Overall Case Outcomes
BPTP Limited is a well-known builder operating in various states, including Uttar Pradesh and Haryana. Like many builders, BPTP has had its fair share of legal disputes and customer complaints. With a total of 1,773 complaints filed against the builder, this article will analyze the patterns behind the complaints, the outcomes of legal cases, and important insights for potential buyers.
BPTP Limited has faced a substantial number of legal challenges, having won only 560 out of 1,773 complaints, while losing 1,213 cases. This translates to a loss rate of approximately 68.3%, indicating potential issues in fulfilling contractual obligations as per guidelines set by the Real Estate (Regulation and Development) Act, 2016.
The legal battles faced by BPTP Limited highlight a potential discrepancy between customer expectations and the obligations that builders, like BPTP, may be under. Given the high number of lost cases, potential buyers should exercise caution and perform their due diligence.
In summary, while BPTP Limited has impressive projects, prospective buyers should weigh their options and ensure they are fully informed and protected before making a purchase.
Yearly Trend for these Cases
Analysis of the cases filed against BPTP Ltd. reveals a multitude of disputes primarily centered around delayed possession claims, non-compliance with municipal orders, and disagreements over land conversion or classification. The cases demonstrate a consistent pattern where buyers contest delays in project delivery, often attributing the causes to the builder's failure to adhere to timelines and regulatory requirements.
The most prevalent theme is delayed possession claims, where buyers sought compensation for the prolonged duration in which they were unable to receive their properties. This points to an ongoing issue within BPTP Ltd.'s project management capabilities, as buyers repeatedly expressed dissatisfaction with the builder's inability to meet promised deadlines.
Another significant area of dispute revolves around super area and cost escalation. Buyers often found themselves facing unexpected increases in costs due to revisions in the super area of their properties. This led to claims of financial mismanagement and lack of transparency on the part of the builder, as buyers argued that they were not adequately informed of potential changes in costs when they signed their agreements.
The builder's non-compliance with municipal orders also emerged as a key theme. Buyers highlighted instances where BPTP Ltd. failed to secure necessary approvals or adhere to established regulations, resulting in further project delays and complications. This suggests a systemic issue within the company's compliance practices and may indicate a lack of due diligence when navigating legal and regulatory frameworks.
In terms of why people commonly brought cases to court, the summaries show that buyers were primarily motivated by a desire to seek justice for delayed possession and financial losses incurred due to the builder's actions. There was also a pattern of buyers disputing project delays attributed to other parties, such as contractors or regulatory bodies, which reflects a broader trend of deflecting responsibility in the construction sector.
The common reasons BPTP Ltd. lost these cases include insufficient evidence to support their claims, non-compliance with legal or regulatory requirements, and failure to follow interim directions from authorities. Buyers also highlighted instances where the builder misunderstood land or project classification rules, leading to disputes that could have been avoided with proper knowledge and planning.
Overall, the analysis of these cases underscores the importance of transparency, compliance, and effective communication in the real estate sector. Buyers expect builders to deliver on their promises and adhere to established regulations, and failures in these areas can lead to significant legal and financial repercussions.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
936/2019936/2019 | HaryanaHaryana | Complainant was allotted a ground floor flat but …Complainant was allotted a ground floor flat but offered a first floor flat instead. Authority directed respondent to charge 10% less price for the first floor flat. | ["Flat pricing disp…["Flat pricing dispute"] | {"appellant_claim": "The complainant was allotted…{"appellant_claim": "The complainant was allotted a ground floor flat but the respondent offered a first floor flat instead, claiming it was cheaper.", "respondent_claim": "The respondent claimed that the first floor flat was cheaper and offered it to the complainant as an alternative.", "final_verdict": "The Authority directed the respondent to charge 10% less price for the first floor flat and deliver possession within 30 days.", "in_favor_of_respondent": "no"} | Mohinder Nath MehtaMohinder Nath Mehta | B.P.T.P LimitedB.P.T.P Limited | Link |
1247 of 20201247 of 2020 | HaryanaHaryana | Complainant sought possession of booked unit alon…Complainant sought possession of booked unit along with delay interest. Authority directed respondent to offer possession and awarded delay interest. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought possession of the booked unit along with delay interest. The complainant had paid around 90% of the basic sale price and was still waiting for possession.", "respondent_claim(in detail)": "The respondent claimed that the delay was due to various reasons, including changes in the layout plans and revisions in the tentative layout. The respondent also claimed that the complainant had signed an undertaking to not hold the respondent responsible for any delay caused due to changes in the layout plans.", "final_verdict(in detail)": "The Authority directed the respondent to offer possession of the unit to the complainant after receiving the occupation certificate. The Authority also awarded delay interest to the complainant in the amount of Rs. 3,60,890/-.", "in_favor_of_respondent": "no"} | AnrAnr | B.P.T.P LimitedB.P.T.P Limited | Link |
1358 of 20191358 of 2019 | HaryanaHaryana | Complainant sought possession of flat and delay i…Complainant sought possession of flat and delay interest from respondent. Authority directed respondent to pay delay interest and provide possession. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and delay interest from respondent.", "respondent_claim": "Respondent claimed that complainant was not entitled to delay interest and that the project was not complete.", "final_verdict": "Authority directed respondent to pay delay interest and provide possession.", "in_favor_of_respondent": "no"} | Rakesh SinghRakesh Singh | B.P.T.P LimitedB.P.T.P Limited | Link |
645 of 2021645 of 2021 | HaryanaHaryana | Complainant booked a flat in respondent's project…Complainant booked a flat in respondent's project but did not receive possession. Authority ordered respondent to pay delay interest and provide possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not provide possession of the flat despite receiving payment.", "respondent_claim": "The respondent claimed that the project was still under construction and that possession would be given soon.", "final_verdict": "The Authority ordered the respondent to pay delay interest to the complainant and provide possession of the flat.", "in_favor_of_respondent": "no"} | Krishna RazdanKrishna Razdan | B.P.T.P LimitedB.P.T.P Limited | Link |
731 of 2020731 of 2020 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to deliver possession of unit along with delay interest. Authority directed respondent to offer possession of unit after receiving occupation certificate and awarded delay interest to complainant. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "Complainant sought direction…{"appellant_claim": "Complainant sought direction against respondent to deliver possession of unit along with delay interest.", "respondent_claim": "Respondent denied allegations and stated that delay was caused due to inaction of government agencies and that booking was accepted based on self-certification policy.", "final_verdict": "Authority directed respondent to offer possession of unit after receiving occupation certificate and awarded delay interest to complainant.", "in_favor_of_respondent": "no"} | Manik GiriManik Giri | B.P.T.P LimitedB.P.T.P Limited | Link |
736 of 2020736 of 2020 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to deliver possession of unit along with delay interest and to quash unjustified demands. Authority awarded delay interest and directed respondent to review disputed demands. | ["Delay in possessi…["Delay in possession", "Unjustified demands"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent delayed possession of the unit and made unjustified demands.", "respondent_claim": "Respondent claimed that the delay was due to unforeseen circumstances and that the demands were legitimate.", "final_verdict": "Authority awarded delay interest to the complainant and directed respondent to review the disputed demands.", "in_favor_of_respondent": "no"} | Vikas MalhotraVikas Malhotra | B.P.T.P LimitedB.P.T.P Limited | Link |
RERA-PKL-COMP. 266/…RERA-PKL-COMP. 266/2018 | Not providedNot provided | Complaint withdrawn by Khushuboo Aggarwal and ano…Complaint withdrawn by Khushuboo Aggarwal and another against M/s B.P.T.P. Limited. | Complaint withdrawalComplaint withdrawal | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by appellant.", "in_favor_of_respondent": "no"} | anotheranother | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-435 of 2018RERA-PKL-435 of 2018 | HaryanaHaryana | Complainant Neeraj Dhingra filed a complaint agai…Complainant Neeraj Dhingra filed a complaint against M/s B.P.T.P. Limited for failing to deliver possession of a flat despite payment of Rs. 13.42,675. The Authority directed the respondent to refund the paid amount with interest. | ["Failure to delive…["Failure to deliver possession", "Refund of paid amount"] | {"appellant_claim": "The complainant paid Rs. 13.…{"appellant_claim": "The complainant paid Rs. 13.42,675 for a flat but the respondent failed to deliver possession despite more than five years from the date of execution of the buyer's agreement.", "respondent_claim": "Not provided", "final_verdict": "The Authority directed the respondent to refund the paid amount to the complainant along with interest under Rule 15 of the HRERA Rules. 2017.", "in_favor_of_respondent": "no"} | Neeraj DhingraNeeraj Dhingra | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-252 of 2018RERA-PKL-252 of 2018 | HaryanaHaryana | The parties have amicably settled the dispute and…The parties have amicably settled the dispute and filed a settlement deed. The complaint is disposed of in terms of the said settlement. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have amicably settled the dispute and filed a settlement deed.", "in_favor_of_respondent": "no"} | anotheranother | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-1228 of 20…RERA-PKL-1228 of 2018 | HaryanaHaryana | The complainant, Discovery Park Buyers Welfare As…The complainant, Discovery Park Buyers Welfare Association, filed a complaint against M/s B.P.T.P. Limited for not completing the construction of flats and not providing the promised amenities. The Authority directed the respondent to complete the construction and provide the amenities within a specified timeframe. | ["Construction dela…["Construction delay", "Non-provision of amenities"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not complete the construction of flats and did not provide the promised amenities.", "respondent_claim": "The respondent claimed that the construction was ongoing and that the amenities would be provided soon.", "final_verdict": "The Authority directed the respondent to complete the construction and provide the amenities within a specified timeframe.", "in_favor_of_respondent": "no"} | Discovery Park Buye…Discovery Park Buyers Welfare Association | B.P.T.P. LimitedB.P.T.P. Limited | Link |
944 of 2018944 of 2018 | HaryanaHaryana | Complainants sought possession of flat and delay …Complainants sought possession of flat and delay compensation. Authority directed respondent to deliver possession and calculate super area as per laid down principles. | ["Possession of fla…["Possession of flat", "Delay compensation", "Super area"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants purchased a flat from the respondent and paid an amount of Rs. 19,40,018/-. They sought directions for the respondent to handover possession with promised amenities and to pay delay compensation.", "respondent_claim(in detail)": "The respondent claimed that the delay occurred due to lack of clarity in the policy of self-certification prescribed for developers. They stated that the complainants were aware of the fact that super area mentioned in buyer's agreement is tentative in nature and was liable to be changed.", "final_verdict(in detail)": "The Authority directed the respondent to deliver possession to the complainants after obtaining occupation certificate, along with delay compensation to be calculated as per the majority view in Madhu Sareen case. The respondent was also directed to calculate the super area strictly as per the principle laid down in Vivek Kadyan's case and supply a detailed statement to the complainants.", "in_favor_of_respondent": "no"} | anotheranother | B.P.T.P. LimitedB.P.T.P. Limited | Link |
823 of 2018823 of 2018 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed off as withdrawn. | Withdrawal of compl…Withdrawal of complaint | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case is disposed off as withdrawn.", "in_favor_of_respondent": "no"} | Vikas JainVikas Jain | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-1341 of 20…RERA-PKL-1341 of 2019 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed off as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant applied for withdrawal of his complaint.", "respondent_claim(in detail)": "The respondent did not make any claim as the case was withdrawn.", "final_verdict(in detail)": "The case was disposed off as withdrawn.", "in_favor_of_respondent": "no"} | Ravi MakhijaRavi Makhija | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1930 of 20191930 of 2019 | HaryanaHaryana | Complainant sought refund for a flat in a stuck p…Complainant sought refund for a flat in a stuck project. Authority granted refund with interest. | ["Stuck project", "…["Stuck project", "Refund"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for a flat in a stuck project, alleging that the respondent had not completed the project and had not given a timeline for completion.", "respondent_claim": "The respondent claimed that the project was a RERA-registered project, and that the agreements executed prior to the RERA Act coming into force were valid and binding.", "final_verdict": "The Authority granted refund to the complainant, along with interest, and directed the respondent to refund the principal amount of Rs. 36,59,426/-.", "in_favor_of_respondent": "no"} | Sandeep KumarSandeep Kumar | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1968 of 20191968 of 2019 | HaryanaHaryana | Complainant sought refund for a flat in a stalled…Complainant sought refund for a flat in a stalled project. Authority ordered refund of the principal amount with interest. | ["Refund for stalle…["Refund for stalled real estate project"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund for the flat he had booked in the respondent's project, citing extraordinary delay in completion of the project.", "respondent_claim(in detail)": "The respondent argued that the delay was due to various reasons, including force majeure circumstances, and that the complainant was not entitled to a refund.", "final_verdict(in detail)": "The Authority ordered the respondent to refund the entire principal amount of Rs. 30,95,990/- to the complainant, along with interest at the rate of 9.40%.", "in_favor_of_respondent": "no"} | Sanjay ChaudharySanjay Chaudhary | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1869 of 20191869 of 2019 | HaryanaHaryana | Complainant sought refund for a flat not delivere…Complainant sought refund for a flat not delivered by respondent. Authority granted refund with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for a flat not delivered by respondent.", "respondent_claim": "Respondent claimed that the project was registered with RERA and that the agreement was valid.", "final_verdict": "Authority granted refund with interest.", "in_favor_of_respondent": "no"} | Ajay PaliwalAjay Paliwal | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1909 of 20191909 of 2019 | Not providedNot provided | The complainant sought refund for a flat not deli…The complainant sought refund for a flat not delivered by the respondent. The authority granted refund with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for a flat not delivered by the respondent.", "respondent_claim": "The respondent claimed that the project was RERA registered and that the agreement was valid and binding.", "final_verdict": "The authority granted refund with interest.", "in_favor_of_respondent": "no"} | Amit ManglaAmit Mangla | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1871 of 20191871 of 2019 | HaryanaHaryana | Complainant sought refund for a flat in a stuck p…Complainant sought refund for a flat in a stuck project. Authority granted refund with interest. | ["Refund for stuck …["Refund for stuck flat"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for a flat in a stuck project.", "respondent_claim": "Respondent denied allegations and argued that agreements executed prior to RERA Act, 2016, were valid and binding.", "final_verdict": "Authority granted refund with interest.", "in_favor_of_respondent": "no"} | Rajesh Kumar GuptaRajesh Kumar Gupta | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1141 of 20201141 of 2020 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent with interest. Authority ordered refund of principal amount plus interest. | ["Refund of amount …["Refund of amount paid", "Interest"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed that they had paid an amount of Rs. 5,56,398/- to respondent and sought refund of the amount with interest.", "respondent_claim(in detail)": "Respondent claimed that complainant had defaulted in making payments and was a defaulter under section 19(6) and 19(7) of the Act.", "final_verdict(in detail)": "Authority ordered refund of principal amount of Rs. 2,51,973/- plus interest of Rs. 2,16,224/- to the complainant.", "in_favor_of_respondent": "no"} | Neetal RelanNeetal Relan | B.P.T.P. LimitedB.P.T.P. Limited | Link |
1242 of 20191242 of 2019 | HaryanaHaryana | Complainant sought refund of Rs. 4,95,000/- paid …Complainant sought refund of Rs. 4,95,000/- paid to respondent. Authority directed respondent to refund Rs. 1,68,499/- with interest. | ["Refund of payment…["Refund of payment"] | {"appellant_claim": "Complainant claimed that she…{"appellant_claim": "Complainant claimed that she had paid Rs. 4,95,000/- to respondent and sought refund with interest.", "respondent_claim": "Respondent claimed that complainant had paid only Rs. 3,97,000/- and that her unit was terminated to non-payment.", "final_verdict": "Authority directed respondent to refund Rs. 1,68,499/- with interest.", "in_favor_of_respondent": "no"} | Priyanka SharmaPriyanka Sharma | B.P.T.P. LimitedB.P.T.P. Limited | Link |
335 of 2020335 of 2020 | HaryanaHaryana | Complainant sought refund for delayed project, Au…Complainant sought refund for delayed project, Authority granted refund with interest. | ["Refund for delaye…["Refund for delayed project"] | {"appellant_claim": "Refund for delayed project w…{"appellant_claim": "Refund for delayed project with interest.", "respondent_claim": "Project is in progress, delay not their fault.", "final_verdict": "Refund granted with interest.", "in_favor_of_respondent": "no"} | Ankita PalAnkita Pal | B.P.T.P. LimitedB.P.T.P. Limited | Link |
814 of 2020814 of 2020 | HaryanaHaryana | Complainant sought refund of Rs. 7,25,062/- paid …Complainant sought refund of Rs. 7,25,062/- paid to respondent. Authority ordered refund of Rs. 5,44,602/- plus interest. | ["Refund", "Real Es…["Refund", "Real Estate"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed refund of Rs. 7,25,062/- paid to respondent, alleging that respondent had changed his flat without consent and failed to return money after terminating his allotment.", "respondent_claim(in detail)": "Respondent claimed that the agreement was signed before RERA came into effect and that the project had received occupation certificate, making it exempt from RERA. They also claimed that the complainant had defaulted on payments and was not entitled to a refund.", "final_verdict(in detail)": "Authority ordered refund of Rs. 5,44,602/- plus interest to the complainant, finding that both parties were at fault and that the respondent had failed to return the money after terminating the allotment.", "in_favor_of_respondent": "no"} | Vinay GuptaVinay Gupta | B.P.T.P. LimitedB.P.T.P. Limited | Link |
661 of 2021661 of 2021 | HaryanaHaryana | Complainant sought refund for delayed project. Au…Complainant sought refund for delayed project. Authority ordered refund with interest. | ["Delayed Project",…["Delayed Project", "Refund"] | {"appellant_claim": "Refund for delayed project w…{"appellant_claim": "Refund for delayed project with interest", "respondent_claim": "Project completion delayed due to various reasons", "final_verdict": "Refund ordered with interest at 9.70%", "in_favor_of_respondent": "no"} | Neelam SinghNeelam Singh | B.P.T.P. LimitedB.P.T.P. Limited | Link |
Complaint (Executio…Complaint (Execution)No. 739 of 2021 | HaryanaHaryana | Decree holder's counsel stated that cheques amoun…Decree holder's counsel stated that cheques amounting to ₹6,97,956 have been cleared and the decree stands satisfied. | ["Satisfied Decree"]["Satisfied Decree"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The decree stands satisfied as cheques amounting to \u20b96,97,956 have been cleared.", "in_favor_of_respondent": "no"} | Madhu NigamMadhu Nigam | B.P.T.P. LimitedB.P.T.P. Limited | Link |
243 of 2021243 of 2021 | HaryanaHaryana | Complainant sought refund for unpaid amount with …Complainant sought refund for unpaid amount with interest due to delay in project completion. Authority ordered refund with interest. | ["Refund for Delaye…["Refund for Delayed Project"] | {"appellant_claim": "Complainant alleged delay in…{"appellant_claim": "Complainant alleged delay in project completion and sought refund for unpaid amount with interest.", "respondent_claim": "Respondent claimed delay due to force majeure conditions and offered an alternate unit.", "final_verdict": "Authority ordered refund of principal amount with interest.", "in_favor_of_respondent": "no"} | Ved PaulVed Paul | B.P.T.P. LimitedB.P.T.P. Limited | Link |
737 of 2021737 of 2021 | HaryanaHaryana | Complainant sought refund for an office space in …Complainant sought refund for an office space in an incomplete project. Authority ordered refund of the amount paid with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked an office space in the respondent's project and paid Rs. 35,52,601.12. The project is not completed, and the complainant seeks a refund of the amount paid with interest.", "respondent_claim(in detail)": "The respondent claims that they offered an alternate unit to the complainant and provided discounts. They argue that the project is not completed due to force majeure events.", "final_verdict(in detail)": "The Authority ordered refund of the amount paid by the complainant with interest. The respondent is required to refund the principal amount of Rs. 35,52,601.12 plus interest of Rs. 37,47,346/- within 90 days.", "in_favor_of_respondent": "no"} | Renu GargRenu Garg | B.P.T.P. LimitedB.P.T.P. Limited | Link |
761 of 2018761 of 2018 | HaryanaHaryana | Complaint against M/s BPTP Pvt Ltd and others for…Complaint against M/s BPTP Pvt Ltd and others for delay in handing over possession of a residential flat. Authority directed the respondent to pay interest for the delayed period. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the handing over of possession of the residential flat and sought refund of the amount invested.", "respondent_claim": "The respondent denied the allegations and stated that the complainant was aware of the terms and conditions of the agreement.", "final_verdict": "The authority directed the respondent to pay interest for the delayed period and ordered the complainant to pay outstanding dues.", "in_favor_of_respondent": "no"} | Mr. Sandeep KumarMr. Sandeep Kumar | Countrywide Promote…Countrywide Promoter Private Limited | Link |
1214 of 20181214 of 2018 | HaryanaHaryana | Complainant Mr. Anirudh Badia filed a complaint a…Complainant Mr. Anirudh Badia filed a complaint against M/s BPTP Ltd. for delay in possession of a flat in the project 'Terra' in Gurugram. The authority directed the respondent to pay interest at the prescribed rate of 10.75% per annum on the amount deposited by the complainant. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat and sought interest payment at the prescribed rate.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including defaults in payment by other allottees.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 10.75% per annum on the amount deposited by the complainant.", "in_favor_of_respondent": "no"} | Mr. Anirudh BadiaMr. Anirudh Badia | BPTP LimitedBPTP Limited | Link |
1194 of 20181194 of 2018 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed possession of flat. Authority directed payment of interest on delayed possession. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and compensation for delayed possession of flat.", "respondent_claim": "Respondent claimed that complainant had not paid outstanding amounts and that delay was due to unforeseen circumstances.", "final_verdict": "Authority directed payment of interest on delayed possession at the rate of 10.75% per annum from 12.12.2016 until the date of offer of possession.", "in_favor_of_respondent": "no"} | Mr. Aman SoodMr. Aman Sood | BPTP LimitedBPTP Limited | Link |
609 of 2018609 of 2018 | HaryanaHaryana | The complainants, Mrs. Monica Bakshi and Mr. Vish…The complainants, Mrs. Monica Bakshi and Mr. Vishal Bakshi, filed a complaint against M/s BPTP Ltd. for violation of obligations under the Real Estate (Regulation and Development) Act, 2016. The case was settled through a settlement agreement dated 14.03.2019. | ["Settlement of com…["Settlement of complaint", "Violation of obligations"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent, M/s BPTP Ltd., had violated its obligations under the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that the complainants had not complied with the terms of the agreement.", "final_verdict": "The case was settled through a settlement agreement dated 14.03.2019, and the complainants were refunded the deposited amount without interest or compensation.", "in_favor_of_respondent": "no"} | Mr. Vishal BakshiMr. Vishal Bakshi | BPTP LimitedBPTP Limited | Link |
1892/20181892/2018 | HaryanaHaryana | Complainant Aurangzeb Khan seeks permission to wi…Complainant Aurangzeb Khan seeks permission to withdraw complaint against BPTP Ltd. and file afresh. Case disposed as complainant does not want to proceed. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim": "Complainant seeks permission…{"appellant_claim": "Complainant seeks permission to withdraw complaint and file afresh.", "respondent_claim": "Respondent does not oppose the complainant's prayer.", "final_verdict": "Case disposed as complainant does not want to proceed.", "in_favor_of_respondent": "no"} | Aurangzeb KhanAurangzeb Khan | BPTP LimitedBPTP Limited | Link |
2205 of 20182205 of 2018 | HaryanaHaryana | Complainants filed a complaint against the respon…Complainants filed a complaint against the respondent for not handing over the possession of a flat by the due date. The authority directed the respondent to pay delay possession charges and follow the flat buyer's agreement. | ["Delay in possessi…["Delay in possession", "Non-compliance with flat buyer's agreement"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over the possession of the flat by the due date and sought relief for delay in possession.", "respondent_claim": "The respondent claimed that the delay in possession was due to reasons beyond their control and sought relief for not being liable for the delay.", "final_verdict": "The authority directed the respondent to pay delay possession charges at the prescribed rate of interest and follow the flat buyer's agreement.", "in_favor_of_respondent": "no"} | Mr Sanjay SaxenaMr Sanjay Saxena | BPTP LimitedBPTP Limited | Link |
1820 of 20181820 of 2018 | HaryanaHaryana | Complainants sought relief for delayed possession…Complainants sought relief for delayed possession of a flat and non-compliance with the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay delayed possession charges and interest. | ["Delayed possessio…["Delayed possession", "Non-compliance with RERA"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had failed to deliver possession of the flat within the stipulated time and had not complied with the provisions of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that the delay in possession was due to unforeseen circumstances and that they had complied with the provisions of the Act.", "final_verdict": "The authority directed the respondent to pay delayed possession charges and interest to the complainants.", "in_favor_of_respondent": "no"} | Mrs Ritu AgrawalMrs Ritu Agrawal | BPTP LimitedBPTP Limited | Link |
2201 of 20182201 of 2018 | HaryanaHaryana | The complainant, Mr. Satbir Singh, filed a compla…The complainant, Mr. Satbir Singh, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat in the project 'Park Generations' in Gurugram. The authority directed the respondent to pay delayed possession charges and rectify the demand for additional amounts. | ["Delay in possessi…["Delay in possession", "Additional demands"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat by 2 years and 16 days, and also demanded additional amounts for terrace area, super area, and escalation cost.", "respondent_claim": "The respondent claimed that the delay was due to reasons beyond their control, and that the additional demands were as per the agreement.", "final_verdict": "The authority directed the respondent to pay delayed possession charges at the prescribed rate of interest and rectify the demand for additional amounts.", "in_favor_of_respondent": "no"} | Mr. Satbir SinghMr. Satbir Singh | BPTP LimitedBPTP Limited | Link |
4440f20194440f2019 | HaryanaHaryana | The complainants, Mr. Prashant Chandrakant Soni a…The complainants, Mr. Prashant Chandrakant Soni and Mrs. Pooja Prashant Soni, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat. The authority directed the respondent to pay delayed possession charges at the prescribed rate of 10.45% per annum. | ["Delay in possessi…["Delay in possession", "Flat buyer's agreement"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed the possession of the flat beyond the agreed-upon period of 36 months with a grace period of 180 days.", "respondent_claim": "The respondent did not file a reply to the complaint.", "final_verdict": "The authority directed the respondent to pay delayed possession charges at the prescribed rate of 10.45% per annum.", "in_favor_of_respondent": "no"} | Mrs. Pooja Prashant…Mrs. Pooja Prashant Soni | BPTP LimitedBPTP Limited | Link |
702 of 2019702 of 2019 | HaryanaHaryana | The complainants, Mr. Dinesh Gupta and Mrs. Ankit…The complainants, Mr. Dinesh Gupta and Mrs. Ankita Gupta, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat in the project 'Park Generations' in Gurugram. The HARERA directed the respondent to pay delayed possession charges and rejected other demands. | ["Delay in possessi…["Delay in possession", "Real Estate dispute"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat beyond the agreed-upon date and sought compensation for the same.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had completed the project as per the agreement.", "final_verdict": "The HARERA directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest of 10.45% per annum with effect from the committed date of delivery of possession till the date of offer of possession letter dated 17.10.2018.", "in_favor_of_respondent": "no"} | Mrs. Ankita GuptaMrs. Ankita Gupta | BPTP LimitedBPTP Limited | Link |
400 of 2019400 of 2019 | HaryanaHaryana | The complainant, Mr. Neeraj Gulati, filed a compl…The complainant, Mr. Neeraj Gulati, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat and various other issues. | ["Delay in possessi…["Delay in possession", "Unfair terms in agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the handing over of possession of the flat by 2 years 4 months 10 days and sought compensation and relief.", "respondent_claim": "The respondent claimed that the delay was due to various reasons and sought to justify the terms of the agreement.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the prescribed rate of interest of 10.45% per annum and reduced the escalation cost to Rs. 2,94,517/-.", "in_favor_of_respondent": "no"} | Mr. Neeraj GulatiMr. Neeraj Gulati | BPTP LimitedBPTP Limited | Link |
543 of 2019543 of 2019 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for delay in possession of a flat, unfair terms in the agreement, and various charges. The Authority directed the respondent to pay delayed possession charges and reduce the escalation charges. | ["Delay in possessi…["Delay in possession", "Unfair terms in agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat by 1 year and 11 months, charged unfair amounts, and demanded additional charges without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including the complainant's failure to make payments on time.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the rate of 10.45% per annum from 09.11.2016 to 17.10.2018, and reduce the escalation charges to Rs. 3,25,188/-.", "in_favor_of_respondent": "no"} | Mr. Santusht BhatiaMr. Santusht Bhatia | BPTP LimitedBPTP Limited | Link |
F 523 of 2019F 523 of 2019 | HaryanaHaryana | The complainant, Mr. Amit Arora, filed a complain…The complainant, Mr. Amit Arora, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and various charges. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondent to pay delayed possession charges and reduced the escalation charges. | ["Delay in possessi…["Delay in possession", "Escalation charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat and charged various amounts without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons and the charges were as per the agreement.", "final_verdict": "The HARERA directed the respondent to pay delayed possession charges at the rate of 10.45% per annum and reduced the escalation charges to 50%.", "in_favor_of_respondent": "no"} | Mr. Amit AroraMr. Amit Arora | BPTP LimitedBPTP Limited | Link |
F 149 of 2019F 149 of 2019 | HaryanaHaryana | The complainant, Mr. Kapil Kumar, filed a complai…The complainant, Mr. Kapil Kumar, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat and various other issues. The Haryana Real Estate Regulatory Authority (HARERA) passed an order directing the respondent to pay delayed possession charges and reduce the escalation charges. | ["Delay in possessi…["Delay in possession", "Escalation charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat by 2 years 2 months 25 days and sought various reliefs, including payment of interest on delayed possession and reduction of escalation charges.", "respondent_claim": "The respondent did not file a reply to the complaint.", "final_verdict": "The HARERA directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest of 10.45% per annum and reduce the escalation charges to Rs. 2,72,635/-.", "in_favor_of_respondent": "no"} | Mr. Kapil KumarMr. Kapil Kumar | BPTP LimitedBPTP Limited | Link |
22140f201822140f2018 | HaryanaHaryana | The complainant, Mr. Himanshu Khatri, filed a com…The complainant, Mr. Himanshu Khatri, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat and various other issues. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondent to pay delayed possession charges and reduce the cost escalation charges. | ["Delay in possessi…["Delay in possession", "Cost escalation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat by 2 years 2 months 16 days and demanded various charges without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons and that the charges were as per the agreement.", "final_verdict": "The HARERA directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest of 10.45% per annum and reduce the cost escalation charges to Rs. 3,25,188/-.", "in_favor_of_respondent": "no"} | Mr. Himanshu KhatriMr. Himanshu Khatri | BPTP LimitedBPTP Limited | Link |
519 of 2019519 of 2019 | HaryanaHaryana | The complainants, Mr. Manish Sheokand and Mrs. Ka…The complainants, Mr. Manish Sheokand and Mrs. Kavita Kataria, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat and various other issues. | ["Delay in possessi…["Delay in possession", "Unfair trade practices"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat by 2 years 3 months 18 days and sought compensation for the same.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including the complainants' failure to make timely payments.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the prescribed rate of interest of 10.45% per annum.", "in_favor_of_respondent": "no"} | Mrs. Kavita KatariaMrs. Kavita Kataria | BPTP LimitedBPTP Limited | Link |
423 of 2019423 of 2019 | HaryanaHaryana | The complainants, Mr. Anil Rawat and Mrs. Vidhi K…The complainants, Mr. Anil Rawat and Mrs. Vidhi Kansal, filed a complaint against M/s BPTP Ltd. for delay in handing over possession of a flat and various other issues. | ["Delay in possessi…["Delay in possession", "Unfair trade practices"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed handing over possession of the flat by 2 years 4 months 10 days and sought compensation for the same.", "respondent_claim": "The respondent claimed that the increase in super area was within reasonable limits and that the complainants were not entitled to raise this grievance.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the prescribed rate of interest of 10.45% per annum and quashed the demand for advance maintenance charges.", "in_favor_of_respondent": "no"} | Mrs. Vidhi KansalMrs. Vidhi Kansal | BPTP LimitedBPTP Limited | Link |
