EXPERION DEVELOPERS PRIVATE LIMITED

  • No of Complaints: 68
  • States (Active in): Haryana
CIN U70109DL2006FTC151343
Year Established 27-Jul-06
Address F- 9, First Floor, Manish Plaza 1, Plot No. 7, MLU, Sector 10, Dwarka, New Delhi DL 110075 IN
Company Status Private

Introduction

Experion Developers Private Limited is a real estate builder primarily operating in Haryana. Like many construction companies, they encounter legal challenges that can significantly impact their reputation and operational capabilities. In this blog post, we will explore their legal journey, analyze patterns in the lawsuits they have faced, and provide potential buyers with valuable insights when considering a purchase from them.

Overview of Legal Challenges

Experion Developers has faced a total of 68 complaints, of which they secured victory in 19 cases while losing 49. Analyzing these figures reveals a significant proportion of losses, prompting a deeper investigation into the nature of the cases.

Legal Case Details:

  • Cases Filed and Lost (Total: 8): The majority of the cases lost resulted from amicable settlements or dismissals. Factors indicating a lack of merit were also prevalent, particularly in cases where the appellant claimed defaults in payments, yet judgments often favored the allottees.
  • Cases Filed and Won (Total: 9): In cases where Experion won, they frequently claimed that respondents failed to meet their financial obligations. The rulings reinforced the importance of contractual adherence on both sides.
  • Cases Lost Against the Builder (Total: 10): Common reasons included procedural dismissals, unilateral cancellations based on default by the builder, and the dismissal of claims due to pending matters in higher forums.
  • Cases Won Against the Builder (Total: 41): The builder appeared more successful when disputes centered around non-payment of dues by consumers and in instances where entitlement to possession was contested.

Analysis of Patterns

Lost Cases:

A few recurring patterns emerge in the cases lost by Experion Developers:

  1. Settlement Prevalence: Many losses resulted in amicable settlements, suggesting a potential strategy employed to resolve disputes swiftly.
  2. Failure to Prove Claims: Several cases were dismissed due to insufficient merit or failure of the builder to justify claims against buyers, particularly in disputing defaults by allottees.
  3. Regulatory Compliance: Issues often arose around the builder's adherence to the stipulations of the Real Estate (Regulation and Development) Act, leading to unfavorable rulings.

Won Cases:

Conversely, patterns in the won cases can be summarized as follows:

  1. Strong Documentation: Successful outcomes frequently hinged on clear documentation and evidence demonstrating that buyers had defaulted or failed to comply with payment schedules.
  2. Navigation of Technical Issues: The builder often won cases by pivoting around technical deficiencies or procedural missteps on the part of complainants.
  3. Issues Focused on Non-Payment: Complaints focusing on non-payment of dues largely favored Experion in court decisions, indicating a robust contractual framework in such scenarios.

Conclusion

The legal history of Experion Developers Private Limited reveals a mixed track record characterized by a larger number of losses compared to wins. This discrepancy underscores the necessity for potential homebuyers to conduct thorough research before engaging with the builder.

Tips for Potential Buyers

  1. Thorough Research: Investigate the builder's past projects, reviews, and any existing legal issues. Understanding previous complaints can provide insights into potential risks.
  2. Demand Transparency: Ensure all transactions and obligations are well-documented, and ask for clear timelines regarding project deliverables.
  3. Consult Legal Experts: Before committing, consult with a real estate attorney to better understand contractual obligations and to protect your investment.

General Tips for Selecting Any Builder

  1. Check Licenses and Accreditations: Verify that the builder has proper licensing and is registered with relevant governing bodies.
  2. Refer to Past Projects: Visit existing projects to gauge construction quality and workmanship.
  3. Read Customer Testimonials: Look for unbiased reviews and experiences from other buyers to gauge satisfaction levels.
  4. Evaluate Financial Stability: Ensure the builder has the financial robustness needed to complete the project without delay.

