builder logo

KOLTE PATIL DEVELOPERS LIMITED

  • No of Complaints: 58
  • States (Active in): Karnataka, Maharashtra
CIN Not Available
Year Established Not Available
Address Not Available
Company Status Not Available

Understanding KOLTE PATIL DEVELOPERS LIMITED: A Dive into Their Legal Journey

Introduction

KOLTE PATIL DEVELOPERS LIMITED is a prominent builder in the real estate sector, especially recognized in states like Maharashtra and Karnataka. However, like many builders, they have navigated a path filled with legal challenges, which can provide valuable insights for potential buyers.

Overview of Legal Disputes

KOLTE PATIL DEVELOPERS LIMITED has faced a total of 58 complaints, with outcomes split between 23 cases won and 35 cases lost. This imbalance highlights a noteworthy trend in the builder's legal landscape and necessitates a closer examination.

Patterns in Cases Lost

Common Factors
  1. Compensation Claims: A significant number of the cases lost by Kolte Patil involved claims for delay compensation, particularly in their high-profile 'MIRABILIS' project. Complainants frequently cited delays in possession and completion dates as primary reasons for seeking compensation, suggesting that this builder has struggled with timeliness in project delivery.
  2. Settlement and Withdrawal: In many cases, complainants opted to settle outside of court or withdrew their complaints once settlements were agreed upon. This indicates that while Kolte Patil may lose formally, they often manage to resolve disputes amicably, albeit after significant legal wrangling.
  3. Absence of Representation: Several complaints were dismissed or closed due to the continuous absence of the complainants in court. This situation underscores the potential lack of engagement or dissatisfaction among some clients that may lead them to withdraw their claims entirely.

Patterns in Cases Won

Common Factors
  1. Settlement Agreements: Many of the builder’s successful outcomes involved some form of settlement or directive to provide documentation and fulfill contractual obligations, indicating that KOLTE PATIL DEVELOPERS LIMITED may often negotiate favorable outcomes through agreements rather than relying solely on legal victories.
  2. Adjudicating Authority's Support: In several winning cases, the Adjudicating Authorities appeared to favor the builder by recognizing their claims for jurisdiction over the complaints. This suggests that when legal definitions and jurisdiction are clear-cut, the builder has a chance of prevailing in disputes.
  3. Lack of Contest: A notable aspect of the cases won involved instances where the opposing party failed to contest the claims adequately. This pattern demonstrates that the builder can benefit significantly when the opposition does not respond effectively.

Conclusion

KOLTE PATIL DEVELOPERS LIMITED operates in a complex legal environment, with a forward-facing approach to managing disputes that often leads to resolution through settlement rather than outright victory. While their history reflects a pattern of delays and issues with project completion, there are still chances for amicable solutions that favor the builder, especially when the opposing party lacks representation.

Tips for Potential Buyers
  1. Research Thoroughly: Investigate the builder's history and project timelines. Understand their past performance with specific projects to gauge reliability.
  2. Beware of Promised Timelines: Given the history of delays in possession, consider the likelihood of timelines being met and prepare for potential delays.
  3. Seek Professional Advice: Consult with a legal professional before signing contracts to gain a solid understanding of your rights and the builder's obligations.
General Tips for Buyers Choosing Any Builder
  • Check Customer Feedback: Look for reviews and complaints from previous buyers to assess the builder's reputation.
  • Understand the Terms: Ensure that you fully comprehend all terms and conditions, especially regarding timelines and penalties for delays.
  • Look for Transparency: A reliable builder should provide clear communication and transparency regarding project statuses and future timelines.

In navigating the home-buying process, informed decisions lead to better outcomes. Keep these considerations in mind when evaluating KOLTE PATIL DEVELOPERS LIMITED or any other builder.

No builder reviews yet. Be the first to share your thoughts!

Delayed Possession Claims Compensation for Mental Agony and Delay Disputes over Sale Deeds and Agreements Refund and Advance Payment Disputes Penalties for Project Delays

Analysis of the cases filed against Kolte Patil Developers Limited, which it lost, reveals a multitude of challenges faced by the builder in fulfilling its commitments to customers. The cases can be broadly categorized into several themes, each highlighting a significant area of dispute.

The most recurring theme is Delayed Possession Claims. In numerous instances, plaintiffs sought compensation for the builder's failure to deliver possession of their flats within the agreed-upon timeframes. This points to an apparent systemic issue within the builder's project management capabilities, resulting in repeated failures to meet contractual obligations.

Another common theme is Compensation for Mental Agony and Delay. Here, complainants sought damages for the emotional distress and financial hardships caused by the delays. The builder's inability to provide timely possession led to multiple lawsuits seeking various amounts of compensation, indicating a lack of adequate customer care during prolonged wait periods.