2216 of 20182216 of 2018 | HaryanaHaryana | The complainant, Mr. Sanjay Goel and Mrs. Shelly …The complainant, Mr. Sanjay Goel and Mrs. Shelly Goel, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and various other issues. | ["Delay in possessi…["Delay in possession", "Escalation charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat by one year and charged escalation costs without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including changes in the super area and carpet area.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the prescribed rate of interest of 10.45% per annum and reduced the escalation charges to 50%.", "in_favor_of_respondent": "no"} | Mrs. Shelly GoelMrs. Shelly Goel | BPTP LimitedBPTP Limited | Link |
785 of 2019785 of 2019 | HaryanaHaryana | The complainants, Mr. Ankit Pagoria and Mr. Krish…The complainants, Mr. Ankit Pagoria and Mr. Krishan Gopal, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and various other issues. | ["Delay in possessi…["Delay in possession", "Escalation of costs"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed the possession of the flat by more than 2 years and had also escalated the costs without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including changes in the project plan and unforeseen circumstances.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the prescribed rate of interest of 10.45% per annum and reduced the escalation charges to Rs. 2,72,814/-.", "in_favor_of_respondent": "no"} | Mr. Krishan GopalMr. Krishan Gopal | BPTP LimitedBPTP Limited | Link |
157 of 2019157 of 2019 | HaryanaHaryana | The complainant, Smt. Laxmi Devi, filed a complai…The complainant, Smt. Laxmi Devi, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and increase in super area without consent. The Authority directed the respondent to pay delayed possession charges and adjust the increased price. | ["Delay in possessi…["Delay in possession", "Increase in super area"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat by 2 years 3 months 20 days and increased the super area without consent, leading to an increase in price.", "respondent_claim": "The respondent did not file a reply, and the Authority decided the case ex parte.", "final_verdict": "The Authority directed the respondent to pay delayed possession charges at the rate of 10.45% per annum from 27.06.2016 to 17.10.2018 and adjust the increased price by refunding the excess amount to the complainant.", "in_favor_of_respondent": "no"} | Smt. Laxmi DeviSmt. Laxmi Devi | BPTP LimitedBPTP Limited | Link |
2487 of 20182487 of 2018 | HaryanaHaryana | The complainant, Mr. Amit Sharma, filed a complai…The complainant, Mr. Amit Sharma, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat. The Haryana Real Estate Regulatory Authority directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest. | ["Delay in possessi…["Delay in possession", "Real Estate"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent had failed to hand over the possession of the flat within the agreed-upon time frame and sought compensation for the delay.", "respondent_claim(in detail)": "The respondent did not file a reply to the complaint despite being served with notice.", "final_verdict(in detail)": "The Authority directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest of 10.40% per annum with effect from the committed date of delivery of possession i.e. 24.07.2016 till date.", "in_favor_of_respondent": "no"} | Mr. Amit SharmaMr. Amit Sharma | BPTP LimitedBPTP Limited | Link |
58 of 201958 of 2019 | HaryanaHaryana | The complainant, Mr. Harbir Singh Brar, filed a c…The complainant, Mr. Harbir Singh Brar, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and various other issues. The Haryana Real Estate Regulatory Authority (HARERA) passed an order directing the respondent to pay delayed possession charges and quashing the demand for advance maintenance charges. | ["Delay in possessi…["Delay in possession", "Maintenance charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat by more than 2 years and demanded various charges including advance maintenance charges.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including changes in the super area and that the advance maintenance charges were as per the agreement.", "final_verdict": "The HARERA directed the respondent to pay delayed possession charges at the prevalent prescribed rate of interest and quashed the demand for advance maintenance charges.", "in_favor_of_respondent": "no"} | Mr. Harbir Singh Br…Mr. Harbir Singh Brar | BPTP LimitedBPTP Limited | Link |
3258 of 20193258 of 2019 | HaryanaHaryana | The complainants sought delay possession charges …The complainants sought delay possession charges and interest at the prescribed rate of 9.30% per annum for every month of delay on the amount paid by the complainants with the respondent from the due date of possession i.e., 16.07.2017 till the handing over of possession after obtaining occupation certificate. | ["Delay in possessi…["Delay in possession", "Interest at prescribed rate"] | {"appellant_claim": "The complainants sought dela…{"appellant_claim": "The complainants sought delay possession charges and interest at the prescribed rate of 9.30% per annum for every month of delay on the amount paid by the complainants with the respondent from the due date of possession i.e., 16.07.2017 till the handing over of possession after obtaining occupation certificate.", "respondent_claim": "The respondent claimed that the complainants had not paid the outstanding dues and that the delay in possession was due to various reasons including force majeure circumstances.", "final_verdict": "The authority held that the respondent had failed to hand over possession of the subject apartment till date of this order and that the non-compliance of the mandate contained in section 11(4)(a) read with proviso to section 18(1) of the Act on the part of the respondent is established.", "in_favor_of_respondent": "no"} | Mr. Gaurav KalraMr. Gaurav Kalra | BPTP LimitedBPTP Limited | Link |
33 of 202033 of 2020 | HaryanaHaryana | The complainant, Smt. Neelima Khanna, filed a com…The complainant, Smt. Neelima Khanna, filed a complaint against M/s BPTP Limited for delay in handing over possession of a residential unit. The Haryana Real Estate Regulatory Authority (HARERA) found the respondent guilty of delay and directed them to pay interest at the prescribed rate. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the residential unit beyond the agreed-upon date.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including construction-related issues and obtaining necessary approvals.", "final_verdict": "The HARERA found the respondent guilty of delay and directed them to pay interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Smt. Neelima KhannaSmt. Neelima Khanna | BPTP LimitedBPTP Limited | Link |
3790f20203790f2020 | HaryanaHaryana | The complainant sought delay possession charges a…The complainant sought delay possession charges and compensation for not receiving possession of the flat within the stipulated period. The authority directed the respondents to pay interest for every month of delay at the prescribed rate of 9.30% per annum. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents failed to hand over possession of the flat within the stipulated period of 36 months from the date of booking and sought delay possession charges and compensation.", "respondent_claim": "The respondents claimed that the delay in possession was due to various reasons including force majeure circumstances and sought to justify the delay.", "final_verdict": "The authority directed the respondents to pay interest for every month of delay at the prescribed rate of 9.30% per annum.", "in_favor_of_respondent": "no"} | Rajeev SehgalRajeev Sehgal | BPTP LimitedBPTP Limited | Link |
2392 of 20192392 of 2019 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondents for not handing over possession of a flat within the stipulated time. The authority held that the respondents were in contravention of section 11(4)(a) of the Act and directed the respondents to pay delayed possession charges to the complainants. | ["Delay in possessi…["Delay in possession", "Non-compliance with agreement"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents did not hand over possession of the flat within the stipulated time and sought delay possession charges.", "respondent_claim": "The respondents claimed that the complainants were in default of payment and that the delay in possession was due to the complainants' fault.", "final_verdict": "The authority held that the respondents were in contravention of section 11(4)(a) of the Act and directed the respondents to pay delayed possession charges to the complainants.", "in_favor_of_respondent": "no"} | Sahil GahuriSahil Gahuri | BPTP LimitedBPTP Limited | Link |
4712 of 20204712 of 2020 | HaryanaHaryana | The complainants, Ram Kumar Agarwal and Vivek Aga…The complainants, Ram Kumar Agarwal and Vivek Agarwal, filed a complaint against M/s BPTP Limited for violation of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the handing over of possession after obtaining the occupation certificate. | ["Non-handover of p…["Non-handover of possession", "Delay in possession"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to hand over possession of the flat within the stipulated time and demanded compensation for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they were working to complete the project as soon as possible.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the handing over of possession after obtaining the occupation certificate.", "in_favor_of_respondent": "no"} | Vivek AgarwalVivek Agarwal | BPTP LimitedBPTP Limited | Link |
706 of 2020706 of 2020 | HaryanaHaryana | The complainant, Smt. Rajni Bajpai Alias Rajni Kh…The complainant, Smt. Rajni Bajpai Alias Rajni Khanna, filed a complaint against M/s BPTP Limited for not handing over possession of a residential apartment despite receiving full payment. The Haryana Real Estate Regulatory Authority (HARERA) found the respondent in contravention of the Real Estate (Regulation and Development) Act, 2016 and directed the payment of delayed possession charges at the rate of 9.30% per annum. | ["Delay in possessi…["Delay in possession", "Non-compliance with Real Estate Act"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had paid full payment for the residential apartment but the respondent had not handed over possession despite several requests.", "respondent_claim": "The respondent claimed that the delay in possession was due to various reasons including force majeure circumstances.", "final_verdict": "The HARERA found the respondent in contravention of the Real Estate (Regulation and Development) Act, 2016 and directed the payment of delayed possession charges at the rate of 9.30% per annum.", "in_favor_of_respondent": "no"} | Smt. Rajni Bajpai A…Smt. Rajni Bajpai Alias Rajni Khanna | BPTP LimitedBPTP Limited | Link |
2889 of 20202889 of 2020 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for delay in possession of a flat. The authority found the respondent guilty of delay and directed them to pay interest at the prescribed rate. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat beyond the agreed-upon date.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had taken steps to complete the project as soon as possible.", "final_verdict": "The authority found the respondent guilty of delay and directed them to pay interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Helen K. SonyHelen K. Sony | BPTP LimitedBPTP Limited | Link |
269 of 2019269 of 2019 | HaryanaHaryana | The complainant, Shri Sachin Minocha, filed a com…The complainant, Shri Sachin Minocha, filed a complaint against M/s BPTP Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the allotted flat within the stipulated period and sought payment of interest for the delayed period.", "respondent_claim": "The respondent claimed that the complainant had defaulted in making payments and sought forfeiture of the earnest money.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession.", "in_favor_of_respondent": "no"} | Shri Sachin MinochaShri Sachin Minocha | BPTP LimitedBPTP Limited | Link |
5779 of 20195779 of 2019 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for delay in possession of a flat. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat and sought interest payment at the prescribed rate.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had offered the possession of the flat as per the agreement.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Swati JainSwati Jain | BPTP LimitedBPTP Limited | Link |
5778 of 20195778 of 2019 | HaryanaHaryana | The complainants, Alok Sharma and his wife Anju S…The complainants, Alok Sharma and his wife Anju Sharma, filed a complaint against M/s BPTP Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest for every month of delay in offering possession of the flat to the complainants. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat and sought interest payment for the same.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had completed the construction of the flat.", "final_verdict": "The authority directed the respondent to pay interest for every month of delay in offering possession of the flat to the complainants.", "in_favor_of_respondent": "no"} | Anju SharmaAnju Sharma | BPTP LimitedBPTP Limited | Link |
1907 of 20191907 of 2019 | HaryanaHaryana | Complainant Sandhya Sharma filed a complaint agai…Complainant Sandhya Sharma filed a complaint against M/S BPTP Ltd. for not delivering possession of a flat despite payment of Rs 61,05,161. The Haryana Real Estate Regulatory Authority (HRERA) allowed the complaint and directed the respondent to refund the amount with interest. | ["Refund of amount …["Refund of amount paid for undelivered possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she paid Rs 61,05,161 for a flat in the respondent's project Amstoria, but the respondent failed to deliver possession despite repeated requests.", "respondent_claim": "The respondent claimed that the complainant defaulted in making timely payment of instalments and that the possession timeline was affected due to revisions in the building plan.", "final_verdict": "The HRERA allowed the complaint and directed the respondent to refund the amount of Rs 61,05,161 with interest @ 9.3% p.a. from the date of each payment, till realisation of amount.", "in_favor_of_respondent": "no"} | Sandhya SharmaSandhya Sharma | BPTP LimitedBPTP Limited | Link |
351 of 2021351 of 2021 | HaryanaHaryana | The complainants sought relief for delayed posses…The complainants sought relief for delayed possession charges and other relief included excess EDC/IDC. The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the date of offer of possession + 2 months. | ["Delayed Possessio…["Delayed Possession", "Interest Payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver possession of the flat within the agreed-upon time frame and sought relief for delayed possession charges.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had taken steps to rectify the situation.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the date of offer of possession + 2 months.", "in_favor_of_respondent": "no"} | Smt. Plara MadhokSmt. Plara Madhok | BPTP LimitedBPTP Limited | Link |
1718 of 20191718 of 2019 | HaryanaHaryana | The complainants, Gaurav Modi and Rajat Aggarwal,…The complainants, Gaurav Modi and Rajat Aggarwal, filed a complaint against M/s Anjali Promoters & Developers Pvt. Ltd. and M/s BPTP Ltd. for delay in possession of a commercial space in the project 'Centra One' in Gurugram. The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the date of offer of possession plus two months. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the commercial space in the project 'Centra One' in Gurugram.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including force majeure circumstances and timely payment of installments by the allottees.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till the date of offer of possession plus two months.", "in_favor_of_respondent": "no"} | Rajat AggarwalRajat Aggarwal | BPTP LimitedBPTP Limited | Link |
2937 of 20202937 of 2020 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for delay in possession of a flat and sought relief for delayed penalty, exclusion of development charges, and refund of club membership charges. | ["Delay in possessi…["Delay in possession", "Refund of charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed the possession of the flat and sought relief for delayed penalty, exclusion of development charges, and refund of club membership charges.", "respondent_claim": "The respondent claimed that the complainants had not made timely payments and that the delay in possession was due to various reasons.", "final_verdict": "The authority directed the respondent to pay interest to the complainants at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession.", "in_favor_of_respondent": "no"} | Poonam KhullarPoonam Khullar | BPTP LimitedBPTP Limited | Link |
2953 of 20202953 of 2020 | HaryanaHaryana | The complainant filed a complaint against the res…The complainant filed a complaint against the respondent for delay in possession of a flat and sought relief for delayed penalty, exclusion of development charges, and refund of club membership charges. | ["Delay in possessi…["Delay in possession", "Refund of charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat and sought relief for delayed penalty, exclusion of development charges, and refund of club membership charges.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the complainant had not made timely payments.", "final_verdict": "The authority directed the respondent to pay interest to the complainant at the prescribed rate of 9.30% p.a. for every month of delay and to refund the club membership charges.", "in_favor_of_respondent": "no"} | Ajay BajajAjay Bajaj | BPTP LimitedBPTP Limited | Link |
1616 of 20211616 of 2021 | HaryanaHaryana | The complainant, Surendra Bardia, filed a complai…The complainant, Surendra Bardia, filed a complaint against M/s BPTP Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority found that the respondent was not entitled to charge GST from the complainant as the liability of GST had not become due up to the due date of possession. | Non-payment of GSTNon-payment of GST | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent was not entitled to charge GST from him as the liability of GST had not become due up to the due date of possession.", "respondent_claim": "The respondent claimed that they were entitled to charge GST from the complainant.", "final_verdict": "The authority found that the respondent was not entitled to charge GST from the complainant as the liability of GST had not become due up to the due date of possession.", "in_favor_of_respondent": "no"} | Surendra BardiaSurendra Bardia | BPTP LimitedBPTP Limited | Link |
373 of 2019 and 11 …373 of 2019 and 11 others | HaryanaHaryana | The complainants sought relief for delay in posse…The complainants sought relief for delay in possession, increase in super area, cost escalation, and other charges. The authority directed the respondent to pay interest at the prescribed rate, revise the super area, and charge VAT and service tax as per the agreement. | ["Delay in possessi…["Delay in possession", "Increase in super area", "Cost escalation"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed possession, increased the super area, and charged excess amounts.", "respondent_claim": "The respondent claimed that the complainants had agreed to pay excess amounts and that the increase in super area was as per the agreement.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate, revise the super area, and charge VAT and service tax as per the agreement.", "in_favor_of_respondent": "no"} | Mrs. Satinder KaurMrs. Satinder Kaur | BPTP LimitedBPTP Limited | Link |
1102 of 20211102 of 2021 | HaryanaHaryana | The complainant sought relief for delay in posses…The complainant sought relief for delay in possession of a flat and non-payment of compensation. The authority directed the respondent to revoke the termination of the flat and pay interest at the prescribed rate. | ["Delay in possessi…["Delay in possession", "Non-payment of compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat and did not pay compensation for the delay.", "respondent_claim": "The respondent claimed that the complainant had not made timely payments and that the delay in possession was due to unforeseen circumstances.", "final_verdict": "The authority directed the respondent to revoke the termination of the flat and pay interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Rajesh KaulRajesh Kaul | BPTP LimitedBPTP Limited | Link |
CR/3203/2019CR/3203/2019 | HaryanaHaryana | Sony Ashwin Advani and Piya Puri vs BPTP Limited.…Sony Ashwin Advani and Piya Puri vs BPTP Limited. The parties have arrived at an amicable settlement. | ["Amicable Settleme…["Amicable Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The parties have arrived at an amicable settlement.", "in_favor_of_respondent": "no"} | Piya PuriPiya Puri | BPTP LimitedBPTP Limited | Link |
1688 of 20211688 of 2021 | HaryanaHaryana | The complainants sought refund of the amount paid…The complainants sought refund of the amount paid for a plot and compensation for harassment. The authority directed the respondents to refund the amount with interest and not to levy holding charges. | ["Refund of amount"…["Refund of amount", "Compensation for harassment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid Rs. 1,08,06,226/- for a plot and sought refund of the amount with interest and compensation for harassment.", "respondent_claim": "The respondents claimed that the complainants had approached the authority with unclean hands and that the complaint was frivolous.", "final_verdict": "The authority directed the respondents to refund the amount of Rs. 1,08,06,226/- with interest at the rate of 9.40% p.a. from the date of each payment till the actual date of refund of the deposited amount within 90 days.", "in_favor_of_respondent": "no"} | Mrs. Pooja SaxenaMrs. Pooja Saxena | BPTP LimitedBPTP Limited | Link |
2156 of 20182156 of 2018 | HaryanaHaryana | Complainants sought refund of Rs. 13,99,605/- fro…Complainants sought refund of Rs. 13,99,605/- from respondent for cancellation of flat. Authority directed respondent to return balance amount with interest. | ["Refund", "Cancell…["Refund", "Cancellation of Flat"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of Rs. 13,99,605/- for cancellation of flat by respondent.", "respondent_claim": "Respondent claimed that complainants were in default of payments and cancellation was legitimate.", "final_verdict": "Authority directed respondent to return balance amount with interest.", "in_favor_of_respondent": "no"} | Purnima KapurPurnima Kapur | BPTP LimitedBPTP Limited | Link |
44 of 201944 of 2019 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid by her with interest for delay in possession of the apartment. The authority held that the respondents were in contravention of the provisions of the Act and granted refund with interest. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents failed to deliver possession of the apartment within the agreed-upon time and sought refund of the amount paid by her with interest.", "respondent_claim": "The respondents claimed that the complainant was in breach of the agreement for non-invocation of arbitration and that the delay in possession was due to unforeseen circumstances.", "final_verdict": "The authority held that the respondents were in contravention of the provisions of the Act and granted refund of the amount paid by the complainant with interest at the rate of 9.40% per annum.", "in_favor_of_respondent": "no"} | Mrs. Sandal Jeet Ka…Mrs. Sandal Jeet Kaur | Countrywide Promote…Countrywide Promoter Private Limited | Link |
957 of 2019957 of 2019 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a flat in a project developed by the respondent. The authority directed the respondent to return the amount with interest. | ["Refund of amount …["Refund of amount paid for flat", "Non-completion of project by respondent"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid the amount for a flat in the project developed by the respondent, but the respondent failed to complete the project and hand over the possession of the flat.", "respondent_claim": "The respondent claimed that the complainant had not invoked arbitration proceedings as per the agreement and that the complainant was not entitled to refund.", "final_verdict": "The authority directed the respondent to return the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Sh. Sanjay SharanSh. Sanjay Sharan | BPTP LimitedBPTP Limited | Link |
419 of 2019419 of 2019 | HaryanaHaryana | The complainant, Rattan Chugh, filed a complaint …The complainant, Rattan Chugh, filed a complaint against M/s BPTP Ltd. and M/s Anjali Promoters & Developers Pvt. Ltd. for delay in handing over possession of an office space. The authority directed the respondents to pay interest at the prescribed rate for every month of delay from due date of possession till the handing over of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed handing over possession of the office space beyond the agreed-upon date.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including force majeure circumstances.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate for every month of delay from due date of possession till the handing over of possession.", "in_favor_of_respondent": "no"} | Rattan ChughRattan Chugh | BPTP LimitedBPTP Limited | Link |
2274 of 20192274 of 2019 | HaryanaHaryana | The complainant, Sandeep Yadav, filed a complaint…The complainant, Sandeep Yadav, filed a complaint against M/s BPTP Ltd. and M/s Anjali Promoters & Developers Pvt. Ltd. for delay in handing over the possession of an office space. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondents to refund the amount paid by the complainant with interest. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed the handing over of possession of the office space and sought refund of the amount paid with interest.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including force majeure circumstances.", "final_verdict": "The HARERA directed the respondents to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Sandeep YadavSandeep Yadav | BPTP LimitedBPTP Limited | Link |
1894-20211894-2021 | HaryanaHaryana | The complainants sought relief for delay in posse…The complainants sought relief for delay in possession of a flat, and the authority directed the respondents to pay interest at the prescribed rate of 9.80% per annum for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents delayed possession of the flat and sought relief for the same.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including force majeure, and sought to justify the same.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate of 9.80% per annum for every month of delay.", "in_favor_of_respondent": "no"} | Salil AnandSalil Anand | BPTP LimitedBPTP Limited | Link |
1895-20211895-2021 | HaryanaHaryana | The complainants sought delay possession charges …The complainants sought delay possession charges and other relief, but the authority directed the respondents to pay interest at the prescribed rate for every month of delay from the due date of possession till the date of offer of possession. | ["Delay Possession …["Delay Possession Charges", "Interest Rate"] | {"appellant_claim": "The complainants sought dela…{"appellant_claim": "The complainants sought delay possession charges and other relief.", "respondent_claim": "The respondents claimed that the complainants were not entitled to delay possession charges and that the interest rate was not applicable.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate for every month of delay from the due date of possession till the date of offer of possession.", "in_favor_of_respondent": "no"} | Salil AnandSalil Anand | BPTP LimitedBPTP Limited | Link |
1896-20211896-2021 | HaryanaHaryana | The complainants sought delay possession charges,…The complainants sought delay possession charges, area calculation, and restraint on certain charges. The authority directed the respondents to pay interest at the prescribed rate and comply with other obligations. | ["Delay Possession …["Delay Possession Charges", "Area Calculation", "Builder Buyer Agreement"] | {"appellant_claim": "The complainants claimed del…{"appellant_claim": "The complainants claimed delay in possession of the flat and sought compensation, area calculation, and restraint on certain charges.", "respondent_claim": "The respondents claimed that the complainants had not paid the full amount and had not completed the documentation process.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate and comply with other obligations.", "in_favor_of_respondent": "no"} | Salil AnandSalil Anand | BPTP LimitedBPTP Limited | Link |
3001 of 20203001 of 2020 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondents for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority held that the respondents were not entitled to charge GST from the complainants as the liability of GST had not become due up to the due date of possession. | ["Violation of sect…["Violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents had violated section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016 by not providing them with the necessary documents and information.", "respondent_claim": "The respondents claimed that they had provided the complainants with all the necessary documents and information.", "final_verdict": "The authority held that the respondents were not entitled to charge GST from the complainants as the liability of GST had not become due up to the due date of possession.", "in_favor_of_respondent": "no"} | Lata JoshiLata Joshi | BPTP LimitedBPTP Limited | Link |
2247 of 20212247 of 2021 | HaryanaHaryana | The complainant, Pooja Gambhir, filed a complaint…The complainant, Pooja Gambhir, filed a complaint against M/s BPTP Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority directed the respondent to pay interest on the amount paid by the complainant and to provide relief with respect to various charges. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to deliver possession of the flat within the agreed-upon time frame and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and sought to justify the delay.", "final_verdict": "The authority directed the respondent to pay interest on the amount paid by the complainant and to provide relief with respect to various charges.", "in_favor_of_respondent": "no"} | Pooja GambhirPooja Gambhir | BPTP LimitedBPTP Limited | Link |
678 of 2018678 of 2018 | HaryanaHaryana | Complainant sought refund for unpaid amount with …Complainant sought refund for unpaid amount with interest due to non-completion of real estate project by respondent. | ["Non-completion of…["Non-completion of real estate project", "Refund claim"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for the amount paid with interest due to non-completion of the real estate project by the respondent.", "respondent_claim": "The respondent claimed that the complainant was an investor and not entitled to protection under the Act.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Bhawana DuttaBhawana Dutta | BPTP LimitedBPTP Limited | Link |
3204 of 20193204 of 2019 | HaryanaHaryana | The complainant sought refund of paid-up amount a…The complainant sought refund of paid-up amount and delay possession charges from the respondent-builder for failure to complete the project and offer possession of the allotted unit by the due date. | ["Delay in possessi…["Delay in possession", "Non-compliance with agreement terms"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent-builder failed to complete the project and offer possession of the allotted unit by the due date, and sought refund of the paid-up amount and delay possession charges.", "respondent_claim": "The respondent-builder claimed that the complainant had made defaults in making timely payments and had not executed the buyer's agreement, and sought dismissal of the complaint.", "final_verdict": "The authority directed the respondent-builder to pay interest at the prescribed rate of 10.25% p.a. for every month of delay from the due date of possession till offer of possession of the allotted unit, and to pay the arrears of such interest accrued from due date of possession till its admissibility.", "in_favor_of_respondent": "no"} | Mrs. Archana Aggarw…Mrs. Archana Aggarwal | Countrywide Promote…Countrywide Promoters Limited | Link |
3415 of 20193415 of 2019 | HaryanaHaryana | The complainants booked a flat in the project 'Ma…The complainants booked a flat in the project 'Mansions Park Prime' developed by the respondents. The respondents failed to deliver the possession of the flat within the stipulated period, and the complainants sought delay possession charges. | ["Delay in possessi…["Delay in possession", "Interest on delay"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents failed to deliver the possession of the flat within the stipulated period and sought delay possession charges.", "respondent_claim": "The respondents claimed that the complainants had failed to pay the outstanding dues and that the delay in possession was due to the complainants' fault.", "final_verdict": "The authority directed the respondents to pay interest on the paid-up amount at the prescribed rate of 10.60% p.a. for every month of delay from 20.07.2013 till the date of offer of possession i.e., 06.03.2020, plus two months ie. 06.05.2020 to the complainant(s).", "in_favor_of_respondent": "no"} | Anita RaikheyAnita Raikhey | BPTP LimitedBPTP Limited | Link |
716 of 2020716 of 2020 | HaryanaHaryana | The complainant paid an initial booking amount of…The complainant paid an initial booking amount of Rs. 6,00,000/- towards the booking of the residential flat/unit no. E-43-FF in Project ‘ASTAIRE GARDENS’ located in sector 70-A, Gurgaon, Haryana-122001. The respondent terminated the unit of the complainant due to non-payment. | ["Non-payment", "Te…["Non-payment", "Termination of unit"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent terminated the unit of the complainant due to non-payment and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the complainant did not make payments towards the consideration of the allotted unit as per the allotment letter dated 12.07.2011.", "final_verdict": "The authority held that the complainant violated the provision of section 19(6) & (7) of Act of 2016 by not making payments towards the consideration of the allotted unit. However, the authority did not direct the respondent to refund the amount paid by the complainant as the amount paid by the complainant was less than 10% of the total consideration.", "in_favor_of_respondent": "no"} | Akhilesh BansalAkhilesh Bansal | BPTP LimitedBPTP Limited | Link |
1613-20181613-2018 | HaryanaHaryana | The complainants booked a residential flat in the…The complainants booked a residential flat in the respondent's project 'Terra' in Sector-37D, Gurugram, but the respondent failed to deliver possession within the agreed-upon time frame. The complainants sought compensation and interest for the delay. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver possession of the flat within the agreed-upon time frame of 42 months and sought compensation and interest for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had completed the project and obtained the occupation certificate.", "final_verdict": "The authority directed the respondent to pay interest on the paid-up amount at the prescribed rate of 10.70% p.a. for every month of delay from the due date of possession till the date of offer of possession.", "in_favor_of_respondent": "no"} | Gurpreet Kaur RikhiGurpreet Kaur Rikhi | BPTP LimitedBPTP Limited | Link |
CR/561/2022CR/561/2022 | HaryanaHaryana | Rita Gupta vs BPTP Limited. The parties have arri…Rita Gupta vs BPTP Limited. The parties have arrived at an amicable settlement and a settlement deed dated 23.03.2023 to this effect has been placed on record duly signed by both the parties. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have arrived at an amicable settlement and a settlement deed dated 23.03.2023 to this effect has been placed on record duly signed by both the parties.", "in_favor_of_respondent": "no"} | Rita GuptaRita Gupta | BPTP LimitedBPTP Limited | Link |
5197-20215197-2021 | HaryanaHaryana | Complainant sought delay possession charges and i…Complainant sought delay possession charges and interest on paid amount. Authority directed respondents to pay interest at prescribed rate for every month of delay. | ["Delay in Possessi…["Delay in Possession", "Interest on Paid Amount"] | {"appellant_claim": "Complainant sought delay pos…{"appellant_claim": "Complainant sought delay possession charges and interest on paid amount.", "respondent_claim": "Respondents contested the complaint, alleging that the complainant was not in default and that the delay was due to force majeure circumstances.", "final_verdict": "Authority directed respondents to pay interest at prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Amit SethAmit Seth | BPTP LimitedBPTP Limited | Link |
437-2019437-2019 | HaryanaHaryana | The complainant, Neha Gupta, filed a complaint ag…The complainant, Neha Gupta, filed a complaint against M/s BPTP Limited and Country Wide Promoters for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority held that the respondents were not entitled to charge GST from the complainant as the liability of GST had not become due up to the due date of possession. | ["Real Estate", "GS…["Real Estate", "GST"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents had violated section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016 by charging GST from her without justification.", "respondent_claim": "The respondents claimed that they were entitled to charge GST from the complainant as the liability of GST had become due up to the due date of possession.", "final_verdict": "The authority held that the respondents were not entitled to charge GST from the complainant as the liability of GST had not become due up to the due date of possession.", "in_favor_of_respondent": "no"} | Neha GuptaNeha Gupta | BPTP LimitedBPTP Limited | Link |
198-2020198-2020 | HaryanaHaryana | The complainant booked a plot from BPTP Ltd. and …The complainant booked a plot from BPTP Ltd. and sought relief for delay in possession. The Authority directed the respondents to pay interest at the prescribed rate and execute the sale deed. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed possession of the plot and sought relief for the same.", "respondent_claim": "The respondents claimed that the complainant had already filed similar complaints in other forums and that the current complaint was an attempt at forum shopping.", "final_verdict": "The Authority directed the respondents to pay interest at the prescribed rate and execute the sale deed.", "in_favor_of_respondent": "no"} | Satish OswalSatish Oswal | BPTP LimitedBPTP Limited | Link |
