Overall Case Outcomes
Parsvnath Developers Limited is a notable player in the real estate sector of India, operating primarily in states like Uttar Pradesh, Delhi, Haryana, Rajasthan, and Punjab. However, their legal journey has been turbulent, as highlighted by the high number of complaints and the outcomes of legal cases against them. In this blog, we'll delve into the patterns observed in their legal battles and offer insights for potential buyers.
The overwhelming number of cases lost by Parsvnath Developers Limited signifies potential issues in their operational practices. Here are some common themes identified:
In contrast, the limited number of cases won by Parsvnath Developers Limited suggest instances where:
Overall, Parsvnath Developers Limited presents a mixed profile based on the provided data. The high volume of complaints and the legal struggles paint a concerning picture for potential buyers. Here are some essential tips for potential buyers considering purchasing from this builder:
In summary, while Parsvnath Developers Limited has a notable presence in the Indian real estate market, prospective buyers should exercise caution and perform diligent research before proceeding with any transactions.
Yearly Trend for these Cases
Analysis of the cases filed against Parsvnath Developers Limited, which the builder lost, reveals a multitude of themes surrounding their legal disputes. Most cases revolve around delayed possession claims, where buyers sought refunds or compensation for the builder's failure to deliver properties on time.
The first common theme is Delayed Possession Claims. In numerous instances, the builder was held accountable for significant delays in delivering residential flats and plots. Buyers claimed that despite their payments, the builder had not provided possession, leading to emotional distress and financial losses. The authority consistently directed the builder to refund amounts paid along with interest, often citing the builder's failure to adhere to promised timelines.
Refund and Compensation Disputes constitute another frequent theme. Here, the issues typically revolved around the builder's obligation to return deposits or compensate buyers for delays. The builder's defenses often hinged on claims of unforeseen circumstances or the buyers’ alleged lack of entitlements. However, the adjudicating bodies generally sided with the buyers, emphasizing the need for timely refunds and adequate compensation.
Non-Compliance with RERA and HRERA Rules is a critical theme that emerges from these cases. The builder faced several penalties and legal consequences for failing to comply with the Real Estate (Regulation and Development) Act, 2016, and the Haryana Real Estate Regulatory Authority (HRERA) Rules. Buyers reported instances where the builder did not obtain necessary approvals, registrations, or occupancy certificates, which further aggravated the delays.
Disputes over Allotment and Possession also stand out in these summaries. In various cases, the builder was accused of not allotting properties or delivering possession to buyers who had made substantial payments. The builder's claims of technicalities or prior agreements did not typically resonate with the authorities, who prioritized the buyers' rights to timely possession.
Lastly, the theme of Assured Returns and Interest Payment Delays highlights an important aspect of the builder's obligations. Buyers who invested in commercial units often expected assured returns, which the builder failed to deliver promptly. This resulted in additional claims for interest on overdue payments and compensation for financial distress caused to the buyers.
The patterns emerging from these summaries indicate that buyers commonly brought cases due to the builder's inability to fulfill contractual obligations, particularly concerning timely possession and returns on investment. The builder's defenses were often undermined by their failure to comply with legal frameworks and provide transparency in their dealings.
The reasons the builder lost these cases can be distilled into a few key factors:
In conclusion, the analysis of these cases serves as a cautionary tale for potential buyers of Parsvnath Developers Limited's projects. It highlights the importance of thorough due diligence, ensuring compliance with legal standards, and transparency in builder-buyer relationships.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
4-5A-8-454-5A-8-45 | Madhya PradeshMadhya Pradesh | The applicant, Shri Bhagatram Agarwal, filed a co…The applicant, Shri Bhagatram Agarwal, filed a complaint against Parshnath Developers Ltd for delay in possession of a plot and non-completion of work. The authority rejected the applicant's demand for cancellation and refund, and directed the applicant to pay the remaining amount and register the plot. | ["Delay in possessi…["Delay in possession", "Non-completion of work"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the respondent had delayed possession of the plot by more than 40 years and 6 months, and had not completed the work as per the contract.", "respondent_claim": "The respondent claimed that the applicant had not paid the remaining amount, and that the delay in possession was due to unforeseen circumstances.", "final_verdict": "The authority rejected the applicant's demand for cancellation and refund, and directed the applicant to pay the remaining amount and register the plot.", "in_favor_of_respondent": "no"} | Shri Bhagatram Agar…Shri Bhagatram Agarwal | Parshnath Developer…Parshnath Developers Limited | Link |
13-55543-19-086513-55543-19-0865 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicants for delay in possession of a plot and sought compensation. The Adjudicating Officer awarded compensation at the rate of Rs. 20/- per sq. ft. per month for the period of delay. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicants delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicants claimed that the delay was due to unforeseen circumstances and sought to justify the same.", "final_verdict": "The Adjudicating Officer awarded compensation at the rate of Rs. 20/- per sq. ft. per month for the period of delay.", "in_favor_of_respondent": "no"} | Smt. Archana UmdekarSmt. Archana Umdekar | Parsvnath Builders …Parsvnath Builders & Developers Limited | Link |
NSWR--7-0456NSWR--7-0456 | Madhya PradeshMadhya Pradesh | The applicant booked a plot in the Parsvnath City…The applicant booked a plot in the Parsvnath City project, but the developer failed to deliver possession within the stipulated time. The applicant sought compensation for the delay and other issues. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the developer failed to deliver possession of the plot within the stipulated time and sought compensation for the delay and other issues.", "respondent_claim": "The developer claimed that the delay was due to unforeseen circumstances and that the applicant was not entitled to compensation.", "final_verdict": "The adjudicating officer ordered the developer to grant possession of the plot to the applicant within two months and to pay compensation at the rate of Rs. 20 per square yard per month till the date of grant of possession.", "in_favor_of_respondent": "no"} | Avinash ParanjpeAvinash Paranjpe | Pashvanath Develope…Pashvanath Developers Limited | Link |
1042, 2084, 2087 of…1042, 2084, 2087 of 2019 | HaryanaHaryana | The complainants and respondent reached an amicab…The complainants and respondent reached an amicable settlement, and the complaint was disposed of as compromised. The respondent was directed to ensure that all postdated cheques were honored. | ["Settlement", "Com…["Settlement", "Compromise"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was disposed of as compromised due to an amicable settlement between the parties.", "in_favor_of_respondent": "no"} | Mrs. Mona JainMrs. Mona Jain | Parsvynath Develope…Parsvynath Developers Limited | Link |
236 of 2018236 of 2018 | HaryanaHaryana | The complainants, Mr. Anup Bhargava and Mrs. Jais…The complainants, Mr. Anup Bhargava and Mrs. Jaishree Bhargava, filed a complaint against M/s Parsvnath Developers Pvt. Ltd. and M/s Parsvnath Hessa Developers Pvt. Ltd. for not delivering possession of their flat within the stipulated time. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents failed to deliver possession of their flat within the stipulated time and demanded interest payment for the delay.", "respondent_claim": "The respondents claimed that the delay was due to various factors beyond their control and that the complainants were defaulting in payment of instalments.", "final_verdict": "The authority directed the respondents to give physical possession of the flat to the complainants on the date when the project is likely to be completed and to pay interest at the prescribed rate of 10.45% on the amount deposited by the complainants for every month of delay.", "in_favor_of_respondent": "no"} | Mrs. Jaishree Bharg…Mrs. Jaishree Bhargava | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
RERA-PKL-COMP. 251/…RERA-PKL-COMP. 251/2018 | HaryanaHaryana | Complainants sought refund for flat not completed…Complainants sought refund for flat not completed by respondent. Authority directed respondent to offer flat in completed tower, refund preferential payment, and compensate for delay. | ["Refund for incomp…["Refund for incomplete flat", "Compensation for delay"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants sought refund of Rs. 55,35,705/- paid to the respondent for a flat not completed despite the deemed date of possession being 04.03.2014.", "respondent_claim(in detail)": "The respondent admitted the payment but offered to adjust the complainants in completed towers, compensate for late possession, and refund the preferential amount paid.", "final_verdict(in detail)": "The Authority directed the respondent to offer a flat in Tower 1 or 2 to the complainants, refund the preferential amount paid, and compensate for the delay in the form of interest on the deposited amount.", "in_favor_of_respondent": "no"} | anotheranother | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
169 of 2018169 of 2018 | HaryanaHaryana | Complainant Ravi Khattar booked a flat in Project…Complainant Ravi Khattar booked a flat in Project 'Proston Sonipat' developed by M/s Parsvnath Developers Pvt. Ltd. and sought refund for non-payment of EMIs by the respondent. | ["Non-payment of EM…["Non-payment of EMIs", "Refund"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of money paid to the respondent, refund of EMIs paid by him to the Axis Bank, and payment of unpaid EMIs to the bank directly by the respondent.", "respondent_claim": "The respondent admitted all the facts and claimed that refund should not be allowed at this stage as it would jeopardize the entire project.", "final_verdict": "The Authority directed the respondent to refund the entire amount paid by the complainant, refund the EMIs paid by the complainant to the bank, and pay the remaining EMIs directly to the bank.", "in_favor_of_respondent": "no"} | Ravi KhattarRavi Khattar | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
557/2018557/2018 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of a plot. Authority directed refund with interest. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant purchased a plot from an original buyer and paid 50% of the total sale consideration. Despite a delay of 14 years, no possession has been offered. The complainant seeks a refund of the entire amount paid with interest.", "respondent_claim(in detail)": "The respondent claims that the delay was not intentional. They attribute the delay to the acquisition of the land by the government. They also state that the original allottee applied for registration to avail a discount. The respondent offers to allot an alternate plot to the complainant, subject to mutual consent.", "final_verdict(in detail)": "The Authority directed the respondent to refund the entire amount paid by the complainant at interest calculated as per the State Bank of India's highest marginal cost of lending rate plus 2%. The respondent must make the payment within 60 days in two installments, failing which a penal interest of 18% will be charged.", "in_favor_of_respondent": "no"} | Rajiv SahniRajiv Sahni | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
1332/20181332/2018 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 with no construction started. Authority directed refund with interest and compensation claim to be filed separately. | ["Refund for Undeli…["Refund for Undelivered Flat"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a 4 BHK flat in 2008 and paid Rs. 8,56,200/- out of the total consideration of Rs. 97,08,000/-. He found no construction started in 2015 and sought refund for the entire amount paid along with interest.", "respondent_claim(in detail)": "The respondent admitted the facts alleged by the complainant and offered an alternative flat, but the complainant rejected it.", "final_verdict(in detail)": "The Authority directed the respondent to refund the entire paid amount along with interest as per Rule 15, within 90 days. The complainant was advised to file a separate complaint for compensation.", "in_favor_of_respondent": "no"} | Mukesh KohliMukesh Kohli | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