Disputes over Sale Deeds and Agreements also feature prominently in the cases against the builder. Several complaints revolved around the builder's reluctance or failure to execute and register appropriate sale deeds, which is critical in real estate transactions. This raises concerns about the builder's adherence to standard practices and contractual requirements.

Additionally, there were Refund and Advance Payment Disputes, where customers sought refunds due to delays or issues with their payments. Some complaints highlighted the builder's collection of exorbitant advance maintenance charges without proper justification, leading to direct financial disputes.

Lastly, the Penalties for Project Delays theme encapsulates the various penalties imposed on the builder for failing to complete projects on time. This includes interest on delays and other financial repercussions mandated by the courts.

The common triggers for these lawsuits primarily revolve around the builder's inability to deliver timely possession, fulfill agreements, and address customer grievances adequately. People brought cases to court largely to seek justice for the emotional distress, financial losses, and unmet expectations caused by the builder's actions.

The builder lost these cases predominantly due to a combination of factors, including insufficient evidence to justify delays, non-compliance with contractual obligations, and failure to respond adequately to customer complaints. The absence of a robust defense in many cases further facilitated the plaintiffs' victories, highlighting potential inadequacies in the builder's legal counsel or litigation strategies.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
CMP/180623/0000951 Karnataka Plaintiff BHARAT GOVINDARAJAN filed a suit agains… ["Delay in possessi… {"appellant_claim": "The plaintiff claimed that t… KOLTE PATIL DEVELOP… https://rera.karnataka.gov.in/reraDocument?DOC=180667
CMP/190708/0003511 Karnataka Complainant seeks compensation for delay in flat … ["Flat possession d… {"appellant_claim": "The complainant seeks compen… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=409296
CMP/220914/0010014 Karnataka Complainant Mr. Praveen Gopinathan filed complain… ["Compensation for … {"appellant_claim": "Complainant claimed compensa… Mr. Praveen Gopinat… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3025622
CMP/220328/0009270 Karnataka The complainants, Mr. Avinash Kumar and Mrs. Chan… Delay in possession… {"appellant_claim": "The complainants claimed tha… Mrs. Chanda Devi Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2790995
13118/2022 Karnataka Complainant Ranjan Lahiri filed a complaint again… ["Refund of advance… {"appellant_claim": "The complainant claimed refu… Ranjan Lahiri Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2428957
CMP/200814/0006387 Karnataka The complainant filed a complaint against the res… ["Delay in possessi… {"appellant_claim": "The complainant claimed that… Complainant Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2790992
CMP /190922 / 00043… Karnataka The complainant, Smt. Jyotirmayee Dehury, filed a… ["Delay in delivery… {"appellant_claim": "The complainant claimed comp… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=603795
CMP/180915/0001273 Karnataka Complainant Venkata Krishna Kotra filed a complai… ["Delay in possessi… {"appellant_claim": "The complainant claimed that… Venkata Krishna Kot… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=250286
CMP/200628/0006093 Karnataka Complaint against Kolte Patil Developers Ltd for … ["Delay in possessi… {"appellant_claim": "Complainant claimed delay in… Complainant Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3274421
CMP/200812/0005887 Karnataka The complainant filed a complaint against the res… Delay in possession… {"appellant_claim": "The complainant claimed that… Complainant Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3274416
00228/2023 Karnataka Complainant Mr. Praveen Gopinathan filed complain… ["Exorbitant advanc… {"appellant_claim": "Complainant claimed that res… Mr. Praveen Gopinat… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3304191
CMP/221102/0010159 Karnataka The complainant, Mr. Praveen Gopinathan, filed a … Compensation for me… {"appellant_claim": "The complainant claimed comp… Mr. Praveen Gopinat… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3208848
CMP/221027/0010133 Karnataka Complainant Mr. Praveen Gopinathan filed a compla… ["Non-payment of pr… {"appellant_claim": "The complainant claimed comp… Mr. Praveen Gopinat… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2915838
CMP/191121/0004745 Karnataka The plaintiff sought delay compensation for Flat … ["Delay Compensatio… {"appellant_claim": "The plaintiff claimed delay … Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=586406
CMP/191030/0004578 Karnataka Complainants sought delay compensation for flat i… ["Delay Compensatio… {"appellant_claim": "The complainants claimed del… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=662179
CMP/190922/0004271 Karnataka Complaint filed by Biswaranjan Sahoo against Kolt… ["Delay Compensatio… {"appellant_claim": "Delay compensation for the p… Biswaranjan Sahoo Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=553646
CMP/190922/0004268 Karnataka Complainant sought delay compensation for delayed… ["Delayed Possessio… {"appellant_claim": "Complainant sought delay com… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=553643
CMP/191221/0003943 Karnataka Complaint withdrawn by the complainant with a dee… ["Complaint withdra… {"appellant_claim": "Seeking refund of the amount… Complainant Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=974632
CMP/190202/0002044 Karnataka The plaintiff, Nikhil Bhave, filed a complaint ag… ["Delay Compensatio… {"appellant_claim": "The plaintiff claimed delay … Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=367727
CMP/180703/0000990 Karnataka The plaintiff, Murugaiyah Pandi, filed a suit aga… ["Delay Compensatio… {"appellant_claim": "The plaintiff claimed that t… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=180669
866 Karnataka The plaintiffs, Jibin Baby and Vidya, sought comp… ["Compensation for … {"appellant_claim": "The plaintiffs claimed that … Vidya Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=171003
CMP/180705/0001007 Karnataka The plaintiff Smita Venugopal filed a complaint a… ["Delay Compensatio… {"appellant_claim": "The plaintiff claimed that t… Smita Venugopal Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=180671
1. CMP/200224/00082% Karnataka Complaints filed against KOLTE PATIL DEVELOPERS L… ["Mirablis project"… {"appellant_claim": "The complainants alleged tha… Mr. Praveen Gopinat… KOLTE PATIL DEVELOP… https://rera.karnataka.gov.in/reraDocument?DOC=851187
Delay Compensation Disputes Adjudicating Officer Jurisdiction Challenges