3048 of 20203048 of 2020 | HaryanaHaryana | The complainant sought relief for delay in posses…The complainant sought relief for delay in possession of a flat, unfair charges, and non-provision of amenities. The authority directed the respondent to pay delay possession charges, refund certain charges, and not charge anything not part of the agreement. | ["Delay in possessi…["Delay in possession", "Unfair charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat, charged unfair amounts, and did not provide amenities as promised.", "respondent_claim": "The respondent claimed that the complainant was aware of the status of the project and not entitled to delay compensation.", "final_verdict": "The authority directed the respondent to pay delay possession charges, refund certain charges, and not charge anything not part of the agreement.", "in_favor_of_respondent": "no"} | Mahesh KoshiMahesh Koshi | BPTP LimitedBPTP Limited | Link |
3058 of 20203058 of 2020 | HaryanaHaryana | The complainant sought relief for delay in posses…The complainant sought relief for delay in possession of a flat, and the authority directed the respondent to pay interest at the prescribed rate for the delayed period. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat and sought relief for the same.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including force majeure circumstances.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for the delayed period.", "in_favor_of_respondent": "no"} | Nitin ChhapariaNitin Chhaparia | BPTP LimitedBPTP Limited | Link |
6148 of 20226148 of 2022 | HaryanaHaryana | The complainant, Dr. Sonali Mishra, filed a compl…The complainant, Dr. Sonali Mishra, filed a complaint against M/s BPTP Ltd. and others for delay in possession of a flat in the 'Park Terra' project. The Haryana Real Estate Regulatory Authority (HARERA) directed the respondents to pay interest at the prescribed rate for every month of delay and to execute the conveyance deed within a period of 90 days. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed the possession of the flat and sought compensation.", "respondent_claim": "The respondents claimed that the delay was due to force majeure circumstances and that they had completed the project as per the agreement.", "final_verdict": "The HARERA directed the respondents to pay interest at the prescribed rate for every month of delay and to execute the conveyance deed within a period of 90 days.", "in_favor_of_respondent": "no"} | Dr. Sonali MishraDr. Sonali Mishra | Countrywide Promote…Countrywide Promoters Limited | Link |
1001 of 20221001 of 2022 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of flat. Authority directed refund with interest and deducted earnest money. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainant claimed refund f…{"appellant_claim": "Complainant claimed refund for delayed possession of flat worth Rs. 1,19,44,825/-", "respondent_claim": "Respondent claimed that construction was delayed due to COVID-19 and lockdown", "final_verdict": "Authority directed refund of Rs. 76,71,478/- with interest and deducted 10% as earnest money", "in_favor_of_respondent": "no"} | Samrat DhawanSamrat Dhawan | BPTP LimitedBPTP Limited | Link |
168/2023 in CR/5265…168/2023 in CR/5265/2019 | HaryanaHaryana | Complaint for delayed possession charges and othe…Complaint for delayed possession charges and other charges. Authority directed respondent to handover possession within two weeks after payment of outstanding amount. | ["Delayed possessio…["Delayed possession", "Charges"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed delayed possession charges and other charges.", "respondent_claim(in detail)": "The respondent claimed that the complainant was not entitled to delayed possession charges and other charges.", "final_verdict(in detail)": "The Authority held that the complainant was entitled to delayed possession charges and other charges as per committee report.", "in_favor_of_respondent": "no"} | Pradeep LoyalPradeep Loyal | BPTP LimitedBPTP Limited | Link |
594 of 2022594 of 2022 | HaryanaHaryana | The complainant sought possession of a residentia…The complainant sought possession of a residential unit and compensation for delay. The authority directed the respondent to handover possession and pay delayed possession charges. | ["Delayed Possessio…["Delayed Possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the residential unit and sought compensation for the same.", "respondent_claim": "The respondent claimed that the delay was due to various reasons including force majeure circumstances.", "final_verdict": "The authority directed the respondent to handover possession of the unit within 30 days from the date of receipt of occupation certificate and pay delayed possession charges to the complainant at the prescribed rate of interest.", "in_favor_of_respondent": "no"} | Ankur KhuranaAnkur Khurana | BPTP LimitedBPTP Limited | Link |
1056 of 20221056 of 2022 | HaryanaHaryana | The complainant's unit was cancelled by the respo…The complainant's unit was cancelled by the respondent for non-payment of dues. The authority directed the respondent to refund the amount paid by the complainant with interest. | ["Non-payment of du…["Non-payment of dues", "Refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that his unit was cancelled by the respondent for non-payment of dues despite having paid the required amounts.", "respondent_claim": "The respondent claimed that the complainant had not paid the required amounts and therefore the unit was cancelled.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Shri Mansoor Ali Sh…Shri Mansoor Ali Shoket | Countrywide Promote…Countrywide Promoter Private Limited | Link |
CR/2257/2022CR/2257/2022 | HaryanaHaryana | Rohit Madhok and Plara Madhok vs BPTP Limited. Co…Rohit Madhok and Plara Madhok vs BPTP Limited. Complaint withdrawn by the complainants. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants filed a complaint against BPTP Limited, but later withdrew it.", "respondent_claim(in detail)": "Not applicable, as the complainants withdrew the complaint.", "final_verdict(in detail)": "The complaint was withdrawn by the complainants, and the matter was disposed off.", "in_favor_of_respondent": "no"} | Plara MadhokPlara Madhok | BPTP LimitedBPTP Limited | Link |
338 of 2022338 of 2022 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for not handing over the possession of the unit within the stipulated period. The authority directed the respondent to hand over the possession within 30 days and pay delayed possession charges at the prescribed rate of interest. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over the possession of the unit within the stipulated period and sought compensation for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had offered the possession of the unit within a reasonable time period.", "final_verdict": "The authority directed the respondent to hand over the possession within 30 days and pay delayed possession charges at the prescribed rate of interest.", "in_favor_of_respondent": "no"} | Pallavi DasPallavi Das | BPTP LimitedBPTP Limited | Link |
4738 of 20224738 of 2022 | HaryanaHaryana | The complainants sought refund of the amount paid…The complainants sought refund of the amount paid by them along with interest and compensation on the pretext that there is delay in possession and that there has been a financial loss caused to them. The authority directed the respondent to refund the amount received by it along with interest. | ["Delay in possessi…["Delay in possession", "Refund of amount"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had booked a unit in the project of the respondent in the year 2013 and despite the lapse of 9 years from the date of booking, the respondent had failed to offer possession of the unit. They sought refund of the amount paid by them along with interest and compensation.", "respondent_claim": "The respondent claimed that the construction of the project was delayed due to various reasons including orders passed by National Green Tribunal, non-payment of instalment by allottees, and Covid-19. They denied the claim of the complainants and sought dismissal of the complaint.", "final_verdict": "The authority directed the respondent to refund the amount received by it along with interest at the rate of 10.75% p.a. from the date of each payment till the actual date of refund of the amount.", "in_favor_of_respondent": "no"} | Bharat ChopraBharat Chopra | BPTP LimitedBPTP Limited | Link |
MA NO. 284/2023 in …MA NO. 284/2023 in CR/5083/2021 | HaryanaHaryana | Complaint was rejected by not being maintainable …Complaint was rejected by not being maintainable being barred by res judicata. Application for rectification of order was declined due to appeal filed before Hon'ble Tribunal. | ["Real Estate", "Re…["Real Estate", "Regulation"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants sought rectification of the order dated 06.02.2023, which was rejected by not being maintainable being barred by res judicata.", "respondent_claim(in detail)": "The respondent stated that there was an inadvertent error in the order dated 06.02.2023 and sought rectification of the same.", "final_verdict(in detail)": "The application for rectification of order was declined due to appeal filed before Hon'ble Tribunal.", "in_favor_of_respondent": "no"} | Arvind Kumar SharmaArvind Kumar Sharma | BPTP LimitedBPTP Limited | Link |
MA No. 347/2023 in …MA No. 347/2023 in CR/5004/2020 | HaryanaHaryana | The complainants were directed to pay outstanding…The complainants were directed to pay outstanding dues and take possession of the unit. The application was disposed off as it was not filed under any relevant provision of the Act. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had not executed the conveyance deed and had not handed over possession of the unit.", "respondent_claim": "The respondent claimed that the complainants had not paid the balance amount and had not complied with the earlier order.", "final_verdict": "The complainants were directed to pay outstanding dues and take possession of the unit.", "in_favor_of_respondent": "no"} | Anr.Anr. | BPTP LimitedBPTP Limited | Link |
CR/953/2022CR/953/2022 | HaryanaHaryana | Akash Khurana vs BPTP Limited: The parties reache…Akash Khurana vs BPTP Limited: The parties reached an amicable settlement, and a settlement deed was signed on 30.11.2023. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties reached an amicable settlement and signed a settlement deed on 30.11.2023.", "in_favor_of_respondent": "no"} | Akash KhuranaAkash Khurana | BPTP LimitedBPTP Limited | Link |
CR/3207/2021CR/3207/2021 | HaryanaHaryana | Satender Singh and Parminder Kaur vs BPTP Limited…Satender Singh and Parminder Kaur vs BPTP Limited. The parties have arrived at an amicable settlement and a settlement deed has been placed on record. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have arrived at an amicable settlement and a settlement deed has been placed on record.", "in_favor_of_respondent": "no"} | Parminder KaurParminder Kaur | BPTP LimitedBPTP Limited | Link |
CR/3206/2021CR/3206/2021 | HaryanaHaryana | Jasmeet Singh vs BPTP Limited: The parties have a…Jasmeet Singh vs BPTP Limited: The parties have arrived at an amicable settlement and a settlement deed dated 23.10.2023 has been placed on record. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have arrived at an amicable settlement and a settlement deed dated 23.10.2023 has been placed on record.", "in_favor_of_respondent": "no"} | Jasmeet SinghJasmeet Singh | BPTP LimitedBPTP Limited | Link |
CR/3008/2020CR/3008/2020 | HaryanaHaryana | Ganesh Singh Rana filed an application for rectif…Ganesh Singh Rana filed an application for rectification regarding delayed possession charges. The Authority clarified that the respondent must hand over physical possession after obtaining an occupation certificate and the complainant must take possession within 2 months. | ["Delayed Possessio…["Delayed Possession Charges"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had not paid the delayed possession charges as per the earlier order.", "respondent_claim": "The respondent claimed that they had paid the delayed possession charges as per the prescribed rate.", "final_verdict": "The Authority clarified that the respondent must hand over physical possession after obtaining an occupation certificate and the complainant must take possession within 2 months.", "in_favor_of_respondent": "no"} | Ganesh Singh RanaGanesh Singh Rana | BPTP LimitedBPTP Limited | Link |
7309 of 20227309 of 2022 | HaryanaHaryana | The complainants sought relief for delayed posses…The complainants sought relief for delayed possession of a flat and unfair demands by the respondent. The authority directed the respondent to withdraw the termination letter, pay interest, and hand over possession of the flat. | ["Delayed possessio…["Delayed possession", "Unfair demands"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent delayed possession of the flat and made unfair demands for payment.", "respondent_claim": "The respondent claimed that the delay was due to force majeure circumstances and that the complainants were defaulters who failed to make payments as per the agreed payment plan.", "final_verdict": "The authority directed the respondent to withdraw the termination letter, pay interest, and hand over possession of the flat.", "in_favor_of_respondent": "no"} | Mrs. Kavi ManavMrs. Kavi Manav | BPTP LimitedBPTP Limited | Link |
MA NO. 114/2024 in …MA NO. 114/2024 in CR/32/2022 | HaryanaHaryana | Complaint filed by Gaurav Dua against BPTP Limite…Complaint filed by Gaurav Dua against BPTP Limited. Application for rectification of previous order filed. | ["Rectification of …["Rectification of previous order"] | {"appellant_claim": "The complainant filed an app…{"appellant_claim": "The complainant filed an application for rectification of the previous order dated 25.08.2023.", "respondent_claim": "The respondent did not file any claim.", "final_verdict": "The application for rectification was allowed.", "in_favor_of_respondent": "no"} | Gaurav DuaGaurav Dua | BPTP LimitedBPTP Limited | Link |
CR/5876/2023CR/5876/2023 | HaryanaHaryana | Apoorv Jain vs BPTP LTD: The complainant filed an…Apoorv Jain vs BPTP LTD: The complainant filed an application for withdrawal of the complaint as the matter has been settled between the parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the matter has been settled between him and the respondent.", "respondent_claim(in detail)": "The respondent did not make any claim.", "final_verdict(in detail)": "The matter stands disposed off as the parties have arrived at a settlement.", "in_favor_of_respondent": "no"} | Apoorv JainApoorv Jain | BPTP LimitedBPTP Limited | Link |
RERA-PKL-COMP. 8/20…RERA-PKL-COMP. 8/2018 | HaryanaHaryana | Complainant Ms. Kavita Phogat purchased a flat fr…Complainant Ms. Kavita Phogat purchased a flat from original allottee Shri Rakesh Chander Garg and filed a complaint against respondent M/s BPTP Limited for delay in possession and refund. The Authority directed the respondent to deliver possession and pay delay compensation. | ["Delay in possessi…["Delay in possession", "Refund"] | {"appellant_claim": "The complainant claimed dela…{"appellant_claim": "The complainant claimed delay in possession and refund of the paid amount with interest and compensation.", "respondent_claim": "The respondent claimed that the project was completed and occupancy certificate was applied for, and therefore the complaint was liable for dismissal.", "final_verdict": "The Authority directed the respondent to deliver possession within 30 days of the grant of completion/occupation certificate and pay delay compensation at the rate of Rs. 10/- per sq.ft. of super area for every month of delay.", "in_favor_of_respondent": "no"} | Ms. Kavita PhogatMs. Kavita Phogat | BPTP LimitedBPTP Limited | Link |
RERA-PK] COMP 72720…RERA-PK] COMP 7272018 | Not providedNot provided | Complaint withdrawn by complainant Shri Ravi Bans…Complaint withdrawn by complainant Shri Ravi Bansal. Case dismissed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case dismissed as withdrawn upon application by complainant.", "in_favor_of_respondent": "no"} | Shri Ravi BansalShri Ravi Bansal | BPTP LimitedBPTP Limited | Link |
RERA-PKL-39-2018RERA-PKL-39-2018 | Not providedNot provided | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of a commercial unit. Case settled amicably with compensation and possession timeline. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim": "Refund for delayed possessio…{"appellant_claim": "Refund for delayed possession and compensation for harassment, litigation costs, etc.", "respondent_claim": "Delay in delivery of possession, willing to pay compensation as per agreement.", "final_verdict": "Case settled amicably with compensation and possession timeline. Possession to be handed over by July 2019. Excess payment to be refunded. Additional demands to be made by respondent.", "in_favor_of_respondent": "no"} | Dheerendra SinghDheerendra Singh | BPTP LimitedBPTP Limited | Link |
RERA-PKL 432/2018RERA-PKL 432/2018 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed of as having been withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by the complainant.", "in_favor_of_respondent": "no"} | Nitesh SharmaNitesh Sharma | BPTP LimitedBPTP Limited | Link |
RERA-PKL178/2018RERA-PKL178/2018 | HaryanaHaryana | The complainants filed cases against M/s BPTP Ltd…The complainants filed cases against M/s BPTP Ltd. for not providing possession of apartments in Phase-II of the project. The Authority directed the respondent to give an undertaking regarding the date by which possession will be offered to the complainants. | ["Possession of Apa…["Possession of Apartments", "Project Completion"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not provide possession of apartments in Phase-II of the project.", "respondent_claim": "The respondent claimed that the construction at the site is going on in full swing and the respondents company is making efforts to hand over Possession of the units in Phase-II of the project by the end of March, 2019.", "final_verdict": "The Authority directed the respondent to give an undertaking regarding the date by which possession will be offered to the complainants and to complete the project by March, 2019.", "in_favor_of_respondent": "no"} | Abhishek SharmaAbhishek Sharma | BPTP LimitedBPTP Limited | Link |
RERA-PKL 310/2018RERA-PKL 310/2018 | HaryanaHaryana | Complaint regarding delay in possession of flat b…Complaint regarding delay in possession of flat by BPTP Ltd. Disposed in favor of the complainant with directions for the respondent. | ["Delay in possessi…["Delay in possession", "Flat booking"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent, BPTP Ltd., had delayed the possession of their flat despite receiving full payment.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had taken steps to complete the project.", "final_verdict": "The Authority directed the respondent to provide possession of the flat to the complainants within a specified timeframe and to prepare a statement of accounts in accordance with the principles laid down in a previous case.", "in_favor_of_respondent": "no"} | OthersOthers | BPTP LimitedBPTP Limited | Link |
449-2018449-2018 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed delivery of possession. Authority directed respondent to recalculate accounts, pay compensation, and issue show cause notice for non-registration of project. | ["Delayed possessio…["Delayed possession", "Non-registration of project"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and compensation for delayed delivery of possession.", "respondent_claim": "Respondent claimed that possession would be delivered by May 2019 and that delay was due to various reasons.", "final_verdict": "Authority directed respondent to recalculate accounts, pay compensation, and issue show cause notice for non-registration of project.", "in_favor_of_respondent": "no"} | Anshul GoelAnshul Goel | BPTP LimitedBPTP Limited | Link |
RERA-PKL-210/2018RERA-PKL-210/2018 | HaryanaHaryana | The complainant, Rohit Chawla, filed a complaint …The complainant, Rohit Chawla, filed a complaint against M/s BPTP Ltd. for not providing him with the necessary documents to get his loan disbursed. The Haryana Real Estate Regulatory Authority (HRERA) held that both parties had contributed to the breach of conditions of the allotment and ordered the respondent to refund the entire amount of money received from the complainant. | Non-supply of docum…Non-supply of documents by respondent | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not provide him with the necessary documents to get his loan disbursed, which led to default in payment of due installments and cancellation of the allotment.", "respondent_claim": "The respondent claimed that the complainant was a defaulter who did not pay due installments in time and that the booking of the apartment was automatically cancelled on account of non-payment of outstanding installments.", "final_verdict": "The HRERA held that both parties had contributed to the breach of conditions of the allotment and ordered the respondent to refund the entire amount of money received from the complainant.", "in_favor_of_respondent": "no"} | Rohit ChawlaRohit Chawla | BPTP LimitedBPTP Limited | Link |
380/2018380/2018 | HaryanaHaryana | Complaint withdrawn by the complainant.Complaint withdrawn by the complainant. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case is disposed off as withdrawn due to the application filed by the complainant.", "in_favor_of_respondent": "no"} | Ritu DevgunRitu Devgun | BPTP LimitedBPTP Limited | Link |
RERA-PKL-1375-2018RERA-PKL-1375-2018 | HaryanaHaryana | Complaint withdrawn by the complainant as the par…Complaint withdrawn by the complainant as the parties have amicably settled the matter. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as having been amicably settled.", "in_favor_of_respondent": "no"} | Nitin ChhibbarNitin Chhibbar | BPTP LimitedBPTP Limited | Link |
923/2018923/2018 | HaryanaHaryana | Complainant sought direction for possession of fl…Complainant sought direction for possession of flat and compensation for delay. Authority directed possession by December 2019 and compensation for delay. | ["Possession delay"…["Possession delay", "Compensation"] | {"appellant_claim": "Complainant sought direction…{"appellant_claim": "Complainant sought direction for possession of flat and compensation for delay.", "respondent_claim": "Respondent claimed that the project was not required to be registered as it was less than 500 sq. meters, and that the complainant was in breach of the agreement.", "final_verdict": "Authority directed possession by December 2019 and compensation for delay.", "in_favor_of_respondent": "no"} | Sanjay Singh TangerSanjay Singh Tanger | BPTP LimitedBPTP Limited | Link |
422/2018422/2018 | HaryanaHaryana | Complainant booked an independent floor from resp…Complainant booked an independent floor from respondent, but faced issues with delivery of possession and charges. Authority ordered respondent to recalculate amounts payable and give credit for delay compensation. | ["Real Estate", "Po…["Real Estate", "Possession Delay", "Charges"] | {"appellant_claim": "Complainant claimed delay in…{"appellant_claim": "Complainant claimed delay in delivery of possession and excessive charges.", "respondent_claim": "Respondent claimed that complainant delayed execution of agreement and owed unpaid installments.", "final_verdict": "Authority ordered respondent to recalculate amounts payable and give credit for delay compensation.", "in_favor_of_respondent": "no"} | Praveen YadavPraveen Yadav | BPTP LimitedBPTP Limited | Link |
875/2018875/2018 | HaryanaHaryana | Complainant sought refund of deposited amount wit…Complainant sought refund of deposited amount with interest for undelivered flat. Authority directed refund with interest in 3 installments within 90 days. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in May 2009 and paid Rs. 9,08,580/- up to July 2012. The respondent sent a letter in February 2015 stating that the allotted unit could not be delivered due to litigation pending with the land owner and the amount deposited by the complainant would be refunded with 9% interest from the date of receipt. The complainant approached the respondent multiple times requesting refund but did not receive any payment despite four years having passed.", "respondent_claim(in detail)": "The respondent admitted their inability to develop the unit and agreed to refund the amount deposited by the complainant in their letter dated 17.02.2015.", "final_verdict(in detail)": "The Authority directed the respondent to refund the entire amount paid by the complainant along with interest from the date of deposit till payment, in accordance with Rule 15 of the HRERA Rule, 2017, i.e., at the rate of SBI highest marginal cost of leading rate plus 2%. The amount shall be paid in 3 installments and shall be paid in 90 days from uploading of this order on the website of HRERA.", "in_favor_of_respondent": "no"} | Seema GuptaSeema Gupta | BPTP LimitedBPTP Limited | Link |
1231/20181231/2018 | HaryanaHaryana | Complaint settled outside of court with post-date…Complaint settled outside of court with post-dated cheques handed over to complainant. Authority directed respondent to pay imposed cost and penal interest if any cheque is dishonoured. | ["Settled complaint…["Settled complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint settled outside of court with post-dated cheques handed over to complainant. Authority directed respondent to pay imposed cost and penal interest if any cheque is dishonoured.", "in_favor_of_respondent": "no"} | Neena AhujaNeena Ahuja | BPTP LimitedBPTP Limited | Link |
592/2019592/2019 | HaryanaHaryana | Complaint withdrawn by complainant, case disposed…Complaint withdrawn by complainant, case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed as withdrawn by complainant.", "in_favor_of_respondent": "no"} | Sunil KumarSunil Kumar | BPTP LimitedBPTP Limited | Link |
625 of 2018625 of 2018 | HaryanaHaryana | Complainant sought withdrawal of offer of possess…Complainant sought withdrawal of offer of possession and additional demands made by respondent. Authority directed respondent to issue fresh offer of possession, recalculate super area, and pay delay compensation. | ["Delay in possessi…["Delay in possession", "Additional demands"] | {"appellant_claim": "Complainant sought withdrawa…{"appellant_claim": "Complainant sought withdrawal of offer of possession and additional demands made by respondent.", "respondent_claim": "Respondent claimed that the agreement was executed prior to the coming into force of RERA Act and that the project was not required to be registered.", "final_verdict": "Authority directed respondent to issue fresh offer of possession, recalculate super area, and pay delay compensation.", "in_favor_of_respondent": "no"} | Sunil SharmaSunil Sharma | BPTP LimitedBPTP Limited | Link |
1065 of 20191065 of 2019 | HaryanaHaryana | Complaint for recovery of cost of Rs. 37,000 levi…Complaint for recovery of cost of Rs. 37,000 levied upon the respondent in complaint no. 633 of 2018. Case disposed of upon receipt of demand draft. | ["Recovery of cost"]["Recovery of cost"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed of upon receipt of demand draft of Rs. 37,000", "in_favor_of_respondent": "no"} | Not providedNot provided | BPTP LimitedBPTP Limited | Link |
646 of 2019646 of 2019 | HaryanaHaryana | Complainant sought refund of excess amount charge…Complainant sought refund of excess amount charged for alleged increase in super area, Enhanced EDC, Cost escalation, interest etc. and delay compensation @ MCLR+2 % from 16.10.2012 till offer of possession dated 15.12.2018. | ["Refund of excess …["Refund of excess amount", "Delay compensation"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of excess amount charged for alleged increase in super area, Enhanced EDC, Cost escalation, interest etc. and delay compensation @ MCLR+2 % from 16.10.2012 till offer of possession dated 15.12.2018.", "respondent_claim(in detail)": "The respondent claimed that the Authority has no jurisdiction to entertain the present complaint as the complainant cannot rely on the provisions of RERA Act qua the agreement that was executed prior to coming into force of the said Act.", "final_verdict(in detail)": "The Authority quashed the offer of possession dated 15.12.2018 to the extent ordered and directed the respondents to recalculate the amounts payable by the complainants in accordance with the aforesaid directions and issue to the complainant a fresh offer of Possession along with fresh statement of accounts after duly accounting for the interest to be paid on account of delay in offering possession as calculated above.", "in_favor_of_respondent": "no"} | Ashim KohliAshim Kohli | BPTP LimitedBPTP Limited | Link |
192 of 2019 and oth…192 of 2019 and others | HaryanaHaryana | The complainants booked flats in the project 'Par…The complainants booked flats in the project 'Park Elite Premium' developed by BPTP Ltd. They sought possession of their flats along with delay compensation and quashed the impugned demands of additional amount. | ["Delay in possessi…["Delay in possession of flats", "Additional demands by the respondent"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had booked flats in the project 'Park Elite Premium' developed by BPTP Ltd. They sought possession of their flats along with delay compensation and quashed the impugned demands of additional amount.", "respondent_claim": "The respondent claimed that the complainants had not paid the additional amounts demanded by them. They also claimed that the delay in possession of flats was due to the complainants' failure to pay the additional amounts.", "final_verdict": "The Authority directed the respondent to offer fresh possession to the complainants along with a statement of accounts payable and receivable by the complainants. The Authority also directed the respondent to recalculate the super area in accordance with the principles laid down in the said judgment and send a detailed statement to the complainants.", "in_favor_of_respondent": "no"} | Man Singh ChauhanMan Singh Chauhan | BPTP LimitedBPTP Limited | Link |
192 of 2019192 of 2019 | HaryanaHaryana | The complainants booked flats in the project 'Par…The complainants booked flats in the project 'Park Elite Premium' developed by BPTP Ltd. They alleged that the respondent had not given them possession of the flats within the agreed-upon time frame and had demanded additional amounts. | ["Delay in possessi…["Delay in possession", "Additional amounts"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent had not given them possession of the flats within the agreed-upon time frame and had demanded additional amounts.", "respondent_claim": "The respondent claimed that the complainants had not paid the additional amounts as per the agreement and that the delay in possession was due to unforeseen circumstances.", "final_verdict": "The Authority directed the respondent to offer fresh possession to the complainants along with a statement of accounts payable and receivable by the complainants.", "in_favor_of_respondent": "no"} | Man Singh ChauhanMan Singh Chauhan | BPTP LimitedBPTP Limited | Link |
1377 of 20181377 of 2018 | HaryanaHaryana | Complaint settled by parties, terms to be filed. …Complaint settled by parties, terms to be filed. Cost of Rs. 20,000 imposed for non-submission of reply. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The matter was settled by both parties, and the terms of the settlement deed were to be filed. A cost of Rs. 20,000 was imposed on the respondent for not submitting their reply on time.", "in_favor_of_respondent": "no"} | Saurabh GhoshSaurabh Ghosh | BPTP LimitedBPTP Limited | Link |
Complaint No. 609 o…Complaint No. 609 of 2019 | HaryanaHaryana | Complainant sought refund with compensation for d…Complainant sought refund with compensation for delayed construction of flat and mental agony. Authority allowed refund with interest and directed respondent to pay within 90 days. | ["Refund for delaye…["Refund for delayed flat possession"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund with compensation for delayed construction of flat and mental agony.", "respondent_claim(in detail)": "Respondent claimed that delay was due to force majeure circumstances and that construction was underway.", "final_verdict(in detail)": "Authority allowed refund with interest and directed respondent to pay within 90 days.", "in_favor_of_respondent": "no"} | Nalin MadanNalin Madan | BPTP LimitedBPTP Limited | Link |
1090 of 20191090 of 2019 | HaryanaHaryana | Complainant seeks refund for unpaid flat and inte…Complainant seeks refund for unpaid flat and interest due to non-delivery of possession. Authority orders refund with interest and costs. | ["Non-delivery of p…["Non-delivery of possession", "Refund"] | {"appellant_claim": "The complainant was allotted…{"appellant_claim": "The complainant was allotted a residential independent floor in the respondent's project. He paid Rs. 10,66,812/- but did not receive possession. He sought refund with interest.", "respondent_claim": "Not provided", "final_verdict": "The Authority ordered the respondent to refund the entire amount of Rs. 10,66,812/- along with interest at the rate of SBI highest marginal cost of lending rate (MCLR) + 2% from the date of amounts received till the actual realization.", "in_favor_of_respondent": "no"} | Bhuvan Vikaram SinghBhuvan Vikaram Singh | BPTP LimitedBPTP Limited | Link |
Complaint No. 31 of…Complaint No. 31 of 2019 | HaryanaHaryana | Complainant Ram Kripal Yadav filed a complaint ag…Complainant Ram Kripal Yadav filed a complaint against BPTP Ltd for not providing necessary documents for disbursal of loan amount. The Authority directed the respondent to refund the entire amount with interest. | ["Refund of loan am…["Refund of loan amount", "Non-provision of documents"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not provide necessary documents for disbursal of loan amount, despite repeated requests.", "respondent_claim": "The respondent claimed that the complainant was supposed to first refer the matter to the Arbitrator, and that the agreement was terminated in 2013 due to non-payment of installments.", "final_verdict": "The Authority directed the respondent to refund the entire amount with interest, and also paid costs to the complainant.", "in_favor_of_respondent": "no"} | Ram Kripal YadavRam Kripal Yadav | BPTP LimitedBPTP Limited | Link |
2165 of 20192165 of 2019 | HaryanaHaryana | Complaint withdrawn by learned counsel for compla…Complaint withdrawn by learned counsel for complainant. Complaint disposed of as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by learned counsel for complainant.", "in_favor_of_respondent": "no"} | Sarvesh AgarwalSarvesh Agarwal | BPTP LimitedBPTP Limited | Link |
2359 of 20192359 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant with liberty t…Complaint withdrawn by complainant with liberty to file before Haryana Real Estate Regulatory Authority. Original documents returned to complainant. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by complainant with liberty to file before Haryana Real Estate Regulatory Authority.", "in_favor_of_respondent": "no"} | Jai VinderJai Vinder | BPTP LimitedBPTP Limited | Link |
430 of 2019430 of 2019 | HaryanaHaryana | Complainant booked a flat in 2010, but possession…Complainant booked a flat in 2010, but possession was delayed by 5 years and 8 months. The authority ordered the respondent to offer fresh possession and calculate delay compensation. | ["Delay in possessi…["Delay in possession", "Delay compensation"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that he booked a flat in 2010 and paid Rs. 3,00,000, but possession was delayed by 5 years and 8 months. He sought refund of the paid amount and delay compensation.", "respondent_claim(in detail)": "The respondent claimed that the delay was due to inaction of government authorities and that the complainant had defaulted in making payments. They argued that the demand for Rs. 10,89,394 was legitimate.", "final_verdict(in detail)": "The authority ordered the respondent to offer fresh possession to the complainant, calculate delay compensation in accordance with the principles laid down in Madhu Sareen's case, and provide a statement of amounts payable and receivable by the complainant.", "in_favor_of_respondent": "no"} | Rajneesh KapoorRajneesh Kapoor | BPTP LimitedBPTP Limited | Link |
348 and 560 of 2019348 and 560 of 2019 | HaryanaHaryana | Complaints against BPTP Ltd regarding possession …Complaints against BPTP Ltd regarding possession of flat, charges, and super area. Authority directed respondent to recalculate super area, refund club membership charges, and pay delay compensation. | ["Possession of fla…["Possession of flat", "Charges", "Super area"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent had charged excess amounts for various services and had not provided proper possession of the flat.", "respondent_claim": "Respondent claimed that the charges were as per the agreement and that the possession of the flat had been given as per the agreement.", "final_verdict": "Authority directed respondent to recalculate super area, refund club membership charges, and pay delay compensation.", "in_favor_of_respondent": "no"} | Niranjan Prasad Aga…Niranjan Prasad Agarwal | BPTP LimitedBPTP Limited | Link |
2884 of 20192884 of 2019 | HaryanaHaryana | Complainant seeks execution of settlement deed. S…Complainant seeks execution of settlement deed. Settlement deed stands fully executed. | ["Execution of sett…["Execution of settlement deed"] | {"appellant_claim": "Seeking execution of settlem…{"appellant_claim": "Seeking execution of settlement deed", "respondent_claim": "Payment due to bank has been made", "final_verdict": "Settlement deed stands fully executed", "in_favor_of_respondent": "no"} | Vishal GargVishal Garg | BPTP LimitedBPTP Limited | Link |
2663 of 20192663 of 2019 | HaryanaHaryana | Complainants sought possession of flat and intere…Complainants sought possession of flat and interest for delay. Authority directed respondent to offer possession by February 2021 and pay interest. | ["Possession of fla…["Possession of flat", "Interest for delay"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of flat and interest for delay.", "respondent_claim": "Respondent denied receipt of full payment and delayed possession.", "final_verdict": "Authority directed respondent to offer possession by February 2021 and pay interest.", "in_favor_of_respondent": "no"} | Sarita DeviSarita Devi | BPTP LimitedBPTP Limited | Link |