RERA-PKL-COMP. 26/2…RERA-PKL-COMP. 26/2018 | Not providedNot provided | The complainant and respondent have amicably sett…The complainant and respondent have amicably settled the dispute and filed a written compromise. The complainant has no further grievance against the respondent. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complainant and respondent have amicably settled the dispute and filed a written compromise.", "in_favor_of_respondent": "no"} | Manoj BansalManoj Bansal | Parsynath Developer…Parsynath Developers Limited | Link |
RERA-PKL-303/2018RERA-PKL-303/2018 | HaryanaHaryana | Complainant and respondent reached an amicable se…Complainant and respondent reached an amicable settlement. Respondent issued cheques to complainant, but with a warning that dishonored cheques could lead to penal action. | ["Amicable settleme…["Amicable settlement", "Cheques"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint is disposed of in terms of the settlement arrived at between the parties.", "in_favor_of_respondent": "no"} | PardeepPardeep | Parsynath Developer…Parsynath Developers Limited | Link |
972/2018972/2018 | HaryanaHaryana | Complainant sought refund of balance amount and i…Complainant sought refund of balance amount and interest for delayed flat project. Authority directed refund with interest. | ["Refund for delaye…["Refund for delayed flat project"] | {"appellant_claim(in detail)": "The complainant h…{"appellant_claim(in detail)": "The complainant had booked an apartment and paid Rs.8,34,750/- in 2006 and 2007. Despite no construction work starting, the developer agreed to refund Rs.3,34,750/- in August 2015. The remaining Rs. 5,00,000/- was not refunded. The complainant sought refund of the balance amount and interest for the earlier paid amount.", "respondent_claim(in detail)": "The respondent claimed they had started developing the project according to statutory approvals. Time was not essential for the contract. They applied for RERA registration and stated no intentional delay, citing reasons beyond their control.", "final_verdict(in detail)": "The Authority directed the respondents to refund the remaining amount of Rs. 5,00,000/- along with interest @ provided for in Rule 15 of the HRERA Rules. The interest on this money shall be calculated from the date of making payments by the complainants up to the date of actual refund by the respondents. The respondent should also pay interest to the complainants for the already refunded amount of Rs.3,34,750/- for the period between the receipt of money by the respondent and refund to the complainants.", "in_favor_of_respondent": "no"} | Vineet YadavVineet Yadav | Parsynath Developer…Parsynath Developers Limited | Link |
133 of 2019133 of 2019 | HaryanaHaryana | Complainants paid 95% of basic sale price for sho…Complainants paid 95% of basic sale price for shops, but respondent failed to provide possession within 42 months. Respondent agreed to pay monthly assured returns, but defaulted. | ["Failure to provid…["Failure to provide possession", "Default on monthly assured returns"] | {"appellant_claim": "The complainants paid 95% of…{"appellant_claim": "The complainants paid 95% of the basic sale price for shops, but the respondent failed to provide possession within 42 months. The respondent also defaulted on paying monthly assured returns.", "respondent_claim": "The respondent claimed that they would pay the outstanding monthly returns within 6 months and provide possession within 8-9 months.", "final_verdict": "The Authority directed the respondent to pay the outstanding monthly returns by 03.06.2020 and not to deduct TDS on amounts payable till March, 2018.", "in_favor_of_respondent": "no"} | Ajit Singh DahiyaAjit Singh Dahiya | Parsynath Developer…Parsynath Developers Limited | Link |
537 of 2018537 of 2018 | HaryanaHaryana | Complainant sought early possession of flat and c…Complainant sought early possession of flat and compensation. Authority revived its original order dated 27.11.2018. | ["Possession of fla…["Possession of flat", "Compensation"] | {"appellant_claim": "The complainant sought early…{"appellant_claim": "The complainant sought early possession of the flat and compensation.", "respondent_claim": "The respondent did not file any claim.", "final_verdict": "The Authority revived its original order dated 27.11.2018.", "in_favor_of_respondent": "no"} | Ramesh KumarRamesh Kumar | Parsynath Developer…Parsynath Developers Limited | Link |
87 of 202087 of 2020 | HaryanaHaryana | The complainant sought refund for a delayed real …The complainant sought refund for a delayed real estate project. The authority directed the respondent to refund the amount paid by the complainant with interest. | ["Refund for delaye…["Refund for delayed real estate project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the completion of the real estate project and sought refund for the amount paid.", "respondent_claim": "The respondent claimed that the project was delayed due to unforeseen circumstances and that the complainant was not entitled to a refund.", "final_verdict": "The authority directed the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Bharti SalujaBharti Saluja | Parsynath Developer…Parsynath Developers Limited | Link |
COMPLAINT NO. 1166 …COMPLAINT NO. 1166 OF 2021 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of a residential villa. Authority ordered refund with interest due to breach of agreement. | ["Delayed possessio…["Delayed possession", "Breach of agreement"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed possession of a residential villa.", "respondent_claim": "Not provided", "final_verdict": "Authority ordered refund with interest due to breach of agreement.", "in_favor_of_respondent": "no"} | Mohinder SinghMohinder Singh | Parsynath Developer…Parsynath Developers Limited | Link |
309 of 2021309 of 2021 | HaryanaHaryana | Complainant sought possession of plot, delay inte…Complainant sought possession of plot, delay interest, and refund of preferential location charges. Authority directed respondent to pay delay interest and issue fresh statement of accounts. | ["Delay in possessi…["Delay in possession", "Refund of preferential location charges"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of plot, delay interest, and refund of preferential location charges.", "respondent_claim": "Respondent claimed that delay in possession was due to force majeure conditions and that complainant was not entitled to refund of preferential location charges.", "final_verdict": "Authority directed respondent to pay delay interest and issue fresh statement of accounts.", "in_favor_of_respondent": "no"} | Baljeet MalikBaljeet Malik | Parsynath Developer…Parsynath Developers Limited | Link |
964 of 2021964 of 2021 | HaryanaHaryana | Complainants sought refund for apartment booked i…Complainants sought refund for apartment booked in 2009 due to project delays. Authority directed respondent to refund amounts paid with interest. | ["Project Delay", "…["Project Delay", "Refund"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for apartment booked in 2009 due to project delays.", "respondent_claim": "Respondent claimed that the project was being developed in terms of statutory approvals and that they had completed all development works.", "final_verdict": "Authority directed respondent to refund amounts paid with interest.", "in_favor_of_respondent": "no"} | Payal MittalPayal Mittal | Parsynath Developer…Parsynath Developers Limited | Link |
455 of 2020455 of 2020 | HaryanaHaryana | Complainant seeks refund for amounts paid to resp…Complainant seeks refund for amounts paid to respondent for a flat in an unregistered project. Authority grants refund with interest, but case is adjourned to determine rightful legal heirs. | ["Refund for unregi…["Refund for unregistered project", "Determining rightful legal heirs"] | {"appellant_claim": "Complainant seeks refund for…{"appellant_claim": "Complainant seeks refund for amounts paid to respondent for a flat in an unregistered project.", "respondent_claim": "Respondent claims that the project is not their responsibility and that the complainant should seek refund from the original developer.", "final_verdict": "Authority grants refund with interest, but case is adjourned to determine rightful legal heirs.", "in_favor_of_respondent": "no"} | Smt. Pooja AnandSmt. Pooja Anand | Parsynath Developer…Parsynath Developers Limited | Link |
1417 of 20201417 of 2020 | HaryanaHaryana | The complainant sought refund for a flat booked i…The complainant sought refund for a flat booked in 2006, but the developer failed to deliver possession. The authority granted refund with interest. | ["Refund for Undeli…["Refund for Undelivered Flat"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund for the flat booked in 2006, but the developer failed to deliver possession.", "respondent_claim": "The respondent claimed that the project was being developed in terms of statutory approvals granted by competent authority, but due to certain reasons beyond control, the project got delayed.", "final_verdict": "The authority granted refund with interest to the complainant.", "in_favor_of_respondent": "no"} | Rajpal Singh YadavRajpal Singh Yadav | Parsynath Developer…Parsynath Developers Limited | Link |
1549 and 1550 of 20…1549 and 1550 of 2022 | HaryanaHaryana | Complainants sought refund of amount deposited fo…Complainants sought refund of amount deposited for a flat in an incomplete project. Authority directed respondent to refund the amount with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they had paid for a flat in an incomplete project and sought refund of the amount deposited.", "respondent_claim": "Respondent claimed that the project was delayed due to reasons beyond their control and sought to complete the project.", "final_verdict": "Authority directed respondent to refund the amount deposited by complainants with interest.", "in_favor_of_respondent": "no"} | Saurabh BhargavaSaurabh Bhargava | Parsynath Developer…Parsynath Developers Limited | Link |
625 of 2020625 of 2020 | HaryanaHaryana | Complainant sought relief of possession along wit…Complainant sought relief of possession along with delay interest for a residential plot in the project named as “Parsvnath City Karnal” of the respondent. The Authority observed that offer of possession dated 30.06.2021 made to the complainant is invalid and directed the respondent to issue fresh offer of possession within 45 days. | ["Delay in possessi…["Delay in possession", "Interest calculation"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that an inordinate delay of more than 5 years has already been caused since agreement was signed between them but possession of the plot has not been handed over to him till date.", "respondent_claim": "The respondent stated that on 08.02.2014, the complainant has applied for registration of a residential plot in the new project of the respondent company after knowing complete status of project, which initially was applied by original applicant Mr. Ramesh Kumar.", "final_verdict": "The Authority observed that offer of possession dated 30.06.2021 made to the complainant is invalid and directed the respondent to issue fresh offer of possession within 45 days.", "in_favor_of_respondent": "no"} | Bharat Veer MalikBharat Veer Malik | Parsynath Developer…Parsynath Developers Limited | Link |
1370 of 20221370 of 2022 | HaryanaHaryana | Complainant seeks refund of amount paid along wit…Complainant seeks refund of amount paid along with interest for delayed possession of flat. Authority directs refund of amount with interest. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainant claims refund of…{"appellant_claim": "Complainant claims refund of amount paid along with interest for delayed possession of flat.", "respondent_claim": "Respondent claims that delay was not intentional and seeks dismissal of complaint.", "final_verdict": "Authority directs refund of amount with interest.", "in_favor_of_respondent": "no"} | Ashok Kumar SangwanAshok Kumar Sangwan | Parsynath Developer…Parsynath Developers Limited | Link |
APPEAL-69/2019APPEAL-69/2019 | Uttar PradeshUttar Pradesh | The appellants sought refund of deposited amount …The appellants sought refund of deposited amount with interest and compensation for a delayed real estate project. The appellate tribunal confirmed the impugned judgment with modifications, directing the respondent to refund the amount with interest at 12% per annum. | ["Real estate proje…["Real estate project delay", "Refund of deposited amount"] | {"appellant_claim": "The appellants claimed refun…{"appellant_claim": "The appellants claimed refund of deposited amount with interest and compensation for a delayed real estate project.", "respondent_claim": "The respondent claimed that the delay was due to reasons beyond their control and that they were not at fault.", "final_verdict": "The appellate tribunal confirmed the impugned judgment with modifications, directing the respondent to refund the amount with interest at 12% per annum.", "in_favor_of_respondent": "no"} | Deepak SehajpaulDeepak Sehajpaul | Parsvnath Developer…Parsvnath Developers Limited | Link |
