a penalty was imposed. | ["Violation of stat…["Violation of statutory provisions", "Non-submission of completion certificate"] | {"appellant_claim": "The Authority claimed that t…{"appellant_claim": "The Authority claimed that the promoter had not submitted the completion certificate and had sought an extension for the project without proper grounds.", "respondent_claim": "The promoter claimed that the project was completed on 31.12.2019 and that the completion certificate was obtained on 27.01.2021.", "final_verdict": "The Authority found that the promoter had violated statutory provisions by not seeking an extension for the project and not submitting the completion certificate. A penalty of Rs. 50,000 was imposed.", "in_favor_of_respondent": "no"} | Suo Moto through Re…Suo Moto through Registrar of the Authority | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
RAJRERA-C-N-2022-48…RAJRERA-C-N-2022-4883 | RajasthanRajasthan | Complainant sought refund for incomplete project.…Complainant sought refund for incomplete project. Authority allowed refund with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for incomplete project.", "respondent_claim": "Respondent claimed that complainant was not entitled to refund.", "final_verdict": "Authority allowed refund with interest.", "in_favor_of_respondent": "no"} | Chanprika KaushikChanprika Kaushik | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
F.3(2037)RAJ/RERAIQ…F.3(2037)RAJ/RERAIQPR/2O२२ | RajasthanRajasthan | The Authority directed the promoter to file pendi…The Authority directed the promoter to file pending QPRs within 30 days. Failure to do so may result in appropriate action. | ["Non-submission of…["Non-submission of QPRs"] | {"appellant_claim": "The Authority claimed that t…{"appellant_claim": "The Authority claimed that the promoter did not submit pending QPRs despite service of notice.", "respondent_claim": "The respondent (Ansal Housing and Construction Limited) did not appear before the Authority.", "final_verdict": "The promoter is directed to file the pending QPRs within 30 days.", "in_favor_of_respondent": "no"} | RERARERA | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
RAJIRERA/C-2021 4542RAJIRERA/C-2021 4542 | RajasthanRajasthan | Complainant sought direction to execute Sale Deed…Complainant sought direction to execute Sale Deed for plot booked in 2018. Authority directed execution of Sale Deed within 30 days. | ["Non-execution of …["Non-execution of Sale Deed"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in the project ANSAL TOWN and paid Rs. 11.00 lakh. Despite the project being completed on 21.12.2021, the Sale Deed was never executed in favour of the complainant. The complainant sought a direction to be issued against the promoter to execute the Sale Deed at the agreed rates.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The Authority directed the promoter to execute the Sale Deed within 30 days for the plot allotted to the complainant.", "in_favor_of_respondent": "no"} | Mahesh Chand GoyalMahesh Chand Goyal | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
GC 1161 of 2018GC 1161 of 2018 | PunjabPunjab | Complaint against M/s Ansal Housing and Construct…Complaint against M/s Ansal Housing and Construction Limited for various violations and deficiencies in the real estate project Ansal Woodbury Apartments. The Chairperson, Real Estate Regulatory Authority, Punjab dismissed the complaint after considering the rival submissions and record of the case. | ["Real estate viola…["Real estate violations", "Deficiencies in service"] | {"appellant_claim": "The complainant alleged vari…{"appellant_claim": "The complainant alleged various violations and deficiencies in the real estate project Ansal Woodbury Apartments, including lack of Completion Certificate, delay in forming Residents Welfare Association, and shortcomings in the project.", "respondent_claim": "The respondent denied the allegations and claimed that they had made efforts to obtain the Completion Certificate, had formed the Residents Welfare Association, and had provided the necessary facilities to the complainant.", "final_verdict": "The complaint was dismissed after considering the rival submissions and record of the case. The Chairperson directed the respondent to obtain the Completion Certificate within 6 months and upload details of the project on the Authority's website within 2 months.", "in_favor_of_respondent": "no"} | Charanjeet Singh Ba…Charanjeet Singh Bagga | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
222/2018222/2018 | HaryanaHaryana | Complainant seeks refund with interest on amount …Complainant seeks refund with interest on amount deposited for delayed possession of flat. Authority directs refund with interest and initiates separate proceeding for unregistered project. | ["Delayed Possessio…["Delayed Possession", "Refund with Interest"] | {"appellant_claim": "Complainant seeks refund wit…{"appellant_claim": "Complainant seeks refund with interest on amount deposited for delayed possession of flat.", "respondent_claim": "Respondent claims delay due to circumstances beyond control.", "final_verdict": "Authority directs refund with interest and initiates separate proceeding for unregistered project.", "in_favor_of_respondent": "no"} | Sucheela DeviSucheela Devi | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
38 of 201938 of 2019 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed possession of flat. Authority directed payment of delayed possession charges and initiation of separate proceeding for non-registration of project. | ["Delayed possessio…["Delayed possession", "Non-registration of project"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and compensation for delayed possession of flat.", "respondent_claim": "Respondent claimed that delay was due to unforeseen circumstances and that project was not registered with RERA.", "final_verdict": "Authority directed payment of delayed possession charges at 10.75% per annum from 24.01.2017 till offer of possession. Separate proceeding to be initiated for non-registration of project.", "in_favor_of_respondent": "no"} | Mr. Amit KalraMr. Amit Kalra | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1156 of 20181156 of 2018 | HaryanaHaryana | Complainant Mr. Laxman Yadav filed a complaint ag…Complainant Mr. Laxman Yadav filed a complaint against M/s. Ansal Housing and Construction Ltd. for non-refund of paid amount. HARERA directed the respondent to refund the balance deposited amount after deducting 10% of the total sales consideration. | ["Non-refund of pai…["Non-refund of paid amount", "HARERA directions"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent did not refund the paid amount despite repeated reminders and service of legal notice.", "respondent_claim": "The respondent claimed that the complainant was not forthcoming to pay the due instalments in time and forfeited 20% of the total consideration.", "final_verdict": "HARERA directed the respondent to refund the balance deposited amount after deducting 10% of the total sales consideration.", "in_favor_of_respondent": "no"} | Mr. Laxman YadavMr. Laxman Yadav | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
923 of 2019923 of 2019 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed respondent to pay interest for delay and hand over possession. | ["Delay in possessi…["Delay in possession", "Compensation for delay"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and compensation for delay.", "respondent_claim": "Respondent claimed that delay was due to force majeure factors and that complainant was not entitled to compensation.", "final_verdict": "Authority directed respondent to pay interest for delay and hand over possession.", "in_favor_of_respondent": "no"} | Mr. Ranbir Singh Ka…Mr. Ranbir Singh Kanwar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1565 of 20181565 of 2018 | HaryanaHaryana | Complainant Mr. Kedar Singh Bhadauria filed a com…Complainant Mr. Kedar Singh Bhadauria filed a complaint against M/s Ansal Housing and Construction Ltd for not handing over possession of a flat within the stipulated time. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondent to pay interest at the prescribed rate for every month of delay. | Delay in possession…Delay in possession of flat | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to hand over possession of the flat within the stipulated time of 48 months from the date of execution of the agreement.", "respondent_claim": "The respondent claimed that the delay was due to various circumstances beyond their control, including orders from the Punjab and Haryana High Court and the National Green Tribunal.", "final_verdict": "The HARERA directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Mr. Kedar Singh Bha…Mr. Kedar Singh Bhadauria | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
4998 of 20204998 of 2020 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for not handing over the possession of the flat within the stipulated period. The authority directed the respondent to pay interest at the rate of 9.30% per annum from the due date of possession i.e., 11.09.2016 till the actual handing over of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over the possession of the flat within the stipulated period of 36 months from the date of execution of allotment or sanction of building plans whichever is later.", "respondent_claim": "The respondent claimed that the delay in possession was due to various reasons including force majeure circumstances.", "final_verdict": "The authority directed the respondent to pay interest at the rate of 9.30% per annum from the due date of possession i.e., 11.09.2016 till the actual handing over of possession.", "in_favor_of_respondent": "no"} | Mr. Arvind BhardwajMr. Arvind Bhardwaj | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1467 of 20211467 of 2021 | HaryanaHaryana | Complainants sought relief for delay in possessio…Complainants sought relief for delay in possession of flat by respondent. Authority directed respondent to pay interest for delay and hand over possession within 6 months. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent delayed possession of flat beyond the agreed-upon date.", "respondent_claim": "Respondent claimed that the delay was due to various reasons, including force majeure circumstances.", "final_verdict": "Authority directed respondent to pay interest for delay and hand over possession within 6 months.", "in_favor_of_respondent": "no"} | Mr. Rohtas Kumar To…Mr. Rohtas Kumar Tokas | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1436 of 20211436 of 2021 | HaryanaHaryana | The complainants filed a complaint against M/s An…The complainants filed a complaint against M/s Ansal Housing and Construction Ltd. for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to complete the construction of the flat, hand over the possession, and pay interest for delay. | ["Delay in possessi…["Delay in possession", "Non-compliance of section 11(4)(a)"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver the possession of the flat within the stipulated period and demanded interest for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they were not liable for the same.", "final_verdict": "The authority directed the respondent to complete the construction of the flat, hand over the possession, and pay interest for delay.", "in_favor_of_respondent": "no"} | Mr. Vivek GuptaMr. Vivek Gupta | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
2372 of 20212372 of 2021 | HaryanaHaryana | The complainants, Mr. Kannan Rajendran and Mrs. J…The complainants, Mr. Kannan Rajendran and Mrs. Jegatha Kannan, filed a complaint against M/s Ansal Housing and Construction Ltd. for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority found that the respondent had not complied with the mandate contained in section 11(4)(a) read with proviso to section 18(1) of the Act. | ["Non-compliance wi…["Non-compliance with section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had not complied with the mandate contained in section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that they had complied with all the requirements of the Act and the Rules.", "final_verdict": "The authority found that the respondent had not complied with the mandate contained in section 11(4)(a) read with proviso to section 18(1) of the Act.", "in_favor_of_respondent": "no"} | Mrs. Jegatha KannanMrs. Jegatha Kannan | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