Complaint No. 180 o…Complaint No. 180 of 2020 | HaryanaHaryana | The complainants sought possession of a flat and …The complainants sought possession of a flat and compensation for delay. The authority directed the respondent to offer possession by February 2021 and pay interest to the complainants. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid Rs. 24,42,040/- and that the respondent had failed to deliver possession by the agreed date of 08.11.2012. They sought compensation for the delay and interest on the amount paid.", "respondent_claim": "The respondent denied receiving Rs. 24,42,040/- and claimed that the complainants were liable to pay statutory dues including GST. They offered to deliver possession by February 2021.", "final_verdict": "The authority directed the respondent to offer possession by February 2021 and pay interest to the complainants at the rate of 10.75% per annum from 08.11.2012 to the date of filing of the complaint. The amount of interest payable was calculated as Rs. 17,82,934/-.", "in_favor_of_respondent": "no"} | othersothers | BPTP LimitedBPTP Limited | Link |
2810 of 20192810 of 2019 | HaryanaHaryana | Complainant requests for withdrawal of the compla…Complainant requests for withdrawal of the complaint. The request is allowed. Complaint is disposed of as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant r…{"appellant_claim(in detail)": "The complainant requested for withdrawal of the complaint.", "respondent_claim(in detail)": "Not applicable.", "final_verdict(in detail)": "The complaint is disposed of as withdrawn with a liberty to file a fresh complaint if the complainant so desires.", "in_favor_of_respondent": "no"} | Rajbir SinghRajbir Singh | BPTP LimitedBPTP Limited | Link |
Complaint No. 24 of…Complaint No. 24 of 2020 | HaryanaHaryana | Suo-moto complaint for recovery of cost of Rs.10,…Suo-moto complaint for recovery of cost of Rs.10,000/- payable to the Authority. Cost has been duly paid. | ["Recovery of cost"]["Recovery of cost"] | {"appellant_claim": "", "respondent_claim": "", "…{"appellant_claim": "", "respondent_claim": "", "final_verdict": "Case disposed of as cost has been duly paid.", "in_favor_of_respondent": "no"} | BPTP LimitedBPTP Limited | Link | |
1064 of 20191064 of 2019 | HaryanaHaryana | Suo-moto complaint for recovery of costs. Cost pa…Suo-moto complaint for recovery of costs. Cost payable to complainant not paid. Adjourned for payment. | ["Recovery of costs…["Recovery of costs"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Cost of Rs. 20,000/- payable to the Authority has been paid but the cost payable to the complainant has not been paid. Adjourned to 29.10.2020 for paying costs awarded to the complainant.", "in_favor_of_respondent": "no"} | Not providedNot provided | BPTP LimitedBPTP Limited | Link |
2152 of 20192152 of 2019 | HaryanaHaryana | Complainant Harbinder Singh Sandhu withdrew the c…Complainant Harbinder Singh Sandhu withdrew the complaint against M/S BPTP Ltd. due to a settlement deed. | ["Settlement deed"]["Settlement deed"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as withdrawn due to a settlement deed.", "in_favor_of_respondent": "no"} | Harbinder Singh San…Harbinder Singh Sandhu | BPTP LimitedBPTP Limited | Link |
2994 of 20192994 of 2019 | HaryanaHaryana | Complainant seeks refund for unpaid flat in BPTP …Complainant seeks refund for unpaid flat in BPTP project. Authority orders refund with interest for delayed payment. | ["Refund for delaye…["Refund for delayed flat payment"] | {"appellant_claim(in detail)": "Complainant paid …{"appellant_claim(in detail)": "Complainant paid Rs. 9,08,581 for a flat in BPTP's Park Elite project. Despite multiple requests, BPTP did not provide possession of the flat. Complainant seeks refund with 18% interest and compensation for mental harassment and litigation costs.", "respondent_claim(in detail)": "BPTP claims lack of jurisdiction, independent floor ownership, timely payment defaults, disputed sale consideration, and unexecuted agreement. They deny construction delays and offer an alternative unit.", "final_verdict(in detail)": "Authority orders BPTP to refund the complainant's Rs. 9,08,581 with SBI MCLR+2% interest (Rs. 9,15,833), totaling Rs. 18,24,414. The refund must be made within 90 days.", "in_favor_of_respondent": "no"} | Jai VinderJai Vinder | BPTP LimitedBPTP Limited | Link |
309, 302 of 2018309, 302 of 2018 | HaryanaHaryana | Complaints withdrawn by Sandeep Chandhok against …Complaints withdrawn by Sandeep Chandhok against BPTP Ltd. | Withdrawal of compl…Withdrawal of complaint | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaints withdrawn", "in_favor_of_respondent": "no"} | Sandeep ChandhokSandeep Chandhok | BPTP LimitedBPTP Limited | Link |
2608 of 20192608 of 2019 | HaryanaHaryana | Complainants sought possession of flat and delay …Complainants sought possession of flat and delay interest. Authority ordered payment of delay interest and confirmation of calculations. | ["Delay interest", …["Delay interest", "Possession"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of flat and delay interest.", "respondent_claim": "Respondent claimed that complainants were not original allottees and therefore not entitled to delay interest.", "final_verdict": "Authority ordered payment of delay interest and confirmation of calculations.", "in_favor_of_respondent": "no"} | Rajeev RanjanRajeev Ranjan | BPTP LimitedBPTP Limited | Link |
312 of 2018312 of 2018 | HaryanaHaryana | The case was settled between the parties, and the…The case was settled between the parties, and the Authority disposed of the case with a liberty to the complainant to file afresh in case the settlement is not honored. | ["Settlement betwee…["Settlement between parties"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as settled with a liberty to the complainant to file afresh in case the settlement is not honored.", "in_favor_of_respondent": "no"} | Sandeep ChandhokSandeep Chandhok | BPTP LimitedBPTP Limited | Link |
687/2019687/2019 | HaryanaHaryana | The complainant is entitled to delay interest for…The complainant is entitled to delay interest for the period ranging from 26.12.2015 to 27.07.2021 @9.30%. | ["Delay interest", …["Delay interest", "Possession of flat"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the possession of the flat and sought delay interest.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including approval from the authorities.", "final_verdict": "The Authority held that the complainant was entitled to delay interest for the period ranging from 26.12.2015 to 27.07.2021 @9.30%.", "in_favor_of_respondent": "no"} | Prabhat Kumar MishraPrabhat Kumar Mishra | BPTP LimitedBPTP Limited | Link |
2199/20192199/2019 | HaryanaHaryana | The complainants, Mr. Bhupesh Devgun and Mrs. Rit…The complainants, Mr. Bhupesh Devgun and Mrs. Ritu Devgun, filed a complaint against M/s BPTP Ltd for delay in possession and compensation. The Adjudicating Officer awarded compensation to the complainants. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainants claimed del…{"appellant_claim": "The complainants claimed delay in possession and compensation for the same.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including force majeure and compliance of Space Buyer's Agreement.", "final_verdict": "The Adjudicating Officer awarded compensation to the complainants in the amount of \u20b97,70,876.", "in_favor_of_respondent": "no"} | Mrs. Ritu DevgunMrs. Ritu Devgun | BPTP LimitedBPTP Limited | Link |
3067 of 20193067 of 2019 | HaryanaHaryana | Complainant Sudesh Rani Wadhwa filed a complaint …Complainant Sudesh Rani Wadhwa filed a complaint against BPTP Ltd. for delay in possession of a flat. The Haryana Real Estate Regulatory Authority ordered the respondent to pay delay interest and recalculate demands as per guidelines. | ["Delay in possessi…["Delay in possession", "Real Estate"] | {"appellant_claim": "The complainant claimed dela…{"appellant_claim": "The complainant claimed delay in possession of the flat and sought delay interest.", "respondent_claim": "The respondent claimed that the complainant was not entitled to delay interest as she had not accepted the offer of possession.", "final_verdict": "The Authority ordered the respondent to pay delay interest of Rs. 15,82,267/- and recalculate demands as per guidelines.", "in_favor_of_respondent": "no"} | Sudesh Rani WadhwaSudesh Rani Wadhwa | BPTP LimitedBPTP Limited | Link |
1991 of 20191991 of 2019 | HaryanaHaryana | Complainant Sonia filed a complaint against BPTP …Complainant Sonia filed a complaint against BPTP Ltd for delay in possession of a villa. The Haryana Real Estate Regulatory Authority directed the respondent to pay delay interest and provide possession. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the villa and sought delay interest.", "respondent_claim": "The respondent claimed that the delay was due to force majeure and that they were making efforts to hand over possession.", "final_verdict": "The Authority directed the respondent to pay delay interest at the rate of SBI MCLR+2% (9.30%) and provide possession.", "in_favor_of_respondent": "no"} | SoniaSonia | BPTP LimitedBPTP Limited | Link |
1448 of 20181448 of 2018 | HaryanaHaryana | The complainant, Rajesh Jain, filed a complaint a…The complainant, Rajesh Jain, filed a complaint against BPTP Ltd and others regarding various demands and charges. The Haryana Real Estate Regulatory Authority (HAREDA) passed an order dated 16.12.2020 and a subsequent order on 18.08.2021, disposing of the case. | ["Real Estate", "De…["Real Estate", "Demands and Charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had demanded various amounts from him, including basic sales price, external development charges, infrastructure development charges, and others.", "respondent_claim": "The respondent claimed that the demands were as per the agreement between the parties.", "final_verdict": "The HAREDA ordered that the respondent shall only charge a reasonable rate of interest, which is 9% per annum. The Authority also disposed of the case regarding the demands of electrification and STP charges, stamp duty charges, and conveyance deed registration charges.", "in_favor_of_respondent": "no"} | Rajesh JainRajesh Jain | BPTP LimitedBPTP Limited | Link |
Complaint No. 802 o…Complaint No. 802 of 2020 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed off as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed off as withdrawn upon application by the complainant.", "in_favor_of_respondent": "no"} | Ashok Kumar MehtaAshok Kumar Mehta | BPTP LimitedBPTP Limited | Link |
1830 of 20191830 of 2019 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed off as withdrawn. | Complaint withdrawalComplaint withdrawal | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed off as withdrawn", "in_favor_of_respondent": "no"} | Kavita PhogatKavita Phogat | BPTP LimitedBPTP Limited | Link |
576 of 2020576 of 2020 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and other reliefs against respondent for delayed possession. Authority ordered payment of delay interest and possession to be given after occupation certificate. | ["Delayed possessio…["Delayed possession", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and other reliefs against respondent for delayed possession.", "respondent_claim": "Respondent claimed that complainant cannot seek relief qua the agreement that was executed prior to coming into force of the RERA Act, and that delay in possession was due to force majeure events.", "final_verdict": "Authority ordered payment of delay interest and possession to be given after occupation certificate.", "in_favor_of_respondent": "no"} | Parminder Singh Soh…Parminder Singh Sohal | BPTP LimitedBPTP Limited | Link |
1441 of 20201441 of 2020 | HaryanaHaryana | Complaint withdrawn by applicant. Case disposed o…Complaint withdrawn by applicant. Case disposed off as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed off as withdrawn upon application by the complainant.", "in_favor_of_respondent": "no"} | Rajesh KhoslaRajesh Khosla | BPTP LimitedBPTP Limited | Link |
1318 of 20201318 of 2020 | HaryanaHaryana | Complainant seeks delivery of possession with occ…Complainant seeks delivery of possession with occupation certificate, delay interest, and quashing of demands. Authority directs recalculation of demands, payment of delay interest, and delivery of possession. | ["Delay in possessi…["Delay in possession", "Unjustified demands"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleges that the respondent demanded club membership charges and GST, which are not justified. The complainant seeks delivery of possession with occupation certificate, delay interest as per Rule 15, and quashing of the impugned demands.", "respondent_claim(in detail)": "The respondent contests the complaint, arguing that the dispute is referable to an arbitrator. The respondent claims that the construction of the unit is in full swing and possession will be handed over shortly. The respondent justifies the demand of club membership charges and GST.", "final_verdict(in detail)": "The Authority directs the respondent to recalculate the demands as per the guidelines laid down in the case of Madhu Sareen v/s BPTP Ltd. The Authority orders the payment of delay interest at the rate of SBI MCLR+2% (9.30%) from the deemed date of possession (06.01.2015) till the date of the order (08.09.2021). The Authority further orders the delivery of possession and payment of monthly interest of Rs. 24,710/- from 09.10.2021 onwards.", "in_favor_of_respondent": "no"} | Madhuri SalunkeMadhuri Salunke | BPTP LimitedBPTP Limited | Link |
1917 of 20191917 of 2019 | HaryanaHaryana | Complainant sought delay interest for non-deliver…Complainant sought delay interest for non-delivery of possession by respondent. Authority ordered payment of delay interest and monthly interest. | ["Delay interest", …["Delay interest", "Non-delivery of possession"] | {"appellant_claim": "Complainant claimed delay in…{"appellant_claim": "Complainant claimed delay interest for non-delivery of possession by respondent.", "respondent_claim": "Respondent claimed that complainant had made default in payments and possession timelines were subject to force majeure.", "final_verdict": "Authority ordered payment of delay interest and monthly interest to complainant.", "in_favor_of_respondent": "no"} | Chandra Bhushan Tha…Chandra Bhushan Thakur | BPTP LimitedBPTP Limited | Link |
1916 of 20191916 of 2019 | HaryanaHaryana | Complainant sought possession of flat and delay i…Complainant sought possession of flat and delay interest from respondent. Authority ordered respondent to pay delay interest and possess the flat. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant bought an allotment rights of Unit No. B-607 in respondent\u2019s project named Discovery Park, Sector-80, Faridabad from its original allottee Ashok Taneja in the year 2012. Transfer of allotment rights were duly endorsed by the respondent in his favor on 04.03.2014. Builder Buyer Agreement (BBA) was executed between the respondent and the original allottee of the unit on 19.09.2012 and the respondent in terms of the said agreement was obliged to deliver possession latest by 18.03.2016. Respondent had already been paid an amount of Rs.37,30,576/- against the basic sale price of Rs. 29,06,400/-.", "respondent_claim(in detail)": "The respondent contested the complaint by raising preliminary objection against its maintainability averring that the dispute between the parties is liable to be adjudicated by an Arbitrator in terms of BBA. As regards delivery of possession, the plea raised by the respondent is that the possession of the unit will be offered shortly. Complainant had made default in making due payments and the possession time lines were subject to force majeure.", "final_verdict(in detail)": "The Authority held that the complainant is entitled to delay interest from deemed date of possession (18.03.2016) till a valid offer of possession is made after receiving occupation certificate. The Authority ordered the respondent to pay delay interest of Rs. 14,03,501/- and possess the flat. The respondent is liable to pay monthly interest of Rs. 25,464/- to complainant for further delay occurring after the date of this order.", "in_favor_of_respondent": "no"} | Nitya Nand UniyalNitya Nand Uniyal | BPTP LimitedBPTP Limited | Link |
1300 of 20201300 of 2020 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to deliver possession after obtaining Occupation certificate along with delay interest and to revise the final demand. | ["Delay in possessi…["Delay in possession", "Revised demand"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not delivered possession on the deemed date of possession and had also not revised the final demand correctly.", "respondent_claim": "The respondent claimed that the possession timeline was dependent on force majeure clause and timely payment of instalment by the allottees.", "final_verdict": "The Authority ordered the respondent to deliver possession after obtaining Occupation certificate and to revise the final demand correctly. The Authority also calculated the delay interest payable to the complainant.", "in_favor_of_respondent": "no"} | Ashish SharmaAshish Sharma | BPTP LimitedBPTP Limited | Link |
3068 of 20193068 of 2019 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed as settled. | ["Settled case"]["Settled case"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case settled between parties.", "in_favor_of_respondent": "no"} | Suraj Prakash Agarw…Suraj Prakash Agarwal | BPTP LimitedBPTP Limited | Link |
827 of 2019827 of 2019 | HaryanaHaryana | Complainant withdrew the case, and it was dispose…Complainant withdrew the case, and it was disposed of as withdrawn. | ["Withdrawal of cas…["Withdrawal of case"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as withdrawn upon the complainant's application.", "in_favor_of_respondent": "no"} | Mukesh MadanMukesh Madan | BPTP LimitedBPTP Limited | Link |
1437 of 20201437 of 2020 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to deliver possession of unit along with delay interest and quash unjustified demand. Authority awarded delay interest and quashed invalid offer of possession. | ["Delay in possessi…["Delay in possession", "Invalid offer of possession"] | {"appellant_claim": "Complainant claimed that he …{"appellant_claim": "Complainant claimed that he did not accept offer of possession due to unjustified demands, non-adjustment of interest payable to complainant on account of delay in handing over of possession in the absence of occupation certificate.", "respondent_claim": "Respondent denied all allegations made by complainant and stated that complainant had filed the complaint completely ignoring clause 33 of the agreement which provides that dispute involved therein was supposed to be referred to an arbitrator.", "final_verdict": "Authority awarded delay interest and quashed invalid offer of possession.", "in_favor_of_respondent": "no"} | Lalit Kumar SainiLalit Kumar Saini | BPTP LimitedBPTP Limited | Link |
1063 of 20211063 of 2021 | HaryanaHaryana | Complainant Anita Rani Gera filed a complaint aga…Complainant Anita Rani Gera filed a complaint against BPTP Ltd for terminating her plot allotment without justification. The Haryana Real Estate Regulatory Authority quashed the cancellation letter and directed the respondent to execute the builder-buyer agreement. | ["Termination of pl…["Termination of plot allotment", "Non-execution of builder-buyer agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that her plot allotment was terminated without justification and that the respondent had not executed the builder-buyer agreement despite receiving payment.", "respondent_claim": "The respondent claimed that the plot allotment was terminated due to force majeure conditions beyond their control.", "final_verdict": "The Authority quashed the cancellation letter and directed the respondent to execute the builder-buyer agreement in the prescribed format.", "in_favor_of_respondent": "no"} | Anita Rani GeraAnita Rani Gera | BPTP LimitedBPTP Limited | Link |
1060 of 20211060 of 2021 | HaryanaHaryana | Complainant booked a plot in respondent's project…Complainant booked a plot in respondent's project but respondent demanded additional amount without executing Builder-Buyer Agreement. Complainant's allotment was terminated illegally. | ["Illegal terminati…["Illegal termination of allotment", "Non-execution of Builder-Buyer Agreement"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent demanded additional amount without executing Builder-Buyer Agreement, which led to illegal termination of allotment.", "respondent_claim": "Not provided", "final_verdict": "Termination letter dated 22.2.2021 is hereby quashed. Respondents are directed to execute BBA with the complainant within a period of 45 days and provide all requisite documents to enable the complainant to avail of loan from HDFC.", "in_favor_of_respondent": "no"} | Romi TyagiRomi Tyagi | BPTP LimitedBPTP Limited | Link |
1302 of 20191302 of 2019 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment along with interest for delay. Authority directed respondent to offer alternative plots and pay delay interest. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant sought relief of…{"appellant_claim": "Complainant sought relief of possession of booked apartment along with interest for delay.", "respondent_claim": "Respondent claimed that possession was not possible due to various reasons, including a stay by the Hon'ble High Court.", "final_verdict": "Authority directed respondent to offer alternative plots and pay delay interest.", "in_favor_of_respondent": "no"} | Vijay WadhwaVijay Wadhwa | BPTP LimitedBPTP Limited | Link |
1003 of 20201003 of 2020 | HaryanaHaryana | Complainant sought possession of unit and delay c…Complainant sought possession of unit and delay compensation. Authority granted delay interest for period before keys were offered. | ["Possession delay"…["Possession delay", "Compensation"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of unit and delay compensation for not receiving possession despite conveyance deed execution.", "respondent_claim": "Respondent claimed complainant had accepted possession and compensation, and execution of conveyance deed ended contractual obligations.", "final_verdict": "Authority granted delay interest for period before keys were offered, and denied refund of club charges not mentioned in BBA.", "in_favor_of_respondent": "no"} | Yogita SharmaYogita Sharma | BPTP LimitedBPTP Limited | Link |
674 of 2020674 of 2020 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment and payment of admissible delay interest. Authority ordered respondent to pay upfront delay interest and monthly interest till the date of actual handing over of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant sought relie…{"appellant_claim": "The complainant sought relief of possession of the booked apartment and payment of admissible delay interest.", "respondent_claim": "The respondent argued that the Authority did not have jurisdiction to deal with the complaint, that the provisions of RERA Act did not apply to agreements executed prior to its coming into force, and that the delay in possession was due to various reasons including defaults by previous allottees.", "final_verdict": "The Authority ordered the respondent to pay upfront delay interest of Rs. 20,30,747/- and monthly interest of Rs. 19,535/- till the date of actual handing over of possession.", "in_favor_of_respondent": "no"} | Sugan Singh Dhanwan…Sugan Singh Dhanwantri | BPTP LimitedBPTP Limited | Link |
1137 of 20201137 of 2020 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment, interest for delay, and refund of excess charges. Authority directed refund of certain charges and payment of delay interest. | ["Refund of excess …["Refund of excess charges", "Delay interest"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of excess charges, interest for delay in possession, and execution of conveyance deed.", "respondent_claim": "Respondent claimed that complainant had accepted certain charges and had not proved that the unit was not complete.", "final_verdict": "Authority directed refund of certain charges, payment of delay interest, and execution of conveyance deed.", "in_favor_of_respondent": "no"} | Veena Rani JainVeena Rani Jain | BPTP LimitedBPTP Limited | Link |
866 of 2021866 of 2021 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment along with interest for delay in offering possession and quashing of illegal demand of GST. Authority ordered respondent to pay delay interest and monthly interest until possession is handed over. | ["Delay in possessi…["Delay in possession", "GST demand"] | {"appellant_claim": "Complainant sought relief of…{"appellant_claim": "Complainant sought relief of possession of booked apartment along with interest for delay in offering possession and quashing of illegal demand of GST.", "respondent_claim": "Respondent claimed that possession was delayed due to force majeure conditions and that GST was payable as per agreement.", "final_verdict": "Authority ordered respondent to pay delay interest and monthly interest until possession is handed over.", "in_favor_of_respondent": "no"} | RashmiRashmi | BPTP LimitedBPTP Limited | Link |
532 of 2018532 of 2018 | HaryanaHaryana | The complainant, Jitender Kumar, filed a complain…The complainant, Jitender Kumar, filed a complaint against M/s BPTP Ltd for delay in possession of a residential floor. The authority awarded compensation of Rs. 5,25,000 to the complainant. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the residential floor and sought compensation for the same.", "respondent_claim": "The respondent claimed that the delay was due to force majeure reasons and that the complainant had not paid the outstanding dues on time.", "final_verdict": "The authority awarded compensation of Rs. 5,25,000 to the complainant.", "in_favor_of_respondent": "no"} | Jitender KumarJitender Kumar | BPTP LimitedBPTP Limited | Link |
542 of 2021542 of 2021 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment along with interest for delay in offering possession. Authority ordered respondent to pay delay interest and monthly interest until possession is handed over. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant claimed delay in…{"appellant_claim": "Complainant claimed delay in possession of apartment and sought interest for the same.", "respondent_claim": "Respondent claimed delay in possession was due to force majeure conditions and lack of registration for plot area below 500 sq. meters.", "final_verdict": "Authority ordered respondent to pay delay interest and monthly interest until possession is handed over.", "in_favor_of_respondent": "no"} | Ashok SuriAshok Suri | BPTP LimitedBPTP Limited | Link |
236 of 2021236 of 2021 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to pay delay interest and quash additional demands. Authority decided on quantum of delay interest, PLC, increase in super area, and change in material of kitchen. | ["Delay interest", …["Delay interest", "PLC", "Increase in super area", "Change in material of kitchen"] | {"appellant_claim": "Complainant sought direction…{"appellant_claim": "Complainant sought direction against respondent to pay delay interest and quash additional demands.", "respondent_claim": "Respondent claimed that increase in super area was within prescribed limits and change in material of kitchen was as per agreement.", "final_verdict": "Authority decided on quantum of delay interest, PLC, increase in super area, and change in material of kitchen.", "in_favor_of_respondent": "no"} | Subhash Chander Mal…Subhash Chander Malik | BPTP LimitedBPTP Limited | Link |
520 of 2020520 of 2020 | HaryanaHaryana | Complainant Mithun Agarwal withdrew his complaint…Complainant Mithun Agarwal withdrew his complaint against M/S BPTP Ltd. on 11.02.2022. The case was disposed of as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed an application to withdraw his complaint.", "respondent_claim(in detail)": "The respondent did not make any claim.", "final_verdict(in detail)": "The case was disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Mithun AgarwalMithun Agarwal | BPTP LimitedBPTP Limited | Link |
979 of 2018979 of 2018 | HaryanaHaryana | Complainant sought refund for unpaid flat in BPTP…Complainant sought refund for unpaid flat in BPTP project. Authority ordered refund with interest due to project delay. | ["Refund for delaye…["Refund for delayed project", "Breach of contract"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for unpaid flat in BPTP project due to delay.", "respondent_claim": "Respondent claimed that agreement was executed before RERA came into effect and thus not regulated by RERA.", "final_verdict": "Authority ordered refund with interest due to project delay.", "in_favor_of_respondent": "no"} | Krishan SwaroopKrishan Swaroop | BPTP LimitedBPTP Limited | Link |
632 of 2018632 of 2018 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed an application to withdraw his complaint.", "respondent_claim(in detail)": "Not applicable as the complainant withdrew his complaint.", "final_verdict(in detail)": "The case was disposed as withdrawn relying on the complainant's application.", "in_favor_of_respondent": "no"} | Inderjeet MadanInderjeet Madan | BPTP LimitedBPTP Limited | Link |
82/201882/2018 | HaryanaHaryana | Complaint for refund sought by Ram Prakash Sharma…Complaint for refund sought by Ram Prakash Sharma and Ambika Sharma against BPTP Ltd. The Authority revived its original order dated 18.12.2018. | ["Refund", "Jurisdi…["Refund", "Jurisdiction"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants sought relief of refund from BPTP Ltd.", "respondent_claim(in detail)": "BPTP Ltd. denied the refund and instead offered possession of the project.", "final_verdict(in detail)": "The Authority revived its original order dated 18.12.2018, which granted possession of the project to the complainants.", "in_favor_of_respondent": "no"} | Ambika SharmaAmbika Sharma | BPTP LimitedBPTP Limited | Link |
530 of 2018530 of 2018 | HaryanaHaryana | Complainant sought compensation for delay in poss…Complainant sought compensation for delay in possession of a flat and unfair trade practices. Partially allowed, respondent to pay Rs. 5,25,000. | ["Delay in possessi…["Delay in possession", "Unfair trade practices"] | {"appellant_claim": "Delay in possession of flat …{"appellant_claim": "Delay in possession of flat and unfair trade practices", "respondent_claim": "Delay in possession due to force majeure and timely payment of instalments", "final_verdict": "Partially allowed, respondent to pay Rs. 5,25,000", "in_favor_of_respondent": "no"} | Surender SinghSurender Singh | BPTP LimitedBPTP Limited | Link |
589/2019589/2019 | HaryanaHaryana | Complaint settled between parties, complaint with…Complaint settled between parties, complaint withdrawn. | ["Settlement", "Wit…["Settlement", "Withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties, complaint withdrawn.", "in_favor_of_respondent": "no"} | Vijay TiwariVijay Tiwari | BPTP LimitedBPTP Limited | Link |
3081 of 20193081 of 2019 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent along with interest. Authority ordered refund of principal amount plus interest. | ["Refund of amount …["Refund of amount paid"] | {"appellant_claim": "Complainant claimed that he …{"appellant_claim": "Complainant claimed that he had paid an amount of Rs. 11,27,269.30 to respondent and sought refund of the same along with interest.", "respondent_claim": "Respondent claimed that the complainant had defaulted in making payments and therefore, the amount could not be refunded.", "final_verdict": "Authority ordered refund of principal amount of Rs. 10,14,542.37 plus interest of Rs. 8,21,254/- to the complainant.", "in_favor_of_respondent": "no"} | Manish GandotraManish Gandotra | BPTP LimitedBPTP Limited | Link |
Complaint No. 2936 …Complaint No. 2936 of 2019 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent for delayed project. Authority ordered refund with interest. | ["Refund for delaye…["Refund for delayed project"] | {"appellant_claim": "Complainant claimed refund o…{"appellant_claim": "Complainant claimed refund of amount paid to respondent for delayed project.", "respondent_claim": "Respondent claimed that project was delayed due to reasons beyond their control.", "final_verdict": "Authority ordered refund of amount paid with interest.", "in_favor_of_respondent": "no"} | Rameshwar GondRameshwar Gond | BPTP LimitedBPTP Limited | Link |
2716/20192716/2019 | HaryanaHaryana | Complainant sought refund for delayed real estate…Complainant sought refund for delayed real estate project. Authority ordered refund with interest. | ["Real estate proje…["Real estate project delay", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed real estate project.", "respondent_claim": "Respondent claimed that the project was not delayed and that the complainant was not entitled to a refund.", "final_verdict": "Authority ordered refund with interest.", "in_favor_of_respondent": "no"} | Anurag JainAnurag Jain | BPTP LimitedBPTP Limited | Link |
2715 of 20192715 of 2019 | HaryanaHaryana | Complainant sought refund for delayed real estate…Complainant sought refund for delayed real estate project. Authority ordered refund with interest. | ["Real estate refun…["Real estate refund", "Delayed project"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in the respondent's project and paid Rs. 37,33,710/- but the project was not completed. The complainant sought refund with interest.", "respondent_claim(in detail)": "The respondent claimed that the project was still under construction and offered an alternative unit. They argued that the agreement was executed before RERA came into effect and therefore not regulated by RERA.", "final_verdict(in detail)": "The Authority ordered the refund of Rs. 37,33,710/- plus interest of Rs. 25,78,159/- to be paid within 90 days. The Authority held that the respondent had breached the contract by not completing the project and not providing a completion date.", "in_favor_of_respondent": "no"} | Sanjeev JainSanjeev Jain | BPTP LimitedBPTP Limited | Link |
2358 of 20192358 of 2019 | HaryanaHaryana | Complainant sought refund for a flat in a stuck p…Complainant sought refund for a flat in a stuck project. Authority granted refund with interest. | ["Stuck Project", "…["Stuck Project", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for a flat in a stuck project.", "respondent_claim": "Respondent claimed that the project was RERA registered and that the agreement was valid.", "final_verdict": "Authority granted refund with interest.", "in_favor_of_respondent": "no"} | Anr.Anr. | BPTP LimitedBPTP Limited | Link |
895/2021895/2021 | HaryanaHaryana | Complainants sought relief of possession of booke…Complainants sought relief of possession of booked apartment, quashing of illegal demands, and payment of admissible delay interest. Authority quashed offer letter, directed fresh offer of possession, and payment of delay interest. | ["Possession of boo…["Possession of booked apartment", "Delay interest"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondents offered possession of the booked apartment without obtaining occupation certificate and demanded additional amount of Rs. 3,88,864/-.", "respondent_claim": "Respondents claimed that possession was offered on 23.11.2019, and additional demand was made for stamp duty charges of Rs. 1,08,000/-.", "final_verdict": "Authority quashed the offer letter dated 23.11.2019, directed respondents to send a fresh offer of possession after receipt of occupation certificate, and payment of delay interest.", "in_favor_of_respondent": "no"} | anotheranother | BPTP LimitedBPTP Limited | Link |
06 of 202006 of 2020 | HaryanaHaryana | Complainant sought refund for a real estate proje…Complainant sought refund for a real estate project that was not completed. Authority ordered refund with interest. | ["Real estate refun…["Real estate refund", "Project completion"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant paid Rs. 42,45,486/- for a flat in the project 'Park Arena' but the project was not completed. The complainant sought refund with interest.", "respondent_claim(in detail)": "The respondent argued that the project was not completed due to various reasons, including force majeure conditions. They offered an alternate unit to the complainant but did not provide a specific time frame for project completion.", "final_verdict(in detail)": "The Authority ordered refund of Rs. 40,65,398.50/- paid by the complainant, along with interest from 13.01.2014 to 04.05.2022, totaling Rs. 31,76,535/-. The respondent was given 90 days to refund the amount.", "in_favor_of_respondent": "no"} | Harsh VermaHarsh Verma | BPTP LimitedBPTP Limited | Link |
2723/20192723/2019 | HaryanaHaryana | Complainant sought refund for delayed real estate…Complainant sought refund for delayed real estate project. Authority ordered refund with interest. | ["Real Estate", "Re…["Real Estate", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed real estate project.", "respondent_claim": "Respondent claimed lack of jurisdiction and argued that project was still under construction.", "final_verdict": "Authority ordered refund with interest.", "in_favor_of_respondent": "no"} | Preeti BhargavaPreeti Bhargava | BPTP LimitedBPTP Limited | Link |
1165 of 20211165 of 2021 | HaryanaHaryana | Complainant sought relief for delay in possession…Complainant sought relief for delay in possession, cost escalation, and various charges. Authority directed respondent to recalculate cost escalation, refund certain charges, and bear incidence of GST. | ["Delay in possessi…["Delay in possession", "Cost escalation", "Various charges"] | {"appellant_claim": "Complainant alleged delay in…{"appellant_claim": "Complainant alleged delay in possession, cost escalation, and various charges without proper justification.", "respondent_claim": "Respondent claimed that delay was due to force majeure conditions and that charges were as per agreement.", "final_verdict": "Authority directed respondent to recalculate cost escalation, refund certain charges, and bear incidence of GST.", "in_favor_of_respondent": "no"} | Umesh Kumar Prabhak…Umesh Kumar Prabhakar | BPTP LimitedBPTP Limited | Link |
1157 of 20201157 of 2020 | HaryanaHaryana | Complainant sought possession of booked plot or a…Complainant sought possession of booked plot or alternate plot and payment of admissible delay interest. Authority ordered respondent to pay delay interest and offer same or alternate plot. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of booked plot or alternate plot and payment of admissible delay interest.", "respondent_claim": "Respondent claimed that the project did not require registration under RERA, and that the agreement executed prior to RERA coming into force was not subject to RERA provisions.", "final_verdict": "Authority ordered respondent to pay delay interest and offer same or alternate plot.", "in_favor_of_respondent": "no"} | Promila AroraPromila Arora | BPTP LimitedBPTP Limited | Link |