In wrapping up, while Experion Developers presents some legal challenges, due diligence on the part of potential buyers can mitigate risks associated with purchasing properties from them.

No builder reviews yet. Be the first to share your thoughts!

Delayed Possession Claims Refund and Compensation Disputes Charges for Increased Area Cancellation of Allotment Non-Compliance with Agreements Interest on Delays and Refunds
Error

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
6254/3831 Haryana The complainant alleged non-compliance by the res… ["Non-compliance wi… {"appellant_claim": "The complainant alleged that… Sh. Naresh Arora Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM2MDY5
530/2018 Haryana Complaint against Experion Developers Pvt. Ltd. f… ["Delay in possessi… {"appellant_claim": "Delay in possession of flat … Mr. Sunil Kumar Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/NDE5Mg==
1597/2018 Haryana The complainants, Sanjay Jain and Kokila Jain, fi… ["Non-fulfillment o… {"appellant_claim": "The complainants claimed tha… Kokila Jain Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/NzE2Mw==
614 of 2021 Haryana Complaint filed by Mrs. Mona Bedi against M/s Exp… Non-return of amoun… {"appellant_claim": "The complainant claimed that… Mrs. Mona Bedi Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTA5NTkx
6778 of 2019 Haryana The complainant, Arun Puri, filed a complaint aga… ["Real Estate", "Di… {"appellant_claim": "The complainant claimed that… Arun Puri Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTU4MjQ1
5075 of 2021 Haryana The complainants filed a complaint against the re… ["Delay in possessi… {"appellant_claim": "The complainants claimed tha… Purnima Agarwal Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTI1NjY1
989 of 2019 Haryana The complainants, Anil Sachdeva and Monika Sachde… ["Delay in possessi… {"appellant_claim": "The complainants claimed tha… Monika Sachdeva Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTI1NjY2
1015 of 2019 Haryana The complainants, Chander Shekhar Sachdeva and Am… ["Delay in possessi… {"appellant_claim": "The complainants claimed tha… Amit Sachdeva Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTI1NjY0
2022 of 2022 Haryana The complainant sought refund of the paid-up amou… ["Refund of paid-up… {"appellant_claim": "The complainant sought refun… Sh. Mukesh Sharma Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTMzMDY0
CR/1739/2022 Haryana Complainant Pushpender Sethi withdrew the complai… ["Withdrawal of com… {"appellant_claim": "The complainant wished to wi… Pushpender Sethi Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTI5NTMz
2504 of 2022 Haryana The complainant, Avinash Chandra Swain, filed a c… Refund of paid-up a… {"appellant_claim": "The complainant claimed that… Avinash Chandra Swa… Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM0MTI2
2143/2018 Haryana Complainants sought refund of amount paid to resp… ["Refund of amount … {"appellant_claim": "Complainants sought refund o… Digvijay Singh Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM4NjQ0
CR/1644/2018 Haryana The complainant sought relief against the respond… ["Delayed possessio… {"appellant_claim": "The complainant claimed that… Sunil Kumar Nigam Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTQxMTk0
4911 of 2022 Haryana The complainant, Mr. Prem Pradeep and Mrs. Meena … Non-handover of pos… {"appellant_claim": "The complainants claimed tha… Mrs. Meena Pradeep Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM3OTI1
CR/4443/2021 Haryana Vikas Gupta vs Experion Developers Private limite… ["Real Estate Dispu… {"appellant_claim(in detail)": "Not provided", "r… Vikas Gupta Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTUxMTMx
4575 of 2021 Haryana The complainant sought delay possession charges a… ["Delay possession … {"appellant_claim": "The complainant claimed that… Sidharth Kataria Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTUwNzc0
4732/2022 Haryana The complainants, Gopal Krishan Arora and Sunita … Delay in possession… {"appellant_claim": "The complainants claimed tha… Sunita Arora Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTU3MTMy
1734/2021 Haryana The complainant sought relief against the respond… Delay in possession… {"appellant_claim": "The complainant claimed that… Shweta Gupta Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTY1MTQy
6442 of 2022 Haryana The complainant's allotment was cancelled by the … ["Invalid cancellat… {"appellant_claim": "The complainant claimed that… Nand Jee Singh Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTY0ODQ5
4865 of 2022 Haryana The complainants sought delay possession charges,… ["Delay possession … {"appellant_claim": "The complainants sought dela… Pratibha Subudhi Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTgyNTY2
661 of 2019 Haryana Complainants sought direction for delayed possess… ["Delayed possessio… {"appellant_claim": "Complainants sought directio… Priyanka Yadav Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTA3OTM=
507 of 2019 Haryana Complainant sought return of payment and compensa… ["Non-compliance of… {"appellant_claim": "Complainant sought return of… Anjana Radhu Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTA4Nzky
Settlement Claims Disputes over Payments Allegations of Default Possession and Interim Orders