RA-3753/2021RA-3753/2021 | Uttar PradeshUttar Pradesh | Application for recall of order dated 29.11.2021.…Application for recall of order dated 29.11.2021. Case restored to its original number. | ["Recall of order"]["Recall of order"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the counsel for the appellant could not reach the Tribunal well in time due to traffic jam and the case had already been dismissed for want of prosecution.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The application for recall of order dated 29.11.2021 was allowed. The order dated 29.11.2021 was recalled and the case was restored to its original number.", "in_favor_of_respondent": "no"} | TriptachughTriptachugh | Parsvnath Developer…Parsvnath Developers Limited | Link |
RA-3752/2021RA-3752/2021 | Uttar PradeshUttar Pradesh | Application for recall of order dated 29.11.2021.…Application for recall of order dated 29.11.2021. Case restored to its original number. List for final hearing on 07.01.2022. | ["Recall of order"]["Recall of order"] | {"appellant_claim(in detail)": "The appellant's c…{"appellant_claim(in detail)": "The appellant's counsel could not reach the Tribunal on time due to a traffic jam and the case was dismissed for want of prosecution. The appellant claims that the non-appearance was not deliberate and was beyond control.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The application for recall of the order dated 29.11.2021 is allowed. The order is recalled and the case is restored to its original number.", "in_favor_of_respondent": "no"} | TriptachughTriptachugh | Parsvnath Developer…Parsvnath Developers Limited | Link |
APPEAL-296/2019APPEAL-296/2019 | Uttar PradeshUttar Pradesh | The appeal was listed for hearing on 16.11.2021. …The appeal was listed for hearing on 16.11.2021. The respondent was directed to provide a copy of the objection to the grounds of appeal and file an objection in the Registry at least a week before the next date of listing. | ["Appeal Procedure"]["Appeal Procedure"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was listed for hearing on 16.11.2021. The respondent was directed to provide a copy of the objection to the grounds of appeal and file an objection in the Registry at least a week before the next date of listing.", "in_favor_of_respondent": "no"} | MUSTAFA KAMALMUSTAFA KAMAL | Parsvnath Developer…Parsvnath Developers Limited | Link |
RAJRERA-C-2017-2007RAJRERA-C-2017-2007 | RajasthanRajasthan | Complainants sought refund for non-development of…Complainants sought refund for non-development of lawn and other issues in flats. Authority directed developer to cover manholes and develop lawn, and complainants to take possession and point out deficiencies. | ["Non-development o…["Non-development of lawn", "Deficiencies in workmanship and quality"] | {"appellant_claim": "Refund with interest for non…{"appellant_claim": "Refund with interest for non-development of lawn and other issues in flats.", "respondent_claim": "Development of flats as per approved plan and permission, disputes to be settled through discussion or arbitration.", "final_verdict": "Developer to cover manholes and develop lawn, complainants to take possession and point out deficiencies.", "in_favor_of_respondent": "no"} | KavitaKavita | Parsvnath Developer…Parsvnath Developers Limited | Link |
RAJ RERA-C-2018-2164RAJ RERA-C-2018-2164 | RajasthanRajasthan | Complaint withdrawn by the complainant, case dism…Complaint withdrawn by the complainant, case dismissed as infructuous. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint withdrawn, case dismissed as infructuous.", "in_favor_of_respondent": "no"} | Group Captain Pradi…Group Captain Pradip Kumar Routa | Parsvnath Developer…Parsvnath Developers Limited | Link |
RAJRERA-C-2020-3514RAJRERA-C-2020-3514 | RajasthanRajasthan | The applicant, Chandra Shekhar Gupta, filed a com…The applicant, Chandra Shekhar Gupta, filed a complaint against Parsvnath Developers Limited for not delivering possession of a flat and seeking refund of the amount paid. The adjudicating officer directed the respondent to pay the amount with interest and compensation. | ["Refund of amount"…["Refund of amount", "Non-delivery of possession"] | {"appellant_claim": "The applicant claimed that h…{"appellant_claim": "The applicant claimed that he paid Rs.3,50,000/- to Mr. Prashant Gaur and sought refund of the amount with interest and compensation for not delivering possession of the flat.", "respondent_claim": "The respondent claimed that they offered the applicant to take his refund along with interest, but he refused.", "final_verdict": "The adjudicating officer directed the respondent to pay Rs.3,50,000/- and interest on Rs.3,50,000/- at the rate of 7.30% p.a. from 22.05.2012 to till date of payment.", "in_favor_of_respondent": "no"} | Chandra Shekhar Gup…Chandra Shekhar Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
RJ RERA-C- No.2022-…RJ RERA-C- No.2022-5201 | RajasthanRajasthan | The applicant, Rajeev Bhandari, filed a complaint…The applicant, Rajeev Bhandari, filed a complaint against Parsvnath Developers Limited, but later withdrew the complaint stating that the sale deed was executed in the name of Prabhu Dyal. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the sale deed was executed in the name of Prabhu Dyal, but the complaint was filed in the name of Rajeev Bhandari.", "respondent_claim": "None", "final_verdict": "The application for withdrawal was allowed, and the complaint was disposed off.", "in_favor_of_respondent": "no"} | Parsvnath Landmark …Parsvnath Landmark Dev. Limited | Parsvnath Developer…Parsvnath Developers Limited | Link |
RAJRERA-C-2022-4805RAJRERA-C-2022-4805 | RajasthanRajasthan | Complainant Dinesh Agarwal filed a complaint for …Complainant Dinesh Agarwal filed a complaint for refund of Rs.25,18,796 deposited for Flat No. GF-10 in Parsvnath City Centre Bhiwadi project. An ex-parte order was passed on 26.05.2022 allowing the refund with interest. | ["Refund for Flat",…["Refund for Flat", "Parsvnath City Centre"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed a complaint for refund of Rs.25,18,796 deposited for Flat No. GF-10 in Parsvnath City Centre Bhiwadi project.", "respondent_claim(in detail)": "The respondent did not appear before the Authority despite notices being served.", "final_verdict(in detail)": "An ex-parte order was passed on 26.05.2022 allowing the refund with interest.", "in_favor_of_respondent": "no"} | Dinesh AgarwalDinesh Agarwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
RAJ RERA-C-2023-6030RAJ RERA-C-2023-6030 | RajasthanRajasthan | Complainant Dinesh Agrawal filed a complaint agai…Complainant Dinesh Agrawal filed a complaint against Parsvnath Developers Limited for compensation due to delay in possession of a shop. The authority allowed compensation for interest, deficiency in service, loss of opportunity, and physical and mental agony. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainant claimed comp…{"appellant_claim": "The complainant claimed compensation for delay in possession of the shop, financial loss, and physical and mental harassment.", "respondent_claim": "The respondent claimed that the project was completed, and the complainant was given a possession letter, but the project was not operational due to unforeseen reasons.", "final_verdict": "The authority allowed compensation for interest, deficiency in service, loss of opportunity, and physical and mental agony.", "in_favor_of_respondent": "no"} | Dinesh AgrawalDinesh Agrawal | Parsvnath Developer…Parsvnath Developers Limited | Link |
GC No.1772/2020GC No.1772/2020 | PunjabPunjab | Complaint against delay in delivery of possession…Complaint against delay in delivery of possession of flat by Parsvnath Developers Ltd. Authority partly accepted the complaint and directed the respondent to pay the admitted amount and interest for the delay. | ["Delay in delivery…["Delay in delivery of possession"] | {"appellant_claim": "Delay in delivery of possess…{"appellant_claim": "Delay in delivery of possession of flat T7-402 and seeking delivery of possession along with interest for the entire period of delay.", "respondent_claim": "The respondent claimed that the complainant had agreed to the allotment of flat no. T10-502 and hence could not claim possession of the earlier allotment T7-402.", "final_verdict": "The Authority partly accepted the complaint and directed the respondent to pay the admitted amount of Rs 6,08,300/- due for the period till 18.12.2017 within a period of 3 months of the issue of this order. The respondent is further liable to pay interest at the prescribed rate of 9.3% from 18.06.2019 till a valid offer of possession is made to the complainant after obtaining the Completion/Occupation Certificate.", "in_favor_of_respondent": "no"} | Vinit Kumar ChadhaVinit Kumar Chadha | Parsvnath Developer…Parsvnath Developers Limited | Link |
AdC No.1810/2020AdC No.1810/2020 | PunjabPunjab | Complainant sought refund and interest for delaye…Complainant sought refund and interest for delayed flat possession. Authority ordered refund with interest for contravention of Real Estate Act. | ["Delayed possessio…["Delayed possession", "Refund with interest"] | {"appellant_claim": "Refund and interest for dela…{"appellant_claim": "Refund and interest for delayed flat possession", "respondent_claim": "Delay due to COVID-19, flat number change without consent", "final_verdict": "Refund of Rs.7,93,868 with interest as per State Bank of India's highest marginal cost of lending rate plus 2%", "in_favor_of_respondent": "no"} | Mrs PratibhaMrs Pratibha | Parsvnath Developer…Parsvnath Developers Limited | Link |
GC No.0368/2022GC No.0368/2022 | PunjabPunjab | Complainants sought refund and interest for delay…Complainants sought refund and interest for delayed possession of flat in Parsvnath Castle project. Authority directed refund of Rs.15,27,947 with interest for violating RERA provisions. | ["Delayed possessio…["Delayed possession", "RERA violation"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund and interest for delayed possession of flat in Parsvnath Castle project.", "respondent_claim": "Respondent claimed that delay was due to reasons beyond their control and offered a rebate of Rs.5,05,600.", "final_verdict": "Authority directed refund of Rs.15,27,947 with interest for violating RERA provisions.", "in_favor_of_respondent": "no"} | VishwanathVishwanath | Parsvnath Developer…Parsvnath Developers Limited | Link |
AdC No.1307/2019AdC No.1307/2019 | PunjabPunjab | The complainants, Sudha Sail and Lalita Sharma, f…The complainants, Sudha Sail and Lalita Sharma, filed a complaint against Parsvnath Developers Limited for delay in delivery of possession of flats. The Adjudicating Officer held that the respondent was liable to refund the amount paid by the complainants with interest and compensation for mental agony and litigation expenses. | Delay in delivery o…Delay in delivery of possession | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed the delivery of possession of flats and sought refund of the amount paid with interest and compensation for mental agony and litigation expenses.", "respondent_claim": "The respondent claimed that the delay was due to circumstances beyond their control and sought to deny the refund.", "final_verdict": "The Adjudicating Officer held that the respondent was liable to refund the amount paid by the complainants with interest and compensation for mental agony and litigation expenses.", "in_favor_of_respondent": "no"} | Lalita SharmaLalita Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
AdC 1810 of 2020AdC 1810 of 2020 | PunjabPunjab | Complaint for refund and interest due to delay in…Complaint for refund and interest due to delay in completion of real estate project. Compensation awarded for delay, unfair advantage, and harassment. | ["Delay in completi…["Delay in completion of real estate project", "Unfair advantage", "Harassment"] | {"appellant_claim": "Refund and interest due to d…{"appellant_claim": "Refund and interest due to delay in completion of real estate project.", "respondent_claim": "Delay in completion due to COVID-19 pandemic, flat number change without consent, and limitation objection.", "final_verdict": "Complaint partly allowed. Compensation awarded for delay, unfair advantage, and harassment.", "in_favor_of_respondent": "no"} | Mrs. PratibhaMrs. Pratibha | Parsvnath Developer…Parsvnath Developers Limited | Link |
AdC No.0046 of 2022AdC No.0046 of 2022 | PunjabPunjab | The complainants sought compensation for mental p…The complainants sought compensation for mental pain and harassment due to unreasonable delay in handing over possession of a flat booked in the project 'Parsvnath Castle' developed by the respondent. The adjudicating officer held the respondent liable for compensation for the delay and unfair advantage gained. | ["Delay in possessi…["Delay in possession", "Unfair advantage"] | {"appellant_claim": "The complainants claimed com…{"appellant_claim": "The complainants claimed compensation for mental pain and harassment due to unreasonable delay in handing over possession of a flat booked in the project 'Parsvnath Castle' developed by the respondent.", "respondent_claim": "The respondent claimed that the delay was due to circumstances beyond their control and that they had offered compensation for the delay.", "final_verdict": "The adjudicating officer held the respondent liable for compensation for the delay and unfair advantage gained.", "in_favor_of_respondent": "no"} | VishwanathVishwanath | Parsvnath Developer…Parsvnath Developers Limited | Link |