1129 of 20211129 of 2021 | HaryanaHaryana | Complainants sought possession of their apartment…Complainants sought possession of their apartment, delay interest, and refund of club membership charges. Authority ordered delay interest payment and possession offer. | ["Delay in possessi…["Delay in possession", "Refund of club membership charges"] | {"appellant_claim": "Complainants claimed delay i…{"appellant_claim": "Complainants claimed delay in possession of their apartment, payment of delay interest, and refund of club membership charges.", "respondent_claim": "Respondents claimed that the agreement was executed before RERA came into effect, complainants had defaulted on payments, and construction was affected by external factors.", "final_verdict": "Authority ordered payment of delay interest and possession offer. Complainants must pay balance consideration when possession is offered.", "in_favor_of_respondent": "no"} | Shabnam JunejaShabnam Juneja | BPTP LimitedBPTP Limited | Link |
1139 of 20201139 of 2020 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent for a flat, with interest. Authority ordered refund of principal amount and interest, with directions to respondent to pay within 90 days. | ["Refund for flat",…["Refund for flat", "Non-delivery of possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that they had paid Rs. 19,53,226/- to the respondent for a flat, but the respondent had not delivered possession of the flat. The complainant sought refund of the amount paid, with interest.", "respondent_claim": "The respondent claimed that the complainant had defaulted in making payments, and that the delay in delivery of possession was due to various reasons, including force majeure.", "final_verdict": "The Authority ordered refund of the principal amount of Rs. 16,48,801/- to the complainant, along with interest of Rs. 14,14,875/-, to be paid by the respondent within 90 days.", "in_favor_of_respondent": "no"} | Sheeba Jacob OomenSheeba Jacob Oomen | BPTP LimitedBPTP Limited | Link |
728 of 2020728 of 2020 | HaryanaHaryana | Complainants sought refund of paid amount with in…Complainants sought refund of paid amount with interest for a real estate project. The authority ordered refund of the amount with interest. | ["Refund of paid am…["Refund of paid amount", "Interest"] | {"appellant_claim": "The complainants sought refu…{"appellant_claim": "The complainants sought refund of the paid amount with interest for a real estate project.", "respondent_claim": "The respondents argued that the authority did not have jurisdiction to deal with the complaint and that the relationship between the builder and buyer was regulated by the agreement previously executed between them.", "final_verdict": "The authority ordered refund of the principal amount of Rs. 27,19,593.66 plus interest amount of Rs. 23,85,104 to the complainant within a period of 90 days.", "in_favor_of_respondent": "no"} | Gunjan TarnejaGunjan Tarneja | BPTP LimitedBPTP Limited | Link |
2774/20192774/2019 | HaryanaHaryana | Complainant sought refund of Rs. 28,01,556.89 pai…Complainant sought refund of Rs. 28,01,556.89 paid to respondent for an undelivered real estate project. Authority ordered refund with interest due to project delay and breach of contract. | ["Real estate proje…["Real estate project delay", "Refund for undelivered project"] | {"appellant_claim": "Refund of Rs. 28,01,556.89 p…{"appellant_claim": "Refund of Rs. 28,01,556.89 paid to respondent for an undelivered real estate project.", "respondent_claim": "Project is ongoing, and possession will be given soon. Offered an alternate unit in another project.", "final_verdict": "Refund of principal amount of Rs. 28,01,556.89 plus interest of Rs. 23,20,151/- to be paid within 90 days.", "in_favor_of_respondent": "no"} | Yogendra AroraYogendra Arora | BPTP LimitedBPTP Limited | Link |
123/2022123/2022 | HaryanaHaryana | Complainants sought relief of possession of booke…Complainants sought relief of possession of booked apartment along with interest for delay. Authority directed respondent to hand over possession and refund excess payment with interest. | ["Possession of apa…["Possession of apartment", "Delay in possession"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants booked an apartment in an under-construction project and paid Rs. 28,15,463.99. They sought relief for delay in possession of the apartment and interest thereon.", "respondent_claim(in detail)": "The respondent argued that possession was delayed due to force majeure conditions and that agreements executed prior to RERA Act, 2016, were not regulated by the Act. They offered to hand over possession or refund the amount with interest.", "final_verdict(in detail)": "The Authority directed the respondent to hand over possession of the apartment and refund the excess payment of Rs. 3,18,468/- and Rs. 25,368/- paid on account of VAT, along with interest.", "in_favor_of_respondent": "no"} | Kanti DeviKanti Devi | BPTP LimitedBPTP Limited | Link |
1178 of 20211178 of 2021 | HaryanaHaryana | Complainants sought relief of possession of booke…Complainants sought relief of possession of booked apartment along with interest for delay in offering possession. Authority directed respondents to pay interest for delay and ordered respondents to hand over possession of the unit. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondents delayed possession of the booked apartment and sought relief of possession along with interest for the delay.", "respondent_claim": "Respondents claimed that the delay was due to force majeure conditions and that the complainants had signed an undertaking not to hold respondents liable for the delay.", "final_verdict": "Authority directed respondents to pay interest for the delay and ordered respondents to hand over possession of the unit.", "in_favor_of_respondent": "no"} | Pranashar MunshiPranashar Munshi | BPTP LimitedBPTP Limited | Link |
1225 of 20211225 of 2021 | HaryanaHaryana | Complainant sought refund of Rs 28,57,319.10/- pa…Complainant sought refund of Rs 28,57,319.10/- paid to respondent for an undelivered housing project. Authority ordered refund with interest due to project delay and breach of contract. | ["Refund for undeli…["Refund for undelivered housing project"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of Rs 28,57,319.10/- paid to the respondent for an undelivered housing project. The complainant argued that the project was not complete and there was no hope of its completion in the near future.", "respondent_claim(in detail)": "The respondent argued that the construction of the project was ongoing and that an offer of possession would be made soon after completion of the project. The respondent also offered an alternate unit in one of their other projects.", "final_verdict(in detail)": "The Authority ordered the refund of the principal amount of Rs. 28,57,319.10/- plus interest amount of Rs. 24,19,324/- to the complainant within a period of 90 days.", "in_favor_of_respondent": "no"} | Rohan MalikRohan Malik | BPTP LimitedBPTP Limited | Link |
826 of 2020826 of 2020 | HaryanaHaryana | Complainant Jai Prakash Jain filed a complaint ag…Complainant Jai Prakash Jain filed a complaint against M/s BPTP Ltd for delay in possession. The Haryana Real Estate Regulatory Authority directed the respondent to offer fresh possession with interest and delay payment. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed dela…{"appellant_claim": "The complainant claimed delay in possession and sought interest payment.", "respondent_claim": "The respondent claimed that the complainant had paid the amount and sought clarification on the interest payment.", "final_verdict": "The Authority directed the respondent to offer fresh possession with interest and delay payment.", "in_favor_of_respondent": "no"} | Jai Prakash JainJai Prakash Jain | BPTP LimitedBPTP Limited | Link |
1446 of 20211446 of 2021 | HaryanaHaryana | Complainants sought relief of possession of booke…Complainants sought relief of possession of booked apartment, quashing of illegal demands, and payment of admissible delay interest. Authority held that offer of possession was valid, and delay interest was awarded. | ["Valid offer of po…["Valid offer of possession", "Delay interest"] | {"appellant_claim": "Complainants sought relief o…{"appellant_claim": "Complainants sought relief of possession of booked apartment, quashing of illegal demands, and payment of admissible delay interest.", "respondent_claim": "Respondent claimed that offer of possession was valid, and delay interest was not payable.", "final_verdict": "Authority held that offer of possession was valid, and delay interest was awarded.", "in_favor_of_respondent": "no"} | AshaAsha | BPTP LimitedBPTP Limited | Link |
1407 of 20201407 of 2020 | HaryanaHaryana | Complainant sought refund for delayed project. Au…Complainant sought refund for delayed project. Authority ordered refund with interest. | ["Delayed Project",…["Delayed Project", "Refund"] | {"appellant_claim": "Refund for delayed project w…{"appellant_claim": "Refund for delayed project with interest", "respondent_claim": "Project is 80% complete, possession will be given later", "final_verdict": "Refund ordered with interest", "in_favor_of_respondent": "no"} | Sanjay Kumar AroraSanjay Kumar Arora | BPTP LimitedBPTP Limited | Link |
206/2022206/2022 | HaryanaHaryana | Complainant seeks possession of booked apartment …Complainant seeks possession of booked apartment and delay interest for cause delay in offering possession. Authority directs payment of delay interest and possession of alternative unit or refund with interest. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant seeks possession of the booked apartment and delay interest for the cause of delay in offering possession.", "respondent_claim(in detail)": "The respondent claims that the possession of the apartment has been delayed due to force majeure conditions and that the provisions of the RERA Act do not apply to the agreement executed prior to its coming into force.", "final_verdict(in detail)": "The Authority directs the payment of delay interest at the rate of SBI MCLR+2% (9.8%) for the period ranging from 27.10.2012 to 19.07.2022, and monthly interest till the date of actual handing over of possession after obtaining occupation certificate.", "in_favor_of_respondent": "no"} | Ramesh AroraRamesh Arora | BPTP LimitedBPTP Limited | Link |
1243/20211243/2021 | HaryanaHaryana | Complainants sought relief of possession of booke…Complainants sought relief of possession of booked apartment, quashing of offer of possession, and payment of delay interest. Authority awarded delay interest of Rs 23,90,563/-. | ["Delay interest", …["Delay interest", "Possession of apartment"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that the respondent had delayed possession of the apartment and sought relief of delay interest, quashing of offer of possession, and payment of illegal demands.", "respondent_claim": "The respondent claimed that the delay in possession was due to force majeure conditions and that the provisions of the RERA Act did not apply to agreements executed prior to its coming into force.", "final_verdict": "The Authority awarded delay interest of Rs 23,90,563/- to the complainants.", "in_favor_of_respondent": "no"} | Amar Nath AroraAmar Nath Arora | BPTP LimitedBPTP Limited | Link |
112/2023112/2023 | HaryanaHaryana | Complainants sought refund for an undelivered rea…Complainants sought refund for an undelivered real estate project. Authority ordered refund with interest due to project non-completion and lack of a completion timeline. | ["Real estate refun…["Real estate refund", "Project non-completion"] | {"appellant_claim": "Refund for an undelivered re…{"appellant_claim": "Refund for an undelivered real estate project with interest due to project non-completion and lack of a completion timeline.", "respondent_claim": "Refund not applicable as per agreement terms, project completion delayed due to force majeure, and willing to refund in an amicable manner.", "final_verdict": "Refund ordered with interest due to project non-completion and lack of a completion timeline.", "in_favor_of_respondent": "no"} | Ritu SeksariaRitu Seksaria | BPTP LimitedBPTP Limited | Link |
93/202293/2022 | HaryanaHaryana | Complainant seeks possession of apartment and int…Complainant seeks possession of apartment and interest for delay. Authority orders payment of interest and possession within 90 days. | ["Possession delay"…["Possession delay", "Interest payment"] | {"appellant_claim": "Complainant claims delay in …{"appellant_claim": "Complainant claims delay in possession and seeks interest payment.", "respondent_claim": "Respondent claims delay due to force majeure and offers refund or alternative possession.", "final_verdict": "Authority orders payment of interest and possession within 90 days.", "in_favor_of_respondent": "no"} | Kuldeep Singh ThakurKuldeep Singh Thakur | BPTP LimitedBPTP Limited | Link |
248/2022248/2022 | HaryanaHaryana | Complainant sought possession of apartment and de…Complainant sought possession of apartment and delay interest. Authority directed payment of delay interest and possession. | ["Possession delay"…["Possession delay", "Delay interest"] | {"appellant_claim(in detail)": "Complainant booke…{"appellant_claim(in detail)": "Complainant booked an apartment in 2009 and paid Rs. 20,47,359.61. Possession was not given till date. Complainant sought direction for possession and delay interest.", "respondent_claim(in detail)": "Respondent said possession was delayed due to force majeure. They offered to give an alternative unit or refund with interest. They argued RERA does not apply to pre-RERA agreements.", "final_verdict(in detail)": "Authority directed payment of delay interest at SBI MCLR+2% (10%) from 19.07.2014 to 16.08.2022. Complainant to get Rs. 14,36,082/- in 90 days and monthly interest till possession. Complainant entitled to possession.", "in_favor_of_respondent": "no"} | Ajay Kumar AhujaAjay Kumar Ahuja | BPTP LimitedBPTP Limited | Link |
219/2022, 236/2022,…219/2022, 236/2022, 241/2022, 245/2022, 256/2022 | HaryanaHaryana | Complainants sought possession of their apartment…Complainants sought possession of their apartments and delay interest from BPTP Ltd. Authority ordered payment of delay interest and possession of apartments. | ["Delay interest", …["Delay interest", "Possession of apartments"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of their apartments and delay interest from BPTP Ltd.", "respondent_claim": "BPTP Ltd claimed that possession was delayed due to force majeure conditions and that the agreements were executed prior to the RERA Act.", "final_verdict": "Authority ordered payment of delay interest and possession of apartments.", "in_favor_of_respondent": "no"} | Neeraj KukretiNeeraj Kukreti | BPTP LimitedBPTP Limited | Link |
533 of 2018533 of 2018 | HaryanaHaryana | Complainant sought refund for a flat not delivere…Complainant sought refund for a flat not delivered by BPTP Ltd. Authority ordered refund of the principal amount with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for a flat not delivered by BPTP Ltd.", "respondent_claim": "BPTP Ltd. argued that the agreement was executed before the RERA Act came into force and therefore not subject to its provisions.", "final_verdict": "The Authority ordered refund of the principal amount with interest.", "in_favor_of_respondent": "no"} | Jyoti Nathani ChadhaJyoti Nathani Chadha | BPTP LimitedBPTP Limited | Link |
145/2022145/2022 | HaryanaHaryana | Complainant sought refund for an apartment booked…Complainant sought refund for an apartment booked in respondent's project due to delayed possession. Authority ordered refund of the amount paid with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked an apartment in respondent's project and paid Rs. 31,29,920.05. He alleged that the respondent did not start construction by 2014-15, and the possession was delayed. He sought refund of the amount paid with interest.", "respondent_claim(in detail)": "The respondent argued that the complainant had defaulted in making timely payments and that the delay in possession was due to force majeure events. They claimed that the provisions of RERA do not apply to agreements executed prior to the coming into force of the Act.", "final_verdict(in detail)": "The Authority ordered refund of the amount paid by the complainant with interest. The respondent was directed to refund the principal amount of Rs. 31,29,920.05 plus interest of Rs. 33,57,303 within 90 days.", "in_favor_of_respondent": "no"} | Sanjeev Kumar SharmaSanjeev Kumar Sharma | BPTP LimitedBPTP Limited | Link |
2097/20222097/2022 | HaryanaHaryana | Complaint settled between parties, case withdrawn.Complaint settled between parties, case withdrawn. | ["Settled case"]["Settled case"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case settled between parties, withdrawn.", "in_favor_of_respondent": "no"} | Siddartha BhargavaSiddartha Bhargava | BPTP LimitedBPTP Limited | Link |
2327 of 20222327 of 2022 | HaryanaHaryana | Complainant received payment from respondent, mak…Complainant received payment from respondent, making the execution complaint fully satisfied. | ["Payment received"]["Payment received"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed payment from the respondent for an amount of \u20b95,25,000/-.", "respondent_claim(in detail)": "The respondent claimed that the complainant had received payment for the amount.", "final_verdict(in detail)": "The complainant received payment from the respondent, making the execution complaint fully satisfied.", "in_favor_of_respondent": "no"} | Jitender KumarJitender Kumar | BPTP LimitedBPTP Limited | Link |
2776/20192776/2019 | HaryanaHaryana | Complainants sought refund of paid amount with in…Complainants sought refund of paid amount with interest for delayed delivery of possession. Authority directed refund with interest at the rate of 10.60%. | ["Delayed possessio…["Delayed possession", "Refund with interest"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of paid amount with interest for delayed delivery of possession.", "respondent_claim": "Respondent claimed that the complainants had availed a special credit of Rs.14,86,138/- and allotment of new unit No. E40-36-SF in Park Elite Floors, Faridabad in lieu of surrender of previous unit.", "final_verdict": "Authority directed refund of paid amount with interest at the rate of 10.60%.", "in_favor_of_respondent": "no"} | Mrs. Ritu DevgunMrs. Ritu Devgun | BPTP LimitedBPTP Limited | Link |
Execution No. 2168 …Execution No. 2168 of 2022 | HaryanaHaryana | Dispute settled between parties. Execution compla…Dispute settled between parties. Execution complaint disposed of as settled. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Dispute settled between parties.", "in_favor_of_respondent": "no"} | Ajay PaliwalAjay Paliwal | BPTP LimitedBPTP Limited | Link |
705 af 2021705 af 2021 | HaryanaHaryana | Complainants sought refund for a real estate proj…Complainants sought refund for a real estate project. The authority allowed the refund with interest, but denied a recalculation of interest based on new evidence. | ["Real Estate Refun…["Real Estate Refund"] | {"appellant_claim": "The complainants sought a re…{"appellant_claim": "The complainants sought a refund for the real estate project and claimed to have paid Rs. 1,50,34,853/-.", "respondent_claim": "The respondent claimed that the complainants had paid only Rs. 1,41,14,554/- and that the excess amount was not proven.", "final_verdict": "The authority allowed the refund of Rs. 1,41,14,554/- with interest, but denied the recalculation of interest based on new evidence.", "in_favor_of_respondent": "no"} | Kajal SinghKajal Singh | BPTP LimitedBPTP Limited | Link |
Execution No. 1182 …Execution No. 1182 of 2022 | HaryanaHaryana | Dispute settled between parties, settlement deed …Dispute settled between parties, settlement deed executed. Case disposed as fully satisfied. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed as fully satisfied", "in_favor_of_respondent": "no"} | Chandra Bhushan Tha…Chandra Bhushan Thakur | BPTP LimitedBPTP Limited | Link |
225 of 2022225 of 2022 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and compensation for arbitrary builder-buyer agreement. Authority directed payment of delay interest, but compensation claims were referred to Adjudicating Officer. | ["Delay in possessi…["Delay in possession", "Arbitrary agreement"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and compensation for arbitrary builder-buyer agreement.", "respondent_claim": "Respondent claimed that agreement was executed before RERA came into effect and that delay was due to unforeseen circumstances.", "final_verdict": "Authority directed payment of delay interest, but compensation claims were referred to Adjudicating Officer.", "in_favor_of_respondent": "no"} | Shikha KhuranaShikha Khurana | BPTP LimitedBPTP Limited | Link |
227 of 2022227 of 2022 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and compensation for mental agony and loss of building life. Authority directed payment of delay interest, but compensation claims to be handled by Adjudicating Officer. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and compensation for mental agony and loss of building life.", "respondent_claim": "Respondent claimed that possession delay was due to circumstances beyond control and that the complainant had not objected to the delay until filing the complaint.", "final_verdict": "Authority directed payment of delay interest at 10.70% per annum from the deemed date of possession (12.08.2012) until the date of actual handing over of possession, after obtaining occupation certificate.", "in_favor_of_respondent": "no"} | Sunil Karan AggarwalSunil Karan Aggarwal | BPTP LimitedBPTP Limited | Link |
228 of 2022228 of 2022 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and compensation for arbitrary builder-buyer agreement. Authority directed payment of delay interest, but rejected claims of arbitrariness. | ["Delay in possessi…["Delay in possession", "Arbitrariness of builder-buyer agreement"] | {"appellant_claim": "Complainant alleged that the…{"appellant_claim": "Complainant alleged that the builder-buyer agreement was one-sided and arbitrary, and that the respondent had delayed possession of the flat.", "respondent_claim": "Respondent claimed that the agreement was valid and that the delay in possession was due to circumstances beyond their control.", "final_verdict": "Authority directed payment of delay interest, but rejected claims of arbitrariness.", "in_favor_of_respondent": "no"} | Vikram MattooVikram Mattoo | BPTP LimitedBPTP Limited | Link |
238 of 2022238 of 2022 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and compensation for mental agony and loss of building life. Authority directed payment of delay interest, possession to be handed over, and compensation to be sought from Adjudicating Officer. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and compensation for mental agony and loss of building life.", "respondent_claim": "Respondent claimed that possession was delayed due to various reasons, including force majeure conditions.", "final_verdict": "Authority directed payment of delay interest, possession to be handed over, and compensation to be sought from Adjudicating Officer.", "in_favor_of_respondent": "no"} | Sandeep Ratn SemwalSandeep Ratn Semwal | BPTP LimitedBPTP Limited | Link |
3044 of 20223044 of 2022 | HaryanaHaryana | Complainant sought delay interest and possession …Complainant sought delay interest and possession of flat. Authority ordered delay interest payment and possession after occupation certificate. | ["Delay interest", …["Delay interest", "Possession of flat"] | {"appellant_claim": "Complainant sought delay int…{"appellant_claim": "Complainant sought delay interest and possession of flat.", "respondent_claim": "Respondent claimed that complainant had agreed to extend the date of possession and that the delay was due to force majeure circumstances.", "final_verdict": "Authority ordered delay interest payment and possession after occupation certificate.", "in_favor_of_respondent": "no"} | Vimmi SuriVimmi Suri | BPTP LimitedBPTP Limited | Link |
Execution No. 1477 …Execution No. 1477 of 2021 | HaryanaHaryana | Dispute settled between parties. Case disposed as…Dispute settled between parties. Case disposed as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Dispute settled between parties.", "in_favor_of_respondent": "no"} | Anr.Anr. | BPTP LimitedBPTP Limited | Link |
222/2022222/2022 | HaryanaHaryana | Complaint settled amicably between parties. Case …Complaint settled amicably between parties. Case disposed as settled. | ["Settled dispute"]["Settled dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed as settled due to amicable settlement between parties.", "in_favor_of_respondent": "no"} | Deepak YadavDeepak Yadav | BPTP LimitedBPTP Limited | Link |
862 of 2022862 of 2022 | HaryanaHaryana | Complaint settled between parties. Complainant to…Complaint settled between parties. Complainant to initiate fresh proceedings if settlement is defied. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint settled between parties", "in_favor_of_respondent": "no"} | Brijesh KumarBrijesh Kumar | BPTP LimitedBPTP Limited | Link |
11307 of 202211307 of 2022 | HaryanaHaryana | Complainants sought refund of amount paid to resp…Complainants sought refund of amount paid to respondent for undelivered possession of flat. Authority directed refund with interest. | ["Refund for undeli…["Refund for undelivered possession"] | {"appellant_claim": "Complainants sought refund o…{"appellant_claim": "Complainants sought refund of amount paid to respondent for undelivered possession of flat.", "respondent_claim": "Respondent claimed that construction was delayed due to various reasons and offered refund with interest.", "final_verdict": "Authority directed refund of amount paid with interest at the rate of SBI MCLR + 2%.", "in_favor_of_respondent": "no"} | Sanjana ChatrathSanjana Chatrath | BPTP LimitedBPTP Limited | Link |
495 of 2021495 of 2021 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed of with liberty to complainant to initiate fresh proceedings in case of default. | ["Settled complaint…["Settled complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint settled between parties", "in_favor_of_respondent": "no"} | Mandip SinghMandip Singh | BPTP LimitedBPTP Limited | Link |
231 of 2020231 of 2020 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed of as settled", "in_favor_of_respondent": "no"} | Vinod Kumar SharmaVinod Kumar Sharma | BPTP LimitedBPTP Limited | Link |
338 of 2019338 of 2019 | HaryanaHaryana | Complaint settled between parties. Settlement dee…Complaint settled between parties. Settlement deed signed. | ["Settlement of dis…["Settlement of dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties. Settlement deed signed.", "in_favor_of_respondent": "no"} | Hira Lal JorwalHira Lal Jorwal | BPTP LimitedBPTP Limited | Link |
2191 of 20222191 of 2022 | HaryanaHaryana | Complainant seeks compensation for delay in posse…Complainant seeks compensation for delay in possession of flat by respondent. Authority directs respondent to pay delay interest at 10.75% per annum. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "Complainant claims delay in …{"appellant_claim": "Complainant claims delay in possession of flat by respondent and seeks compensation.", "respondent_claim": "Respondent claims that delay was due to circumstances beyond their control.", "final_verdict": "Authority directs respondent to pay delay interest at 10.75% per annum.", "in_favor_of_respondent": "no"} | Deepak Kumar TyagiDeepak Kumar Tyagi | BPTP LimitedBPTP Limited | Link |
717 of 2021717 of 2021 | HaryanaHaryana | The complaint was settled amicably between the pa…The complaint was settled amicably between the parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was disposed of as settled.", "in_favor_of_respondent": "no"} | Mr. Dinesh GuptaMr. Dinesh Gupta | BPTP LimitedBPTP Limited | Link |
Execution No. 1227 …Execution No. 1227 of 2021 | HaryanaHaryana | The case was fixed for settlement, and both parti…The case was fixed for settlement, and both parties agreed to a settlement. The execution complaint is disposed of as fully satisfied. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint is disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Ajay KumarAjay Kumar | BPTP LimitedBPTP Limited | Link |
2820 of 20222820 of 2022 | HaryanaHaryana | Complaint settled between parties. Costs imposed …Complaint settled between parties. Costs imposed on respondents. | ["Settled complaint…["Settled complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint settled between parties.", "in_favor_of_respondent": "no"} | Dharmender AroraDharmender Arora | BPTP LimitedBPTP Limited | Link |
835 of 2022835 of 2022 | HaryanaHaryana | Complainants sought possession of a unit in a pro…Complainants sought possession of a unit in a project developed by the respondent, but the respondent failed to deliver possession within the stipulated time. The Authority directed the respondent to pay delay interest to the complainants. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver possession of the unit within the stipulated time and sought delay interest.", "respondent_claim": "The respondent claimed that the delay in possession was due to various reasons, including force majeure circumstances.", "final_verdict": "The Authority directed the respondent to pay delay interest to the complainants.", "in_favor_of_respondent": "no"} | Seema BhatiaSeema Bhatia | BPTP LimitedBPTP Limited | Link |
612 of 2022612 of 2022 | HaryanaHaryana | Complaint dismissed as withdrawn. Complainants re…Complaint dismissed as withdrawn. Complainants returned cheques and withdrew complaint. | ["Withdrawn complai…["Withdrawn complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed as withdrawn", "in_favor_of_respondent": "no"} | Sonia HasijaSonia Hasija | BPTP LimitedBPTP Limited | Link |
Execution No. 2260 …Execution No. 2260 of 2022 | HaryanaHaryana | Dispute settled between parties. Execution compla…Dispute settled between parties. Execution complaint disposed of as fully satisfied. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Dispute settled between parties. Execution complaint disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Sanjay Kumar AroraSanjay Kumar Arora | BPTP LimitedBPTP Limited | Link |
Execution No. 2176 …Execution No. 2176 of 2022 | HaryanaHaryana | The case was disposed as a conveyance deed has be…The case was disposed as a conveyance deed has been executed in favor of the decree holder. The execution complaint stands fully satisfied. | ["Conveyance Deed"]["Conveyance Deed"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed as a conveyance deed has been executed in favor of the decree holder.", "in_favor_of_respondent": "no"} | Rajesh Kumar GuptaRajesh Kumar Gupta | BPTP LimitedBPTP Limited | Link |
Execution No. 861 o…Execution No. 861 of 2022 | HaryanaHaryana | Decree holder withdrew case as conveyance deed wa…Decree holder withdrew case as conveyance deed was executed. Case disposed as fully satisfied. | ["Withdrawal of cas…["Withdrawal of case"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed as fully satisfied as decree holder withdrew case after conveyance deed was executed.", "in_favor_of_respondent": "no"} | Jolly SaxenaJolly Saxena | BPTP LimitedBPTP Limited | Link |
Execution No. 1627 …Execution No. 1627 of 2023 | HaryanaHaryana | The complaint was withdrawn by the decree holder'…The complaint was withdrawn by the decree holder's advocate, Sh. Vijay Kumar Sheoran, as it was filed by mistake. The original complaint was disposed of on 01.09.2021. | ["Withdrawn complai…["Withdrawn complaint"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the decree holder had filed the complaint by mistake.", "respondent_claim": "The respondent did not make any claim.", "final_verdict": "The complaint was withdrawn as it was filed by mistake.", "in_favor_of_respondent": "no"} | Ajay KumarAjay Kumar | BPTP LimitedBPTP Limited | Link |
Execution No. 161 o…Execution No. 161 of 2022 | HaryanaHaryana | The case was fixed for taking possession by decre…The case was fixed for taking possession by decree holders, but the dispute has been settled between the parties and the case is disposed of as fully satisfied. | ["Settlement", "Dis…["Settlement", "Dispute Resolution"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case is disposed of as fully satisfied due to settlement between the parties.", "in_favor_of_respondent": "no"} | Lalit Kumar SainiLalit Kumar Saini | BPTP LimitedBPTP Limited | Link |
Execution No. 1467 …Execution No. 1467 of 2022 | HaryanaHaryana | The case was fixed for taking possession by decre…The case was fixed for taking possession by decree holders, but the dispute has been settled between the parties and the case has been disposed of as fully satisfied. | ["Settlement", "Dis…["Settlement", "Dispute Resolution"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case has been disposed of as fully satisfied due to settlement between the parties.", "in_favor_of_respondent": "no"} | Neha GeraNeha Gera | BPTP LimitedBPTP Limited | Link |
Execution No. 1438 …Execution No. 1438 of 2020 | HaryanaHaryana | Dispute settled between parties. Execution compla…Dispute settled between parties. Execution complaint disposed of as fully satisfied. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Dispute settled between parties. Execution complaint disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Jaishree GeraJaishree Gera | BPTP LimitedBPTP Limited | Link |
636/2021636/2021 | HaryanaHaryana | Complaint settled between parties through a settl…Complaint settled between parties through a settlement deed. Case disposed as settled. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed as settled based on a settlement deed executed between the parties.", "in_favor_of_respondent": "no"} | Pankaj GuptaPankaj Gupta | BPTP LimitedBPTP Limited | Link |
Execution No. 2616 …Execution No. 2616 of 2022 | HaryanaHaryana | The decree holder, Ashok Suri, wanted to take pos…The decree holder, Ashok Suri, wanted to take possession of a property from BPTP Ltd, but the case was withdrawn as the dispute between the parties was settled. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "The decree holder…{"appellant_claim(in detail)": "The decree holder, Ashok Suri, claimed that the dispute between the parties had been settled and he wanted to withdraw the execution complaint as fully satisfied.", "respondent_claim(in detail)": "The respondent, BPTP Ltd, did not make any claims in this case.", "final_verdict(in detail)": "The execution complaint was disposed of as fully satisfied based on the statement made by the learned counsel for the decree holder.", "in_favor_of_respondent": "no"} | Ashok SuriAshok Suri | BPTP LimitedBPTP Limited | Link |
Appeal No.1393 of 2…Appeal No.1393 of 2019 | HaryanaHaryana | The appellant's complaint was dismissed for non-p…The appellant's complaint was dismissed for non-prosecution, but the appeal was allowed, and the complaint was restored to its original number. | ["Real Estate", "Co…["Real Estate", "Complaint Dismissal"] | {"appellant_claim": "The appellant's complaint wa…{"appellant_claim": "The appellant's complaint was dismissed for non-prosecution, and they claimed that their rights were involved and required a decision on merits.", "respondent_claim": "The respondent claimed that the appellant had the liberty to file a fresh complaint and that there was no need for restoration of the complaint.", "final_verdict": "The appeal was allowed, and the complaint was restored to its original number.", "in_favor_of_respondent": "no"} | Awnindra Dutt TiwariAwnindra Dutt Tiwari | BPTP LimitedBPTP Limited | Link |
Appeal No. 22 of 20…Appeal No. 22 of 2018 | HaryanaHaryana | The appellant withdrew their appeal, and the part…The appellant withdrew their appeal, and the parties had amicably settled the dispute. | ["Withdrawal of app…["Withdrawal of appeal", "Settlement of dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "no"} | SunnySunny | BPTP LimitedBPTP Limited | Link |
Application No.23 o…Application No.23 of 2021 | HaryanaHaryana | The appeal was dismissed as withdrawn due to a co…The appeal was dismissed as withdrawn due to a compromise between the parties. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the matter had been compromised between the parties and there was no surviving grievance against the respondent.", "respondent_claim": "The respondent did not make any claims.", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "no"} | Nikhil MalhotraNikhil Malhotra | BPTP LimitedBPTP Limited | Link |
Appeal No.84 of 2021Appeal No.84 of 2021 | HaryanaHaryana | The appeal has been disposed of as infructuous si…The appeal has been disposed of as infructuous since the execution petition has proceeded further. The appeal was filed against the order adjourning the execution petition sine die. | ["Infructuous appea…["Infructuous appeal"] | {"appellant_claim": "The appeal was filed against…{"appellant_claim": "The appeal was filed against the order adjourning the execution petition sine die.", "respondent_claim": "Not provided", "final_verdict": "The appeal is disposed of as infructuous since the execution petition has proceeded further.", "in_favor_of_respondent": "no"} | Anr.Anr. | BPTP LimitedBPTP Limited | Link |
619 of 2021619 of 2021 | HaryanaHaryana | The appellant sought delay possession interest on…The appellant sought delay possession interest on the total amount paid by him to the respondent-promoter. The respondent-promoter deducted the amount of External Development Charges (EDC) from the total amount paid by the appellant-allottee for calculating the delay possession interest. | ["Delay possession …["Delay possession interest", "External Development Charges"] | {"appellant_claim": "The appellant sought delay p…{"appellant_claim": "The appellant sought delay possession interest on the total amount paid by him to the respondent-promoter.", "respondent_claim": "The respondent-promoter deducted the amount of External Development Charges (EDC) from the total amount paid by the appellant-allottee for calculating the delay possession interest.", "final_verdict": "The appeal filed by the appellant is allowed and the impugned order of the Ld. authority to the aforesaid account is set aside to that extent only.", "in_favor_of_respondent": "no"} | Parminder Singh Soh…Parminder Singh Sohal | BPTP LimitedBPTP Limited | Link |