The analysis of the cases filed by the builder Experion Developers Private Limited, which it lost, reveals significant insights into the nature of disputes and the builder's positions in court.

One of the primary themes identified is Settlement Claims. In multiple instances, the promoter sought to withdraw appeals after reaching amicable settlements with the allottees, suggesting a frequent reliance on negotiation rather than prolonged litigation. The consistent resolutions indicate that both parties found value in coming to terms outside of the courtroom, reflecting a need for closure in their transactions.

Another key theme is Disputes over Payments, where the promoter contended that the allottees had defaulted on payment plans. However, this was met with responses from the allottees questioning the reasonableness of the earnings claimed and highlighting the promoter's inability to demonstrate significant losses due to payment defaults. This recurring motif underscores the importance of clear payment structures and expectations in real estate dealings.

Additionally, the Allegations of Default theme showcases the complexities arising when payment agreements are not strictly adhered to. The builder often argued for the forfeiture of earnest money, but the rulings frequently favored the allottees, suggesting that the courts viewed these forfeiture demands with scrutiny, assessing whether the impositions by the builder were justifiable.

Lastly, cases also delved into Possession and Interim Orders, where the builder attempted to contest interim rulings concerning the handover of property. The disputes typically centered around whether all due payments had been received and if the requests for possession were justified, placing the onus on the builder to substantiate their claims.

Examining these patterns, it is clear that the builder commonly brought cases to court primarily to contest penalties or seek clarity over financial disputes concerning defaults and settlement agreements. A frequent trigger for litigation appears to be disagreements over contract interpretations, especially concerning payment obligations and entitlement to possession of properties.

However, the builder consistently lost these cases due to a few common reasons: a lack of compelling evidence to support claims of defaults, failure to adhere to legal and regulatory mandates, and issues of transparency in dealings with allottees. Notably, in cases involving interim orders, the promoter's failure to comply with previous rulings significantly weakened their position, indicating a possible misalignment with regulatory expectations.

Overall, these case summaries paint a picture of a builder that, despite its proactive litigation stance, often faced challenges in substantiating its claims and adhering to the legal frameworks guiding real estate transactions, highlighting the importance for buyers to scrutinize the legal conduct of potential builders.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
Appeal No.379 of 20… Haryana The appellant-promoter filed an appeal against th… ["Real Estate Dispu… {"appellant_claim": "The appellant-promoter claim… Experion Developers… Surender Kumar Arora https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTEzNDEz
292/2019 & 35/2021 Haryana The appeal was dismissed as it contained no merit… ["Refund", "Earnest… {"appellant_claim": "The appellant claimed that t… Experion Developers… Smt. Kokila Jain https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTMwOTE2
Appeal No. 107 of 2… Haryana The appeal was dismissed as withdrawn after a set… ["Settlement", "Wit… {"appellant_claim": "The appellant claimed that a… Experion Developers… Ms. Monika Sachdeva https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM4Mzk2
Appeal No. 720 of 2… Haryana The appeal was dismissed as withdrawn after the p… ["Settlement", "Ami… {"appellant_claim(in detail)": "The appellant-pro… Experion Developers… Anjana Radhu https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTg0MjE5
Non-payment of Dues Mutual Settlements Technical Defects and Withdrawals

An analysis of the cases filed by the builder, which it won, revealed the following information. The disputes primarily centered around three key themes: Non-payment of Dues, Mutual Settlements, and Technical Defects and Withdrawals.