APPEAL NO. 167 OF 2…APPEAL NO. 167 OF 2022 | PunjabPunjab | The appeal was disposed of in terms of a settleme…The appeal was disposed of in terms of a settlement deed between the appellant and respondent. The matter was resolved amicably. | ["Settlement", "Rea…["Settlement", "Real Estate"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal was disposed of in terms of a settlement deed.", "in_favor_of_respondent": "no"} | Dr. Puneet BediDr. Puneet Bedi | Parsvnath Developer…Parsvnath Developers Limited | Link |
Narada Sh-Ra)-9-035Narada Sh-Ra)-9-035 | Madhya PradeshMadhya Pradesh | The applicant, Shri Janakaraj Arora, filed a comp…The applicant, Shri Janakaraj Arora, filed a complaint against Parsvnath Developers Ltd. for financial fraud and seeking refund of the amount paid. The case was resolved through mutual consent and an MoU was executed. | ["Financial Fraud",…["Financial Fraud", "Refund"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the respondent had committed financial fraud by reducing the size of the plot and not returning the excess amount paid.", "respondent_claim": "The respondent claimed that the reduction in plot size was due to modification in the layout plan and that the applicant had not taken possession of the plot as per the agreement.", "final_verdict": "The case was resolved through mutual consent and an MoU was executed, where the respondent agreed to refund the amount paid by the applicant in six installments.", "in_favor_of_respondent": "no"} | Shri Janakaraj AroraShri Janakaraj Arora | Parsvnath Developer…Parsvnath Developers Limited | Link |
4-7-00-49--42524-7-00-49--4252 | Madhya PradeshMadhya Pradesh | The applicant sought refund of consideration amou…The applicant sought refund of consideration amount with interest for delay in possession of a plot. The Authority ordered payment of interest at 6% per annum and compensation for mental distress and suit expenditure. | ["Refund for delay …["Refund for delay in possession"] | {"appellant_claim": "The applicant claimed refund…{"appellant_claim": "The applicant claimed refund of consideration amount with interest for delay in possession of a plot.", "respondent_claim": "The respondent denied the claim and argued that the applicant cannot exit the project after completion.", "final_verdict": "The Authority ordered payment of interest at 6% per annum and compensation for mental distress and suit expenditure.", "in_favor_of_respondent": "no"} | Smt. Kiran SinghSmt. Kiran Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
542 31-2-0554542 31-2-0554 | Madhya PradeshMadhya Pradesh | The applicant sought compensation for delay in gr…The applicant sought compensation for delay in grant of possession by the non-applicants. The Adjudicating Officer awarded interest and compensation to the applicant. | Delay in grant of p…Delay in grant of possession | {"appellant_claim": "The applicant claimed compen…{"appellant_claim": "The applicant claimed compensation for delay in grant of possession by the non-applicants.", "respondent_claim": "The non-applicants claimed that they had completed the development work and were ready to hand over possession.", "final_verdict": "The Adjudicating Officer awarded interest and compensation to the applicant.", "in_favor_of_respondent": "no"} | Shri Jaiprakash GaurShri Jaiprakash Gaur | Parsvnath Developer…Parsvnath Developers Limited | Link |
2 -5542-22-04202 -5542-22-0420 | Madhya PradeshMadhya Pradesh | The applicant sought compensation for delayed pos…The applicant sought compensation for delayed possession of a plot in Parsvnath City, Indore. The adjudicating officer awarded compensation for the delay and interest. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim": "The applicant claimed compen…{"appellant_claim": "The applicant claimed compensation for delayed possession of a plot in Parsvnath City, Indore.", "respondent_claim": "The respondent claimed that the project was not registered with RERA and therefore the provisions of RERA Act were not applicable.", "final_verdict": "The adjudicating officer awarded compensation for the delay and interest.", "in_favor_of_respondent": "no"} | Shri Surendra Singh…Shri Surendra Singh Parihar | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D--7-0490M.I&D--7-0490 | Madhya PradeshMadhya Pradesh | The applicant sought compensation for delay in po…The applicant sought compensation for delay in possession of a plot by the non-applicant. The adjudicating officer determined the compensation and ordered the non-applicant to grant possession and refund the amount due. | ["Compensation for …["Compensation for delay in possession", "Refund of amount due"] | {"appellant_claim": "The applicant claimed compen…{"appellant_claim": "The applicant claimed compensation for delay in possession of the plot and refund of the amount paid.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that the applicant was not entitled to compensation.", "final_verdict": "The adjudicating officer determined that the non-applicant was liable to pay compensation at the rate of Rs. 10 per square yard per month and refund the amount due to the applicant.", "in_favor_of_respondent": "no"} | Shri Rajesh TrivediShri Rajesh Trivedi | Parsvnath Developer…Parsvnath Developers Limited | Link |
M-I&D-47-069M-I&D-47-069 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and non-compliance with the contract terms. The adjudicating officer passed an order directing the non-applicant to grant possession of the plot and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Non-compliance with contract terms"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not complied with the terms of the contract.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that they had complied with the terms of the contract.", "final_verdict": "The adjudicating officer directed the non-applicant to grant possession of the plot to the applicant and pay compensation to the applicant for the delay.", "in_favor_of_respondent": "no"} | Shri Rakesh TrivediShri Rakesh Trivedi | Parsvnath Developer…Parsvnath Developers Limited | Link |
NSWR--7-0447NSWR--7-0447 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot. The adjudicating officer passed an order directing the non-applicant to grant possession and pay compensation. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to adjust the compensation amount.", "final_verdict": "The adjudicating officer directed the non-applicant to grant possession of the plot and pay compensation to the applicant.", "in_favor_of_respondent": "no"} | Shri Rajendra Puran…Shri Rajendra Purandare | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR--7-0428MSWR--7-0428 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and non-performance of development work. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation to the applicant. | Delay in possession…Delay in possession of plot and non-performance of development work | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not performed development work as per the contract.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that they had made efforts to complete the development work.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot to the applicant and pay compensation at the rate of Rs. 20 per square yard per month from 04.05.2047 to 03.09.2048.", "in_favor_of_respondent": "no"} | Shri Himanshu Praka…Shri Himanshu Prakash Pathak | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR-47-0474MSWR-47-0474 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot. The Adjudicating Officer passed an order directing the non-applicant to grant possession and pay compensation. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to justify the same.", "final_verdict": "The Adjudicating Officer directed the non-applicant to grant possession of the plot to the applicant and pay compensation at the rate of Rs. 40 per square yard per month from 04-09-2048 onwards.", "in_favor_of_respondent": "no"} | Shri Amit KashmirisShri Amit Kashmiris | Parsvnath Developer…Parsvnath Developers Limited | Link |
NSWR,.-47-060NSWR,.-47-060 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and sought compensation. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation to the applicant. | Delay in possession…Delay in possession of plot | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to justify the same.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot to the applicant and pay compensation to the applicant.", "in_favor_of_respondent": "no"} | Smt. Vidha PurandareSmt. Vidha Purandare | Parsvnath Developer…Parsvnath Developers Limited | Link |
M-I.AND, D-47-0094M-I.AND, D-47-0094 | Madhya PradeshMadhya Pradesh | The appellant, Shrimati Priti Jain, filed a compl…The appellant, Shrimati Priti Jain, filed a complaint against M/s Parsvnath Developers Limited for not providing possession of a plot in the Parsvnath City project in Indore. The appellant sought compensation for the delay and interest on the amount paid. | Delay in possession…Delay in possession of plot and compensation | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had not provided possession of the plot within the stipulated time period and sought compensation for the delay and interest on the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and offered to provide compensation at the rate of Rs. 10 per square yard per month.", "final_verdict": "The respondent was directed to provide possession of the plot to the appellant within two months from the date of the order and pay compensation at the rate of Rs. 45 per square yard per month for the period from 04-05-2047 to 04-09-2048.", "in_favor_of_respondent": "no"} | Shrimati Priti JainShrimati Priti Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
K̍. NSWR-7-0095K̍. NSWR-7-0095 | Madhya PradeshMadhya Pradesh | The applicant booked a plot in the Parsvnath City…The applicant booked a plot in the Parsvnath City project but did not receive possession despite paying most of the amount. The non-applicant was ordered to return the amount due to the applicant and pay compensation for the delay. | Delay in possession…Delay in possession of plot | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that they did not receive possession of the plot despite paying most of the amount and sought compensation for the delay.", "respondent_claim": "The non-applicant claimed that the delay was due to various reasons, including completion of the project being delayed due to certain reasons.", "final_verdict": "The non-applicant was ordered to return the amount due to the applicant and pay compensation for the delay.", "in_favor_of_respondent": "no"} | Shri Yatin Lalit Wa…Shri Yatin Lalit Waikar | Parsvnath Developer…Parsvnath Developers Limited | Link |
K̍. MSWR,-47-057K̍. MSWR,-47-057 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and sought compensation. The Adjudicating Officer passed an order directing the non-applicant to grant possession and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to compensate the applicant at a lower rate.", "final_verdict": "The Adjudicating Officer directed the non-applicant to grant possession of the plot to the applicant and pay compensation at the rate of Rs. 20 per square yard per month from 04-05-2047 to 30-06-2048.", "in_favor_of_respondent": "no"} | Mr. Sunil GuptaMr. Sunil Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I.&D-47--0274M.I.&D-47--0274 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against M/s Parsv…The applicant filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and non-development of the project. The Adjudicating Officer passed an order directing the non-applicant to grant possession of the plot and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Non-development of project"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not developed the project as per the agreement.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that the project was still under development.", "final_verdict": "The Adjudicating Officer directed the non-applicant to grant possession of the plot to the applicant and pay compensation to the applicant for the delay.", "in_favor_of_respondent": "no"} | Shri Vaideshmitra S…Shri Vaideshmitra Singh Raghuvanshi | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D-47-0273M.I&D-47-0273 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against M/s Parsv…The applicant filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and sought compensation. The Adjudicating Officer passed an order directing the non-applicant to give possession of the plot and pay compensation at the rate of Rs. 20 per square yard per month. | Delay in possession…Delay in possession of plot and compensation | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot for 8-9 years and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to adjust the compensation amount.", "final_verdict": "The Adjudicating Officer directed the non-applicant to give possession of the plot to the applicant by 05-09-2048 and pay compensation at the rate of Rs. 20 per square yard per month.", "in_favor_of_respondent": "no"} | Shri Sanjiv DubeyShri Sanjiv Dubey | Parsvnath Developer…Parsvnath Developers Limited | Link |