1449/20181449/2018 | HaryanaHaryana | Complaint withdrawn by complainant, case dismisse…Complaint withdrawn by complainant, case dismissed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case dismissed as withdrawn", "in_favor_of_respondent": "no"} | Karanvir RajputKaranvir Rajput | BPP LimitedBPP Limited | Link |
1879 of 20191879 of 2019 | HaryanaHaryana | The complainants filed a complaint against the re…The complainants filed a complaint against the respondents for not handing over possession of the flat within the stipulated period. The authority held that the respondents were liable to pay interest to the complainants for the delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents did not hand over possession of the flat within the stipulated period and sought interest payment for the delay.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including the NGT order and the COVID-19 pandemic.", "final_verdict": "The authority held that the respondents were liable to pay interest to the complainants for the delay.", "in_favor_of_respondent": "no"} | Mrs. Meenakshi Kamp…Mrs. Meenakshi Kampani | BPTP LimitedBPTP Limited | Link |
4799 of 20214799 of 2021 | HaryanaHaryana | The complainant, Ravi Kumar Rao, filed a complain…The complainant, Ravi Kumar Rao, filed a complaint against M/s BPTP Limited and M/s Countrywide Limited for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. The authority passed directions to ensure compliance of obligations cast upon the promoter. | ["Real Estate", "Po…["Real Estate", "Possession Delay"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that despite paying more than 90% of the actual amount, the respondent failed to deliver the possession of the flat as per specifications and amenities shown in the brochure and flat buyer agreement.", "respondent_claim": "The respondent claimed that the occupation certificate was obtained on 14.02.2020 and the offer of possession was made on 13.03.2020.", "final_verdict": "The authority passed directions to ensure compliance of obligations cast upon the promoter, including payment of interest at the prescribed rate of 10.70% per annum for every month of delay in possession.", "in_favor_of_respondent": "no"} | Ravi Kumar RaoRavi Kumar Rao | BPTP LimitedBPTP Limited | Link |
4404 of 20194404 of 2019 | HaryanaHaryana | The complainant sought delay possession charges a…The complainant sought delay possession charges and interest at the prescribed rate for not receiving possession of the apartment within the stipulated time. The authority directed the respondents to pay interest at the prescribed rate for every month of delay from the due date of possession till the handing over of possession. | ["Delay in possessi…["Delay in possession", "Interest at prescribed rate"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents failed to deliver possession of the apartment within the stipulated time and sought delay possession charges and interest at the prescribed rate.", "respondent_claim": "The respondents claimed that the complainant made several defaults in making timely payments and that the delay in possession was due to the complainant's fault.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate for every month of delay from the due date of possession till the handing over of possession.", "in_favor_of_respondent": "no"} | Narinder Singh Malh…Narinder Singh Malhan | BPTP LimitedBPTP Limited | Link |
4694 of 20214694 of 2021 | HaryanaHaryana | The complainant sought delay possession charges a…The complainant sought delay possession charges and interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till offer of possession after obtaining occupation certificate plus two months or handing over of possession whichever is earlier. | ["Delay in possessi…["Delay in possession", "Interest at prescribed rate"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents failed to hand over possession of the flat within the stipulated period and sought delay possession charges and interest at the prescribed rate.", "respondent_claim": "The respondents claimed that the complainant had defaulted in making timely payments and that the delay in possession was due to various reasons including force majeure circumstances.", "final_verdict": "The authority directed the respondents to pay interest at the prescribed rate of 9.30% p.a. for every month of delay from the due date of possession till offer of possession after obtaining occupation certificate plus two months or handing over of possession whichever is earlier.", "in_favor_of_respondent": "no"} | Tarun WaliaTarun Walia | BPTP LimitedBPTP Limited | Link |
CR/2150/2018CR/2150/2018 | HaryanaHaryana | The complainant booked a plot in the project BPTP…The complainant booked a plot in the project BPTP Amstoria developed by the respondents. The respondents failed to deliver possession by the due date and charged excess development charges. | ["Delay in possessi…["Delay in possession", "Excess development charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents failed to deliver possession by the due date and charged excess development charges.", "respondent_claim": "The respondents claimed that they had delivered possession by the due date and that the development charges were as per the agreement.", "final_verdict": "The authority found that the respondents had failed to deliver possession by the due date and that the development charges were excess. The authority directed the respondents to pay interest at the prescribed rate for the delay and to refund the excess development charges.", "in_favor_of_respondent": "no"} | Vikas ManglaVikas Mangla | BPTP LimitedBPTP Limited | Link |
636/2020636/2020 | HaryanaHaryana | Complainant sought compensation for delay in poss…Complainant sought compensation for delay in possession of a flat by the respondent. The adjudicating officer directed the respondent to pay 50% of the calculated compensation in two installments. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that the respondent failed to deliver possession of the flat within the agreed-upon time frame of 16.12.2012 and sought compensation of \u20b925,86,062/-.", "respondent_claim(in detail)": "The respondent claimed that the complainant had not paid instalments timely and that the delay in possession was not entirely the respondent's fault.", "final_verdict(in detail)": "The adjudicating officer directed the respondent to pay 50% of the calculated compensation of \u20b915,50,570/- in two installments.", "in_favor_of_respondent": "no"} | Madhu NigamMadhu Nigam | B.P.T.P Private Lim…B.P.T.P Private Limited | Link |
15200f201915200f2019 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed respondents to pay delayed possession charges at 9.30% per annum. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and compensation for delay.", "respondent_claim": "Respondents claimed that complainant had defaulted on payments and that possession was given within the agreed-upon time frame.", "final_verdict": "Authority directed respondents to pay delayed possession charges at 9.30% per annum.", "in_favor_of_respondent": "no"} | Educational Media C…Educational Media Centre | BPTP LimitedBPTP Limited | Link |
22170f201822170f2018 | HaryanaHaryana | The complainants sought refund of Rs. 39,64,567/-…The complainants sought refund of Rs. 39,64,567/- with interest for not being given possession of their apartment within the agreed-upon time. The authority directed the respondents to refund the amount with interest at the rate of 9.40% p.a. | ["Refund", "Possess…["Refund", "Possession of Apartment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they were not given possession of their apartment within the agreed-upon time of 36 months and sought refund of the amount paid with interest.", "respondent_claim": "The respondents claimed that the complainants were informed about the progress of the construction and that the delay was due to various reasons.", "final_verdict": "The authority directed the respondents to refund the amount of Rs. 39,64,567/- with interest at the rate of 9.40% p.a. from the date of each payment till the actual date of refund.", "in_favor_of_respondent": "no"} | Mrs. Harleen KaurMrs. Harleen Kaur | BPTP LimitedBPTP Limited | Link |
177 of 2020177 of 2020 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a shop in the Freedom Park Life project, alleging non-compliance of obligations by the promoter. The authority directed the promoter to refund the amount with interest. | ["Non-compliance of…["Non-compliance of obligations", "Refund of amount"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the promoter failed to comply with obligations, including not executing the buyer's agreement and not handing over possession of the shop.", "respondent_claim": "The respondent claimed that the booking and allotment for the unit were done prior to 08.11.2012, and that the project was approved by DTCP in revised building plans in the year 2008.", "final_verdict": "The authority directed the promoter to refund the entire amount of Rs. 32,68,612/- paid by the complainant along with prescribed rate of interest @ 10.60% p.a.", "in_favor_of_respondent": "no"} | Sudha VatsSudha Vats | BPTP LimitedBPTP Limited | Link |
480 of 2019480 of 2019 | HaryanaHaryana | Complainant seeks possession of unit and interest…Complainant seeks possession of unit and interest for delay. Authority awards delay interest and directs respondent to offer possession. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of unit and interest for delay.", "respondent_claim": "Respondent denies liability for delay and argues that complainant is not entitled to delay interest.", "final_verdict": "Authority awards delay interest and directs respondent to offer possession.", "in_favor_of_respondent": "no"} | Rachna JainRachna Jain | BPTP LimitedBPTP Limited | Link |
1181 of 20201181 of 2020 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and quashing of illegal demands. Authority awarded delay interest, quashed illegal demands, and directed respondent to pay amount within 45 days. | ["Delay interest", …["Delay interest", "Illegal demands", "Possession of flat"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and quashing of illegal demands.", "respondent_claim": "Respondent denied allegations, claimed delay was due to force majeure circumstances, and sought to refer dispute to arbitrator.", "final_verdict": "Authority awarded delay interest, quashed illegal demands, and directed respondent to pay amount within 45 days.", "in_favor_of_respondent": "no"} | Pushkar Raj KaushikPushkar Raj Kaushik | Countrywide Promote…Countrywide Promoters | Link |
1180/20201180/2020 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and quashing of illegal demands. Authority awarded delay interest, quashed illegal demands, and directed respondent to pay upfront delay interest. | ["Delay interest", …["Delay interest", "Illegal demands", "Possession of flat"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and quashing of illegal demands.", "respondent_claim": "Respondent denied allegations, claimed delay was due to force majeure circumstances, and sought to collect additional charges.", "final_verdict": "Authority awarded delay interest, quashed illegal demands, and directed respondent to pay upfront delay interest.", "in_favor_of_respondent": "no"} | Jayender Singh RawatJayender Singh Rawat | Countrywide Promote…Countrywide Promoters | Link |
1928 of 20221928 of 2022 | HaryanaHaryana | The complainants sought relief for delayed posses…The complainants sought relief for delayed possession of a flat, excess payment, and various charges imposed by the respondents. The authority directed the respondents to pay interest for delayed possession, refund certain charges, and revise the super area of the flat. | ["Delayed possessio…["Delayed possession", "Excess payment", "Charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid excess amount and were charged various amounts without any justification.", "respondent_claim": "The respondents claimed that the complainants had not paid the correct amount and that the charges were as per the agreement.", "final_verdict": "The authority directed the respondents to pay interest for delayed possession, refund certain charges, and revise the super area of the flat.", "in_favor_of_respondent": "no"} | Nilanjan DuttaNilanjan Dutta | BPTP LimitedBPTP Limited | Link |
617 of 2021617 of 2021 | HaryanaHaryana | Complainant sought relief of possession of booked…Complainant sought relief of possession of booked apartment along with interest for delay. Authority directed respondent to pay delay interest and settle other issues. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant sought relief of…{"appellant_claim": "Complainant sought relief of possession of booked apartment along with interest for delay.", "respondent_claim": "Respondent claimed that possession had been offered in 2018 and complainant was a defaulter.", "final_verdict": "Authority directed respondent to pay delay interest of Rs. 13,31,025/- and settle other issues.", "in_favor_of_respondent": "no"} | Ruma TanwarRuma Tanwar | BPTP Parkland Pride…BPTP Parkland Pride Limited | Link |
233 of 2020233 of 2020 | HaryanaHaryana | Complainant sought refund of paid amount with int…Complainant sought refund of paid amount with interest for delay in possession. Authority directed refund with interest at 10.70%. | ["Refund with inter…["Refund with interest"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of paid amount with interest for delay in possession.", "respondent_claim": "Respondent claimed that complainant had delayed payments and that the agreement was executed prior to the RERA Act coming into force.", "final_verdict": "Authority directed refund of paid amount with interest at 10.70%.", "in_favor_of_respondent": "no"} | BaljeetBaljeet | BPTP Parkland Pride…BPTP Parkland Pride Limited | Link |
546 of 2022546 of 2022 | HaryanaHaryana | Complainant sought relief for delay in possession…Complainant sought relief for delay in possession of flat, non-registration of project, and various other issues. Authority directed payment of delay interest and compliance with other obligations. | ["Delay in possessi…["Delay in possession", "Non-registration of project"] | {"appellant_claim": "Delay in possession of flat,…{"appellant_claim": "Delay in possession of flat, non-registration of project, and various other issues.", "respondent_claim": "Project not registered with RERA, agreement executed prior to RERA Act coming into force, and various other defenses.", "final_verdict": "Authority directed payment of delay interest and compliance with other obligations.", "in_favor_of_respondent": "no"} | Shanta SaxenaShanta Saxena | BPTP Parkland Pride…BPTP Parkland Pride Limited | Link |
908 of 2022908 of 2022 | HaryanaHaryana | Complainant sought possession of flat, delay inte…Complainant sought possession of flat, delay interest, and relief from arbitrary charges. Authority directed payment of delay interest, prohibited arbitrary charges, and ensured conforming to RERA Act and rules. | ["Delay in possessi…["Delay in possession", "Arbitrary charges"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat, delay interest, and relief from arbitrary charges.", "respondent_claim": "Respondent claimed that agreement was executed before RERA Act came into force and that complainant was a defaulter.", "final_verdict": "Authority directed payment of delay interest, prohibited arbitrary charges, and ensured conforming to RERA Act and rules.", "in_favor_of_respondent": "no"} | Virendra Singh Bhad…Virendra Singh Bhadauria | BPTP LimitedBPTP Limited | Link |
2118 of 20222118 of 2022 | HaryanaHaryana | Complainant seeks possession of unit, delay inter…Complainant seeks possession of unit, delay interest, and other relief for delayed possession by respondent. Authority directs respondent to pay delay interest and comply with agreement terms. | ["Delayed possessio…["Delayed possession", "Delay interest"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of unit, delay interest, and other relief for delayed possession by respondent.", "respondent_claim": "Respondent claims delay due to circumstances beyond control, including NGT orders and COVID-19 pandemic.", "final_verdict": "Authority directs respondent to pay delay interest and comply with agreement terms.", "in_favor_of_respondent": "no"} | Vivek GuptaVivek Gupta | BPTP LimitedBPTP Limited | Link |
2844 of 20222844 of 2022 | HaryanaHaryana | Complainant seeks possession of unit and delay in…Complainant seeks possession of unit and delay interest for delay caused in delivery of possession. Authority directs respondent to pay delay interest at the rate of 10.75% from the due date of possession till the date of a valid offer of possession. | ["Delay in delivery…["Delay in delivery of possession", "Delay interest"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of unit and delay interest for delay caused in delivery of possession.", "respondent_claim": "Respondent claims that the delay in delivery of possession was due to unforeseen circumstances beyond their control.", "final_verdict": "Authority directs respondent to pay delay interest at the rate of 10.75% from the due date of possession till the date of a valid offer of possession.", "in_favor_of_respondent": "no"} | Bikash BanerjeeBikash Banerjee | BPTP LimitedBPTP Limited | Link |
2757 of 20222757 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount with in…Complainants sought refund of paid amount with interest due to delay in delivery of possession. Authority directed respondent to refund the amount with interest. | ["Delay in delivery…["Delay in delivery of possession", "Refund of paid amount"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they had paid a total amount of \u20b927,56,820.50 to the respondent, but the respondent failed to deliver possession of the flat within the stipulated time.", "respondent_claim": "The respondent claimed that the delay in delivery of possession was due to various reasons, including NGT orders, COVID-19 pandemic, and delay in payments by customers.", "final_verdict": "The Authority directed the respondent to refund the entire amount of \u20b960,14,044.64 to the complainants and pay further interest beginning from 07.12.2023 till actual realisation of the amount at the rate of 10.75%.", "in_favor_of_respondent": "no"} | Usha SharmaUsha Sharma | BPTP LimitedBPTP Limited | Link |
CR/1 136/2021CR/1 136/2021 | HaryanaHaryana | The parties have settled their dispute amicably a…The parties have settled their dispute amicably and a settlement deed dated 04.07.2023 has been placed on record. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have settled their dispute amicably and a settlement deed dated 04.07.2023 has been placed on record.", "in_favor_of_respondent": "no"} | Rahul ShuklaRahul Shukla | BPTP LIMITEDBPTP LIMITED | Link |
CR/5451/2022CR/5451/2022 | HaryanaHaryana | Amit Balia and Jolly Balia vs BPTP LIMITED. The p…Amit Balia and Jolly Balia vs BPTP LIMITED. The parties have arrived at an amicable settlement and a settlement deed dated 24.05.2023 has been placed on record. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The parties have arrived at an amicable settlement and a settlement deed dated 24.05.2023 has been placed on record.", "in_favor_of_respondent": "no"} | Jolly BaliaJolly Balia | BPTP LIMITEDBPTP LIMITED | Link |
Tcr/181/2023Tcr/181/2023 | HaryanaHaryana | Hemant Thanawala vs BPTP LIMITED. The matter has …Hemant Thanawala vs BPTP LIMITED. The matter has been amicably settled and the settlement deed dated 11.08.2023 has been executed between the parties. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The matter has been disposed off in terms of settlement deed.", "in_favor_of_respondent": "no"} | Hemant ThanawalaHemant Thanawala | BPTP LIMITEDBPTP LIMITED | Link |
2362 of 20192362 of 2019 | HaryanaHaryana | Complainant withdrew their complaint, case dispos…Complainant withdrew their complaint, case disposed as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant applied for withdrawal of their complaint pending before the Authority.", "respondent_claim(in detail)": "Not applicable as the respondent's claim is not mentioned in the order.", "final_verdict(in detail)": "The case was disposed off as withdrawn upon the complainant's application.", "in_favor_of_respondent": "no"} | Subodh SaxenaSubodh Saxena | BP TP LimitedBP TP Limited | Link |
200 of 2018200 of 2018 | HaryanaHaryana | Complaint settled amicably between parties. Case …Complaint settled amicably between parties. Case disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as settled due to an amicable settlement between the parties.", "in_favor_of_respondent": "no"} | Manoj KumarManoj Kumar | B.PT.P Private Limi…B.PT.P Private Limited | Link |
77 of 202177 of 2021 | HaryanaHaryana | Complainant sought direction against respondent t…Complainant sought direction against respondent to deliver possession after obtaining Occupation certificate along with delay interest and for quashing demands which are allegedly not payable to the respondent. | ["Possession", "Del…["Possession", "Delay Interest", "Demands"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not delivered possession on time and had made demands that were not payable.", "respondent_claim": "The respondent claimed that the complainant had not paid the demands on time and that the possession was delivered as per the agreement.", "final_verdict": "The Authority ordered that the respondent should deliver possession after obtaining Occupation certificate and pay delay interest to the complainant.", "in_favor_of_respondent": "no"} | Chandan SinghChandan Singh | BPTP LimitedBPTP Limited | Link |
853 of 2021853 of 2021 | HaryanaHaryana | Complainant sought possession of apartment and de…Complainant sought possession of apartment and delay interest for a project completed by respondent. Authority directed respondent to send a fresh offer of possession and payment of delay interest. | ["Possession of apa…["Possession of apartment", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of apartment and delay interest for a project completed by respondent.", "respondent_claim": "Respondent claimed that the project was complete and that the complainant was not entitled to possession.", "final_verdict": "Authority directed respondent to send a fresh offer of possession and payment of delay interest.", "in_favor_of_respondent": "no"} | Kapil SuriKapil Suri | BPTP LimitedBPTP Limited | Link |
RERA-PKL-Comp.113/2…RERA-PKL-Comp.113/2018 | HaryanaHaryana | The complainant, Madhu Sareen, filed a complaint …The complainant, Madhu Sareen, filed a complaint against M/s BPTP Ltd. for delay in possession of a flat and unfair charges. The Authority held that the respondent is liable to pay compensation at the rate of SBI MCLR + 2% from 06.11.2014 till the actual date of delivery of possession. | ["Delay in possessi…["Delay in possession", "Unfair charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat for more than 4 years and charged unfair amounts.", "respondent_claim": "The respondent claimed that the delay was due to various reasons and the charges were as per the agreement.", "final_verdict": "The Authority held that the respondent is liable to pay compensation at the rate of SBI MCLR + 2% from 06.11.2014 till the actual date of delivery of possession.", "in_favor_of_respondent": "no"} | Madhu SareenMadhu Sareen | BPTP LimitedBPTP Limited | Link |
2969 of 20202969 of 2020 | HaryanaHaryana | The complainants sought relief for delay in posse…The complainants sought relief for delay in possession, unfair practices, and various charges. The authority directed the respondents to refund certain charges, pay interest for delay, and comply with the agreement. | ["Delay in possessi…["Delay in possession", "Unfair practices", "Charges"] | {"appellant_claim": "The complainants claimed del…{"appellant_claim": "The complainants claimed delay in possession, unfair practices, and various charges.", "respondent_claim": "The respondents claimed that the complainants had agreed to the terms and conditions, and the delay was due to various reasons.", "final_verdict": "The authority directed the respondents to refund certain charges, pay interest for delay, and comply with the agreement.", "in_favor_of_respondent": "no"} | Akhilesh SharmaAkhilesh Sharma | CountrywideCountrywide | Link |
1761 of 20221761 of 2022 | HaryanaHaryana | The complainant sought relief for delay in posses…The complainant sought relief for delay in possession of a flat, increase in super area, and various charges. The authority directed the respondents to pay interest for delay, revise the super area, and clarify certain charges. | ["Delay in possessi…["Delay in possession", "Increase in super area", "Charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed possession of the flat, increased the super area without notice, and demanded various charges without justification.", "respondent_claim": "The respondents claimed that the delay was due to force majeure circumstances, the increase in super area was as per agreement, and the charges were as per the flat buyer's agreement.", "final_verdict": "The authority directed the respondents to pay interest for delay, revise the super area, and clarify certain charges.", "in_favor_of_respondent": "no"} | Avinash Kumar LohiaAvinash Kumar Lohia | BPTP LimitedBPTP Limited | Link |
3161 of 20223161 of 2022 | HaryanaHaryana | Complaints were withdrawn by the parties after a …Complaints were withdrawn by the parties after a successful settlement. The complaints are dismissed as withdrawn with liberty to file a fresh complaint if the terms of settlement are not abided by. | ["Settlement", "Wit…["Settlement", "Withdrawal"] | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that they had a dispute with the respondents, BPTP Ltd & anr.", "respondent_claim": "The respondents, BPTP Ltd & anr, claimed that they had a valid defense against the appellants' claims.", "final_verdict": "The complaints were dismissed as withdrawn with liberty to file a fresh complaint if the terms of settlement are not abided by.", "in_favor_of_respondent": "no"} | Abhishek GuptaAbhishek Gupta | BPTP LimitedBPTP Limited | Link |
1433 of 20221433 of 2022 | HaryanaHaryana | The complainants sought refund of the amount paid…The complainants sought refund of the amount paid by them in respect of the subject unit along with interest at the prescribed rate as provided under section 18(1) of the Act. The respondent was directed to refund the paid-up amount after deducting 10% of the sale consideration and shall return the amount with interest at the rate of 10.75%. | ["Refund of amount …["Refund of amount paid", "Interest at prescribed rate"] | {"appellant_claim": "The complainants sought refu…{"appellant_claim": "The complainants sought refund of the amount paid by them in respect of the subject unit along with interest at the prescribed rate as provided under section 18(1) of the Act.", "respondent_claim": "The respondent contested the complaint on the grounds that the complainants approached the respondent out of their own freewill and consent and also after carrying out the necessary due diligence and further after evaluating the commercial viability of the project of the respondent with the other options available in the vicinity.", "final_verdict": "The respondent was directed to refund the paid-up amount after deducting 10% of the sale consideration and shall return the amount with interest at the rate of 10.75%.", "in_favor_of_respondent": "no"} | Ritu SharmaRitu Sharma | BPTP LimitedBPTP Limited | Link |
Yearly Trend for these Cases
The analysis of the cases filed by the builder BPTP Limited, which it lost, reveals a pattern of disputes heavily rooted in regulatory non-compliance and a struggle to manage delays in possession.
One prominent theme identified through these cases is Non-Compliance with Regulatory Provisions. Several cases centered around the builder’s failed adherence to Section 43(5) of the Real Estate (Regulation and Development) Act, where the builder claimed compliance but ultimately could not substantiate these claims, leading to dismissals and withdrawals of their appeals.
Another category of appeals involved Withdrawal of Appeals, where BPTP Limited often chose to withdraw cases, frequently invoking non-compliance due to regulatory mandates, such as Section 43(5). This indicates a strategic retreat rather than a determination to contest the decisions, suggesting a potential lack of confidence in their standing.
Compensation for Delay in Possession has also been a recurring theme, where BPTP Limited faced significant penalties. Many respondents claimed entitlement to compensation for delays in possession, leading to unfavorable verdicts that upheld original decisions granting such compensation.
Furthermore, disputes over Compliance with the Real Estate Act led to dismissals based on the builder’s failure to meet legal obligations, an issue that seems prevalent throughout their cases. This includes disagreements over the calculated delay interest, highlighted by instances where the builder sought re-calculation only to be dismissed due to procedural constraints.
The reasons frequently cited by the builder for litigation included attempts to contest penalties arising from delays or to challenge grievances that they believed were addressed. However, a notable pattern emerged: BPTP Limited often lost their cases due to a lack of sufficient evidence or proof to substantiate their claims of compliance, which paints a troubling picture of their operational transparency.
In conclusion, the analysis of BPTP Limited’s legal battles underscores critical weaknesses in their operational execution, particularly in adhering to regulatory standards and managing client expectations around possession timelines. This indicative pattern of non-compliance and subsequent legal failures should serve as a significant warning for potential buyers considering investments in properties associated with this builder.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
290 of 2021290 of 2021 | HaryanaHaryana | The applicant sought to recall an earlier order d…The applicant sought to recall an earlier order dated 04.03.2021, but the application was dismissed with costs. | ["Recall of order",…["Recall of order", "Delay in execution"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that there was a mis-communication and inadvertent mis-appreciation of events, and sought to recall the earlier order.", "respondent_claim": "The respondent claimed that the applicant was trying to delay the execution of the earlier order, and that there was no ground for recalling the order.", "final_verdict": "The application was dismissed with costs.", "in_favor_of_respondent": "yes"} | B.P.T.P. LimitedB.P.T.P. Limited | Madhu NigamMadhu Nigam | Link |
1696 of 20221696 of 2022 | HaryanaHaryana | Complainant BPTP Ltd seeks review of earlier orde…Complainant BPTP Ltd seeks review of earlier order regarding calculation of delay interest. Authority dismisses prayer for re-calculation. | ["RERA", "Delay Int…["RERA", "Delay Interest"] | {"appellant_claim": "Complainant seeks review of …{"appellant_claim": "Complainant seeks review of earlier order regarding calculation of delay interest.", "respondent_claim": "Respondent argues that re-calculation of delay interest is not allowed as per section 39 of RERA Act.", "final_verdict": "Authority dismisses prayer for re-calculation of delay interest.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Moli GyanMoli Gyan | Link |
Appeal No.355 of 20…Appeal No.355 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellant did not…The appeal was dismissed as the appellant did not comply with the provisions of the Real Estate (Regulation and Development) Act, 2016. The appellant did not deposit the requisite amount despite being given multiple opportunities. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had not complied with the provisions of the Real Estate Act due to various reasons.", "respondent_claim": "The respondent claimed that the appellant had not complied with the provisions of the Real Estate Act and had not deposited the requisite amount.", "final_verdict": "The appeal was dismissed as the appellant did not comply with the provisions of the Real Estate Act.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Hemant Kumar PanditHemant Kumar Pandit | Link |
364 of 2019364 of 2019 | HaryanaHaryana | The appeal was dismissed due to non-compliance wi…The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appellant-promoter had not deposited the required amount and had also not complied with the condition of pre-deposit. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with all the requirements of the Real Estate Act.", "respondent_claim": "The respondent claimed that the appellant had not complied with Section 43(5) of the Act and had not deposited the required amount.", "final_verdict": "The appeal was dismissed due to non-compliance with Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Ankur MehanAnkur Mehan | Link |
Appeal No. 362 of 2…Appeal No. 362 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellant failed …The appeal was dismissed as the appellant failed to comply with the mandatory provisions of the Real Estate (Regulation and Development) Act, 2016. | ["Real Estate", "RE…["Real Estate", "RERA Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the appeal should be entertained.", "respondent_claim": "The respondent claimed that the appellant failed to comply with the mandatory provisions of the Real Estate (Regulation and Development) Act, 2016.", "final_verdict": "The appeal was dismissed.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | M.C. MittalM.C. Mittal | Link |
356 of 2019356 of 2019 | HaryanaHaryana | The appeal was dismissed due to non-compliance wi…The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appellant-promoter had not deposited the required amount and had also not complied with the condition of pre-deposit. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with the provisions of the Real Estate Act.", "respondent_claim": "The respondent claimed that the appellant had not complied with the provisions of the Real Estate Act.", "final_verdict": "The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate Act.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Atul Kumar RohatgiAtul Kumar Rohatgi | Link |
104 of 2020104 of 2020 | HaryanaHaryana | BPTP Ltd.'s appeal was dismissed due to non-compl…BPTP Ltd.'s appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appeal was restored but ultimately dismissed. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appeal was filed by BPTP…{"appellant_claim": "The appeal was filed by BPTP Ltd. against Shelly Saxena.", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Shelly SaxenaShelly Saxena | Link |
323 of 2019323 of 2019 | HaryanaHaryana | The appeal was dismissed due to non-compliance wi…The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appellant-promoter had not deposited the required amount and had not complied with the condition of pre-deposit. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with the provisions of the Real Estate Act.", "respondent_claim": "The respondent claimed that the appellant had not complied with the provisions of the Real Estate Act.", "final_verdict": "The appeal was dismissed due to non-compliance with Section 43(5) of the Real Estate Act.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Anjana Saraf-IIAnjana Saraf-II | Link |
Appeal No.321 of 20…Appeal No.321 of 2019 | HaryanaHaryana | The appellant-promoter, M/s BPTP Ltd., filed an a…The appellant-promoter, M/s BPTP Ltd., filed an appeal against the order of the Haryana Real Estate Regulatory Authority, which had directed the appellant-promoter to pay delayed possession charges to the respondents-allottees. | ["Delayed possessio…["Delayed possession charges"] | {"appellant_claim": "The appellant-promoter claim…{"appellant_claim": "The appellant-promoter claimed that the respondents-allottees were not entitled to delayed possession charges.", "respondent_claim": "The respondents-allottees claimed that they were entitled to delayed possession charges as the appellant-promoter had failed to deliver possession of the flat within the agreed-upon timeframe.", "final_verdict": "The appellate tribunal held that the respondents-allottees were entitled to delayed possession charges and directed the appellant-promoter to pay the same.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Sanjay Singh TangerSanjay Singh Tanger | Link |
150 of 2022150 of 2022 | HaryanaHaryana | The appellant, M/s BPTP Limited, appealed against…The appellant, M/s BPTP Limited, appealed against the order of the Haryana Real Estate Regulatory Authority, which had awarded compensation to the respondents for delay in possession and other issues. The appellate tribunal dismissed the appeal, upholding the original order. | ["Real Estate", "Co…["Real Estate", "Compensation", "Possession Delay"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondents were not entitled to compensation for delay in possession and that the original order was incorrect.", "respondent_claim": "The respondents claimed that they were entitled to compensation for delay in possession and that the original order was correct.", "final_verdict": "The appellate tribunal dismissed the appeal and upheld the original order, awarding compensation to the respondents.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Mrs. Ritu DevgunMrs. Ritu Devgun | Link |
820 of 2022820 of 2022 | HaryanaHaryana | The appeal was dismissed as withdrawn due to a se…The appeal was dismissed as withdrawn due to a settlement between the appellant and the respondents. The appeal was filed with various deficiencies and without pre-deposit. | ["Settlement", "Wit…["Settlement", "Withdrawal of Appeal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed as withdrawn due to a settlement between the appellant and the respondents.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | AnnuAnnu | Link |
816 of 2022816 of 2022 | HaryanaHaryana | The appeals were withdrawn by the appellant due t…The appeals were withdrawn by the appellant due to non-compliance with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Withdrawal of app…["Withdrawal of appeals"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondents claimed that the appellant had not complied with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "final_verdict": "The appeals were withdrawn by the appellant due to non-compliance with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Prabhat Kumar MishraPrabhat Kumar Mishra | Link |
Yearly Trend for these Cases
An analysis of the cases filed by the builder, which it won, revealed the following information. The cases predominantly center around several recurring themes that are typical in the real estate market.