2475 of 20212475 of 2021 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for not handing over the possession of the apartment within the stipulated period. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over the possession of the apartment within the stipulated period of 42 months from the date of execution of the agreement.", "respondent_claim": "The respondent claimed that the delay was due to various circumstances beyond their control, including orders from the court and government agencies.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for every month of delay from the due date of possession till the actual handing over of the possession.", "in_favor_of_respondent": "no"} | Ms. Rekha SinghalMs. Rekha Singhal | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
3496 of 20213496 of 2021 | HaryanaHaryana | The complainant filed a complaint against M/s Ans…The complainant filed a complaint against M/s Ansal Housing and Construction Ltd. for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest at the prescribed rate of 9.50% p.a. for every month of delay from the due date of possession till the actual handing over of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to hand over possession of the flat within the stipulated period and sought interest payment at the rate of 18% p.a.", "respondent_claim": "The respondent claimed that the delay in possession was due to unforeseen circumstances and sought exemption from interest payment.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.50% p.a. for every month of delay from the due date of possession till the actual handing over of possession.", "in_favor_of_respondent": "no"} | Vijay Kumar ThakurVijay Kumar Thakur | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
4439 of 20214439 of 2021 | HaryanaHaryana | The complainant sought compensation for delayed p…The complainant sought compensation for delayed possession of a shop in the 'Ansal Hub' project. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the shop within the stipulated period of 36 months and sought compensation in the form of interest payment.", "respondent_claim": "The respondent argued that the delay was due to unforeseen circumstances and that the complainant was not entitled to compensation.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.50% per annum for every month of delay from the due date of possession until the actual handing over of possession.", "in_favor_of_respondent": "no"} | Pradeep Kumar Shriv…Pradeep Kumar Shrivastava | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
0, 802 of 20180, 802 of 2018 | HaryanaHaryana | Complainant seeks refund of amount paid with inte…Complainant seeks refund of amount paid with interest for delayed possession. Authority directs refund with prescribed interest rate. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant paid Rs. 37,82,858/- for a shop/office in the Ansal Townwalk project. Despite repeated requests, the possession was not delivered within the agreed-upon 42 months plus 6 months grace period. The complainant seeks refund of the amount paid with interest at the prescribed rate.", "respondent_claim(in detail)": "The respondent claims that the project was affected by various force majeure circumstances, including court orders, environmental issues, and political unrest. They argue that the delay was beyond their control and that they are not liable for the refund.", "final_verdict(in detail)": "The Authority directs the respondent to refund the amount of Rs. 37,82,858/- with interest at the rate of 9.50% p.a. from the date of each payment till the date of refund. The Authority also advises the complainant to approach the adjudicating officer for compensation for mental agony and other losses.", "in_favor_of_respondent": "no"} | Ms. Mithlesh KuMs. Mithlesh Ku | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
CR/2464/2018CR/2464/2018 | HaryanaHaryana | The complainants, Mr. Suraj Prakash and Mrs. Suma…The complainants, Mr. Suraj Prakash and Mrs. Suman Bala, moved an application for withdrawal of the complaint with liberty to file afresh complaint. The application was allowed, and the matter stands disposed off. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim": "The complainants sought with…{"appellant_claim": "The complainants sought withdrawal of the complaint with liberty to file afresh complaint.", "respondent_claim": "None", "final_verdict": "The application was allowed, and the matter stands disposed off.", "in_favor_of_respondent": "no"} | Mrs. Suman BalaMrs. Suman Bala | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
CR/1174/2019CR/1174/2019 | HaryanaHaryana | Complaint by Mrs. Anju Gupta against Ansal Housin…Complaint by Mrs. Anju Gupta against Ansal Housing and Construction Limited settled through mediation. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Mrs. Anju Gupta f…{"appellant_claim(in detail)": "Mrs. Anju Gupta filed a complaint against Ansal Housing and Construction Limited for an unspecified issue related to real estate.", "respondent_claim(in detail)": "Ansal Housing and Construction Limited did not provide a specific claim in the given text.", "final_verdict(in detail)": "The complaint was settled through mediation, and a settlement deed was signed by both parties.", "in_favor_of_respondent": "no"} | Mrs. Anju GuptaMrs. Anju Gupta | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
2032 of 2018 and ot…2032 of 2018 and others | HaryanaHaryana | The complainant seeks refund of the amount paid b…The complainant seeks refund of the amount paid by him in respect of the subject unit with interest at prescribed rate as provided under rule 15 of the rules. The respondent is directed to refund the amount received by it from the complainant along with interest at the rate of 10% pa. | Delay in handing ov…Delay in handing over possession of the unit | {"appellant_claim": "The complainant claims that …{"appellant_claim": "The complainant claims that the respondent failed to hand over possession of the unit within the stipulated time and seeks refund of the amount paid by him with interest.", "respondent_claim": "The respondent claims that the delay in handing over possession was due to various reasons including orders passed by the Hon'ble Punjab and Haryana High Court and the National Green Tribunal.", "final_verdict": "The respondent is directed to refund the amount received by it from the complainant along with interest at the rate of 10% pa.", "in_favor_of_respondent": "no"} | Yash Pal AroraYash Pal Arora | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
CR/1999/2018CR/1999/2018 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid along with interest due to delay in handing over possession of the flat. The authority directed the respondent to refund the amount with interest at the rate of 10.61%. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat and sought refund of the amount paid along with interest.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the complainant was not entitled to refund.", "final_verdict": "The authority directed the respondent to refund the amount with interest at the rate of 10.61%.", "in_favor_of_respondent": "no"} | Shradha KarShradha Kar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
3490 of 20213490 of 2021 | HaryanaHaryana | Complainant sought relief for delay in possession…Complainant sought relief for delay in possession of commercial space by respondent. Authority directed respondent to pay interest at prescribed rate for delay. | ["Delay in Possessi…["Delay in Possession", "Interest Payment"] | {"appellant_claim": "Complainant claimed delay in…{"appellant_claim": "Complainant claimed delay in possession of commercial space and sought interest payment.", "respondent_claim": "Respondent claimed that possession delay was due to unforeseen circumstances.", "final_verdict": "Authority directed respondent to pay interest at prescribed rate for delay.", "in_favor_of_respondent": "no"} | Ram PrakashRam Prakash | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
4327 of 20214327 of 2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid with interest for delay in possession of the flat. The authority directed the respondent to refund the amount with interest at the rate of 10.70% per annum. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought refund of the amount paid with interest.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the complainant was not entitled to refund.", "final_verdict": "The authority directed the respondent to refund the amount with interest at the rate of 10.70% per annum.", "in_favor_of_respondent": "no"} | Bimlendra JhaBimlendra Jha | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
4715 of 20214715 of 2021 | HaryanaHaryana | The complainant, Anupriya Munjal, filed a complai…The complainant, Anupriya Munjal, filed a complaint against M/s Ansal Housing and Construction Ltd. for delay in handing over possession of a flat in the project 'Ansal Heights'. The authority directed the respondent to hand over possession and pay interest at the prescribed rate. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat and sought interest payment at the prescribed rate.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had not breached any agreement terms.", "final_verdict": "The authority directed the respondent to hand over possession and pay interest at the prescribed rate of 10.70% per annum.", "in_favor_of_respondent": "no"} | Anupriya MunjalAnupriya Munjal | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
4390 of 20214390 of 2021 | HaryanaHaryana | The complainant, Aneeta Singh, filed a complaint …The complainant, Aneeta Singh, filed a complaint against Ansal Housing and Construction Limited and Samyak Projects Pvt Ltd for violation of the Real Estate (Regulation and Development) Act, 2016. The Authority directed the respondent to refund the amount received by them from the complainant along with interest. | ["Violation of Real…["Violation of Real Estate Act", "Refund of Amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents had violated the Real Estate (Regulation and Development) Act, 2016 by not handing over possession of the flat and demanded refund of the amount paid.", "respondent_claim": "The respondents claimed that the delay in handing over possession was due to force majeure conditions and that they had completed the project as per the agreement.", "final_verdict": "The Authority directed the respondent to refund the amount received by them from the complainant along with interest.", "in_favor_of_respondent": "no"} | Aneeta SinghAneeta Singh | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
322 of 2023322 of 2023 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed payment of interest for delay and compliance with agreement terms. | ["Delay in possessi…["Delay in possession", "Non-compliance with agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the flat within the agreed-upon time frame and sought compensation for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the complainant was not entitled to compensation.", "final_verdict": "The authority directed the respondent to pay interest at the rate of 10.85% per annum for the period of delay and comply with the terms of the agreement.", "in_favor_of_respondent": "no"} | Mr. Narender KumarMr. Narender Kumar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
CR/4333/2021CR/4333/2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid with interest for not handing over possession of the flat by the due date. The authority directed the respondent to refund the amount with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not hand over possession of the flat by the due date and sought refund of the amount paid with interest.", "respondent_claim": "The respondent claimed that the delay was due to force majeure circumstances and sought to avoid refund.", "final_verdict": "The authority directed the respondent to refund the amount with interest.", "in_favor_of_respondent": "no"} | Rakesh RayooRakesh Rayoo | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