K.N.S.W.R.-7-0222K.N.S.W.R.-7-0222 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Swati Mittal, filed a complai…The applicant, Smt. Swati Mittal, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and compensation. The Adjudicating Officer passed an order directing the non-applicant to give possession of the plot and pay compensation. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and did not pay compensation as per the contract.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they had paid compensation as per the contract.", "final_verdict": "The Adjudicating Officer directed the non-applicant to give possession of the plot and pay compensation at the rate of Rs. 40 per square yard per month for the period from 04.05.2047 to 06.09.2048.", "in_favor_of_respondent": "no"} | Smt. Swati MittalSmt. Swati Mittal | Parsvnath Developer…Parsvnath Developers Limited | Link |
KM-SWR-47-0243KM-SWR-47-0243 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Rashmi Kulkarni, filed a comp…The applicant, Smt. Rashmi Kulkarni, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and non-development of the project. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation for the delay. | Delay in possession…Delay in possession of plot and non-development of project | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not developed the project as per the agreement.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they had completed the development work.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot to the applicant and pay compensation for the delay.", "in_favor_of_respondent": "no"} | Smt. Rashmi KulkarniSmt. Rashmi Kulkarni | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D-47-0405M.I&D-47-0405 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Deepti Lad, filed a complaint…The applicant, Smt. Deepti Lad, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and non-performance of development work. The Adjudicating Officer passed an order directing the non-applicant to give possession of the plot and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Non-performance of development work"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not performed the development work as per the contract.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they had not received the completion certificate from the authorities.", "final_verdict": "The Adjudicating Officer directed the non-applicant to give possession of the plot to the applicant and pay compensation at the rate of Rs. 40 per square yard per month for the period from 30.04.2047 to 06.09.2048, and at the rate of Rs. 45 per square yard per month for the period from 06.09.2048 to 07.09.2048.", "in_favor_of_respondent": "no"} | Smt. Deepti LadSmt. Deepti Lad | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR,.-47-0437MSWR,.-47-0437 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against M/s Parsv…The applicant filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and non-implementation of development work. The Adjudicating Officer passed an order directing the non-applicant to pay compensation and grant possession of the plot. | Delay in possession…Delay in possession of plot and non-implementation of development work | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not implemented development work as per the contract.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they had paid compensation to the applicant.", "final_verdict": "The Adjudicating Officer directed the non-applicant to pay compensation to the applicant and grant possession of the plot.", "in_favor_of_respondent": "no"} | Shri Ashish PatniShri Ashish Patni | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D-47-0620M.I&D-47-0620 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against M/s Parsv…The applicant filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and non-development of the project. The Adjudicating Officer passed an order directing the non-applicant to grant possession of the plot and pay compensation for the delay. | Delay in possession…Delay in possession of plot and non-development of project | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant had delayed possession of the plot and had not developed the project as per the agreement.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they had completed the development work.", "final_verdict": "The Adjudicating Officer directed the non-applicant to grant possession of the plot to the applicant and pay compensation for the delay.", "in_favor_of_respondent": "no"} | Shri Pankaj Kumar D…Shri Pankaj Kumar Dixit | Parsvnath Developer…Parsvnath Developers Limited | Link |
NSWR-47-0047NSWR-47-0047 | Madhya PradeshMadhya Pradesh | The applicant booked two plots in the Parsvnath C…The applicant booked two plots in the Parsvnath City project in Indore, but did not receive possession within the stipulated time. The applicant sought compensation for the delay and other expenses. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that they did not receive possession of the plots within the stipulated time and sought compensation for the delay and other expenses.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they were ready to pay compensation for the period of delay.", "final_verdict": "The Adjudicating Officer ordered the respondent to pay compensation to the applicant at the rate of Rs. 40 per square yard per month from 0.05.2047 to 06.09.2048, and at the rate of Rs. 45 per square yard per month from 06.09.2048 onwards.", "in_favor_of_respondent": "no"} | Shri Milind KulkarniShri Milind Kulkarni | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D--7--0275M.I&D--7--0275 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Saksham Dubey, filed a compla…The applicant, Smt. Saksham Dubey, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and sought compensation. The Adjudicating Officer passed an order directing the non-applicant to grant possession and pay compensation at the rate of Rs. 40 per square yard per month. | Delay in possession…Delay in possession of plot and compensation | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to pay compensation at a lower rate.", "final_verdict": "The Adjudicating Officer directed the non-applicant to grant possession of the plot and pay compensation at the rate of Rs. 40 per square yard per month.", "in_favor_of_respondent": "no"} | Smt. Saksham DubeySmt. Saksham Dubey | Parsvnath Developer…Parsvnath Developers Limited | Link |
N-I&D--7--0480N-I&D--7--0480 | Madhya PradeshMadhya Pradesh | The applicant booked a plot in the Parsvnath City…The applicant booked a plot in the Parsvnath City project but did not receive possession within the stipulated time. The non-applicant, Parsvnath Developers Ltd., was ordered to pay compensation for the delay and grant possession of the plot. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that they did not receive possession of the plot within the stipulated time and sought compensation for the delay.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and that they were not liable for compensation.", "final_verdict": "The non-applicant was ordered to pay compensation for the delay and grant possession of the plot to the applicant.", "in_favor_of_respondent": "no"} | Shri Amol DeshmukhShri Amol Deshmukh | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR--47-0599MSWR--47-0599 | Madhya PradeshMadhya Pradesh | The applicant booked a plot in the Parsvnath City…The applicant booked a plot in the Parsvnath City project in Indore and sought compensation for delay in possession. The Adjudicating Officer determined the compensation and granted possession of the plot. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed compen…{"appellant_claim": "The applicant claimed compensation for delay in possession of the plot and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to certain reasons and offered to give compensation at a lower rate.", "final_verdict": "The Adjudicating Officer determined the compensation at a rate of Rs. 40 per square yard per month for the period before 04.05.2007 and Rs. 15 per square yard per month for the period after 04.05.2007. The respondent was directed to grant possession of the plot and refund the amount due to the applicant.", "in_favor_of_respondent": "no"} | Shri Shyam HaryaniShri Shyam Haryani | Parsvnath Developer…Parsvnath Developers Limited | Link |
N.I&D-47-0099N.I&D-47-0099 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot. The Adjudicating Officer passed an order directing the non-applicant to give possession of the plot and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to justify the same.", "final_verdict": "The Adjudicating Officer directed the non-applicant to give possession of the plot to the applicant and pay compensation at the rate of Rs. 45 per square yard per month from 04.05.2047 to 07.09.2048.", "in_favor_of_respondent": "no"} | Smt. Deepali KherSmt. Deepali Kher | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR-48-002MSWR-48-002 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Priti Gupta, filed a complain…The applicant, Smt. Priti Gupta, filed a complaint against M/s Parsvnath Developers Ltd. for not giving possession of development work within stipulated time. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant did not give possession of the development work within stipulated time and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay in possession was due to various reasons and sought to justify the same.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot and compensation to the applicant.", "in_favor_of_respondent": "no"} | Smt. Priti GuptaSmt. Priti Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
MSWR-47-066MSWR-47-066 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and non-development of the block. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation. | ["Delay in possessi…["Delay in possession", "Non-development of block"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and did not develop the block.", "respondent_claim": "The non-applicant claimed that the delay was due to various reasons and that they had developed the block as per the contract.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot and pay compensation at the rate of Rs. 20 per square yard per month till the date of offer of possession.", "in_favor_of_respondent": "no"} | Shri Sanjoy Kumar S…Shri Sanjoy Kumar Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
M.I&D--7--0453M.I&D--7--0453 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and non-development of the block. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation. | Delay in possession…Delay in possession and non-development | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant did not develop the block and delayed possession of the plot.", "respondent_claim": "The non-applicant claimed that the development work was done within 24 months and possession was granted to the applicant.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot and pay compensation at the rate of Rs. 20 per square yard per month till the date of offer of possession.", "in_favor_of_respondent": "no"} | Nitesh JainNitesh Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
NSWR--47-0593NSWR--47-0593 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and sought compensation. The Adjudicating Officer passed an order directing the non-applicant to give possession of the plot and pay compensation to the applicant. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to certain reasons and sought to pay compensation at a lower rate.", "final_verdict": "The Adjudicating Officer directed the non-applicant to give possession of the plot and pay compensation to the applicant at the rate of Rs. 45 per square yard per month.", "in_favor_of_respondent": "no"} | Smt. K. PadmavathiSmt. K. Padmavathi | Parsvnath Developer…Parsvnath Developers Limited | Link |
NSWR--7-0087NSWR--7-0087 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and non-development of the block. The adjudicating officer passed an order directing the non-applicant to give possession of the plot and pay compensation. | ["Delay in possessi…["Delay in possession", "Non-development of block"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and did not develop the block.", "respondent_claim": "The non-applicant claimed that the delay was due to various reasons, including government approvals and market conditions.", "final_verdict": "The adjudicating officer directed the non-applicant to give possession of the plot within two months and pay compensation at the rate of Rs. 40 per square yard per month.", "in_favor_of_respondent": "no"} | Shri Sachin JainShri Sachin Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
04--4571-18--029304--4571-18--0293 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Rajshree Agrawal, filed a com…The applicant, Smt. Rajshree Agrawal, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and excess interest charged. The Adjudicating Officer passed an order in favor of the applicant, directing the non-applicant to pay the consideration amount with 9% interest and compensation for mental distress. | ["Delay in possessi…["Delay in possession", "Excess interest"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and charged excess interest at the rate of 24% per annum.", "respondent_claim": "The non-applicant claimed that the interest rate was as per the contract and that the delay was due to unforeseen circumstances.", "final_verdict": "The Adjudicating Officer directed the non-applicant to pay the consideration amount with 9% interest per annum and compensation for mental distress.", "in_favor_of_respondent": "no"} | Smt. Rajshree Agraw…Smt. Rajshree Agrawal | Parsvnath Developer…Parsvnath Developers Limited | Link |