Throughout these cases, BPTP Limited frequently brought disputes to court to contest penalties for delayed possession, refuting accusations of default from buyers, and clarifying contractual obligations associated with payment timelines and project delivery.
The common thread in BPTP Limited's successful defenses often lies in presenting compelling evidence that undercut opposing claims. This includes demonstrating buyers' failures to comply with payment schedules, inadequate evidence of claims made against them, and reinforcing their justification for delays due to external regulations or unforeseen circumstances. BPTP Limited's adeptness at navigating these complexities has fortified its stance in many cases.
This analysis suggests a significant insight into BPTP Limited’s reputation within the broader real estate market. The outcomes of these cases indicate that there are instances where buyers may misunderstand their obligations or present inflated claims, which can erroneously challenge the builder's credibility. Therefore, BPTP Limited appears to have established a dependable framework for defending itself effectively against what may often be perceived as unjust or exaggerated claims from buyers.
For potential buyers considering investments with builders like BPTP Limited, it is crucial to tread carefully and conduct due diligence. While the real estate landscape may experience its share of legitimate disputes, this analysis illustrates that reputed builders can often uphold their defenses against wrongful allegations. Buyers are encouraged to engage critically with claims and seek reliable evidence before forming conclusions about a builder's reputation.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
Appeal No. 139/2019Appeal No. 139/2019 | Uttar PradeshUttar Pradesh | The appellant, B.P.T.P. Limited, challenged the o…The appellant, B.P.T.P. Limited, challenged the order of the U.P. Real Estate Regulatory Authority, directing the appellant to refund the amount deposited by the respondent with interest. The appellant argued that the delay in possession was due to various reasons, including government approvals and environmental clearance. | ["Real Estate", "De…["Real Estate", "Delay in Possession"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the delay in possession was due to various reasons, including government approvals and environmental clearance.", "respondent_claim": "The respondent claimed that the delay in possession was due to the appellant's fault and poor planning.", "final_verdict": "The Tribunal partly allowed the appeal and modified the impugned order to the extent of rate of interest from 18% per annum to MCLR+1% per annum.", "in_favor_of_respondent": "no"} | B.P.T.P. LimitedB.P.T.P. Limited | Mrs. Santosh BhagatMrs. Santosh Bhagat | Link |
139/2019139/2019 | Uttar PradeshUttar Pradesh | The appellant, B.P.T.P. Limited, challenged the o…The appellant, B.P.T.P. Limited, challenged the order of the U.P. Real Estate Regulatory Authority, directing the appellant to refund the amount deposited by the respondent with interest. The appellant argued that the delay in possession was due to various reasons, including government approvals and environmental clearance. | ["Real Estate", "De…["Real Estate", "Delay in Possession"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the delay in possession was due to various reasons, including government approvals and environmental clearance.", "respondent_claim": "The respondent claimed that the appellant had collected excess amount and failed to refund the same.", "final_verdict": "The Tribunal partly allowed the appeal and modified the impugned order to the extent of rate of interest from 18% per annum to MCLR+1% per annum.", "in_favor_of_respondent": "no"} | B.P.T.P. LimitedB.P.T.P. Limited | Mrs. Santosh BhagatMrs. Santosh Bhagat | Link |
2236/20222236/2022 | HaryanaHaryana | Complainant M/s BPTP Ltd filed review seeking rec…Complainant M/s BPTP Ltd filed review seeking rectification of date of termination mentioned in previous order. Error was found and corrected. | ["Rectification of …["Rectification of date of termination"] | {"appellant_claim": "Complainant sought rectifica…{"appellant_claim": "Complainant sought rectification of date of termination mentioned in previous order.", "respondent_claim": "Respondent did not make any claim.", "final_verdict": "Error was found and corrected. Date of termination was changed to 01.07.2013.", "in_favor_of_respondent": "no"} | BPTP LimitedBPTP Limited | Link | |
514 of 2022514 of 2022 | HaryanaHaryana | The appellant, M/s BPTP Limited, appealed against…The appellant, M/s BPTP Limited, appealed against the order of the Adjudicating Officer, Haryana Real Estate Regulatory Authority, Gurugram. The appeal was disposed of by remanding the matter to the Adjudicating Officer for decision afresh. | ["Remand of matter"]["Remand of matter"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the Adjudicating Officer had committed an error in observing that JD is liable to hand over the possession of the unit in question unconditionally.", "respondent_claim(in detail)": "The respondents claimed that they had no objection if the case is remanded to the Adjudicating Officer.", "final_verdict(in detail)": "The appeal was disposed of by remanding the matter to the Adjudicating Officer for decision afresh.", "in_favor_of_respondent": "no"} | BPTP LimitedBPTP Limited | Ms. Kavita KatariaMs. Kavita Kataria | Link |
833 of 2022833 of 2022 | HaryanaHaryana | The appellant, BPTP Limited, filed an appeal agai…The appellant, BPTP Limited, filed an appeal against the order of the Executing Court, which had frozen the bank accounts of the appellant without affording an opportunity of hearing. The Appellate Tribunal disposed of the matter with a direction to the Authority below to decide the entire matter at the earliest. | ["Frozen bank accou…["Frozen bank accounts", "Opportunity of hearing"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Executing Court had frozen the bank accounts without affording an opportunity of hearing.", "respondent_claim": "The respondents claimed that the order passed by the Executing Court was sustainable as the calculations submitted by them in their revival application were accepted.", "final_verdict": "The Appellate Tribunal disposed of the matter with a direction to the Authority below to decide the entire matter at the earliest.", "in_favor_of_respondent": "no"} | BPTP LimitedBPTP Limited | Ms. JyotiMs. Jyoti | Link |
TA-384/2022TA-384/2022 | Uttar PradeshUttar Pradesh | The applicant, M/SBPTP Limited, requested the ref…The applicant, M/SBPTP Limited, requested the refund of the amount deposited towards the compliance of Section 43(5) of the Act. The Tribunal directed the Registry to release the amount deposited by the applicant within 10 days. | ["Refund of deposit…["Refund of deposited amount"] | {"appellant_claim(in detail)": "The applicant, M/…{"appellant_claim(in detail)": "The applicant, M/SBPTP Limited, requested the refund of the amount deposited towards the compliance of Section 43(5) of the Act.", "respondent_claim(in detail)": "The respondent, SH.PRABHDAS, did not make any claims.", "final_verdict(in detail)": "The Tribunal directed the Registry to release the amount deposited by the applicant within 10 days.", "in_favor_of_respondent": "no"} | BPTP LimitedBPTP Limited | SH.PRABHDASSH.PRABHDAS | Link |
Yearly Trend for these Cases
An analysis of the cases filed against the builder, which the builder won, revealed the following information.
The disputes can be grouped into several recurring themes. First, many cases involved 'Delayed Possession Claims,' where complainants alleged that the builder failed to deliver flats within the stipulated time. However, the builder successfully demonstrated that possession had been offered duly or that the complainants were subsequent allottees who had not suffered any delays.
The second theme is related to 'Land Classification and Regulatory Compliance,' where several complaints were dismissed on the grounds that the builder had complied with necessary regulations or that the appellant had not made timely payments as per agreements. Such cases showed a pattern of misunderstanding regarding the builder's entitlements under the law, resulting in the authority siding with BPTP Limited.
Another prominent theme was 'Penalties and Escalation Costs,' where the respondents often resisted these claims by providing justifications aligned with the original agreements. The builder argued that costs were reasonable and in compliance with contractual terms.
Furthermore, claims regarding 'Disputes Over Payments and Additional Charges' were common, where the builder successfully asserted that the charges were legitimate and previously agreed upon by the complainants. This shows a consistent effort from BPTP Limited to adhere to contractual obligations.
There were numerous instances of 'Withdrawal and Settlement of Complaints,' indicating that many claims brought against the builder were resolved amicably or abandoned outright. This trend underscores the importance of communication between parties.
Of particular note, many cases were dismissed due to 'Unfounded Claims and Lack of Evidence,' where complainants either failed to appear or could not substantiate their claims with sufficient proof. This highlights a crucial point - the builder effectively defended itself, often against false or exaggerated claims from buyers.
The analysis of these case summaries shows that BPTP Limited maintains a robust reputation within the real estate market. While some buyers do raise legitimate concerns, there's a propensity for misconstrued claims that can lead to legal battles. This history of defending itself successfully indicates that buyers must approach such allegations with diligence. Potential buyers should remain vigilant and informed, understanding that while disputes occur, the credibility and practices of builders like BPTP Limited can often withstand scrutiny.
In conclusion, buyers are advised to conduct thorough research and rely on factual data before forming opinions about a builder's reputation. Making informed decisions will help them distinguish between valid grievances and unfounded claims.
This dictionary presents a clear overview of the primary disputes related to BPTP Limited and an insightful summary that touches upon legal cases and the implications for potential buyers in the real estate market.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
1459 of 20201459 of 2020 | HaryanaHaryana | Complaint against M/s B.P.T.P Ltd for not deliver…Complaint against M/s B.P.T.P Ltd for not delivering possession and occupation certificate. Case settled amicably between parties. | ["Possession and Oc…["Possession and Occupation Certificate"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent did not deliver possession and occupation certificate.", "respondent_claim": "Respondent claimed that the matter has been amicably settled between the parties.", "final_verdict": "Case disposed of as settled.", "in_favor_of_respondent": "yes"} | Rali GuptaRali Gupta | B.P.T.P LimitedB.P.T.P Limited | Link |
2007 of 20222007 of 2022 | HaryanaHaryana | Suo-motu complaint against BPTP Ltd. for not uplo…Suo-motu complaint against BPTP Ltd. for not uploading quarterly progress reports. Notice discharged as reports uploaded up to September 2022. | ["Non-uploaded prog…["Non-uploaded progress reports"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Notice discharged as quarterly progress reports uploaded up to September 2022.", "in_favor_of_respondent": "yes"} | BPTL LimitedBPTL Limited | Link | |
2008 of 20222008 of 2022 | HaryanaHaryana | Suo-motu complaint against BPTP Ltd. for not uplo…Suo-motu complaint against BPTP Ltd. for not uploading quarterly progress reports. Notice discharged as reports uploaded up to September 2022. | ["Non-uploaded prog…["Non-uploaded progress reports"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Uploaded quarterly progress reports up to September 2022", "final_verdict": "Notice discharged, complaint disposed of", "in_favor_of_respondent": "yes"} | BPTL LimitedBPTL Limited | Link | |
2024 of 20222024 of 2022 | HaryanaHaryana | Suo-motu complaint against BPTP Ltd. for not uplo…Suo-motu complaint against BPTP Ltd. for not uploading quarterly progress reports. Notice discharged as reports uploaded up to September 2022. | ["Non-uploaded prog…["Non-uploaded progress reports"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Notice discharged as quarterly progress reports uploaded up to September 2022.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | BPTL LimitedBPTL Limited | Link |
1171, 1194 and 1205…1171, 1194 and 1205 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant. Proceedings n…Complaint withdrawn by complainant. Proceedings non-productive due to amendment of HRERA Rules. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Complaints filed …{"appellant_claim(in detail)": "Complaints filed against M/s B.P.T.P. Ltd. for unknown reasons.", "respondent_claim(in detail)": "Not applicable as complaint was withdrawn.", "final_verdict(in detail)": "Complaint withdrawn by complainant. Proceedings non-productive due to amendment of HRERA Rules.", "in_favor_of_respondent": "yes"} | Anurag JainAnurag Jain | B.P.T.P. LimitedB.P.T.P. Limited | Link |
528/2018528/2018 | HaryanaHaryana | Complainant sought compensation for unfair trade …Complainant sought compensation for unfair trade practice, mental harassment, and legal expenses. Adjudicating Officer dismissed the complaint as no merit was found. | ["Compensation for …["Compensation for unfair trade practice", "Mental harassment", "Legal expenses"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought compensation for unfair trade practice, mental harassment, and legal expenses. He alleged that the respondent had committed unfair trade practices by not providing occupation certificate with the offer of possession, charging preferential location charges, and reducing the carpet area without consent.", "respondent_claim(in detail)": "The respondent argued that the occupation certificate was received on 07.09.2018, which was within the stipulated time period. They also stated that the offer of possession was made six months prior to the date fixed for handing over of possession, and the carpet area remained the same as per the builder-buyer agreement.", "final_verdict(in detail)": "The Adjudicating Officer dismissed the complaint as no merit was found. The complainant was not entitled to compensation for unfair trade practice or mental harassment as the possession of the unit was offered prior to the stipulated time period. The legal expenses claim was also rejected as the complainant was not granted compensation on any ground.", "in_favor_of_respondent": "yes"} | Manoj KumarManoj Kumar | B.P.T.P. LimitedB.P.T.P. Limited | Link |
764/2018764/2018 | HaryanaHaryana | Complainant sought compensation for unfair trade …Complainant sought compensation for unfair trade practices, mental harassment, and anxiety due to the respondent's offer of possession without Occupation Certificate. The Adjudicating Officer dismissed the complaint as the respondent had offered possession within the stipulated time and the complainant had not suffered any harm. | ["Unfair trade prac…["Unfair trade practices", "Mental harassment", "Anxiety"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent had offered possession without Occupation Certificate, which was an unfair trade practice. He sought compensation for mental harassment and anxiety due to this.", "respondent_claim": "The respondent claimed that they had offered possession within the stipulated time and that the complainant had not suffered any harm.", "final_verdict": "The Adjudicating Officer dismissed the complaint as the respondent had offered possession within the stipulated time and the complainant had not suffered any harm.", "in_favor_of_respondent": "yes"} | Surendra YadavSurendra Yadav | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-1874 of 20…RERA-PKL-1874 of 2019 | HaryanaHaryana | Complainants withdrew their cases against M/s B.P…Complainants withdrew their cases against M/s B.P.T.P. Ltd. The cases were disposed of as withdrawn. | ["Withdrawal of cas…["Withdrawal of cases"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Cases disposed of as withdrawn", "in_favor_of_respondent": "yes"} | Nancy GumberNancy Gumber | B.P.T.P. LimitedB.P.T.P. Limited | Link |
RERA-PKL-COMP-83-20…RERA-PKL-COMP-83-2018 | Not providedNot provided | Complainant Anjana Saraf failed to appear and fil…Complainant Anjana Saraf failed to appear and file complaint in proper format, leading to dismissal of case. | ["Default of appear…["Default of appearance", "Improper complaint format"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case dismissed due to complainant's failure to appear and file complaint in proper format.", "in_favor_of_respondent": "yes"} | Anjana SarafAnjana Saraf | BPTP Builders & Dev…BPTP Builders & Developers Company | Link |
582 of 2020582 of 2020 | HaryanaHaryana | Complaint filed against respondent to pay cost of…Complaint filed against respondent to pay cost of Rs 5,000/- and Rs 2,000/- payable to Authority and complainant. Respondent has already paid the balance cost of Rs 2,000/-. | ["Payment of cost"]["Payment of cost"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint stands disposed of as the respondent has already paid the balance cost of Rs 2,000/-.", "in_favor_of_respondent": "yes"} | Not providedNot provided | BPTP Countrywide Pr…BPTP Countrywide Promoters | Link |
213/2018213/2018 | HaryanaHaryana | Complaint withdrawn due to settlement between com…Complaint withdrawn due to settlement between complainant and respondent. | ["Settlement", "Wit…["Settlement", "Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent had not fulfilled their obligations as per the Real Estate (Regulation & Development) Act, 2016.", "respondent_claim(in detail)": "The respondent claimed that they had fulfilled their obligations and that the complaint was baseless.", "final_verdict(in detail)": "The complaint was dismissed as withdrawn due to a settlement between the complainant and the respondent.", "in_favor_of_respondent": "yes"} | anotheranother | BPTP LimitedBPTP Limited | Link |
2434 of 20182434 of 2018 | HaryanaHaryana | Complainant sought relief for delay in possession…Complainant sought relief for delay in possession of flat, arbitrary increase in super area, and unfair charges. Authority held that delay in possession was valid, increase in super area was justified, and charges were legitimate. | ["Delay in possessi…["Delay in possession", "Increase in super area", "Unfair charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the flat, increased the super area without justification, and charged arbitrary amounts.", "respondent_claim": "The respondent claimed that the increase in super area was justified, and the charges were legitimate.", "final_verdict": "The authority held that the delay in possession was valid, the increase in super area was justified, and the charges were legitimate.", "in_favor_of_respondent": "yes"} | Mrs. Ranjana Tulsia…Mrs. Ranjana Tulsiang | Countrywide Propert…Countrywide Properties Private Limited | Link |
1451/20181451/2018 | HaryanaHaryana | Complaint dismissed for want of prosecution. Comp…Complaint dismissed for want of prosecution. Complainant not interested to proceed with the complaint. | ["Dispute", "Real E…["Dispute", "Real Estate"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Karanvir Rajput, filed a complaint against BPTP Ltd. for unknown reasons.", "respondent_claim(in detail)": "BPTP Ltd. denied any wrongdoing and claimed that the complainant was not interested in pursuing the complaint.", "final_verdict(in detail)": "The complaint was dismissed for want of prosecution as the complainant was not interested in proceeding with the complaint.", "in_favor_of_respondent": "yes"} | Karanvir RajputKaranvir Rajput | BPTP LimitedBPTP Limited | Link |
1132/20181132/2018 | HaryanaHaryana | Complainant Mohd. Shakeel withdrew his complaint …Complainant Mohd. Shakeel withdrew his complaint against BPTP Limited, and the case was dismissed as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Mohd. Shakeel, claimed that he had a dispute with BPTP Limited, but he later withdrew his complaint.", "respondent_claim(in detail)": "The respondent, BPTP Limited, did not make any claims as the complainant withdrew his complaint.", "final_verdict(in detail)": "The case was dismissed as withdrawn due to the complainant's statement that he had settled the dispute with the respondent.", "in_favor_of_respondent": "yes"} | Mohd. ShakeelMohd. Shakeel | BPTP LimitedBPTP Limited | Link |
620/2018620/2018 | HaryanaHaryana | Complaint dismissed for want of prosecution as co…Complaint dismissed for want of prosecution as complainant failed to appear despite notice. | ["Want of prosecuti…["Want of prosecution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed for want of prosecution", "in_favor_of_respondent": "yes"} | Ram Kishore BansalRam Kishore Bansal | BPTP LimitedBPTP Limited | Link |
CR/709/2019CR/709/2019 | HaryanaHaryana | Yogesh Kumar filed a complaint against Bptp Limit…Yogesh Kumar filed a complaint against Bptp Limited for issues related to a settlement deed. The matter was disposed of by the Authority. | ["Settlement Deed"]["Settlement Deed"] | {"appellant_claim": "The appellant claimed issues…{"appellant_claim": "The appellant claimed issues with the settlement deed signed by him.", "respondent_claim": "The respondent claimed that the settlement deed was signed by the appellant and his representatives.", "final_verdict": "The matter was disposed of by the Authority, and the settlement deed was deemed valid.", "in_favor_of_respondent": "yes"} | Yogesh KumarYogesh Kumar | BPTP LimitedBPTP Limited | Link |
CR/561/2019CR/561/2019 | HaryanaHaryana | Complaint withdrawn by Om Prakash Bhargava agains…Complaint withdrawn by Om Prakash Bhargava against BPTP Limited due to amicable settlement. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Om Prakash Bhargava, filed a complaint against BPTP Limited for an unknown reason.", "respondent_claim(in detail)": "The respondent, BPTP Limited, did not provide any claims in the given text.", "final_verdict(in detail)": "The complaint was disposed of due to an amicable settlement between the parties.", "in_favor_of_respondent": "yes"} | Om Prakash BhargavaOm Prakash Bhargava | BPTP LimitedBPTP Limited | Link |
CR/3365/2020CR/3365/2020 | HaryanaHaryana | Complaint withdrawn by Chhaya Gunawat against BPT…Complaint withdrawn by Chhaya Gunawat against BPTP Limited due to amicable settlement. Case disposed of. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Chhaya Gunawat, had filed a complaint against BPTP Limited.", "respondent_claim(in detail)": "BPTP Limited had not provided any details in the proceeding.", "final_verdict(in detail)": "The complaint was withdrawn by the complainant due to an amicable settlement between the parties.", "in_favor_of_respondent": "yes"} | Chhaya GunawatChhaya Gunawat | BPTP LimitedBPTP Limited | Link |
CR/3846/2020CR/3846/2020 | HaryanaHaryana | Kishalay Sarkar vs BPTP Limited. Settlement arriv…Kishalay Sarkar vs BPTP Limited. Settlement arrived at between parties, complaint stands disposed of. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint stands disposed of due to settlement between parties.", "in_favor_of_respondent": "yes"} | Kishalay SarkarKishalay Sarkar | BPTP LimitedBPTP Limited | Link |
CR/1332/2021CR/1332/2021 | HaryanaHaryana | Vishal Chabra vs BPTP Limited: Complaint disposed…Vishal Chabra vs BPTP Limited: Complaint disposed of due to settlement between parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint disposed of due to settlement between parties.", "in_favor_of_respondent": "yes"} | Vishal ChabraVishal Chabra | BPTP LimitedBPTP Limited | Link |
CR/6716/2019CR/6716/2019 | HaryanaHaryana | Complainant Amarjit Singh Mattoo vs BPTP Limited.…Complainant Amarjit Singh Mattoo vs BPTP Limited. Complaint disposed off due to settlement deed. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint disposed off due to settlement deed.", "in_favor_of_respondent": "yes"} | Amarjit Singh MattooAmarjit Singh Mattoo | BPTP LimitedBPTP Limited | Link |
CR/6707/2019CR/6707/2019 | HaryanaHaryana | Complainants Ritu Bumb and another withdrew their…Complainants Ritu Bumb and another withdrew their complaint against BPTP Ltd. as all claims and disputes were settled. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants withdrew their complaint as all claims and disputes were settled.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The application for withdrawal of complaint was allowed, and the matter stood disposed off.", "in_favor_of_respondent": "yes"} | anotheranother | BPTP LimitedBPTP Limited | Link |
CR/4014/2020CR/4014/2020 | HaryanaHaryana | The complainant sought relief for delay in posses…The complainant sought relief for delay in possession of a flat, but the authority found that the complainant was a subsequent allottee who had not suffered any delay. | ["Delay in possessi…["Delay in possession", "Subsequent allottee"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had not received possession of the flat on time and sought relief for delay.", "respondent_claim": "The respondent claimed that the complainant was a subsequent allottee who had not suffered any delay.", "final_verdict": "The authority found that the complainant was a subsequent allottee who had not suffered any delay and rejected the complaint.", "in_favor_of_respondent": "yes"} | Hemant MakkarHemant Makkar | Countrywide Promote…Countrywide Promoter Private Limited | Link |
CR/5875/2023CR/5875/2023 | HaryanaHaryana | Apoorv Jain vs BPTP LTD: The complainant filed an…Apoorv Jain vs BPTP LTD: The complainant filed an application for withdrawal of the complaint on the ground that the matter has been settled between him and the respondent. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the matter has been settled between him and the respondent.", "respondent_claim(in detail)": "The respondent claimed that the matter has been settled between the parties.", "final_verdict(in detail)": "The matter stands disposed off due to the settlement arrived at between the parties.", "in_favor_of_respondent": "yes"} | Apoorv JainApoorv Jain | BPTP LimitedBPTP Limited | Link |
CR/5148/2023CR/5148/2023 | HaryanaHaryana | Complainant Rachit Chawla withdrew his complaint …Complainant Rachit Chawla withdrew his complaint against BPTP Limited due to ongoing arbitration. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant wanted to withdraw his complaint due to ongoing arbitration.", "respondent_claim(in detail)": "None", "final_verdict(in detail)": "The complaint was withdrawn.", "in_favor_of_respondent": "yes"} | Rachit ChawlaRachit Chawla | BPTP LimitedBPTP Limited | Link |
RERA-PKL-COMP-01-20…RERA-PKL-COMP-01-2018 | Not providedNot provided | Complaint dismissed due to complainant's default …Complaint dismissed due to complainant's default of appearance and failure to file complaint in prescribed format. | Complaint dismissal…Complaint dismissal due to lack of prosecution | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint dismissed due to complainant's default of appearance and failure to file complaint in prescribed format.", "in_favor_of_respondent": "yes"} | AnotherAnother | BPTP LimitedBPTP Limited | Link |
RERA-PKL-COMp 102018RERA-PKL-COMp 102018 | Not providedNot provided | Complaint disposed of as having been compromised …Complaint disposed of as having been compromised due to amicable settlement between parties. Complainant did not appear before the Authority and sent an application stating he does not want to further prosecute the complaint. | ["Amicable settleme…["Amicable settlement", "Compromised complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as having been compromised due to an amicable settlement between the parties.", "in_favor_of_respondent": "yes"} | Vishal VermaniVishal Vermani | BPTP LimitedBPTP Limited | Link |
700 of 2018700 of 2018 | HaryanaHaryana | Complainants sought refund for delayed flat deliv…Complainants sought refund for delayed flat delivery. Authority decided in favor of respondents, citing previous judgments. | ["Delayed flat deli…["Delayed flat delivery", "Refund dispute"] | {"appellant_claim": "Complainants sought refund o…{"appellant_claim": "Complainants sought refund of Rs. 34,46,697/- along with interest @12% on the said amount paid against the booked flat in the project named \u201cPark Elite Floors\u201d situated in district Faridabad.", "respondent_claim": "Respondents challenged the jurisdiction of the Authority to entertain the present complaint by stating that firstly the provisions of RERA Act do not apply to them since the agreement was executed prior to coming in force the RERA Act.", "final_verdict": "The Authority decided in favor of respondents, citing previous judgments.", "in_favor_of_respondent": "yes"} | Anuradha BhanotAnuradha Bhanot | BPTP LimitedBPTP Limited | Link |
RERA-PKL-301-2018RERA-PKL-301-2018 | HaryanaHaryana | Complainant sought refund for failing to deliver …Complainant sought refund for failing to deliver possession of flat. Authority held that possession was due by July 2019, and complaint was premature. Complainant can file again if possession not given by then. | ["Possession of fla…["Possession of flat", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for failing to deliver possession of flat.", "respondent_claim": "Respondent claimed that possession was due by July 2019, and complaint was premature.", "final_verdict": "Authority held that possession was due by July 2019, and complaint was premature. Complainant can file again if possession not given by then.", "in_favor_of_respondent": "yes"} | Sundeep ChandhyokSundeep Chandhyok | BPTP LimitedBPTP Limited | Link |
793/2018793/2018 | HaryanaHaryana | Complaint dismissed in default for lack of repres…Complaint dismissed in default for lack of representation and insufficient evidence. Case not within Adjudicating Officer's jurisdiction. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Compensation for project del…{"appellant_claim": "Compensation for project delay and discount as per agreement clauses. Mental agony and rental accommodation losses claimed.", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed in default due to lack of representation and insufficient evidence. Case not within Adjudicating Officer's jurisdiction.", "in_favor_of_respondent": "yes"} | Pawan Kumar AdhanaPawan Kumar Adhana | BPTP LimitedBPTP Limited | Link |
1312 of 20191312 of 2019 | HaryanaHaryana | Complainant requested for withdrawal, complaint i…Complainant requested for withdrawal, complaint is disposed of as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint is disposed of as withdrawn.", "in_favor_of_respondent": "yes"} | Rohit LohiaRohit Lohia | BPTP LimitedBPTP Limited | Link |
1029 of 20191029 of 2019 | HaryanaHaryana | Complainant requested for withdrawal of the compl…Complainant requested for withdrawal of the complaint. The request is allowed. Complaint is disposed of as withdrawn with a liberty to file a fresh complaint if the complainant so desires. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint is disposed of as withdrawn with a liberty to file a fresh complaint if the complainant so desires.", "in_favor_of_respondent": "yes"} | Sushiila Kumar Dehi…Sushiila Kumar Dehiya | BPTP LimitedBPTP Limited | Link |
933 of 2019933 of 2019 | HaryanaHaryana | Complainant sought refund with interest for a pre…Complainant sought refund with interest for a previous order. Authority found respondent's interest calculation correct. | ["Refund with inter…["Refund with interest"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of the paid amount with interest as per Rule 15 of the HRERA Rules, 2017. The complainant claimed that the respondent had calculated the interest at 10.15% instead of the correct rate of 10.75%.", "respondent_claim(in detail)": "The respondent claimed that they had calculated the interest at 10.15% (SBI MCLR + 2%) and that this was the correct rate.", "final_verdict(in detail)": "The Authority found that the respondent's calculation of interest was correct and that the complainant had no further claim.", "in_favor_of_respondent": "yes"} | Neeraj DhingraNeeraj Dhingra | BPTP LimitedBPTP Limited | Link |
Complaint No. 111 o…Complaint No. 111 of 2019 | HaryanaHaryana | Complaint dismissed in default due to non-appeara…Complaint dismissed in default due to non-appearance of complainant. Respondent directed to pay costs. | ["Non-appearance of…["Non-appearance of complainant"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint dismissed in default due to non-appearance of complainant. Respondent directed to pay costs.", "in_favor_of_respondent": "yes"} | K Raghavendra KumarK Raghavendra Kumar | BPTP LimitedBPTP Limited | Link |
935 of 2018935 of 2018 | HaryanaHaryana | Complainant sought compensation for delay in poss…Complainant sought compensation for delay in possession of flat, mental harassment, and litigation charges. Respondent claimed offer of possession, discounts, and explanation of cost escalation. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant purchased a flat from BPTP Limited and sought compensation for delay in possession of the flat, mental harassment, and litigation charges. He claimed that the project was not fit for habitation even after a delay of more than six years.", "respondent_claim(in detail)": "The respondent claimed that they had offered possession of the flat vide letter dated 17.07.2018 and explained the reasons and calculation of cost escalation. They stated that the complainant failed to clear his dues even after receiving various reminder letters.", "final_verdict(in detail)": "The Authority disposed of the case in terms of Complaint No. 113 of 2018 titled as Madhu Sareen v/s BPTP Ltd. The respondent was directed to offer possession of the flat and issue a fresh statement of accounts within 15 days of uploading the order on the website of the Authority.", "in_favor_of_respondent": "yes"} | Ashok MehtaAshok Mehta | BPTP LimitedBPTP Limited | Link |
Complaint No. 236 o…Complaint No. 236 of 2019 | HaryanaHaryana | Complainant challenged demand notice for cost esc…Complainant challenged demand notice for cost escalation charges, super area increase charges, etc. Authority held that complainant is estopped from challenging the propriety or legality of the refund by virtue of his own conduct in voluntarily paying to the respondent the money as demanded by impugned demand notice. | ["Refund demand not…["Refund demand notice"] | {"appellant_claim(in detail)": "Complainant chall…{"appellant_claim(in detail)": "Complainant challenged demand notice dated 13th March 2018, accompanied with offer of possession with regard to cost escalation charges, super area increase charges, club charges, EDC/enhanced EDC charges, maintenance charges, GST charges, of a sum of Rs. 15,73,740/-.", "respondent_claim(in detail)": "Respondent pleaded that demands were genuine and raised in conformity with the terms of agreement. Learned Counsel for the respondent has also argued that the relationship between the parties ceased to exist after execution of conveyance deeds, therefore the present complaint has no merits and be dismissed.", "final_verdict(in detail)": "Authority held that complainant is estopped from challenging the propriety or legality of the refund by virtue of his own conduct in voluntarily paying to the respondent the money as demanded by impugned demand notice.", "in_favor_of_respondent": "yes"} | Ashok Kumar SethiAshok Kumar Sethi | BPTP LimitedBPTP Limited | Link |