An analysis of the cases filed by the builder KOLTE PATIL DEVELOPERS LIMITED, which it won, revealed the following information. The cases can be broadly grouped under two primary themes: 'Delay Compensation Disputes' and 'Adjudicating Officer Jurisdiction Challenges'.

  1. Delay Compensation Disputes: Several cases centered around the builder’s claim that the delay compensation rate of 10.25% was excessive, suggesting a disagreement over contractual terms related to project delays. The builder contended that the compensation sought was not aligned with the agreement and often coincided with the provision of electrification, which was a point of contention with respondents.
  2. Adjudicating Officer Jurisdiction Challenges: Numerous instances involved questions regarding whether the Adjudicating Officer had the jurisdiction to decide on matters beyond mere compensation. In these cases, the builder argued that the jurisdiction was exceeded, opposing the claims from respondents who believed the compensation awarded was appropriate.

The common reasons that prompted the builder to bring these cases to court predominantly revolved around contesting penalties and seeking to clarify the terms of engagement as outlined in the agreements. In many of the disputes, KOLTE PATIL DEVELOPERS LIMITED demonstrated a pattern of addressing claims it felt were based on overexaggerated expectations or a misunderstanding of contract provisions.

KOLTE PATIL DEVELOPERS LIMITED emerged victorious in these litigations often due to a lack of substantial evidence from the opposing parties, or the builder's assertion that certain claims failed to adhere to established legal standards. This adeptness in legal arguments reveals a strategic defense, emphasizing contractual obligations and the correct application of legal principles.

This analysis sheds light on the builder’s reputation within the broader real estate market. The patterns suggest that while genuine disputes exist, there is also a risk of unfounded claims being made against builders, leading to convoluted legal battles.

KOLTE PATIL DEVELOPERS LIMITED's record of successfully defending against these claims illustrates its robustness in navigating such challenges, underscoring both a strong commitment to contractual fidelity and an ability to counter fraudulent or inflated accusations.

To potential buyers, this serves as a crucial reminder of the importance of informed decision-making in real estate transactions. While the market does encounter legitimate disputes, the analysis of these cases indicates that builders like KOLTE PATIL DEVELOPERS LIMITED are often positioned to successfully defend their interests when faced with unjust claims. Thus, it is essential for buyers to carefully evaluate claims and seek valid information before drawing conclusions about a builder's reputation.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
Appeal (K-REAT) No.… Karnataka The appellant, Kolte Patil Developers Limited, ch… ["Delay compensatio… {"appellant_claim": "The appellant claimed that t… Kolte Patil Develop… Real Estate Regulat… https://rera.karnataka.gov.in//download_jc?DOC_ID=1253970
Delayed Compensation Claims Refund of Amounts Dispute Settlements Non-Prosecution and Withdrawn Complaints

An analysis of the cases filed against the builder, KOLTE PATIL DEVELOPERS LIMITED, which the builder won, revealed the following information.

Several recurring themes were identified in the disputes, primarily centering around delayed compensation claims and refunds. The majority of cases involved buyers seeking compensation for delays related to specific projects, particularly the 'MIRABILIS' project. Additionally, some cases involved claims for refunds of amounts such as booking fees or property taxes.