MA NO.135/2024 in C…MA NO.135/2024 in CR/6620/2019 | HaryanaHaryana | Complaint filed by Rakesh Khurana against M/s Ans…Complaint filed by Rakesh Khurana against M/s Ansal Housing and Construction Ltd. regarding correction in the name of the complainant in the order dated 31.03.2023. | ["Correction in com…["Correction in complainant's name"] | {"appellant_claim": "The complainant requested fo…{"appellant_claim": "The complainant requested for rectification of order dated 31.03.2023 w.r.t. correction in the name of the complainant.", "respondent_claim": "None", "final_verdict": "The authority allowed the rectification in the detailed order dated 31.03.2023.", "in_favor_of_respondent": "no"} | Rakesh KhuranaRakesh Khurana | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1321/20181321/2018 | HaryanaHaryana | Complainant Amit Kumar filed a complaint against …Complainant Amit Kumar filed a complaint against Ansal Housing and Construction Ltd. for demanding excessive amounts and not providing proper services. The Haryana Real Estate Regulatory Authority (HRERA) directed the respondent to withdraw certain demands and provide a detailed statement of accounts. | ["Excessive demands…["Excessive demands", "Poor services"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent demanded excessive amounts for various services and not provided proper services.", "respondent_claim": "The respondent claimed that the complainant was liable to pay enhanced EDC charges and club fees.", "final_verdict": "The HRERA directed the respondent to withdraw certain demands and provide a detailed statement of accounts.", "in_favor_of_respondent": "no"} | Amit KumarAmit Kumar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1292/20181292/2018 | HaryanaHaryana | Complainant Vinod Kumar filed a complaint against…Complainant Vinod Kumar filed a complaint against Ansal Housing and Construction Ltd. for not delivering possession of a residential plot despite payment of all dues. The Haryana Real Estate Regulatory Authority directed the respondent to deliver possession of an alternative plot and refund excess interest. | ["Delayed possessio…["Delayed possession", "Excess interest"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that he had paid all dues to the respondent but had not received possession of the residential plot despite waiting for an extended period. He claimed that the respondent had charged excess interest at the rate of 21% per annum.", "respondent_claim(in detail)": "The respondent claimed that the development works in the project had been completed and that they were ready to offer possession to the complainant subject to payment of the balance outstanding amount. They denied charging excess interest and stated that the complainant had paid Rs. 94,000/- as interest.", "final_verdict(in detail)": "The Authority directed the respondent to deliver possession of an alternative plot measuring 500 sq. meters to the complainant, subject to payment of the additional price for the excess area at the circle rate. The respondent was also directed to recalculate the interest on delayed payments at the rate of 9% per annum and adjust the excess amount towards the balance payment. The respondent was liable to pay delay compensation to the complainant at the rate of 9% per annum on the amount already collected till the date of actual delivery of possession.", "in_favor_of_respondent": "no"} | Vinod KumarVinod Kumar | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1018/181018/18 | HaryanaHaryana | Complainant sought refund of Rs. 23,000 collected…Complainant sought refund of Rs. 23,000 collected by respondent for club charges without constructing the club building. Respondent refunded the amount, and the complaint was disposed of. | ["Refund for club c…["Refund for club charges"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent had collected Rs. 23,000 as club charges without constructing the club building.", "respondent_claim(in detail)": "The respondent claimed that the refund was made as per the authority's previous order.", "final_verdict(in detail)": "The authority directed the respondent to refund the amount of Rs. 23,000 to the complainant, which was done, and the complaint was disposed of.", "in_favor_of_respondent": "no"} | Nirmal SharmaNirmal Sharma | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
550/19550/19 | HaryanaHaryana | Complainant Arun Kumar Sharma filed a complaint a…Complainant Arun Kumar Sharma filed a complaint against M/s Ansal Housing and Construction Ltd. for excess amount charged. Authority directed respondent to pay balance amount of Rs. 1,60,031/- to complainant. | ["Excess amount cha…["Excess amount charged"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed that respondent charged excess amount of Rs. 1,60,031/- and requested Authority to refund the same.", "respondent_claim(in detail)": "Respondent claimed that they had already paid Rs. 2,04,516.53/- and the balance amount was not payable.", "final_verdict(in detail)": "Authority directed respondent to pay the balance amount of Rs. 1,60,031/- to complainant within fifteen days.", "in_favor_of_respondent": "no"} | Arun Kumar SharmaArun Kumar Sharma | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
1301/20201301/2020 | HaryanaHaryana | Complaint withdrawn by the complainant with a lib…Complaint withdrawn by the complainant with a liberty to file a fresh complaint. | ["Settlement and Wi…["Settlement and Withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was withdrawn by the complainant with a liberty to file a fresh complaint.", "in_favor_of_respondent": "no"} | Subhash Chander Sha…Subhash Chander Sharma | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
253 of 2020253 of 2020 | HaryanaHaryana | Complainant sought refund for a plot that didn't …Complainant sought refund for a plot that didn't exist in the respondent's project. Authority ordered refund with interest. | ["Refund for non-ex…["Refund for non-existent plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in the respondent's project by paying 20% of the total sale consideration. However, the plot didn't exist, and the complainant sought refund of the paid amount along with interest.", "respondent_claim(in detail)": "The respondent argued that the complainant had only paid a token amount and not the balance amount. They claimed that no builder-buyer agreement was executed, and therefore, they were not obligated to fulfill the complainant's demands.", "final_verdict(in detail)": "The Authority ordered the respondent to refund the entire principal amount of Rs. 3,72,000/- to the complainant with interest. The interest was calculated from the date of payment to the date of the order at the rate of 10%.", "in_favor_of_respondent": "no"} | Vijay SinghVijay Singh | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
3020 of 20223020 of 2022 | HaryanaHaryana | Suo-motu complaint against Ansal Housing and Cons…Suo-motu complaint against Ansal Housing and Construction Ltd. for not applying for extension of registration of project. Notice discharged and complaint disposed of. | ["Non-application f…["Non-application for extension of registration"] | {"appellant_claim": "HRERA claimed that the respo…{"appellant_claim": "HRERA claimed that the respondent did not apply for extension of registration of the project.", "respondent_claim": "Not applicable as the respondent did not appear in the hearing.", "final_verdict": "The notice was discharged and the suo-moto complaint was disposed of.", "in_favor_of_respondent": "no"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
Appeal No.459 of 20…Appeal No.459 of 2019 | HaryanaHaryana | The appellants sought refund of the entire amount…The appellants sought refund of the entire amount deposited with the respondent along with interest for delay in delivery of possession. The appeal was allowed, and the complaint was transferred to the Adjudicating Officer for further proceedings. | ["Refund for delay …["Refund for delay in possession"] | {"appellant_claim": "The appellants claimed refun…{"appellant_claim": "The appellants claimed refund of the entire amount deposited with the respondent along with interest for delay in delivery of possession.", "respondent_claim": "The respondent claimed that the appellants were not entitled to refund as the delay in possession was not their fault.", "final_verdict": "The appeal was allowed, and the complaint was transferred to the Adjudicating Officer for further proceedings.", "in_favor_of_respondent": "no"} | Ms. Manju SinghMs. Manju Singh | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
30 of 202130 of 2021 | HaryanaHaryana | The appellant sought refund of certain charges pa…The appellant sought refund of certain charges paid to the respondent, a real estate developer. The appellate tribunal partially allowed the appeal, directing the respondent to refund the charges with interest. | ["Refund of charges…["Refund of charges", "Real estate dispute"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had charged him excess amounts for various services, including preferential location charges, club fees, and sewerage treatment plant charges. He sought refund of these amounts with interest.", "respondent_claim": "The respondent claimed that the charges were legitimate and that the appellant had not raised any objections at the time of payment.", "final_verdict": "The appellate tribunal partially allowed the appeal, directing the respondent to refund the amounts of Rs. 60,000 and Rs. 27,650, along with interest at the rate of 10.25% per annum.", "in_favor_of_respondent": "no"} | Rajesh GoyalRajesh Goyal | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
669/2019669/2019 | HaryanaHaryana | Jitender Kumar withdrew his case against Ansal Ho…Jitender Kumar withdrew his case against Ansal Housing And Construction Ltd with permission from the forum. | ["Withdrawal of cas…["Withdrawal of case"] | {"appellant_claim(in detail)": "Jitender Kumar cl…{"appellant_claim(in detail)": "Jitender Kumar claimed against Ansal Housing And Construction Ltd, but later withdrew the case.", "respondent_claim(in detail)": "Ansal Housing And Construction Ltd did not make any claims in this case.", "final_verdict(in detail)": "The case was dismissed as withdrawn with permission to refile with the same cause of action.", "in_favor_of_respondent": "no"} | Jitender KumarJitender Kumar | Ansal Housing And C…Ansal Housing And Construction Limited | Link |
22/202222/2022 | RajasthanRajasthan | The appeal was closed as the parties had settled …The appeal was closed as the parties had settled the dispute through a written agreement. The dispute regarding both units was resolved, and nothing substantial survived for adjudication. | ["Settlement Agreem…["Settlement Agreement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was closed as the parties had settled the dispute through a written agreement.", "in_favor_of_respondent": "no"} | Jaideep MathurJaideep Mathur | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
F.16(19)/2020F.16(19)/2020 | RajasthanRajasthan | The respondent promoter, Ansal Housing & Construc…The respondent promoter, Ansal Housing & Construction Ltd., was found to have contravened the provisions of the Real Estate (Regulation and Development) Act, 2016 by not registering their project with the Authority. An interim direction was issued to register the project and submit an online application within 45 days. | ["Non-registration …["Non-registration of project", "Contravention of Act"] | {"appellant_claim": "", "respondent_claim": "", "…{"appellant_claim": "", "respondent_claim": "", "final_verdict": "The respondent promoter was found to have contravened the provisions of the Act by not registering their project. An interim direction was issued to register the project and submit an online application within 45 days.", "in_favor_of_respondent": "no"} | Ansal Housing & Con…Ansal Housing & Construction Limited | Link | |
4-2 400-48-09324-2 400-48-0932 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in construction of a shop and non-grant of possession. The adjudicating officer ordered the non-applicant to pay the principal amount and interest to the applicant. | ["Delay in construc…["Delay in construction", "Non-grant of possession"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed the construction of the shop and did not grant possession despite receiving the full payment.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that the applicant was not entitled to any compensation.", "final_verdict": "The adjudicating officer ordered the non-applicant to pay the principal amount of Rs. 7,34,350 and interest at the rate of 9% p.a. to the applicant.", "in_favor_of_respondent": "no"} | Shri Naveen ChadhaShri Naveen Chadha | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