80 and others80 and others | HaryanaHaryana | Complaints against BPTP Limited dismissed as defa…Complaints against BPTP Limited dismissed as default. Complainants failed to appear for hearing. | ["Default complaint…["Default complaint", "Dismissal of complaints"] | {"appellant_claim": "Complaints against BPTP Limi…{"appellant_claim": "Complaints against BPTP Limited for unknown reasons", "respondent_claim": "BPTP Limited replied to complaints but complainants failed to appear", "final_verdict": "Complaints dismissed as default", "in_favor_of_respondent": "yes"} | Rupesh BaghelRupesh Baghel | BPTP LimitedBPTP Limited | Link |
Mh 5Mh 5 | HaryanaHaryana | The Haryana Real Estate Regulatory Authority regi…The Haryana Real Estate Regulatory Authority registered a project by BPTP Ltd. subject to certain conditions. | ["Project Registrat…["Project Registration"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The project was registered subject to certain conditions.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Link | |
1892 of 20191892 of 2019 | HaryanaHaryana | Complaint against BPTP Ltd. for not depositing de…Complaint against BPTP Ltd. for not depositing deficit registration fee. Fee deposited after notice. | ["Registration fee"]["Registration fee"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The respondent deposited the deficit registration fee of Rs. 4,03,500/- after notice.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Link | |
584 of 2020 and oth…584 of 2020 and others | HaryanaHaryana | Suo-moto complaints for recovery of cost of Rs.10…Suo-moto complaints for recovery of cost of Rs.10,000/- payable to the Authority in each of the captioned matters and the same has been duly paid. | ["Recovery of cost"]["Recovery of cost"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Cases are disposed of. Files be consigned to record room after uploading the orders of the Authority.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Link | |
1446 of 20181446 of 2018 | HaryanaHaryana | The complainant, Indu Jain, filed a complaint aga…The complainant, Indu Jain, filed a complaint against BPTP Ltd and others regarding various demands and charges. The Haryana Real Estate Regulatory Authority (HRERA) passed an order dated 18.08.2021, disposing of the complaint. | ["Real Estate", "De…["Real Estate", "Demands and Charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had demanded various amounts from her, including basic sales price, external development charges, infrastructure development charges, enhanced external development charges, club membership charges, cheque bouncing charges, interest, utility connection charges, preferential location charges, and electrification and STP charges.", "respondent_claim": "The respondent claimed that the complainant was liable to pay the demanded amounts as per the agreement and the statement of accounts.", "final_verdict": "The HRERA passed an order dated 18.08.2021, disposing of the complaint. The Authority decided that the respondent shall only charge a reasonable rate of interest, which is 9% p.a. The Authority also directed the complainant to visit the office of the respondent to determine whether she is liable to pay preferential location charges.", "in_favor_of_respondent": "yes"} | Indu JainIndu Jain | BPTP LimitedBPTP Limited | Link |
1691, 1693 of 20191691, 1693 of 2019 | HaryanaHaryana | Complainants alleged excess charges by respondent…Complainants alleged excess charges by respondent, but Authority declined to entertain the complaint due to prior litigation and incorrect process of law. | ["Excess charges", …["Excess charges", "Prior litigation"] | {"appellant_claim": "Complainants alleged that re…{"appellant_claim": "Complainants alleged that respondent charged excess amounts and delayed possession.", "respondent_claim": "Respondent claimed that complainants had made payments without protest and taken possession of the plot.", "final_verdict": "Authority declined to entertain the complaint due to prior litigation and incorrect process of law.", "in_favor_of_respondent": "yes"} | Mamta KapoorMamta Kapoor | BPTP LimitedBPTP Limited | Link |
08 of 201908 of 2019 | HaryanaHaryana | Complaint withdrawn/settled due to settlement bet…Complaint withdrawn/settled due to settlement between parties. | ["Settlement", "Wit…["Settlement", "Withdrawal of Complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn/settled due to settlement between parties.", "in_favor_of_respondent": "yes"} | Mukesh MadanMukesh Madan | BPTP LimitedBPTP Limited | Link |
Complaint No. 861 o…Complaint No. 861 of 2019 | HaryanaHaryana | The complainant sought relief for rightful and le…The complainant sought relief for rightful and legitimate possession of plot along with delay interest and to cancel unlawful demands. The Authority examined the case and ordered that the offer of possession made in March 2012 was valid. | ["Possession of plo…["Possession of plot", "Delay interest", "Unlawful demands"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not given them rightful and legitimate possession of the plot and had made unlawful demands.", "respondent_claim": "The respondent claimed that the offer of possession made in March 2012 was valid and that the complainant had not made the necessary payments.", "final_verdict": "The Authority ordered that the offer of possession made in March 2012 was valid and that the complainant was not entitled to delay interest for the period between 2012 and 2019.", "in_favor_of_respondent": "yes"} | Rajesh Jain HUFRajesh Jain HUF | BPTP LimitedBPTP Limited | Link |
Complaint No. 42 of…Complaint No. 42 of 2021 | HaryanaHaryana | Complainant withdrew the case as it has already b…Complainant withdrew the case as it has already been settled between the parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as settled.", "in_favor_of_respondent": "yes"} | Vikas KumarVikas Kumar | BPTP LimitedBPTP Limited | Link |
2638 of 20192638 of 2019 | HaryanaHaryana | The case is about non-submission of online applic…The case is about non-submission of online application for registration of a project by the respondent. The Authority decided to discharge the notice as the area of the project falls under exempted area. | ["Non-submission of…["Non-submission of online application", "Exempted area"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent failed to submit online application for registration of the project.", "respondent_claim": "The respondent claimed that the project area is only 320 Sq.mtr which falls under exempted area as per Section-3 of the RERA, Act.", "final_verdict": "The Authority decided to discharge the notice issued under section 59 and 63 of RERA, Act 2016.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | BPTP LimitedBPTP Limited | Link |
1107 of 20211107 of 2021 | HaryanaHaryana | Complainant seeks review of earlier order regardi…Complainant seeks review of earlier order regarding delay interest calculation. Additional receipts are produced, but recalculation is not allowed as it would alter the substantive part of the original order. | ["Delay interest re…["Delay interest recalculation"] | {"appellant_claim": "The complainant seeks recalc…{"appellant_claim": "The complainant seeks recalculation of delay interest based on additional receipts produced.", "respondent_claim": "The respondent argues that recalculation is not allowed as it would alter the substantive part of the original order.", "final_verdict": "The Authority dismisses the complainant's prayer for recalculation of delay interest.", "in_favor_of_respondent": "yes"} | Raj Kumar DimaniaRaj Kumar Dimania | BPTP LimitedBPTP Limited | Link |
2819/20192819/2019 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of a flat, but the authority dismissed the complaint as the possession was taken after making full payment. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not offered possession of the flat till date and sought refund of the amount paid with 18% interest.", "respondent_claim": "The respondent claimed that the possession was offered to the complainant on 06.10.2018 and the complainant had made full payment including the demand raised along with the offer of possession.", "final_verdict": "The authority dismissed the complaint as the possession was taken after making full payment and the complainant had not sought relief for delay interest in their original complaint.", "in_favor_of_respondent": "yes"} | Shikha AgarwalShikha Agarwal | BPTP LimitedBPTP Limited | Link |
1020, 1023, 1030 of…1020, 1023, 1030 of 2018 | HaryanaHaryana | Complaints settled between parties. Cases dispose…Complaints settled between parties. Cases disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Cases disposed of as settled.", "in_favor_of_respondent": "yes"} | Deepak JainDeepak Jain | BPTP LimitedBPTP Limited | Link |
236/2022236/2022 | HaryanaHaryana | Complainant sought rectification of amount of int…Complainant sought rectification of amount of interest calculated, but calculations were found to be correct. Application under Section 39 of RERA Act,2016 was rejected. | ["RERA", "Interest …["RERA", "Interest Calculation"] | {"appellant_claim": "The complainant sought recti…{"appellant_claim": "The complainant sought rectification of amount of interest calculated, stating that amount of upfront delay interest and monthly interest has been wrongly calculated.", "respondent_claim": "The respondent argued that the calculations are correct and the difference in amount of interest is due to the fact that in complaint no. 241/2022 the whole of amount was paid by complainant before the deemed date of possession whereas in complaint no. 236/2022 the amount of 6 lakhs out of total amount was paid after deemed date of possession.", "final_verdict": "The application filed by complainant under Section 39 of RERA Act,2016 was rejected as the calculations were found to be correct.", "in_favor_of_respondent": "yes"} | Shaveta AroraShaveta Arora | BPTP LimitedBPTP Limited | Link |
Execution petition …Execution petition No. 3138/2022 | HaryanaHaryana | Execution petition for settlement between BPTP Lt…Execution petition for settlement between BPTP Ltd and decree holders. Case disposed as settled. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed as settled.", "in_favor_of_respondent": "yes"} | Ambika SharmaAmbika Sharma | BPTP LimitedBPTP Limited | Link |
Execution No. 1461 …Execution No. 1461 of 2021 | HaryanaHaryana | Decree holder Jitendra Kumar filed execution comp…Decree holder Jitendra Kumar filed execution complaint against BPTP Ltd. The case was disposed of as fully satisfied after the judgment debtor's counsel stated that a conveyance deed had been executed in favor of the decree holder on 16.05.2023. | ["Verification of c…["Verification of conveyance deed"] | {"appellant_claim": "The decree holder filed an e…{"appellant_claim": "The decree holder filed an execution complaint.", "respondent_claim": "The judgment debtor's counsel stated that a conveyance deed had been executed in favor of the decree holder.", "final_verdict": "The case was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Jitendra KumarJitendra Kumar | BPTP LimitedBPTP Limited | Link |
Execution No. 3287 …Execution No. 3287 of 2022 | HaryanaHaryana | The case was fixed for confirmation of the decret…The case was fixed for confirmation of the decretal amount received by the decree holder. The execution complaint stands disposed of as fully satisfied. | ["Confirmation of d…["Confirmation of decretal amount"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint stands disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Harsh VermaHarsh Verma | BPTP LimitedBPTP Limited | Link |
Execution Complaint…Execution Complaint No. 2183 of 2022 | HaryanaHaryana | Decree holders Amit Mangla and Mamta Mangla filed…Decree holders Amit Mangla and Mamta Mangla filed an execution complaint against BPTP Ltd. The case was disposed of as fully satisfied after both parties agreed that a conveyance deed had been executed in favor of the decree holders. | ["Conveyance deed",…["Conveyance deed", "Execution complaint"] | {"appellant_claim": "The decree holders claimed t…{"appellant_claim": "The decree holders claimed that a conveyance deed had been executed in their favor.", "respondent_claim": "The judgment debtor claimed that the case be disposed of as a conveyance deed had been executed in favor of the decree holders.", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Mamta ManglaMamta Mangla | BPTP LimitedBPTP Limited | Link |
Execution Complaint…Execution Complaint No. 422/2020 | HaryanaHaryana | Dispute settled between parties. Execution compla…Dispute settled between parties. Execution complaint disposed of as fully satisfied. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Dispute settled between parties. Execution complaint disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Anr.Anr. | BPTP LimitedBPTP Limited | Link |
Execution No. 1300 …Execution No. 1300 of 2021 | HaryanaHaryana | The execution complaint was disposed of as fully …The execution complaint was disposed of as fully satisfied after the judgment debtor's counsel stated that the matter had been settled between the parties. A copy of the settlement deed was placed on record. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Brig Shailendra Mal…Brig Shailendra Malik | BPTP LimitedBPTP Limited | Link |
Execution No. 434 o…Execution No. 434 of 2023 | HaryanaHaryana | The execution complaint was disposed of as fully …The execution complaint was disposed of as fully satisfied after the judgment debtor's counsel stated that the dispute had been settled and a settlement deed was executed between the parties. | ["Settlement of dis…["Settlement of dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Sheba Jacob OommenSheba Jacob Oommen | BPTP LimitedBPTP Limited | Link |
Execution No. 894 o…Execution No. 894 of 2021 | HaryanaHaryana | The execution complaint was disposed of as fully …The execution complaint was disposed of as fully satisfied after the judgment debtor stated that the dispute had been settled and a copy of the settlement deed was placed on record. | Settlement of Dispu…Settlement of Dispute | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The execution complaint was disposed of as fully satisfied after the judgment debtor stated that the dispute had been settled and a copy of the settlement deed was placed on record.", "in_favor_of_respondent": "yes"} | Anoop Kumar VermaAnoop Kumar Verma | BPTP LimitedBPTP Limited | Link |
1290 of 20211290 of 2021 | HaryanaHaryana | Complaint was dismissed as withdrawn due to amica…Complaint was dismissed as withdrawn due to amicable settlement between parties. | ["Amicable Settleme…["Amicable Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint was dismissed as withdrawn due to amicable settlement between parties.", "in_favor_of_respondent": "yes"} | Sachin AroraSachin Arora | BPTP LimitedBPTP Limited | Link |
Execution No. 66 of…Execution No. 66 of 2023 | HaryanaHaryana | Dispute settled between Shveta Arora and BPTP Ltd…Dispute settled between Shveta Arora and BPTP Ltd. Execution complaint disposed of as fully satisfied. | Dispute settlementDispute settlement | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Dispute settled, execution complaint disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Shveta AroraShveta Arora | BPTP LimitedBPTP Limited | Link |
Execution No. 1335 …Execution No. 1335 of 2021 | HaryanaHaryana | The execution complaint was disposed of as fully …The execution complaint was disposed of as fully satisfied after the judgment debtor's counsel stated that the dispute had been settled and a copy of the settlement deed was placed on record. | ["Settlement of dis…["Settlement of dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Kiran K AroraKiran K Arora | BPTP LimitedBPTP Limited | Link |
Execution No. 2046 …Execution No. 2046 of 2022 | HaryanaHaryana | The decree holder did not appear for the hearing,…The decree holder did not appear for the hearing, and the judgment debtor's counsel stated that the dispute had been settled. The execution complaint was disposed of as fully satisfied. | ["Settlement", "Dis…["Settlement", "Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Rajni AswalRajni Aswal | BPTP LimitedBPTP Limited | Link |
Execution No. 2870 …Execution No. 2870 of 2022 | HaryanaHaryana | The case was disposed of as fully satisfied after…The case was disposed of as fully satisfied after the judgment debtor's counsel stated that the dispute had been settled and a copy of the settlement deed was placed on record. The decree holder is at liberty to file an application to re-open the case if any issues remain pending. | ["Settlement of Dis…["Settlement of Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Promila AroraPromila Arora | BPTP LimitedBPTP Limited | Link |
Execution No. 3063 …Execution No. 3063 of 2022 | HaryanaHaryana | The case was disposed of as fully satisfied due t…The case was disposed of as fully satisfied due to a settlement between the parties. The decree holder is at liberty to file an application to re-open the case if any issues remain pending. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as fully satisfied due to a settlement between the parties.", "in_favor_of_respondent": "yes"} | Manavi SharmaManavi Sharma | BPTP LimitedBPTP Limited | Link |
Execution No. 104 o…Execution No. 104 of 2022 | HaryanaHaryana | The case was disposed of as fully satisfied due t…The case was disposed of as fully satisfied due to a settlement between the parties. The decree holders did not appear, and the judgment debtor's counsel stated that the dispute had been settled. | ["Settlement", "Dis…["Settlement", "Dispute Resolution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as fully satisfied due to a settlement between the parties.", "in_favor_of_respondent": "yes"} | Madhuri SalunkeMadhuri Salunke | BPTP LimitedBPTP Limited | Link |
Execution No. 488 o…Execution No. 488 of 2022 | HaryanaHaryana | Decree holder Sonia withdrew the case due to a se…Decree holder Sonia withdrew the case due to a settlement with BPTP Ltd. The execution complaint was disposed of as fully satisfied. | ["Settlement", "Wit…["Settlement", "Withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The execution complaint was disposed of as fully satisfied due to the withdrawal of the case by the decree holder.", "in_favor_of_respondent": "yes"} | SoniaSonia | BPTP LimitedBPTP Limited | Link |
EXECUTION NO. 783 O…EXECUTION NO. 783 OF 2023 | HaryanaHaryana | The case was disposed of as fully satisfied after…The case was disposed of as fully satisfied after the judgment debtor stated that the dispute has been settled and a copy of the settlement deed was placed on record. The decree holder did not appear. | ["Settlement of dis…["Settlement of dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as fully satisfied after the judgment debtor stated that the dispute has been settled and a copy of the settlement deed was placed on record.", "in_favor_of_respondent": "yes"} | Sangeeta SomaniSangeeta Somani | BPTP LimitedBPTP Limited | Link |
Execution No. 3378 …Execution No. 3378 of 2022 | HaryanaHaryana | The decree holder, Dharamvir Singh, withdrew his …The decree holder, Dharamvir Singh, withdrew his case against BPTP Ltd. after an amicable settlement. The execution complaint was disposed of as fully satisfied. | ["amicable settleme…["amicable settlement", "withdrawal of case"] | {"appellant_claim": "The decree holder claimed ex…{"appellant_claim": "The decree holder claimed execution of the decree against the judgment debtor.", "respondent_claim": "The judgment debtor claimed that the decree holder wanted to withdraw his case after an amicable settlement.", "final_verdict": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Dharamvir SinghDharamvir Singh | BPTP LimitedBPTP Limited | Link |
Execution No. 3412 …Execution No. 3412 of 2022 | HaryanaHaryana | Meenu Munshi and Pranashar Munshi vs BPTP Ltd. Ex…Meenu Munshi and Pranashar Munshi vs BPTP Ltd. Execution complaint disposed of as fully satisfied after settlement between parties. | ["Settlement", "Dis…["Settlement", "Dispute Resolution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Execution complaint disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Pranashar MunshiPranashar Munshi | BPTP LimitedBPTP Limited | Link |
Execution No. 422 o…Execution No. 422 of 2021 | HaryanaHaryana | The case was disposed of as fully satisfied after…The case was disposed of as fully satisfied after the judgment debtor placed a copy of the settlement deed on record. The decree holder is at liberty to file an application to re-open the case if any issue remains pending. | ["Settlement Deed"]["Settlement Deed"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Vikas BhutaniVikas Bhutani | BPTP LimitedBPTP Limited | Link |
Execution No. 108 o…Execution No. 108 of 2021 | HaryanaHaryana | The case was fixed for execution of conveyance de…The case was fixed for execution of conveyance deed in favor of the decree holder. The learned counsel for the judgment debtor stated that the conveyance deed has been executed and placed on record. | ["Execution of conv…["Execution of conveyance deed"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint stands disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | BPTP LimitedBPTP Limited | Link | |
Execution No. 2466 …Execution No. 2466 of 2023 | HaryanaHaryana | Shilpa Gupta vs BPTP Ltd: Execution complaint sta…Shilpa Gupta vs BPTP Ltd: Execution complaint stands disposed as fully satisfied due to settlement between parties. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Execution complaint stands disposed as fully satisfied due to settlement between parties.", "in_favor_of_respondent": "yes"} | Shilpa GuptaShilpa Gupta | BPTP LimitedBPTP Limited | Link |
Execution No. 652 o…Execution No. 652 of 2021 | HaryanaHaryana | Decree holder failed to appear, judgment debtor p…Decree holder failed to appear, judgment debtor provided TDS certificate, case disposed as fully satisfied. | ["Confirmation of p…["Confirmation of payment"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Provided TDS certificate", "final_verdict": "Case disposed as fully satisfied", "in_favor_of_respondent": "yes"} | Nalin MadanNalin Madan | BPTP LimitedBPTP Limited | Link |
Appeal No.71 of 2018Appeal No.71 of 2018 | HaryanaHaryana | The appeal was dismissed as withdrawn due to an a…The appeal was dismissed as withdrawn due to an amicable settlement between the parties. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim(in detail)": "The appellant fil…{"appellant_claim(in detail)": "The appellant filed an application for withdrawal of the appeal due to a compromise between the parties.", "respondent_claim(in detail)": "The respondent confirmed that an amicable settlement had taken place and had no objection to the appeal being dismissed.", "final_verdict(in detail)": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | DK VijhDK Vijh | BPTP LimitedBPTP Limited | Link |
Appeal No. 72 of 20…Appeal No. 72 of 2018 | HaryanaHaryana | The appeal was dismissed as withdrawn due to the …The appeal was dismissed as withdrawn due to the appellant's application and the respondent's agreement to the settlement. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim(in detail)": "The appellant mov…{"appellant_claim(in detail)": "The appellant moved an application to withdraw the appeal.", "respondent_claim(in detail)": "The respondent agreed to the settlement and had no objection to the appeal being dismissed as withdrawn.", "final_verdict(in detail)": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Babita KaushikBabita Kaushik | BPTP LimitedBPTP Limited | Link |
Appeal No. 21 of 20…Appeal No. 21 of 2018 | HaryanaHaryana | The appeal was dismissed as withdrawn due to the …The appeal was dismissed as withdrawn due to the appellant's application and the parties' amicable settlement. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim(in detail)": "The appellant sou…{"appellant_claim(in detail)": "The appellant sought to withdraw the appeal.", "respondent_claim(in detail)": "The respondent had no objection to the appeal being dismissed as withdrawn.", "final_verdict(in detail)": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Rajdeep Kaur BamrahRajdeep Kaur Bamrah | BPTP LimitedBPTP Limited | Link |
Appeal No. 25 of 20…Appeal No. 25 of 2018 | HaryanaHaryana | Puran Sharma vs BPTP Ltd. Appeal dismissed as wit…Puran Sharma vs BPTP Ltd. Appeal dismissed as withdrawn. Parties amicably settled the dispute. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim(in detail)": "The appellant mov…{"appellant_claim(in detail)": "The appellant moved an application for withdrawal of the appeal.", "respondent_claim(in detail)": "The respondent stated that the parties have amicably settled the dispute.", "final_verdict(in detail)": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Puran SharmaPuran Sharma | BPTP LimitedBPTP Limited | Link |
Appeal No. 45 of 20…Appeal No. 45 of 2018 | HaryanaHaryana | The appeal was dismissed as withdrawn by the appe…The appeal was dismissed as withdrawn by the appellant. The parties had amicably settled the dispute. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they wanted to withdraw the appeal.", "respondent_claim": "The respondent claimed that the parties had amicably settled the dispute.", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Akshita SharmaAkshita Sharma | BPTP LimitedBPTP Limited | Link |
Appeal No. 44 of 20…Appeal No. 44 of 2018 | HaryanaHaryana | The appeal was dismissed as withdrawn due to the …The appeal was dismissed as withdrawn due to the appellant's application and the parties' amicable settlement. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the appeal should be dismissed as withdrawn.", "respondent_claim": "The respondent claimed that the parties had amicably settled the dispute and had no objection to the appeal being dismissed as withdrawn.", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Antony VargeseAntony Vargese | BPTP LimitedBPTP Limited | Link |
Application No.28 o…Application No.28 of 2021 | HaryanaHaryana | The appellant, Kamla Jain, withdrew her appeal ag…The appellant, Kamla Jain, withdrew her appeal against BPTP Ltd. due to an amicable settlement. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Kamla JainKamla Jain | BPTP LimitedBPTP Limited | Link |
Appeal No. 63 of 20…Appeal No. 63 of 2018 (O & M) | HaryanaHaryana | The appeal was dismissed as withdrawn due to a se…The appeal was dismissed as withdrawn due to a settlement between the appellant and respondent. A copy of the settlement deed was to be submitted to the registry. | ["Settlement", "Wit…["Settlement", "Withdrawal of Appeal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The appeal was dismissed as withdrawn due to a settlement between the appellant and respondent.", "in_favor_of_respondent": "yes"} | Manoj KumarManoj Kumar | BPTP LimitedBPTP Limited | Link |
Complaint No. 561 o…Complaint No. 561 of 2019 | HaryanaHaryana | Complaint dismissed due to lack of attendance by …Complaint dismissed due to lack of attendance by complainant and amicable settlement between parties. | ["Amicable settleme…["Amicable settlement", "Lack of attendance"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed due to lack of attendance by complainant and amicable settlement between parties.", "in_favor_of_respondent": "yes"} | Kuchibotla Naga Cha…Kuchibotla Naga Chandrasekhar | BPTPBPTP | Link |
3023 of 20213023 of 2021 | HaryanaHaryana | The complainant, Rhea Arora, filed a complaint ag…The complainant, Rhea Arora, filed a complaint against M/s BPTP Limited and M/s Countrywide Limited for violation of the Real Estate (Regulation and Development) Act, 2016. The authority rejected the complaint. | ["Real Estate", "Vi…["Real Estate", "Violation of Act"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents violated the Real Estate (Regulation and Development) Act, 2016 by not providing possession of the flat within the stipulated time and by demanding additional charges.", "respondent_claim": "The respondents claimed that they had provided possession of the flat within the stipulated time and that the additional charges were legitimate.", "final_verdict": "The authority rejected the complaint and held that the respondents had not violated the Act.", "in_favor_of_respondent": "yes"} | Rhea AroraRhea Arora | BPTP LimitedBPTP Limited | Link |
25 OF 202025 OF 2020 | HaryanaHaryana | Complaint against B.P.T.P Pvt Ltd for unpaid cost…Complaint against B.P.T.P Pvt Ltd for unpaid cost of Rs 5,000/-, settled out of court. | ["Unpaid cost"]["Unpaid cost"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Paid the cost of Rs 5,000/-", "final_verdict(in detail)": "Complaint stands disposed of.", "in_favor_of_respondent": "yes"} | B.P.T.P Private Lim…B.P.T.P Private Limited | Link | |
97 of 201997 of 2019 | HaryanaHaryana | Complaint against Countrywide Promoters for devel…Complaint against Countrywide Promoters for developing a Group Housing colony without proper registration. Notice was issued but later discharged as the land had been transferred to Puri Constructions. | ["Real Estate", "Re…["Real Estate", "Registration"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The notice issued to Countrywide Promoters was discharged as the land had been transferred to Puri Constructions and registered with HRERA.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
109 of 2019109 of 2019 | HaryanaHaryana | Notice under Section 35 of the Real Estate (Regul…Notice under Section 35 of the Real Estate (Regulation and Development) Act 2016 was issued to the Promoter/developer. The licensed area has been transferred to Puri Construction Pvt. Ltd. | ["Real Estate", "Li…["Real Estate", "License Transfer"] | {"appellant_claim": "", "respondent_claim": "", "…{"appellant_claim": "", "respondent_claim": "", "final_verdict": "The notice is discharged. The matter is disposed of and the file be consigned to the record room.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
105 of 2019105 of 2019 | HaryanaHaryana | The case was disposed of as the license for the p…The case was disposed of as the license for the project was transferred to M/s Puri Constructions Pvt. Ltd. | ["Non-registration …["Non-registration of project"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The notice was discharged and the matter was disposed of as the license has been transferred to M/s Puri Constructions Pvt. Ltd.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
95 of 201995 of 2019 | PanchkulaPanchkula | Complaint regarding license for land measurement.…Complaint regarding license for land measurement. Notice discharged after counsel's statement. | ["License for land …["License for land measurement"] | {"appellant_claim(in detail)": "Complaint regardi…{"appellant_claim(in detail)": "Complaint regarding license for land measurement.", "respondent_claim(in detail)": "Counsel stated that an application has been filed for migration of land under DDJAY and that the project has not been launched as no bookings have been made.", "final_verdict(in detail)": "Notice discharged after counsel's statement.", "in_favor_of_respondent": "yes"} | HRERAHRERA | Countrywide Promote…Countrywide Promoters | Link |
71 & 101 of 201971 & 101 of 2019 | HaryanaHaryana | The case pertains to License Nos. 192 of 2007 and…The case pertains to License Nos. 192 of 2007 and 16 of 2011 for conversion into DDJAY affordable housing colony. The notices are discharged with directions to register projects with the Authority before launching. | ["License Conversio…["License Conversion", "Affordable Housing"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The notices are discharged with directions to register projects with the Authority before launching.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
76,102,65, 69 Of 20…76,102,65, 69 Of 2019 | HaryanaHaryana | The case is regarding the license for a real esta…The case is regarding the license for a real estate project in Haryana. The authority discharged the notice after the promoters provided details about the development status of the project. | ["Real estate proje…["Real estate project license"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "The promoters claimed that they had developed a significant portion of the project and provided details about the remaining areas.", "final_verdict": "The authority discharged the notice after being satisfied with the promoters' explanations.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
72 & 108 of 201972 & 108 of 2019 | HaryanaHaryana | The case pertains to the License Nos. 1042-1046 &…The case pertains to the License Nos. 1042-1046 & 1048-1061 of 2006 and License No. 275 of 2007. The matter is disposed of and discharged accepting the contentions of the learned counsel. | ["License", "Dispos…["License", "Disposal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The matter is disposed of and discharged accepting the contentions of the learned counsel.", "in_favor_of_respondent": "yes"} | Countrywide Promote…Countrywide Promoters | Link | |
106 of 2019106 of 2019 | HaryanaHaryana | Suo-motu complaint for non-registration of ongoin…Suo-motu complaint for non-registration of ongoing project. Promoter submitted application for registration on 09.05.2022. | ["Non-registration …["Non-registration of ongoing project"] | {"appellant_claim": "Non-registration of ongoing …{"appellant_claim": "Non-registration of ongoing project", "respondent_claim": "Submitted application for registration", "final_verdict": "Direction to examine application and consider for registration", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Countrywide Promote…Countrywide Promoters | Link |
MA NO. 397/2023MA NO. 397/2023 | HaryanaHaryana | The complainant sought rectification of an earlie…The complainant sought rectification of an earlier order due to an inadvertent error in the name of their counsel. The authority allowed the rectification and disposed of the application. | ["Rectification of …["Rectification of earlier order"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought rectification of an earlier order due to an inadvertent error in the name of their counsel.", "respondent_claim(in detail)": "The respondent stated that the error was inadvertent and sought rectification.", "final_verdict(in detail)": "The authority allowed the rectification and disposed of the application.", "in_favor_of_respondent": "yes"} | DILEEP KUMAR RASTOGIDILEEP KUMAR RASTOGI | BPTP LIMITEDBPTP LIMITED | Link |
No reviews for this builder yet. Be the first one to share your thoughts!