  1. Non-payment of Dues: A significant number of the cases involved claims from Experion Developers Private Limited that respondents had failed to pay the dues pertaining to real estate projects. In these instances, the builder consistently asserted that payments had not been completed, while the respondents claimed otherwise, often suggesting that services had not been adequately provided. The tribunal consistently ruled in favor of the builder, emphasizing the necessity for buyers to adhere to their financial commitments.
  2. Mutual Settlements: There were a couple of cases where Experion Developers Private Limited claimed that a settlement had been reached with the allottees. Notably, the respondents did not contest these settlements, indicating a mutual consensus on the matters involved. These instances highlight the importance of communication and negotiation in real estate transactions, leading to resolutions without lengthy litigation.
  3. Technical Defects and Withdrawals: One case revolved around technical defects in the appeal itself, which eventually led to the withdrawal of the appeal and permission to file a fresh one. This indicates that not all disputes stem from the builder's actions; sometimes procedural or technical issues merit consideration.

Commonly, the builder brought these cases to court for reasons such as contesting allegations of penalties for project delays, disputing claims of non-compliance by buyers, and addressing misunderstandings regarding payments. The pattern reveals that many times, the builder faced accusations that lacked substantial evidence or were based on misinterpretations by the buyers.

The triumphs of the builder in these cases can often be attributed to the opposing party's insufficient evidence, failure to comply with legal requirements, or misunderstandings surrounding the agreements. This showcases that Experion Developers was adept at defending itself, effectively countering claims that were at times exaggerated or unfounded.

From this comprehensive analysis, it is evident that Experion Developers Private Limited maintains a strong reputation and a capability to navigate the complexities of the real estate market. Buyers should be aware that false accusations can lead to challenging legal battles; hence the builder has shown resilience against unjust claims made by buyers. Overall, while legitimate disputes may arise, Experion has demonstrated a robust capacity to protect its interests and uphold reputational integrity.

In conclusion, potential buyers are advised to exercise caution and make informed decisions. Understanding the dynamics of such cases will assist buyers in differentiating between legitimate concerns and unfounded allegations. As seen in these tribunal rulings, builders like Experion Developers Private Limited can often successfully defend against wrongful claims, thus it's imperative for buyers to approach claims with careful scrutiny and to seek reliable information before forming opinions about a builder's reputation.

This dictionary contains a structured overview of the builder's case themes and a detailed, well-analyzed summary that reflects the patterns and insights extracted from the given case summaries.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
Appeal No.306 of 20… Haryana Experion Developers Pvt. Ltd. vs Sanjay Jain & An… ["Technical defects… {"appellant_claim(in detail)": "The appellant cla… Experion Developers… Sanjay Jain https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/NTE3MTY=
Appeal No.146 of 20… Haryana Experion Developers Pvt. Ltd. withdrew their appe… ["Mutual Settlement… {"appellant_claim(in detail)": "The appellant cla… Experion Developers… Sunil Kumar https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/NTcwNDU=
Appeal No. 108 of 2… Haryana The appeal was dismissed as withdrawn after a set… ["Settlement", "Wit… {"appellant_claim": "The appellant claimed that a… Experion Developers… Mr. Amit Sachdeva https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTM4Mzk4
Pending Matters in Other Forums Unique Case Claims Allegations of Default and Termination Settlement and Rectification Disputes Claims of Misrepresentation and Non-Execution Refund and Compensation Disputes

An analysis of the cases filed against the builder, Experion Developers Private Limited, which the builder won, revealed several insights into recurring themes of disputes and the builder's capacity to successfully defend its position.