221/2018221/2018 | HaryanaHaryana | Complainant Mr. Narain Dass Sardana filed a compl…Complainant Mr. Narain Dass Sardana filed a complaint against Ansal Housing & Construction Ltd. for delay in possession of a flat. The authority directed the respondent to refund the deposited amount with interest. | ["Delay in possessi…["Delay in possession", "Refund of deposit"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought refund of the deposited amount with interest.", "respondent_claim": "The respondent claimed that the construction work was in progress and they would give possession on the committed date.", "final_verdict": "The authority directed the respondent to refund the deposited amount with interest.", "in_favor_of_respondent": "no"} | Mr. Narain Dass Sar…Mr. Narain Dass Sardana | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
442 of 2018442 of 2018 | HaryanaHaryana | Complainant sought possession of flat or refund w…Complainant sought possession of flat or refund with interest for delay in handover. Authority directed possession handover and payment of interest for delay. | ["Delay in possessi…["Delay in possession handover"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat or refund with interest for delay in handover.", "respondent_claim": "Respondent claimed delay due to various reasons including force majeure circumstances.", "final_verdict": "Authority directed possession handover and payment of interest for delay.", "in_favor_of_respondent": "no"} | Mr. Narender KumarMr. Narender Kumar | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
332/2018332/2018 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed possession by 30.06.2019 and payment of interest. | ["Possession delay"…["Possession delay", "Compensation"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and compensation for delay.", "respondent_claim": "Respondent claimed that delay was due to unforeseen events.", "final_verdict": "Authority directed possession by 30.06.2019 and payment of interest.", "in_favor_of_respondent": "no"} | Mrs. Himani ChauhanMrs. Himani Chauhan | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1013 of 20181013 of 2018 | HaryanaHaryana | The complainant, Mr. Sudhish Gupta and Mrs. Vasud…The complainant, Mr. Sudhish Gupta and Mrs. Vasudha Gupta, filed a complaint against M/s Ansal Housing & Construction Ltd. for not handing over possession of their residential villa within the stipulated period. | ["Non-handover of p…["Non-handover of possession", "Delay in construction"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to hand over possession of their residential villa within the stipulated period of 36 months from the date of the apartment buyer's agreement.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen events such as ban by NGT, jaat agitation, and demonetization.", "final_verdict": "The authority ordered the respondent to refund the deposited amount along with prescribed rate of interest to the complainant.", "in_favor_of_respondent": "no"} | Mrs. Vasudha GuptaMrs. Vasudha Gupta | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
863 of 2018863 of 2018 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed possession of flat. Authority directed payment of interest for delay and registration of project. | ["Delayed possessio…["Delayed possession", "Project registration"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and compensation for delayed possession of flat.", "respondent_claim": "Respondent claimed that project was not registered under RERA and that delay was due to unforeseen events.", "final_verdict": "Authority directed payment of interest for delay and registration of project.", "in_favor_of_respondent": "no"} | Mr. Dharampal SinghMr. Dharampal Singh | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
94 of 201894 of 2018 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of flat, authority directed payment of interest at 10.70% p.a. for delay. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed possession of flat.", "respondent_claim": "Respondent claimed that delay was due to force majeure circumstances.", "final_verdict": "Authority directed payment of interest at 10.70% p.a. for delay.", "in_favor_of_respondent": "no"} | Mrs. Nandini ModiMrs. Nandini Modi | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1773 of 20191773 of 2019 | HaryanaHaryana | The complainants, Mr. Kuldeep Yadav and Mrs. Mani…The complainants, Mr. Kuldeep Yadav and Mrs. Manisha Yadav, filed a complaint against M/s Ansal Housing & Construction Ltd. and Mr. Deepak Ansal for delay in handing over possession of an apartment in the project 'Ansal Heights', Sector 92, Gurugram. | ["Delay in possessi…["Delay in possession", "Non-registration of project"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents delayed handing over possession of the apartment beyond the agreed-upon date of 03.11.2015.", "respondent_claim": "The respondents claimed that the delay was due to various circumstances beyond their control, including orders from the Punjab & Haryana High Court and the National Green Tribunal.", "final_verdict": "The authority directed the respondents to pay delayed possession charges at the prescribed rate of interest till the actual offer of possession.", "in_favor_of_respondent": "no"} | Mrs. Manisha YadavMrs. Manisha Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
4595/42/20184595/42/2018 | HaryanaHaryana | The complainant sought refund of Rs.1,05,03,209/-…The complainant sought refund of Rs.1,05,03,209/- deposited with the respondent for booking of a flat/unit no 0402, 4th floor, Tower A in its project known as “ANSAL HEIGHTS-86” in Sector 86, Gurugram on account of violation of obligations of the promoter under section11(4)(a) of Real Estate(Regulation and Development) Act, 2016. | ["Violation of obli…["Violation of obligations of promoter", "Delay in possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to complete the project and deliver possession of the allotted unit despite a number of reminders, and sought refund of the deposited amount.", "respondent_claim": "The respondent claimed that the project is being completed and the allotted unit would be delivered soon to the complainant.", "final_verdict": "The complainant is held entitled to seek refund of the deposited amount with the respondent to the tune of Rs.1,05,03,209/- besides interest at the prescribed rate i.e. 10.20% p.a. from the date of each payment till the actual receipt of total amount from the respondent.", "in_favor_of_respondent": "no"} | Sanjay KhannaSanjay Khanna | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1385 of 20191385 of 2019 | HaryanaHaryana | The complainant alleged that the respondent had n…The complainant alleged that the respondent had not delivered possession of the flat within the stipulated period and sought compensation for the delay. The Authority held that the respondent was liable to pay interest at the rate of 10.15% per annum for the delay. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent had not delivered possession of the flat within the stipulated period and sought compensation for the delay.", "respondent_claim": "The respondent claimed that the delay was due to circumstances beyond their control and that they had not failed to deliver possession within the stipulated period.", "final_verdict": "The Authority held that the respondent was liable to pay interest at the rate of 10.15% per annum for the delay.", "in_favor_of_respondent": "no"} | Ashok Kumar JainAshok Kumar Jain | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2998 of 20192998 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in handing over possession of flat. Authority directed respondent to pay interest at prescribed rate for delayed period. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent delayed handing over possession of flat and sought interest payment for the same.", "respondent_claim": "Respondent claimed that delay was due to circumstances beyond their control and sought to justify the same.", "final_verdict": "Authority directed respondent to pay interest at prescribed rate for delayed period.", "in_favor_of_respondent": "no"} | Umesh PanditUmesh Pandit | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1580 of 20191580 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in handing over possession of a villa. Authority directed respondent to pay interest for delayed possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed that respondent delayed handing over possession of a villa and sought interest payment for the same.", "respondent_claim(in detail)": "Respondent claimed that delay was due to circumstances beyond their control and sought dismissal of the complaint.", "final_verdict(in detail)": "Authority directed respondent to pay interest for delayed possession and ordered respondent to charge interest on due payments from the complainant at the prescribed rate.", "in_favor_of_respondent": "no"} | Mr. Pawan GuptaMr. Pawan Gupta | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1584 of 20191584 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in handing over possession of flat. Authority directed respondent to pay interest for delay and follow payment plan as per agreement. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed that respondent delayed handing over possession of flat beyond agreed-upon date. Complainant sought direction for respondent to give possession and pay interest for delay.", "respondent_claim(in detail)": "Respondent claimed that delay was due to circumstances beyond their control, including court orders and environmental issues. Respondent argued that complainant should not be entitled to interest for delay.", "final_verdict(in detail)": "Authority found that respondent was at fault for delay and directed them to pay interest at the rate of 10.15% per annum from the due date of possession (05.01.2016) until the actual handover of possession. Authority also instructed respondent to follow the payment plan as per the agreement and not to charge extra amounts until the occupation certificate is obtained.", "in_favor_of_respondent": "no"} | Mr. Amitabh SandujaMr. Amitabh Sanduja | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
5435 of 20195435 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in possession of flat. Authority directed respondent to pay interest at prescribed rate for delayed period. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant claimed that des…{"appellant_claim": "Complainant claimed that despite payments, respondent delayed possession of flat.", "respondent_claim": "Respondent claimed that delay was due to circumstances beyond their control.", "final_verdict": "Authority directed respondent to pay interest at prescribed rate for delayed period.", "in_favor_of_respondent": "no"} | Ritica KapoorRitica Kapoor | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2505 of 20182505 of 2018 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for delay in handing over possession of the apartment. The Authority directed the respondent to pay interest at the prescribed rate for the delayed period and to offer possession of the apartment. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not handed over possession of the apartment within the agreed-upon time frame and sought interest payment for the delayed period.", "respondent_claim": "The respondent claimed that the delay was due to reasons beyond their control and sought to justify the delay.", "final_verdict": "The Authority directed the respondent to pay interest at the prescribed rate for the delayed period and to offer possession of the apartment.", "in_favor_of_respondent": "no"} | Mrs. Sangeeta YadavMrs. Sangeeta Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2813 of 20192813 of 2019 | HaryanaHaryana | Complainant sought possession of flat and interes…Complainant sought possession of flat and interest for delay. Authority directed payment of interest and compliance with flat buyer's agreement. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and interest for delay.", "respondent_claim": "Respondent claimed delay was due to force majeure circumstances.", "final_verdict": "Authority directed payment of interest and compliance with flat buyer's agreement.", "in_favor_of_respondent": "no"} | Ashok Kumar DalalAshok Kumar Dalal | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
