MADHAV CONSTRUCTION logo

MADHAV CONSTRUCTION

3.8/5 (1 case analyzed)
  • States Active In: Gujarat
CINNot Available
Year EstablishedNot Available
AddressNot Available
Company StatusNot Available

Overall Case Outcomes

Understanding Madhav Construction: An In-Depth Look at Performance and Customer Feedback

When deciding to invest in real estate, potential buyers look for reliability and a track record of positive customer experiences. Madhav Construction, a builder operating in Gujarat, provides an intriguing case study to analyze with respect to customer feedback and overall performance.

Overview of Madhav Construction

Madhav Construction recently faced scrutiny due to legal challenges that have come to light. With a total of one complaint recorded against them and having lost that case, it is vital to delve deeper into the implications of such a situation.

Legal Case Details

According to the records, Madhav Construction has had one legal case filed against them. Here’s a summary of what transpired:

  • Case Filed Against Madhav Construction: The complainant raised various claims, including requests for possession of keys for their unit, a refund for a video door camera, structural drawings, reimbursement of security deposits, rectification of faulty electrical wiring, and considerations regarding parking arrangements.
  • Defense by Madhav Construction: The builder maintained that the complainant had indeed been provided possession of the flat along with access to the parking lot.
  • Verdict: The RERA authority ultimately sided partially with the complainant, instructing Madhav Construction to deliver all keys and necessary project drawings.

Analysis of Patterns in Legal Cases

Lost Cases:

In examining the single case that Madhav Construction lost, several patterns can be observed:

  • Claims for Basic Amenities and Safety: The case revolved around fundamental accusations concerning the delivery of keys and structural integrity (i.e., faulty wiring). This indicates potential weaknesses in the builder's oversight concerning the basic amenities and safety measures of their constructions.
  • Customer Satisfaction Issues: The claim for reimbursement and refunds hints at customer dissatisfaction, suggesting a disconnect between expectations and the service provided.

Won Cases:

Interestingly, Madhav Construction has no cases won in the records either. This singular case paints a somber picture for a builder, highlighting challenges in fulfilling customer commitments consistently and upfront.

Conclusion: Overall Assessment of Madhav Construction

Based on the provided data, Madhav Construction appears to have some challenges in managing client expectations and ensuring compliance with legal obligations. The single complaint and subsequent loss raise concerns for potential buyers in terms of warranty, transparency, and overall satisfaction.

Tips for Potential Buyers Considering Madhav Construction:

  1. Thorough Research: Before making any commitments, potential buyers should conduct comprehensive research about any builder they consider, particularly looking into reviews and any past legal cases.
  2. Clarify Terms: Clearly outlining and understanding the terms regarding delivery, refunds, and warranties is vital. Potential buyers should negotiate these aspects beforehand.
  3. Inspection Rights: Ensure your agreement includes the right to inspect the property and its amenities before finalizing any purchase.

General Tips for Selecting a Builder:

  • Check Credentials: Research the builder’s past projects and customer feedback extensively. A history of satisfied clients usually indicates reliability.
  • Legal Standing: Ensure that the builder has a clean legal history; this will save you from potential hassles in the future.
  • Seek References: Engage with former clients and ask about their experiences with the builder. Firsthand accounts can provide valuable insights.
  • Look for Inspections: Always get a pre-purchase inspection done to ensure the property meets safety and quality standards.

In conclusion, while Madhav Construction operates within a challenging context of customer satisfaction and legal proceedings in Gujarat, it is crucial for prospective buyers to remain vigilant and informed, ensuring that their investments are sound and secure.

Cases Lost by Builder (When Defending)

Yearly Trend for these Cases

Common Topics
Possession and Key Disputes Refund and Compensation Claims Document and Drawing Provision Amenities and Facility Disputes

Analysis of the cases filed against Madhav Construction, where the builder lost, reveals several key themes and patterns across the disputes. The cases can be broadly categorized into four types: possession and key disputes, refund and compensation claims, document and drawing provision, and amenities and facility disputes.

Many of the complaints revolved around the issue of possession, with buyers seeking to obtain all keys for their units, as well as resolution regarding parking allotments. This highlights a common trigger for litigation in real estate transactions, where buyers often find themselves at odds with builders over the terms of possession and the fulfillment of contractual obligations.

Buyers also frequently sought refunds and compensation for various issues, such as faulty electrical wiring and the cost of video door cameras that were not provided by the builder. These claims often stem from perceived failures on the part of the builder to deliver properties that meet promised specifications and safety standards.

The provision of project drawings and other essential documents was another recurring theme. Buyers need these documents for a variety of reasons, including understanding their property's layout and for future modifications. The builder’s denial of these documents resulted in legal action, leading to a ruling by the RERA authority that emphasized the importance of transparency in real estate transactions.

Finally, disputes around promised amenities and facilities, such as cable provisions in bedrooms, reflect a broader issue in the real estate sector regarding the adherence to contractual promises. Buyers are entitled to expect that their properties will come with agreed-upon features, and builders must deliver on these promises to avoid legal consequences.

The common reasons for Madhav Construction's losses in these cases include a failure to fulfill contractual agreements, provide necessary documentation, and adhere to regulatory requirements. The RERA authority's rulings emphasize the need for builders to prioritize transparency and compliance to ensure customer satisfaction and avoid legal disputes.

Builder Reviews

No reviews for this builder yet. Be the first one to share your thoughts!


Submit Your Review