4--5$572-18-04 474--5$572-18-04 47 | Madhya PradeshMadhya Pradesh | The applicant, Smt. Jayshree Lakhotia, filed a co…The applicant, Smt. Jayshree Lakhotia, filed a complaint against M/s Parsvnath Developers Ltd. for delay in possession of a plot and excess interest charged. The Adjudicating Officer passed an order in favor of the applicant, directing the non-applicant to pay the principal amount with interest and compensation for mental distress. | ["Delay in possessi…["Delay in possession", "Excess interest"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot and charged excess interest at the rate of 24% per annum.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that the interest rate was as per the contract.", "final_verdict": "The Adjudicating Officer directed the non-applicant to pay the principal amount with interest at the rate of 9% per annum and compensation for mental distress.", "in_favor_of_respondent": "no"} | Smt. Jayshree Lakho…Smt. Jayshree Lakhotia | Parsvnath Developer…Parsvnath Developers Limited | Link |
2-$51-18--05862-$51-18--0586 | Madhya PradeshMadhya Pradesh | The applicant filed a complaint against the non-a…The applicant filed a complaint against the non-applicant for delay in possession of a plot and sought compensation. The Authority held that the non-applicant was liable for delay and awarded compensation at the rate of Rs. 45 per square yard per month. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The applicant claimed that t…{"appellant_claim": "The applicant claimed that the non-applicant delayed possession of the plot by 400 months and sought compensation for the same.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and sought rejection of the applicant's complaint.", "final_verdict": "The Authority held that the non-applicant was liable for delay and awarded compensation at the rate of Rs. 45 per square yard per month.", "in_favor_of_respondent": "no"} | Shri Dheeraj Kumar …Shri Dheeraj Kumar Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
7-55743--18--12957-55743--18--1295 | Madhya PradeshMadhya Pradesh | The applicant sought compensation for delay in po…The applicant sought compensation for delay in possession of a plot by the non-applicant. The Adjudicating Officer awarded compensation at the rate of Rs. 45 per square yard per month for the period of delay. | ["Compensation for …["Compensation for delay in possession"] | {"appellant_claim": "The applicant claimed compen…{"appellant_claim": "The applicant claimed compensation for delay in possession of the plot by the non-applicant.", "respondent_claim": "The non-applicant claimed that the delay was due to unforeseen circumstances and that the applicant had not suffered any loss.", "final_verdict": "The Adjudicating Officer awarded compensation at the rate of Rs. 45 per square yard per month for the period of delay.", "in_favor_of_respondent": "no"} | Shri Dinesh ManglaniShri Dinesh Manglani | Parsvnath Developer…Parsvnath Developers Limited | Link |
244/2018244/2018 | HaryanaHaryana | Complaint against Parsvnath Hessa Developers Pvt.…Complaint against Parsvnath Hessa Developers Pvt. Ltd. and Parsvnath Developers Ltd. for not giving possession of flat on due date and delay in completion of project. | ["Delay in possessi…["Delay in possession", "Delay in project completion"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondents did not give possession of the flat on due date and delayed the completion of the project.", "respondent_claim": "The respondents claimed that the delay was due to various reasons including beneficiary interest policy (BIP) laid down by the government and that the project was not an ongoing project as per Rule 2(0) of the Haryana Real Estate (Regulation and Development) rules 2017.", "final_verdict": "The authority held that the respondents failed to give possession of the flat on due date and delayed the completion of the project. The authority directed the respondents to give interest to the appellant at the prescribed rate of 10.45% on the amount deposited by the appellant for every month of delay.", "in_favor_of_respondent": "no"} | Kish Exportes Limit…Kish Exportes Limited | Parsvnath Developer…Parsvnath Developers Limited | Link |
204 of 2018204 of 2018 | HaryanaHaryana | The complainant, Mr. Mohit Khirbat, filed a compl…The complainant, Mr. Mohit Khirbat, filed a complaint against M/s Parsvnath Hessa Developers Pvt. Ltd. and M/s Parsvnath Developers Ltd. for not handing over the possession of the flat within the due date. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents did not hand over the possession of the flat within the due date and sought interest payment for the delayed period.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including the beneficiary interest policy laid down by the government.", "final_verdict": "The authority directed the respondents to pay interest to the complainant at the prescribed rate of 10.45% for every month of delay till the handing over of possession.", "in_favor_of_respondent": "no"} | Mr. Mohit KhirbatMr. Mohit Khirbat | Parsvnath Developer…Parsvnath Developers Limited | Link |
697 of 2018697 of 2018 | HaryanaHaryana | Complainants sought refund and compensation for d…Complainants sought refund and compensation for delayed possession of flat in Parsvnath Exotica project. Authority directed refund with interest but not compensation. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund and compensation for delayed possession of flat in Parsvnath Exotica project.", "respondent_claim": "Respondents claimed that delay was due to reasons beyond their control and that complainants were aware of the status of the project at the time of purchase.", "final_verdict": "Authority directed refund with interest but not compensation.", "in_favor_of_respondent": "no"} | Ms. Hariti JainMs. Hariti Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1008/20181008/2018 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed possession of flat in Parsvnath Exotica project. Authority directed refund with interest and compensation for delay. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainant claimed refund a…{"appellant_claim": "Complainant claimed refund and compensation for delayed possession of flat beyond agreed date of 17.08.2013.", "respondent_claim": "Respondent claimed delay was due to unforeseen circumstances and not their fault.", "final_verdict": "Authority directed refund of deposited amount with 10.75% interest per annum for 90 days and compensation for delay at 10.75% per annum from date of receipt to date of refund.", "in_favor_of_respondent": "no"} | Vivek BishtVivek Bisht | Parsvnath Developer…Parsvnath Developers Limited | Link |
1945 of 20181945 of 2018 | HaryanaHaryana | Complainants sought interest for delay in possess…Complainants sought interest for delay in possession of flat. Authority directed payment of delayed possession charges at prescribed rate of interest. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainants sought interest…{"appellant_claim": "Complainants sought interest for delay in possession of flat.", "respondent_claim": "Respondents claimed that the project was not registered with RERA and that the complainants were not entitled to interest.", "final_verdict": "Authority directed payment of delayed possession charges at prescribed rate of interest.", "in_favor_of_respondent": "no"} | Mrs. Pratima ChettriMrs. Pratima Chettri | Parsvnath Developer…Parsvnath Developers Limited | Link |
3103 of 20193103 of 2019 | HaryanaHaryana | Complaint filed by allottees for violation of sec…Complaint filed by allottees for violation of section 11(4)(a) of the Real Estate (Regulation and Development) Act, 2016. Authority directed respondent to pay interest and not charge anything not part of the flat buyers agreement. | ["Delay in possessi…["Delay in possession", "Non-compliance with RERA"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent failed to deliver possession of the flat within the stipulated time and did not provide the occupancy certificate.", "respondent_claim": "The respondent claimed that the delay was due to reasons beyond their control and that they had raised all the demands as per the down payment plan.", "final_verdict": "The Authority directed the respondent to pay interest at the prescribed rate of 10.20% till the offer of possession after getting OC from the competent authority.", "in_favor_of_respondent": "no"} | Rahul RaturiRahul Raturi | Parsvnath Developer…Parsvnath Developers Limited | Link |
2329 of 20192329 of 2019 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed respondents to pay interest and comply with flat buyer's agreement. | ["Delayed possessio…["Delayed possession", "Non-compliance with flat buyer's agreement"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought possession of the flat and compensation for delay in possession. The complainant alleged that the respondents failed to deliver possession within the stipulated time and failed to obtain the occupation certificate.", "respondent_claim(in detail)": "The respondents claimed that the delay was due to reasons beyond their control and that they had raised all demands as per the construction linked payment plan.", "final_verdict(in detail)": "The Authority directed the respondents to pay interest at the prescribed rate of 10.20% till the actual offer of possession after getting OC from the competent authority. The Authority also directed the complainant to pay outstanding dues, if any, after adjustment of DPC. The respondents were further directed not to charge anything which is not part of the flat buyers agreement.", "in_favor_of_respondent": "no"} | Sameer BhargavaSameer Bhargava | Parsvnath Developer…Parsvnath Developers Limited | Link |
3592 of 20193592 of 2019 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed payment of interest for delayed possession and compliance with flat buyer's agreement. | ["Delayed possessio…["Delayed possession", "Non-compliance with flat buyer's agreement"] | {"appellant_claim": "The complainant sought posse…{"appellant_claim": "The complainant sought possession of the flat and compensation for delay in delivery of possession.", "respondent_claim": "The respondent claimed that the delay was due to reasons beyond their control and that they had raised all demands as per the construction-linked payment plan.", "final_verdict": "The Authority directed the respondent to pay interest at the prescribed rate of 10.20% till the actual offer of possession after getting OC from the competent authority.", "in_favor_of_respondent": "no"} | Pramod AroraPramod Arora | Parsvnath Developer…Parsvnath Developers Limited | Link |
2327 of 20192327 of 2019 | HaryanaHaryana | Complainant sought possession of flat and compens…Complainant sought possession of flat and compensation for delay. Authority directed respondents to pay interest for delay and not charge excess amounts. | ["Delay in possessi…["Delay in possession", "Excess charges"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and compensation for delay.", "respondent_claim": "Respondents claimed delay was due to reasons beyond their control and not intentional.", "final_verdict": "Authority directed respondents to pay interest for delay and not charge excess amounts.", "in_favor_of_respondent": "no"} | Meera BhargavaMeera Bhargava | Parsvnath Developer…Parsvnath Developers Limited | Link |
716/2018716/2018 | HaryanaHaryana | Complainants sought refund of Rs.1,86,62,892/- de…Complainants sought refund of Rs.1,86,62,892/- deposited with respondents for a flat in project 'Parsvnath Exotica' due to violation of obligations by respondents. Respondents failed to provide clear title to the flat, and litigation was pending regarding the title. | ["Refund for Undeli…["Refund for Undelivered Flat", "Title Dispute"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants booked a flat in the project 'Parsvnath Exotica' and deposited Rs.1,86,62,892/- with the respondents. However, the respondents failed to provide a clear title to the flat, and litigation was pending regarding the title. The complainants sought refund of the amount deposited due to the respondents' failure to deliver the flat as per the agreement.", "respondent_claim(in detail)": "The respondents claimed that the project was complete, and some allottees had taken possession of their flats. They argued that the delay in completing the project was due to various reasons, including the global recession, lack of adequate sources of finance, shortage of labor, rising manpower and material costs, approvals and procedural difficulties, extreme shortage of water in the region, shortage of bricks, unexpected sudden declaration of demonetization policy, recession in economy, and shortage of labor due to implementation of social schemes.", "final_verdict(in detail)": "The Adjudicating Officer ordered the respondents to refund the entire amount of Rs.1,86,62,892/- along with the prescribed rate of interest at the rate of 10.20% from the date of each payment till the return of the full amount to them. Additionally, the respondents were ordered to pay a sum of Rs.3,00,000/- as compensation to the complainants for mental agony and harassment undergone by them, inclusive of a sum of Rs. 10,000/- as costs of litigation for pursuing various matters before different forums.", "in_favor_of_respondent": "no"} | Sudhir TandonSudhir Tandon | Parsvnath Developer…Parsvnath Developers Limited | Link |