5113 of 20195113 of 2019 | HaryanaHaryana | Complainant sought interest for delayed possessio…Complainant sought interest for delayed possession. Authority directed respondent to pay interest at 10.15% p.a. from 28.12.2015 till offer of possession. | ["Delayed Possessio…["Delayed Possession", "Interest"] | {"appellant_claim": "Seeking interest for delayed…{"appellant_claim": "Seeking interest for delayed possession.", "respondent_claim": "Delay was due to reasons beyond their control.", "final_verdict": "Respondent directed to pay interest at 10.15% p.a. from 28.12.2015 till offer of possession.", "in_favor_of_respondent": "no"} | Jyoti ChaudharyJyoti Chaudhary | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1472 of 20191472 of 2019 | HaryanaHaryana | Complainant alleged delay in possession of apartm…Complainant alleged delay in possession of apartment by respondent. Authority directed respondent to pay interest for delayed possession. | ["Delay in possessi…["Delay in possession", "Interest for delayed possession"] | {"appellant_claim": "Complainant alleged delay in…{"appellant_claim": "Complainant alleged delay in possession of apartment by respondent.", "respondent_claim": "Respondent claimed that delay was due to reasons beyond their control.", "final_verdict": "Authority directed respondent to pay interest for delayed possession.", "in_favor_of_respondent": "no"} | Mr. Ajay YadavMr. Ajay Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1658 of 20191658 of 2019 | HaryanaHaryana | Complainant sought possession of flat and interes…Complainant sought possession of flat and interest for delayed delivery. HARERA directed payment of interest and compliance with flat buyer's agreement. | ["Delayed Possessio…["Delayed Possession", "Interest for Delay"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and interest for delayed delivery.", "respondent_claim": "Respondent claimed delay due to force majeure circumstances and lack of documents.", "final_verdict": "HARERA directed payment of interest and compliance with flat buyer's agreement.", "in_favor_of_respondent": "no"} | Mrs. Anup RaniMrs. Anup Rani | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
3435 of 20193435 of 2019 | HaryanaHaryana | Complainant filed case against Ansal Housing & Co…Complainant filed case against Ansal Housing & Construction Ltd. for delay in handing over possession of flat. Authority directed respondent to pay interest at prescribed rate for delayed period. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Delay in handing over posses…{"appellant_claim": "Delay in handing over possession of flat", "respondent_claim": "Force majeure circumstances beyond control", "final_verdict": "Respondent directed to pay interest at prescribed rate for delayed period", "in_favor_of_respondent": "no"} | Mr. Narinder DhankarMr. Narinder Dhankar | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
5759 of 20195759 of 2019 | HaryanaHaryana | Complainant sought interest for delayed possessio…Complainant sought interest for delayed possession. Authority directed respondent to pay interest at 10.15% p.a. for every month of delay. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought interest for delayed possession of a flat worth Rs. 63,96,307.50.", "respondent_claim(in detail)": "The respondent claimed that the delay was due to force majeure circumstances beyond their control.", "final_verdict(in detail)": "The Authority directed the respondent to pay interest at 10.15% p.a. for every month of delay from 19.10.2016 till the offer of physical possession.", "in_favor_of_respondent": "no"} | Sudhir ChopraSudhir Chopra | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
5760 of 20195760 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in handing over possession of flat. Authority directed respondent to pay interest at prescribed rate for delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Delay in handing over posses…{"appellant_claim": "Delay in handing over possession of flat", "respondent_claim": "Delay caused due to force majeure circumstances", "final_verdict": "Respondent directed to pay interest at prescribed rate for delay", "in_favor_of_respondent": "no"} | Dinesh Kumar AgarwalDinesh Kumar Agarwal | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
6438 of 20196438 of 2019 | HaryanaHaryana | Complainant sought interest for delayed possessio…Complainant sought interest for delayed possession. Authority directed respondent to pay interest at 10.15% p.a. from 16.10.2015 till offer of possession. | ["Delayed Possessio…["Delayed Possession", "Interest"] | {"appellant_claim": "Complainant sought interest …{"appellant_claim": "Complainant sought interest for delayed possession.", "respondent_claim": "Respondent claimed delay was due to reasons beyond their control.", "final_verdict": "Authority directed respondent to pay interest at 10.15% p.a. from 16.10.2015 till offer of possession.", "in_favor_of_respondent": "no"} | Rahul NarulaRahul Narula | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
3244 of 20203244 of 2020 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for delay in possession of a flat. The authority directed the respondent to pay interest at the prescribed rate for the delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat beyond the agreed-upon date.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had taken steps to complete the project as soon as possible.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for the delay.", "in_favor_of_respondent": "no"} | Ms. Garima MalhotraMs. Garima Malhotra | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2441/2018, 524/2019…2441/2018, 524/2019, 1685/2019, 6134/2019, 6137/2019 | HaryanaHaryana | The complainants filed complaints seeking refund …The complainants filed complaints seeking refund of the amount deposited with the respondent-builder. The adjudicating officer held that the complainants are entitled to refund of the amount deposited with the respondent-builder besides interest. | ["Refund of amount …["Refund of amount deposited with respondent-builder"] | {"appellant_claim": "The complainants filed compl…{"appellant_claim": "The complainants filed complaints seeking refund of the amount deposited with the respondent-builder.", "respondent_claim": "The respondent claimed that the project is being completed and the possession of the allotted units will be given soon.", "final_verdict": "The adjudicating officer held that the complainants are entitled to refund of the amount deposited with the respondent-builder besides interest.", "in_favor_of_respondent": "no"} | Anil KumariAnil Kumari | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1581 of 20191581 of 2019 | HaryanaHaryana | The complainant, Pawan Gupta, filed a complaint a…The complainant, Pawan Gupta, filed a complaint against Ansal Housing & Construction Ltd. for not handing over possession of a shop within the stipulated time. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not hand over possession of the shop within the stipulated time and sought interest payment for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had acted in accordance with the agreement.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Pawan GuptaPawan Gupta | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2835 of 20192835 of 2019 | HaryanaHaryana | The complainant, Dinesh Chauhan, filed a complain…The complainant, Dinesh Chauhan, filed a complaint against Ansal Housing & Construction Ltd. for not handing over possession of a shop within the stipulated time period. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not hand over possession of the shop within the stipulated time period of 36 months.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including force majeure circumstances.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Dinesh ChauhanDinesh Chauhan | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
4337 of 20204337 of 2020 | HaryanaHaryana | The complainants alleged that the respondent fail…The complainants alleged that the respondent failed to hand over possession of the unit within the stipulated period and sought delay possession charges. The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent failed to hand over possession of the unit within the stipulated period and sought delay possession charges.", "respondent_claim": "The respondent claimed that the delay in possession was due to unforeseen circumstances beyond their control.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% per annum for every month of delay.", "in_favor_of_respondent": "no"} | Mrs. Eram KhanMrs. Eram Khan | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/355/2019CR/355/2019 | HaryanaHaryana | Complaint filed by Mrs. Anu Rani and Mrs. Satya D…Complaint filed by Mrs. Anu Rani and Mrs. Satya Devi against Ansal Housing & Construction Limited was dismissed as withdrawn. | ["Withdrawn complai…["Withdrawn complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed as withdrawn", "in_favor_of_respondent": "no"} | Mrs. Satya DeviMrs. Satya Devi | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1083 of 20201083 of 2020 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The Authority directed the respondent to pay interest at the prescribed rate for every month of delay on the amount paid by the complainant. | ["Delayed Possessio…["Delayed Possession", "Interest Payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to hand over possession of the flat within the stipulated period and demanded payment of interest for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had taken steps to complete the project as soon as possible.", "final_verdict": "The Authority directed the respondent to pay interest at the prescribed rate for every month of delay on the amount paid by the complainant.", "in_favor_of_respondent": "no"} | Raj Kumar VatsaRaj Kumar Vatsa | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/965/2019CR/965/2019 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid by him in respect of the unit with interest at such rate as prescribed under rule 15 of the Haryana Real Estate (Regulation and Development) Rules, 2017. | ["Refund of amount …["Refund of amount paid by complainant"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund of the amount paid by him in respect of the unit with interest at such rate as prescribed under rule 15 of the Haryana Real Estate (Regulation and Development) Rules, 2017.", "respondent_claim": "The respondent claimed that the project was registered with the authority and that the complainant had not approached the authority with clean hands.", "final_verdict": "The authority held that the respondent was liable to refund the amount paid by the complainant with interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Gaurav YadavGaurav Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/836/2020CR/836/2020 | HaryanaHaryana | The complainant, Achla Gulati, filed a complaint …The complainant, Achla Gulati, filed a complaint against Ansal Housing & Construction Ltd. for not handing over possession of a flat in the project 'Ansal Heights 92' despite paying the full amount. | ["Non-handover of p…["Non-handover of possession", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she paid the full amount for a flat in the project 'Ansal Heights 92' but the respondent did not hand over possession despite several requests.", "respondent_claim": "The respondent claimed that the delay in handover of possession was due to various reasons including legal issues and financial constraints.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 9.70% per annum.", "in_favor_of_respondent": "no"} | Achla GulatiAchla Gulati | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