In many instances, the plaintiffs claimed compensation or refunds based on perceived delays in possession or project completion. For example, there were multiple cases focused on compensation for delays in the 'MIRABILIS' project, indicating that this may be a common concern among buyers. Other cases involved plaintiffs withdrawing their claims after reaching settlements or failing to appear, highlighting a potential trend where buyers may overreach in their claims without substantial backing.

The builder successfully won these cases for several reasons. A consistent pattern emerged showing insufficient evidence from the opposing party, like the lack of detailed claims or absence of the complainants during hearings. There was also a trend of disputes being settled amicably between the parties, demonstrating that issues could often be resolved without escalating to a legal judgment. In some instances, the complaints were dismissed due to non-prosecution or withdrawal by the complainants, suggesting that not all claims may hold validity.

This analysis conveys a broader understanding of KOLTE PATIL DEVELOPERS LIMITED's reputation in the real estate market. The builder appears to have a robust defensive approach against unwarranted claims, emphasizing a solid legal backing and the ability to navigate disputes effectively. Buyers occasionally file claims that may, at times, be unfounded or exaggerated.

For potential buyers, this analysis serves as a crucial reminder to conduct thorough due diligence when evaluating a builder's reputation. While legitimate disputes can and do arise in the real estate sector, the experiences and outcomes related to KOLTE PATIL DEVELOPERS LIMITED suggest that the builder is well-equipped to defend against unjust accusations. Buyers are advised to approach claims carefully, seeking reliable and comprehensive information to form an informed opinion regarding a builder's credibility and past performance.

This table provides an analysis of individual cases that contributed to the summary above. Click on any row to expand and view complete details, and use the "Show More" button to load additional rows as needed.

Case Number State Summary Case Topic Detailed Summary Appellant Name Respondent Name Source
2286251 Karnataka The complainant filed a case for compensation, bu… ["Compensation disp… {"appellant_claim": "The complainant claimed comp… KOLTE PATIL DEVELOP… https://rera.karnataka.gov.in/reraDocument?DOC=3305570
CMP/200224/0005511 Not provided The plaintiff filed a case against KOLTE PATIL DE… ["Dispute over paym… {"appellant_claim": "The plaintiff claimed return… Mohan KOLTE PATIL DEVELOP… https://rera.karnataka.gov.in/reraDocument?DOC=2078829
142 Karnataka Complaint for delay in possession of flat by resp… ["Delay in possessi… {"appellant_claim": "Delay in possession of flat … Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3135913
CMP/220725/0009809 Karnataka The complainant sought delay compensation and lit… Delay compensation … {"appellant_claim": "The complainant claimed dela… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=4157713
K-RERA 9910/2022 Karnataka Complainant Dhiraj Tatipalli filed a complaint ag… ["Project delay com… {"appellant_claim": "The complainant claimed comp… Dhiraj Tatipalli Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2434139
8-೫೫೩) 911011 /2022 Karnataka Complaint filed by Rakesh Ranjan against Kolte Pa… ["Compensation for … {"appellant_claim": "Compensation for delay in pr… Rakesh Ranjan Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2434008
K-RERA 5166/2022 Karnataka Complainant Mahesh Arkalgud Shivakumar filed a co… ["Project delay com… {"appellant_claim": "The complainant claimed comp… Mahesh Arkalgud Shi… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2434007
K-RERA 11623/2022 Karnataka Complaint against 'MIRABILIS' project by Kolte Pa… ["Settlement", "Com… {"appellant_claim": "Compensation for delay in th… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2434140
K-RERA 11309/2022 Karnataka Complainant Vinayak Ramesh Kamanuri filed a compl… ["Compensation for … {"appellant_claim": "The complainant claimed comp… Vinayak Ramesh Kama… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=2434138
CMP/220919/0010026 Karnataka Complaint filed against Kolte Patil Developers Lt… Refund with interest {"appellant_claim": "Refund of amount with intere… Raghavendra Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3060953
CMP-1002596 Karnataka Complaint filed against Kolte Patil Developers Lt… ["Refund of booking… {"appellant_claim": "Refund of booking amount for… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=3060760
CMP/200301/0005619 Karnataka Complaint filed for delay compensation, later wit… ["Delay compensatio… {"appellant_claim": "Seeking delay compensation f… Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=799199
CMP/190304/0002340 Karnataka The plaintiff, BISHAL PRASAD, filed a complaint a… ["Delay compensatio… {"appellant_claim": "The plaintiff claimed delay … BISHAL PRASAD Kolte Patil Develop… https://rera.karnataka.gov.in/reraDocument?DOC=381545

Interested to buy from this builder?

Assured Callback in 5 mins