1549 of 20191549 of 2019 | HaryanaHaryana | Complainant Mrs. Ranjana Singh filed a complaint …Complainant Mrs. Ranjana Singh filed a complaint against Parsvnath Developers Limited for delayed possession of a flat. The Haryana Real Estate Regulatory Authority (HRERA) found the respondent in contravention of the provisions of the Act and ordered the payment of interest at the prescribed rate of interest. | ["Delayed possessio…["Delayed possession", "Non-registration of project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the possession of the flat beyond the prescribed period and sought relief for the same.", "respondent_claim": "The respondent claimed that the complainant was aware of the status of the construction at the time of purchasing the flat and that the delay was due to reasons beyond their control.", "final_verdict": "The HRERA found the respondent in contravention of the provisions of the Act and ordered the payment of interest at the prescribed rate of interest.", "in_favor_of_respondent": "no"} | Mrs. Ranjana SinghMrs. Ranjana Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
6177 of 20196177 of 2019 | HaryanaHaryana | Complainant Sunita Sharma filed a complaint again…Complainant Sunita Sharma filed a complaint against Parsvnath Hessa Developers Pvt. Limited and Parsvnath Developers Limited for delay in possession of flat. Authority directed respondents to pay interest at prescribed rate for delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondents delayed possession of flat beyond 36 months from commencement of construction.", "respondent_claim": "Respondents claimed that possession was offered for fit-out purposes and that occupation certificate was not obtained due to non-compliance with EWS unit construction conditions.", "final_verdict": "Authority directed respondents to pay interest at prescribed rate for delay in possession.", "in_favor_of_respondent": "no"} | Sunita SharmaSunita Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
778 of 2020778 of 2020 | HaryanaHaryana | Complainants sought possession of flat and compen…Complainants sought possession of flat and compensation for delay. Authority ordered payment of interest for delay and registration of project. | ["Delay in possessi…["Delay in possession", "Non-registration of project"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of flat and compensation for delay.", "respondent_claim": "Respondent claimed that project was complete and occupation certificate was pending.", "final_verdict": "Authority ordered payment of interest for delay and registration of project.", "in_favor_of_respondent": "no"} | Savita SethSavita Seth | Parsvnath Developer…Parsvnath Developers Limited | Link |
5155 of 20195155 of 2019 | HaryanaHaryana | Complainant sought relief for delay in possession…Complainant sought relief for delay in possession of flat, excess payment, and non-issuance of occupancy certificate. HARERA directed payment of interest for delay and registration of the project. | ["Delay in possessi…["Delay in possession", "Excess payment", "Non-issuance of occupancy certificate"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had made excess payment to the respondent and that the respondent had failed to deliver the possession of the flat as promised.", "respondent_claim": "The respondent claimed that the delay in possession was due to various reasons beyond their control and that the complainant was not a real buyer.", "final_verdict": "HARERA directed the respondent to pay interest at the prescribed rate for the delay in possession and to register the project.", "in_favor_of_respondent": "no"} | Vijay BhatnagarVijay Bhatnagar | Parsvnath Developer…Parsvnath Developers Limited | Link |
458 of 2019458 of 2019 | HaryanaHaryana | The complainants, Mr. Satish Kumar Sharma and Mrs…The complainants, Mr. Satish Kumar Sharma and Mrs. Sucheeta Sharma, filed a complaint against Parsvnath Developers Limited and Parsvnath Hessa Developers Pvt. Ltd. for delay in possession of a flat in the Parsvnath Exotica project. | ["Delay in possessi…["Delay in possession", "Unfair trade practice"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondents delayed the possession of the flat beyond the agreed-upon date and sought compensation for the same.", "respondent_claim": "The respondents claimed that the delay was due to various reasons, including global recession, lack of adequate sources of finance, shortage of labor, rising manpower and material costs, and approvals and procedural difficulties.", "final_verdict": "The authority held that the respondents were in contravention of section 11(4)(a) of the Act by not handing over possession by the due date as per the agreement. The authority directed the respondents to pay interest at the prescribed rate of 9.30% per annum for every month of delay on the amount paid by the complainants from the due date of possession to the handing over of possession after obtaining occupation certificate.", "in_favor_of_respondent": "no"} | Mrs. Sucheeta SharmaMrs. Sucheeta Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
4605 of 20204605 of 2020 | HaryanaHaryana | The complainant, Ms. Indu Khera, filed a complain…The complainant, Ms. Indu Khera, filed a complaint against M/s Parsvnath Developers Limited for delay in handing over possession of a flat. The authority directed the respondent to pay interest at the prescribed rate for every month of delay. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat beyond the agreed-upon date.", "respondent_claim": "The respondent claimed that the delay was due to various reasons beyond their control, including global recession, lack of finance, labor shortages, and regulatory issues.", "final_verdict": "The authority directed the respondent to pay interest at the prescribed rate for every month of delay.", "in_favor_of_respondent": "no"} | Ms. Indu KheraMs. Indu Khera | Parsvnath Developer…Parsvnath Developers Limited | Link |
3550 of 20213550 of 2021 | HaryanaHaryana | The complainant, Mr. Dalip Sud, filed a complaint…The complainant, Mr. Dalip Sud, filed a complaint against M/s Parsvnath Developers Limited for delay in handing over possession of a flat. The Haryana Real Estate Regulatory Authority (HARERA) found that the respondent was in contravention of the section 11(4)(a) of the Act by not handing over possession by the due date as per the agreement. | ["Delay in possessi…["Delay in possession", "Non-compliance with agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed handing over possession of the flat beyond the agreed-upon date.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including global recession, lack of adequate sources of finance, shortage of labour, rising manpower and material costs, and approvals and procedural difficulties.", "final_verdict": "The HARERA found that the respondent was in contravention of the section 11(4)(a) of the Act by not handing over possession by the due date as per the agreement. The complainant is entitled to delay possession charges at prescribed rate of interest @ 9.30 % p.a.", "in_favor_of_respondent": "no"} | Mr. Dalip SudMr. Dalip Sud | Parsvnath Developer…Parsvnath Developers Limited | Link |
1731 of 20191731 of 2019 | HaryanaHaryana | The complainant sought refund of the amount paid …The complainant sought refund of the amount paid for a flat in a project developed by the respondents, citing delay in possession and non-compliance with the agreement. The authority directed the respondents to return the amount with interest. | ["Delay in possessi…["Delay in possession", "Non-compliance with agreement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondents delayed possession of the flat and failed to comply with the agreement.", "respondent_claim": "The respondents claimed that the delay was due to unforeseen circumstances and that they had complied with the agreement.", "final_verdict": "The authority directed the respondents to return the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Jatinder AnejaJatinder Aneja | Parsvnath Developer…Parsvnath Developers Limited | Link |
3484 of 20203484 of 2020 | HaryanaHaryana | The complainant sought relief for non-payment of …The complainant sought relief for non-payment of assured returns and delay in possession of a commercial space. The authority directed the respondent to pay arrears of assured returns and hand over possession of the unit. | ["Non-payment of as…["Non-payment of assured returns", "Delay in possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to pay assured returns as per the agreement and had also delayed possession of the commercial space.", "respondent_claim": "The respondent claimed that the complainant had not paid the balance consideration amount and had also not complied with the terms of the agreement.", "final_verdict": "The authority directed the respondent to pay arrears of assured returns and hand over possession of the unit.", "in_favor_of_respondent": "no"} | Neha AggarwalNeha Aggarwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-COMP-45-20…RERA-PKL-COMP-45-2018 | Not providedNot provided | Complaint disposed of as comprised due to an amic…Complaint disposed of as comprised due to an amicable settlement between the parties. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as comprised due to an amicable settlement between the parties.", "in_favor_of_respondent": "no"} | Janak SainiJanak Saini | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-COMP. 162/…RERA-PKL-COMP. 162/2018 | Not providedNot provided | Complainant sought refund for undelivered apartme…Complainant sought refund for undelivered apartment and interest. Authority allowed refund and interest, directing respondent to pay within specified timelines. | ["Refund for undeli…["Refund for undelivered apartment", "Interest payment"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked an apartment with the respondent and paid Rs. 4,63,680/-. The respondent failed to deliver possession by the agreed date of 16.06.2012. The complainant sought refund of the deposited amount and additional compensation of Rs. 7,51,162 as simple interest at 18% per annum.", "respondent_claim(in detail)": "The respondent did not dispute the booking or payment but claimed that the delay in possession was due to reasons beyond their control. They prayed that the complainant should not be allowed a refund and the complaint be dismissed.", "final_verdict(in detail)": "The Authority allowed the complainant's prayer for refund of Rs. 4,63,680/- and interest @ SBI MCLR plus 2% as per Haryana Real Estate (Regulation and Development) Rules, 2017. The respondent was directed to refund 50% of the amount within 30 days and the balance within 15 days. Failure to comply would attract liability under Section 63 of the Act.", "in_favor_of_respondent": "no"} | Shikha MehraShikha Mehra | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-293/2018RERA-PKL-293/2018 | HaryanaHaryana | Complaint filed by Smt. Ishwar Kaur Saroha agains…Complaint filed by Smt. Ishwar Kaur Saroha against M/s Parsvnath Developers Limited. Case disposed of through a written settlement between the parties. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed of through a written settlement between the parties.", "in_favor_of_respondent": "no"} | Smt. Ishwar Kaur Sa…Smt. Ishwar Kaur Saroha | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-355/2018RERA-PKL-355/2018 | HaryanaHaryana | Complainant seeks refund for flat purchase with i…Complainant seeks refund for flat purchase with interest. Respondent agrees to refund with interest as per HRERA rules. | ["Refund for flat p…["Refund for flat purchase"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant seeks refund of the amount paid to the respondent for purchase of a flat in the respondent project, along with interest.", "respondent_claim(in detail)": "The learned counsel for the respondent submits that he has no objection for refund of the amount along with interest.", "final_verdict(in detail)": "The complaint is disposed of with the direction that respondent shall refund the amount to the complainant along with interest envisaged under Rule 15 of the HRERA, Rules.", "in_favor_of_respondent": "no"} | anotheranother | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-385 of 2018RERA-PKL-385 of 2018 | HaryanaHaryana | Complainant Usha Rani filed a complaint against M…Complainant Usha Rani filed a complaint against M/s Parsvnath Developers Ltd. for not delivering possession of a plot despite payment of Rs. 11,55,087/-. | ["Non-delivery of p…["Non-delivery of possession", "Refund of payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had paid Rs. 11,55,087/- for a plot and the respondent had not delivered possession despite being obligated to do so within 24 months.", "respondent_claim": "The respondent claimed that the delay was caused due to non-delivery of license, non-approval of various plans, and acquisition of some portion of the license land.", "final_verdict": "The Authority directed the respondent to offer valid possession of the plot to the complainant by 30.04.2019 along with interest under Rule 15 of the HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Usha RaniUsha Rani | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-593 of 2018RERA-PKL-593 of 2018 | HaryanaHaryana | Complainant Pawan Chawla sought refund for unpaid…Complainant Pawan Chawla sought refund for unpaid plot worth Rs. 15,46,875/- from Parsvnath Developers Ltd. for not delivering possession since 2005. Authority ordered refund with interest and payment in two installments. | ["Refund for Undeli…["Refund for Undelivered Plot"] | {"appellant_claim": "The complainant purchased th…{"appellant_claim": "The complainant purchased the rights of an original allottee of a 500 Sq. Yds. plot in respondent's project and paid Rs. 15,46,875/-. He seeks refund as the plot was not delivered since 2005.", "respondent_claim": "The respondent claims they agreed to refund Rs. 24,24,666/- and issued post-dated cheques. They request six months to refund the amount.", "final_verdict": "The Authority directs the respondent to refund Rs. 22,24,666/- with interest at the rate prescribed under Rule 15 of the HRERA Rules, 2017, in two installments.", "in_favor_of_respondent": "no"} | Pawan ChawlaPawan Chawla | Parsvnath Developer…Parsvnath Developers Limited | Link |