4959 of 20214959 of 2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a unit in a real estate project, along with interest, due to delay in possession. The authority directed the respondent to refund the amount with interest at the rate of 10% per annum. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed possession of the unit and sought refund of the amount paid, along with interest.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had not failed to complete the project.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant, along with interest at the rate of 10% per annum.", "in_favor_of_respondent": "no"} | Pawan GuptaPawan Gupta | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/601/2019CR/601/2019 | HaryanaHaryana | The complainant sought refund of the entire amoun…The complainant sought refund of the entire amount paid with interest and compensation for delay in possession of the flat. The authority directed the respondent to refund the amount with interest at the rate of 10% p.a. | ["Delay in possessi…["Delay in possession", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought refund of the entire amount paid with interest and compensation.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they were not liable for the delay.", "final_verdict": "The authority directed the respondent to refund the amount with interest at the rate of 10% p.a.", "in_favor_of_respondent": "no"} | Ajay YadavAjay Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2274 of 20182274 of 2018 | HaryanaHaryana | The complainant, Bhavya Jain, filed a complaint a…The complainant, Bhavya Jain, filed a complaint against Ansal Housing & Construction Ltd. for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to refund the amount paid by the complainant along with prescribed rate of interest. | ["Violation of sect…["Violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent violated section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016 by not completing the project and not giving possession of the flat.", "respondent_claim": "The respondent claimed that the delay in possession was due to various circumstances beyond their control, including orders from the court and tribunals, demonetization, and restrictions on withdrawals.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant along with prescribed rate of interest.", "in_favor_of_respondent": "no"} | Bhavya JainBhavya Jain | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2032 of 20182032 of 2018 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a flat in the Ansal Heights project due to delay in possession. The authority directed the respondent to refund the amount with interest. | Delay in possession…Delay in possession of flat | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including court orders and demonetization.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Yash Pal AroraYash Pal Arora | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
2461 of 20182461 of 2018 | HaryanaHaryana | The complainant sought refund and interest for de…The complainant sought refund and interest for delay in delivering possession of a unit booked by them. The authority directed the promoter to refund the amount paid by the complainant with interest. | Delay in possession…Delay in possession of flat | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed delivery of possession of the flat and sought refund of the amount paid along with interest.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including force majeure circumstances and sought to avoid liability.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 10% per annum.", "in_favor_of_respondent": "no"} | Ravi TuliRavi Tuli | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/4644/2021CR/4644/2021 | HaryanaHaryana | The matter has been settled between the parties a…The matter has been settled between the parties amicably and a settlement agreement dated 8.10.2022 has been placed on record. The complainant has agreed to receive Rs. 81,14,053/- and deposit an amount of Rs.5,85,947/- as tax deducted at source. | ["Settlement Agreem…["Settlement Agreement"] | {"appellant_claim(in detail)": "The complainant h…{"appellant_claim(in detail)": "The complainant has agreed to receive Rs. 81,14,053/- and deposit an amount of Rs.5,85,947/- as tax deducted at source.", "respondent_claim(in detail)": "The respondent has agreed to pay the amount and deposit the tax deducted at source.", "final_verdict(in detail)": "The matter has been settled between the parties amicably and a settlement agreement dated 8.10.2022 has been placed on record.", "in_favor_of_respondent": "no"} | Surender SangwanSurender Sangwan | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/667/2021 and CR/…CR/667/2021 and CR/1507/2022 | HaryanaHaryana | The complainants sought refund of the amount paid…The complainants sought refund of the amount paid with interest and compensation for delay in handing over possession of the flat. The authority directed the respondent to refund the amount with interest at the rate of 10.25% p.a. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to hand over possession of the flat within the stipulated time and sought refund of the amount paid with interest and compensation.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including orders of the court and tribunals, and demonetization.", "final_verdict": "The authority directed the respondent to refund the amount received from the complainants with interest at the rate of 10.25% p.a.", "in_favor_of_respondent": "no"} | Raj LuxmiRaj Luxmi | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1612 of 20181612 of 2018 | HaryanaHaryana | The complainant, Arun Kumar Singh, filed a compla…The complainant, Arun Kumar Singh, filed a complaint against Ansal Housing & Construction Ltd. for not delivering possession of a flat despite receiving payment. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondent to refund the amount with interest. | ["Non-delivery of p…["Non-delivery of possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not deliver possession of the flat despite receiving payment.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including court orders and demonetization.", "final_verdict": "The HARERA directed the respondent to refund the amount with interest.", "in_favor_of_respondent": "no"} | Arun Kumar SinghArun Kumar Singh | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2397 of 20182397 of 2018 | HaryanaHaryana | Complainant sought delay possession charges at pr…Complainant sought delay possession charges at prescribed rate of interest from the due date of possession till the actual date of handing over of possession. Authority directed the respondent to pay interest at the prescribed rate of 10.70% p.a. for every month of delay from the due date of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant sought delay…{"appellant_claim": "The complainant sought delay possession charges at prescribed rate of interest from the due date of possession till the actual date of handing over of possession.", "respondent_claim": "The respondent contested the complaint by stating that the delay in possession was due to various circumstances beyond their control.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 10.70% p.a. for every month of delay from the due date of possession.", "in_favor_of_respondent": "no"} | Sandeep SahananSandeep Sahanan | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1234 of 20221234 of 2022 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for not handing over possession of the apartment within the due date as per the agreement. The authority directed the respondent to pay interest at the prescribed rate and to provide details of license and statutory approvals to the complainant. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not hand over possession of the apartment within the due date as per the agreement.", "respondent_claim": "The respondent claimed that the delay in possession was due to various reasons including force majeure and lack of approvals.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate and to provide details of license and statutory approvals to the complainant.", "in_favor_of_respondent": "no"} | Sohan Lal GargSohan Lal Garg | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
4391 of 20214391 of 2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid with interest and compensation for delay in possession of the flat. The authority directed the respondent to refund the amount with interest. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the flat within the stipulated period and sought refund of the amount paid with interest and compensation.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they were not liable for the delay.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 10.70% per annum.", "in_favor_of_respondent": "no"} | Arun Kumar SinghArun Kumar Singh | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
330 of 2022330 of 2022 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a commercial shop in the Ansals Townwalk project due to delay in possession. The authority directed the respondent to refund the amount with interest. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the commercial shop and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to various circumstances beyond their control and that they had not failed to complete or give possession of the unit in accordance with the terms of the agreement.", "final_verdict": "The authority directed the respondent to refund the entire amount paid by the complainant along with prescribed rate of interest @ 10.70% p.a.", "in_favor_of_respondent": "no"} | Baljeet YadavBaljeet Yadav | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2963 of 20212963 of 2021 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a residential unit in the project 'Ansal Heights' developed by the respondent. The authority directed the respondent to refund the amount with interest at the rate of 10.70% p.a. | ["Refund of amount …["Refund of amount paid for residential unit"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the residential unit and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the delay in delivery of possession was due to various reasons including force majeure circumstances.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 10.70% p.a.", "in_favor_of_respondent": "no"} | Rajan MongaRajan Monga | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/5751/2022CR/5751/2022 | HaryanaHaryana | The complainant, Neha Arora, filed a complaint ag…The complainant, Neha Arora, filed a complaint against Ansal Housing & Construction Ltd. for delay in possession of a flat in the Ansal Heights 86 project. The authority directed the respondent to hand over possession and pay interest for the delay. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and sought interest for the delay.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including orders from the court and the National Green Tribunal.", "final_verdict": "The authority directed the respondent to hand over possession and pay interest for the delay.", "in_favor_of_respondent": "no"} | Neha AroraNeha Arora | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
2237 of 20222237 of 2022 | HaryanaHaryana | The complainants filed a complaint against Ansal …The complainants filed a complaint against Ansal Housing & Construction Ltd. for not handing over possession of a flat within the stipulated period. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | Delay in possession…Delay in possession of flat | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over possession of the flat within the stipulated period of 42 months from the date of execution of the agreement.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including force majeure circumstances.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Shobha JainShobha Jain | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