  1. Pending Matters in Other Forums: A common theme emerged, where complaints were dismissed due to ongoing proceedings in other legal forums, such as the State Commission of Haryana, Panchkula. This highlights the importance of ensuring that legal matters are not pursued concurrently in different venues, which could lead to dismissals based on jurisdictional grounds.
  2. Unique Case Claims: Some appellants attempted to distinguish their cases as unique, only to find that their claims were deemed identical to prior appeals. Specifically, two appeals were dismissed because they mirrored an earlier case, showcasing a trend where the courts often resist reopening settled issues.
  3. Allegations of Default and Termination: Several disputes revolved around allegations of default by the complainants, resulting in the termination of bookings. In multiple instances, the builder effectively demonstrated that failings on the part of the buyers justified actions taken against them, reinforcing the idea that completing required formalities is crucial for buyers.
  4. Settlement and Rectification Disputes: Notably, cases that indicated a settlement between parties resulted in withdrawals or dismissals. These reflect the importance of amicable resolutions and the courts' inclination to honor settlements. Additionally, several cases were dismissed due to issues surrounding rectification requests that were invalidated by prior appeals, demonstrating procedural misunderstandings by claimants.
  5. Claims of Misrepresentation and Non-Execution: Several claims were made against the builder regarding misrepresentation of project details and associated agreements. However, the builder successfully countered these claims, emphasizing that cancellations were valid due to non-payment and defaults on the part of the complainants. The builders' defense often relied on solid contractual obligations and evidence of buyer defaults.
  6. Refund and Compensation Disputes: Cases involving demands for refunds and compensation based on alleged coercion or misrepresentation frequently ended in favor of the builder. Courts typically found the builders' obligations were met, and buyers failed to uphold their end of agreements.

Through this analysis, we see that while buyers often file complaints for a variety of reasons—ranging from disputes over project execution to allegations of misrepresentation—many of these claims lack sufficient evidence or legal standing. The outcomes often demonstrate the builder's capability to defend itself effectively against these claims, which suggests that Experion Developers Private Limited maintains a strong track record in managing legal disputes.

This analysis serves as a reminder to potential buyers in the real estate market: becoming informed about a builder's reputation is critical. While legitimate disputes arise, the outcomes of these cases indicate that builders can often successfully challenge unjust claims. Prospective buyers should conduct thorough assessments and seek reliable information before forming opinions about a builder’s integrity in this complex market.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
1563/2018 Haryana Complainant withdrew the complaint as possession … ["Withdrawal of com… {"appellant_claim": "Not provided", "respondent_c… Ravinder Pal Singh Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTA3MTU=
CR/5055/2019 Haryana The matter has been settled amicably between the … ["Real Estate Dispu… {"appellant_claim(in detail)": "The complainant, … Rakesh Tyagi Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTQwMjQ2
4949 of 2020 Haryana Complainant sought refund for misrepresentation o… ["Misrepresentation… {"appellant_claim": "Complainant claimed misrepre… Hanna Minz Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTI2NTU0
MA NO. 88/2023 in C… Haryana Complainant Amrita Baid filed a complaint against… ["Rectification of … {"appellant_claim": "The complainant sought to re… Amrita Baid Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTY0Mjcx
7980 of 2022 Haryana The complainant, a buyer, filed a complaint again… ["Cancellation of b… {"appellant_claim": "The complainant claimed that… Baljeet Asthana Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTc1NTQy
Appeal No.455 of 20… Haryana The appeal was withdrawn by the appellant after a… ["Settlement", "Wit… {"appellant_claim(in detail)": "The appellant cla… Vanni Subhash Experion Developers… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/NjY0ODE=
CR/684/2018 Haryana Complaint dismissed as the same matter is pending… ["Forum shopping", … {"appellant_claim": "The complainant claims that … MR. NARINDER NATH A… EXPERION DEVELOPERS… https://haryanarera.gov.in/assistancecontrol/viewOrderPdf/MTY3MjI3