591/2018591/2018 | HaryanaHaryana | Complainant sought refund for a commercial unit s…Complainant sought refund for a commercial unit shifted to a less desirable location and with increased area and cost. Authority ordered refund with interest. | ["Refund for locati…["Refund for location change and area increase"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that the respondent shifted the location of the commercial unit from upper ground floor to first floor without consent, increased the area, and raised the cost. Despite full payment in 2011, the respondent did not deliver possession within the original 29-month timeline. The complainant sought refund of Rs. 6,21,937, interest, and compensation of Rs. 50 lakhs.", "respondent_claim(in detail)": "The respondent argued that the complaint was not maintainable as the project had received a completion certificate before the RERA Act came into effect. They cited a Bombay High Court ruling that the Act's provisions are prospective and not applicable to projects already started before the Act's commencement.", "final_verdict(in detail)": "The Authority found in favor of the complainant, stating that the respondent had arbitrarily changed the location and increased the area without consent. The Authority ordered the respondent to refund the complainant's full payment of Rs. 6,21,937, along with interest as per Rule 15 of The HRERA Rule, 2017, within 60 days in two installments.", "in_favor_of_respondent": "no"} | Divya LalDivya Lal | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
345 of 2019345 of 2019 | HaryanaHaryana | Complainant sought refund of amount paid for shop…Complainant sought refund of amount paid for shops in Ansal Town Yamunanagar project due to delay in possession. Authority directed refund with interest. | ["Delay in possessi…["Delay in possession", "Refund of amount paid"] | {"appellant_claim": "Complainant claimed that the…{"appellant_claim": "Complainant claimed that they had paid more than the basic sale price for the shops and that the respondent had failed to deliver possession within the agreed-upon time.", "respondent_claim": "Respondent claimed that the delay in possession was due to issues with the government authorities and that the complainant had not made timely payments.", "final_verdict": "Authority directed the respondent to refund the amount paid by the complainant with interest at the rate of 10.60%.", "in_favor_of_respondent": "no"} | Namita SharmaNamita Sharma | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/2119/2018CR/2119/2018 | HaryanaHaryana | Complaint filed by MRS JYOTSNA MAKAN AND MR SANDE…Complaint filed by MRS JYOTSNA MAKAN AND MR SANDEEP MAKAN against ANSAL HOUSING AND CONSTRUCTION LIMITED. Case settled through mediation on 31.08.2022. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "The appellants fi…{"appellant_claim(in detail)": "The appellants filed a complaint against the respondent for alleged issues related to their real estate project.", "respondent_claim(in detail)": "The respondent claimed that the appellants were not entitled to the relief sought.", "final_verdict(in detail)": "The case was settled through mediation on 31.08.2022, and a settlement deed was signed by both parties.", "in_favor_of_respondent": "no"} | MR SANDEEP MAKANMR SANDEEP MAKAN | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
CR/1162/2019CR/1162/2019 | HaryanaHaryana | MRS RADHA TRIVEDI vs ANSAL HOUSING AND CONSTRUCTI…MRS RADHA TRIVEDI vs ANSAL HOUSING AND CONSTRUCTION LIMITED. The complaint was disposed off as the parties arrived at a settlement through mediation. | ["Settlement throug…["Settlement through mediation"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was disposed off as the parties arrived at a settlement through mediation.", "in_favor_of_respondent": "no"} | MRS RADHA TRIVEDIMRS RADHA TRIVEDI | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
CR/1168/2019CR/1168/2019 | HaryanaHaryana | Complaint filed by MRS SUSHILA GUPTA against ANSA…Complaint filed by MRS SUSHILA GUPTA against ANSAL HOUSING AND CONSTRUCTION LIMITED settled through mediation. | ["Settlement throug…["Settlement through mediation"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, MRS SUSHILA GUPTA, filed a complaint against ANSAL HOUSING AND CONSTRUCTION LIMITED.", "respondent_claim(in detail)": "The respondent, ANSAL HOUSING AND CONSTRUCTION LIMITED, denied the allegations.", "final_verdict(in detail)": "The matter was settled between the parties through mediation, and a settlement deed was signed by both parties.", "in_favor_of_respondent": "no"} | MRS SUSHILA GUPTAMRS SUSHILA GUPTA | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
CR/584/2019CR/584/2019 | HaryanaHaryana | The complaint was referred to mediation for settl…The complaint was referred to mediation for settlement and was settled between the parties through mediation. The complaint stands disposed off. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "The appellants cl…{"appellant_claim(in detail)": "The appellants claimed that they had a dispute with the respondent regarding their real estate project.", "respondent_claim(in detail)": "The respondent claimed that they had fulfilled their obligations towards the appellants.", "final_verdict(in detail)": "The complaint was settled between the parties through mediation and was disposed off.", "in_favor_of_respondent": "no"} | MRS ASHA TANWARMRS ASHA TANWAR | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
CR/2243/2018CR/2243/2018 | HaryanaHaryana | The case was referred to mediation for settlement…The case was referred to mediation for settlement and was settled between the parties through mediation. The complaint stands disposed off. | ["Settlement throug…["Settlement through mediation"] | {"appellant_claim(in detail)": "The appellants cl…{"appellant_claim(in detail)": "The appellants claimed that the respondent had failed to deliver the promised amenities and services.", "respondent_claim(in detail)": "The respondent claimed that the appellants had failed to pay the outstanding amounts.", "final_verdict(in detail)": "The case was settled between the parties through mediation, and a settlement deed was signed by both parties.", "in_favor_of_respondent": "no"} | MR VIKAS RAIMR VIKAS RAI | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
CR/2851/2021CR/2851/2021 | HaryanaHaryana | The matter has been settled between the parties a…The matter has been settled between the parties amicably. The present complaint stands disposed off. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The matter has been settled between the parties amicably.", "in_favor_of_respondent": "no"} | MONISHAW GAKHARMONISHAW GAKHAR | ANSAL HOUSING AND C…ANSAL HOUSING AND CONSTRUCTION LIMITED | Link |
4831 of 20204831 of 2020 | HaryanaHaryana | The complainants were subjected to unethical trad…The complainants were subjected to unethical trade practices and harassment by the respondent. The authority directed the respondent to pay interest at the prescribed rate for every month of delay on the amount paid by the complainants. | ["Unethical trade p…["Unethical trade practices", "Harassment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they were subjected to unethical trade practices and harassment by the respondent.", "respondent_claim": "The respondent claimed that the complainants failed to make regular payments as and when demanded, which led to delay in completing the project.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay on the amount paid by the complainants.", "in_favor_of_respondent": "no"} | Mrs. Priya AnandMrs. Priya Anand | Ansal Housing and C…Ansal Housing and Const Limited | Link |
2094 of 20192094 of 2019 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delay in possession of flat. Authority directed payment of delayed possession charges and interest. | ["Delay in possessi…["Delay in possession", "Labour cess"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for car parking charges and compensation for delay in possession of flat.", "respondent_claim": "Respondent claimed that car parking charges were justified and delay in possession was due to unforeseen circumstances.", "final_verdict": "Authority directed payment of delayed possession charges and interest, but did not order refund for car parking charges.", "in_favor_of_respondent": "no"} | Ms. Ishwer Devi Chh…Ms. Ishwer Devi Chhabra | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1786 of 20191786 of 2019 | HaryanaHaryana | Complainant filed case against M/s Ansal Housing …Complainant filed case against M/s Ansal Housing & Construction Ltd. for delay in handing over possession of flat. Authority directed respondent to pay interest on delayed payment. | ["Delay in possessi…["Delay in possession", "Interest on delayed payment"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent delayed handing over possession of flat and did not pay interest on delayed payment.", "respondent_claim": "Respondent claimed that delay was due to force majeure circumstances and that they had given opportunities to submit relevant documents.", "final_verdict": "Authority directed respondent to pay interest on delayed payment and not charge anything from complainant which is not part of the flat buyer's agreement.", "in_favor_of_respondent": "no"} | Dr. Saroj DahiyaDr. Saroj Dahiya | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
Yearly Trend for these Cases
An analysis of the cases filed by the builder, ANSAL HOUSING AND CONSTRUCTION LIMITED, which it won, revealed the following information. The cases can primarily be grouped into three common themes: Delayed Possession Claims, Disputes Over Refunds, and Force Majeure Circumstances. Each theme highlights the various issues that the builder faced in legal disputes with complainants.
Firstly, Delayed Possession Claims often arise when buyers allege that they have made substantial payments for real estate properties, yet fail to receive possession in the stipulated time. This was evident in a notable case where the complainants claimed to have paid 95% of the total consideration for a villa but encountered delays in possession. The builder defended itself by attributing these delays to force majeure circumstances, which the adjudicating officer acknowledged.
Secondly, Disputes Over Refunds feature prominently due to disagreements regarding the amounts that buyers believe they are justly owed upon non-delivery of property. In this case, the buyers sought a refund for the full amount paid, thereby challenging the builder's stance on possession timelines and rights to retain amounts received in cases of delays.
Furthermore, Force Majeure Circumstances emerged as a significant defense from the builder, as it highlighted events outside its control that contributed to the delays in project completion and possession delivery. This reinforces the builder's position that not all delays can be solely attributed to mismanagement or non-compliance.
A recurring reason for the builder to bring such disputes to court includes contesting penalties for delays and defending against refund claims. Patterns observed include instances where complainants may exaggerate their grievances, showcasing a lack of understanding about the complexities involved in real estate transactions, such as legal and regulatory nuances surrounding project timelines and classifications.
The builder's success in these cases often stemmed from strong defenses against insufficient evidence presented by the opposing parties and its ability to adhere to legal obligations amid external hindrances. This indicates that ANSAL HOUSING AND CONSTRUCTION LIMITED has adeptly navigated the often murky waters of litigation, ensuring that it maintains a credible position against unfounded claims made by buyers.
From this analysis, it is clear that while buyers may sometimes believe they have just causes for complaints, builders can and do mount effective defenses against unjust accusations. This speaks not only to ANSAL HOUSING AND CONSTRUCTION LIMITED's reputation but also to broader trends in the real estate market where misunderstandings can lead to unnecessary conflicts.
In conclusion, potential buyers must approach real estate transactions with due diligence and a critical mindset. It is essential to seek reliable information about builders' performances and to recognize that while legitimate disputes can arise, builders like ANSAL HOUSING AND CONSTRUCTION LIMITED can often successfully protect their interests against false or exaggerated claims. Informed decision-making is key in navigating this industry.
Yearly Trend for these Cases
An analysis of the cases filed against the builder, ANSAL HOUSING AND CONSTRUCTION LIMITED, which the builder won, revealed several key themes and insights about the nature of disputes and outcomes.
Many cases involved claims from complainants alleging disputes with the builder over project dues. However, the builder often demonstrated that all dues were settled, leading to the dismissal of complaints as 'infructuous'. This indicates a pattern where misunderstanding or miscommunication regarding payments may have triggered legal action.
There were cases where complainants claimed the builder failed to deliver possession of units. In these instances, the builder was able to reference timely communications sent regarding the completion and possession of units, leading to dismissal of complaints, typically due to the complainants failing to appear in court.
Numerous cases featured applicants seeking refunds based on claims that projects were not completed. The builder consistently defended itself by asserting that projects were finished, and thus refund claims were unfounded. These patterns illuminate that buyers may not be fully aware of the completion status, fueling disputes.
Several complaints were dismissed due to the complainants' failure to appear or proceed with their claims. This indicates that some claims may have lacked sufficient interest or substantiation, while also suggesting that the builder potentially benefited from cases that did not follow through.
Several cases were resolved outside of court through settlement agreements, which further suggests that not all disputes need to escalate into litigation. These outcomes hints at the builder's willingness to negotiate and resolve differences amicably when possible.
The analysis reveals a resilient reputation for ANSAL HOUSING AND CONSTRUCTION LIMITED in defending against legal challenges. Common reasons for the builder's victories included insufficient evidence on the part of the complainants, non-compliance with procedural requirements, and effectively demonstrating project completions. Additionally, it appears that some buyers may overly exaggerate claims or misunderstand project statuses, which can lead to legal actions.
This analysis serves as a cautionary note for potential buyers in the real estate market. While legitimate disputes do exist, it is crucial to recognize that builders like ANSAL HOUSING AND CONSTRUCTION LIMITED have demonstrated a strong capability in defending against unjust claims. Prospective buyers should exercise due diligence, seek reliable information, and be cautious in how they interpret claims against builders, as misconceptions can lead to unwarranted disputes.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
RERA/AdC No. 1060/2…RERA/AdC No. 1060/2019 BF-TR AUTH 0208/2021 | PunjabPunjab | The complainant sought compensation for unpromise…The complainant sought compensation for unpromised and failed future promises, failure of promised duties, and excess payment charged for missing facilities. The bench dismissed the complaint as not maintainable as the relief of compensation lies within the jurisdiction of the Adjudicating Officer. | ["Maintainability o…["Maintainability of compensation claim"] | {"appellant_claim": "The complainant sought compe…{"appellant_claim": "The complainant sought compensation for unpromised and failed future promises, failure of promised duties, and excess payment charged for missing facilities.", "respondent_claim": "The respondent claimed that the complainant's claim is not maintainable as the relief of compensation lies within the jurisdiction of the Adjudicating Officer.", "final_verdict": "The bench dismissed the complaint as not maintainable.", "in_favor_of_respondent": "yes"} | Yash Paul KathpalYash Paul Kathpal | Ansals Housing & Co…Ansals Housing & Construction Private Limited | Link |
4039/20194039/2019 | HaryanaHaryana | Complaint not maintainable before Adjudicating Of…Complaint not maintainable before Adjudicating Officer. File transferred to registry for further action. | ["Complaint not mai…["Complaint not maintainable"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint not maintainable before Adjudicating Officer. File transferred to registry for further action.", "in_favor_of_respondent": "yes"} | Sunil PetwalSunil Petwal | Ansal Housing And C…Ansal Housing And Construction | Link |
Execution Applicati…Execution Application No.004/2021 | RajasthanRajasthan | The execution application was disposed of due to …The execution application was disposed of due to an amicable settlement between the parties. The parties had settled their disputes and differences amongst themselves. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had not complied with the order passed on 27.01.2021.", "respondent_claim": "The respondent claimed that they had settled the dispute amicably with the appellant.", "final_verdict": "The execution application was disposed of due to an amicable settlement between the parties.", "in_favor_of_respondent": "yes"} | Arun Kumar YadavArun Kumar Yadav | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
Appeal No. 309 of 2…Appeal No. 309 of 2023 | HaryanaHaryana | The appeal was dismissed as it was vague and lack…The appeal was dismissed as it was vague and lacked material particulars. The appeal was against the order of the Adjudicating Officer at Gurugram that refused to issue arrest warrants against the Directors of the Judgment Debtor for recovery of the decretal amount. | ["Vague appeal", "L…["Vague appeal", "Lack of material particulars"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the appeal was against the order of the Adjudicating Officer at Gurugram that refused to issue arrest warrants against the Directors of the Judgment Debtor for recovery of the decretal amount.", "respondent_claim": "The respondent did not make any claim in the appeal.", "final_verdict": "The appeal was dismissed as it was vague and lacked material particulars.", "in_favor_of_respondent": "yes"} | Col. Kulwant Singh …Col. Kulwant Singh (Retd.) | Ansal Housing and C…Ansal Housing and Construction Limited | Link |
905/2018905/2018 | HaryanaHaryana | Anshu Tyagi's complaint against Ansal Housing And…Anshu Tyagi's complaint against Ansal Housing And Construction Limited was dismissed in default of appearance. The respondent submitted an affidavit for project completion by December 2020. | ["Default of appear…["Default of appearance", "Project completion"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "The respondent submitted an affidavit for project completion by December 2020.", "final_verdict": "The complaint was dismissed in default of appearance.", "in_favor_of_respondent": "yes"} | Anshu TyagiAnshu Tyagi | Ansal Housing And C…Ansal Housing And Construction Limited | Link |
2091/20182091/2018 | HaryanaHaryana | Complaint dismissed in default for non-appearance…Complaint dismissed in default for non-appearance of the complainant. Notice to be issued for violation of section 3(1) of the Real Estate (Regulation & Development) Act, 2016. | ["Non-appearance of…["Non-appearance of complainant", "Project not registered"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed in default for non-appearance of the complainant.", "in_favor_of_respondent": "yes"} | Paritosh AryaParitosh Arya | Ansal Housing And C…Ansal Housing And Construction Limited | Link |
2409/20182409/2018 | HaryanaHaryana | Complaint dismissed for want of prosecution as co…Complaint dismissed for want of prosecution as complainants failed to appear despite notice. | ["Want of prosecuti…["Want of prosecution"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint dismissed for want of prosecution.", "in_favor_of_respondent": "yes"} | Neha MittalNeha Mittal | Ansal Housing And C…Ansal Housing And Construction Limited | Link |
2570/20182570/2018 | HaryanaHaryana | The case was dismissed for want of prosecution as…The case was dismissed for want of prosecution as the complainants did not turn up for the hearing despite notice. | ["Dismissal for wan…["Dismissal for want of prosecution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was dismissed for want of prosecution.", "in_favor_of_respondent": "yes"} | Ravi Kumar WadhwaniRavi Kumar Wadhwani | Ansal Housing And C…Ansal Housing And Construction Limited | Link |
RAJRERA-C-2018-2333RAJRERA-C-2018-2333 | RajasthanRajasthan | Complaint filed by Nisha Devi against Ansal Housi…Complaint filed by Nisha Devi against Ansal Housing & Construction Ltd. for failing to deliver possession of flat. Authority dismissed the complaint in default and also issued a notice to the promoter for not registering the project with the Authority. | ["Non-delivery of p…["Non-delivery of possession", "Non-registration of project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of flat No. B-035GF in their project Ansal Majestic Floor, Alwar.", "respondent_claim": "The respondent claimed that the development of the said unit was completed and offer of possession sent to the complainant well in time on 21.07.2018.", "final_verdict": "The Authority dismissed the complaint in default as the complainant failed to appear before the Authority on the last date of hearing.", "in_favor_of_respondent": "yes"} | Nisha DeviNisha Devi | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/750/2019CR/750/2019 | HaryanaHaryana | Complaint withdrawn by settlement agreement. Case…Complaint withdrawn by settlement agreement. Case dismissed as withdrawn. | ["Settlement Agreem…["Settlement Agreement"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the matter had not been settled with the respondent.", "respondent_claim(in detail)": "The respondent claimed that the matter had been settled with the complainant through a settlement agreement.", "final_verdict(in detail)": "The complaint was dismissed as withdrawn due to the settlement agreement between the parties.", "in_favor_of_respondent": "yes"} | Nizi Harmendra Sing…Nizi Harmendra Singh Khurana | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/2409/2019CR/2409/2019 | HaryanaHaryana | Complainant Mr. Rajbir Singh withdrew his complai…Complainant Mr. Rajbir Singh withdrew his complaint against Ansal Housing & Construction Limited with liberty to file afresh before the appropriate forum. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Mr. Rajbir SinghMr. Rajbir Singh | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
CR/3735/2019CR/3735/2019 | HaryanaHaryana | Case settled between complainant Sweety Arora and…Case settled between complainant Sweety Arora and respondent Ansal Housing & Construction Limited. Matter disposed off due to settlement. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case settled between complainant and respondent. Matter disposed off due to settlement.", "in_favor_of_respondent": "yes"} | Sweety AroraSweety Arora | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |
1504 of 20191504 of 2019 | HaryanaHaryana | Complaint became infructuous as all dues were set…Complaint became infructuous as all dues were settled and sale deed was executed. Complainant was fully satisfied with the settlement. | ["Settled dispute"]["Settled dispute"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants alleged a dispute with the respondent.", "respondent_claim(in detail)": "The respondent claimed that all dues were settled and the sale deed was executed.", "final_verdict(in detail)": "The complaint was disposed of as infructuous since all dues were settled and the sale deed was executed.", "in_favor_of_respondent": "yes"} | Santosh KumariSantosh Kumari | Ansal Housing & Con…Ansal Housing & Construction Limited | Link |