570/2018570/2018 | HaryanaHaryana | Complainant seeks refund for delayed villa purcha…Complainant seeks refund for delayed villa purchase. Authority orders refund with interest due to respondent's failure to deliver possession within a reasonable time. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a villa in 2008 and paid over 90% of the total sales consideration. Despite waiting for 10 years, the respondent failed to deliver possession. The complainant seeks refund of the amount paid, interest, compensation for deficiency in services, damages for mental agony, and litigation costs.", "respondent_claim(in detail)": "The respondent claims that the complainant booked the villa voluntarily and availed a 2% discount. They state that the delay was caused due to non-renewal of the license and global economic slowdown. The respondent offers an alternate property and claims that internal and external works of the villa are complete.", "final_verdict(in detail)": "The Authority orders the respondent to refund the entire amount paid by the complainant, along with interest @ provided for in Rule 15 of the HRERA Rules, within 90 days. The respondent is directed to make 50% of the payment within 45 days and the remaining 50% in the next 45 days.", "in_favor_of_respondent": "no"} | Rama SharmaRama Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
741/2018741/2018 | HaryanaHaryana | Complainant Sunil Mor filed a complaint against P…Complainant Sunil Mor filed a complaint against Parsvnath Developers for not providing possession of a shop and stopping assured returns. Haryana RERA directed the developer to complete the project, resume assured returns, and pay outstanding amounts with interest. | ["Delayed possessio…["Delayed possession", "Stopped assured returns"] | {"appellant_claim": "Complainant claimed that he …{"appellant_claim": "Complainant claimed that he had paid 95% of the consideration amount, but the developer did not provide possession of the shop and stopped assured returns.", "respondent_claim": "Developer claimed that the project was delayed due to reasons beyond their control and that the complainant had entered into an agreement with a different company.", "final_verdict": "Haryana RERA directed the developer to complete the project within the specified time schedule, resume payment of monthly assured returns, and pay the outstanding amount with interest.", "in_favor_of_respondent": "no"} | Sunil MorSunil Mor | Parsvnath Developer…Parsvnath Developers Limited | Link |
952/2018952/2018 | HaryanaHaryana | Complainant sought refund for a flat booked in an…Complainant sought refund for a flat booked in an abandoned project. Authority directed refund with interest and additional liabilities for non-compliance. | ["Refund for Abando…["Refund for Abandoned Project"] | {"appellant_claim": "Refund for flat booked in an…{"appellant_claim": "Refund for flat booked in an abandoned project with interest.", "respondent_claim": "Ready to refund amount paid with no possession given due to joint venture abandoning the project.", "final_verdict": "Refund amount with interest and additional liabilities for non-compliance.", "in_favor_of_respondent": "no"} | Ramesh Kumar SinghRamesh Kumar Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
926/2018926/2018 | HaryanaHaryana | Complainant Anand Paul Solkey filed a complaint a…Complainant Anand Paul Solkey filed a complaint against Parsvnath Developers Ltd. for not delivering possession of a flat despite payment. The Haryana Real Estate Regulatory Authority directed the respondent to refund the amount paid by the complainant with interest. | ["Refund of amount …["Refund of amount paid", "Non-delivery of possession"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that he had paid Rs. 9,80,444/- for a flat in the 'Parsvnath Elite Floors' project at Rohtak, but no possession had been given despite the payment. He requested a refund of the amount paid along with interest and compensation.", "respondent_claim": "The learned counsel for the respondent stated that the respondent is ready to refund the amount paid by the complainant.", "final_verdict": "The Authority directed the respondent to refund the entire amount paid by the complainant along with interest as prescribed under Rule 15 of Haryana Real Estates Regulatory Authority Rules, 2017 within 90 days.", "in_favor_of_respondent": "no"} | Anand Paul SolkeyAnand Paul Solkey | Parsvnath Developer…Parsvnath Developers Limited | Link |
919/2018919/2018 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of a plot. Authority directed respondent to hand over possession by 30.04.2019 or refund the amount with interest. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed possession of a plot.", "respondent_claim": "Respondent claimed that the project would be completed soon and possession would be offered after approval of layout plans.", "final_verdict": "Authority directed respondent to hand over possession by 30.04.2019 or refund the amount with interest.", "in_favor_of_respondent": "no"} | Smt. Kusum LataSmt. Kusum Lata | Parsvnath Developer…Parsvnath Developers Limited | Link |
1050/20181050/2018 | HaryanaHaryana | Complainant seeks refund and compensation for del…Complainant seeks refund and compensation for delay in possession of plot by Parsvnath Developers. Authority orders possession by 30.04.2019 or refund with interest and compensation. | ["Delay in possessi…["Delay in possession", "Refund and compensation"] | {"appellant_claim": "Complainant paid 90% of the …{"appellant_claim": "Complainant paid 90% of the basic sale price but did not receive the plot or a builder-buyer agreement. He seeks refund and compensation for delay.", "respondent_claim": "The project is delayed due to force majeure conditions, including de-licensing of land and pending approvals. They claim they will offer possession soon.", "final_verdict": "The Authority orders possession of the plot by 30.04.2019. If not provided, the respondent must refund the money paid with interest and compensate the allottees for delay.", "in_favor_of_respondent": "no"} | Ravinder SinghRavinder Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
779/2018779/2018 | HaryanaHaryana | Complainant sought refund and compensation for de…Complainant sought refund and compensation for delayed possession of a residential plot. Authority ordered refund with interest and additional compensatory interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of the amount paid and compensation for delayed possession of the plot.", "respondent_claim": "The respondent claimed that the project was not developed due to acquisition of land by the State Government and that the complainant was not entitled to refund.", "final_verdict": "The Authority ordered the respondent to refund the amount paid by the complainant with interest and additional compensatory interest.", "in_favor_of_respondent": "no"} | Bimla DeviBimla Devi | Parsvnath Developer…Parsvnath Developers Limited | Link |
766/2018766/2018 | HaryanaHaryana | Complainant booked a flat in Parsvnath Elite Floo…Complainant booked a flat in Parsvnath Elite Floors project but didn't receive possession. Authority ordered refund of paid amount with interest due to project delay. | ["Delay in possessi…["Delay in possession", "Refund"] | {"appellant_claim": "Refund of paid amount with i…{"appellant_claim": "Refund of paid amount with interest and compensation for delay in handing over possession of the flat.", "respondent_claim": "Not disputed that the complainant had booked a flat in respondent\u2019s project and buyer\u2019s agreement was executed. Admitted payments made by the complainant and delay caused by the respondent.", "final_verdict": "Refund of the money paid by the complainant along with interest at the rate specified under Rule 15 of the Haryana Real Estate Regulatory Authority (HRERA)Rules, 2017.", "in_favor_of_respondent": "no"} | Mohammed RafiMohammed Rafi | Parsvnath Developer…Parsvnath Developers Limited | Link |
1082/20181082/2018 | HaryanaHaryana | Complainant Shalini Kashyap sought refund for apa…Complainant Shalini Kashyap sought refund for apartment booked in 2007 due to project delay. Authority ordered refund with interest. | ["Project delay", "…["Project delay", "Refund"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked an apartment in 2007 and paid Rs. 25,73,685/-. Due to project delay, she sought refund.", "respondent_claim(in detail)": "The respondent claimed that the complainant had defaulted in making payments and that the project was registered with the Authority with a completion date of December, 2019.", "final_verdict(in detail)": "The Authority ordered the respondent to refund the entire money paid by the complainant along with interest calculated in accordance with Rule 15 of the HRERA Rules.", "in_favor_of_respondent": "no"} | Shalini KashyapShalini Kashyap | Parsvnath Developer…Parsvnath Developers Limited | Link |
30/201930/2019 | HaryanaHaryana | Complaint settled out of court. Complainant can a…Complaint settled out of court. Complainant can approach the Authority again if any dispute remains unsettled. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled out of court", "in_favor_of_respondent": "no"} | Nirmal Kumar SainiNirmal Kumar Saini | Parsvnath Developer…Parsvnath Developers Limited | Link |
175/2018175/2018 | HaryanaHaryana | Complainant seeks refund for undelivered plot. Au…Complainant seeks refund for undelivered plot. Authority directs refund with penal interest for undue delay. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant i…{"appellant_claim(in detail)": "The complainant is a third buyer of property in question and conveyance deed had already been executed in her favour by the respondent on 26.04.2010. The grievance which the complainant is agitating is that even after the execution of conveyance deed, respondent had not delivered the physical possession of the plot. Therefore, the complainant is seeking refund of the entire amount paid by him i.e. Rs. 22,68,512 along with interest @ 20% per annum.", "respondent_claim(in detail)": "The respondent's version is that the plot in question had been freezed by the state govt. due to which its physical Possession could not be handed over to the complainant till date.", "final_verdict(in detail)": "The Authority directed the respondent to refund the entire amount received from the complainant. Additionally, the respondent is directed to pay penal interest of 14% per annum on the deposited amount from the dates on which amounts were paid till its actual payment to the complainant.", "in_favor_of_respondent": "no"} | Mamta JainMamta Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
503 of 2019503 of 2019 | HaryanaHaryana | Complainant sought refund for a plot in an incomp…Complainant sought refund for a plot in an incomplete project. Authority ordered refund with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant purchased a plot from the original allottee and the respondent endorsed transfer in his favour. However, the respondent failed to deliver possession by March 2014. The complainant sought a refund of Rs. 13,50,000/-.", "respondent_claim(in detail)": "The respondent did not deny the genuineness of the receipts attached with the complaint. However, they conceded that the project is neither complete nor the promoter will be in a position to deliver valid possession to the complainant due to pending disputes with the Government.", "final_verdict(in detail)": "The Authority allowed the refund of Rs. 13,50,000/- to the complainant along with interest @ prescribed in Rule-15 of the HRERA Rules, 2017. The respondent was directed to pay the amount in two equal instalments within 90 days.", "in_favor_of_respondent": "no"} | Sunil KumarSunil Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
983 of 2019983 of 2019 | HaryanaHaryana | Complainant withdrew the case and requested to fi…Complainant withdrew the case and requested to file a fresh execution before the Real Estate Regulatory Authority. | ["Execution of Orde…["Execution of Order", "Real Estate"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed the present complaint for execution of order dated 27.11.2018 passed by the Hon'ble Authority in complaint case no. 478/2019.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Sangeet JainSangeet Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
77 of 201877 of 2018 | HaryanaHaryana | Complainants sought refund and compensation for d…Complainants sought refund and compensation for delay in possession of flat. Authority directed respondent to give possession and interest at 10.45% per month. | ["Delay in possessi…["Delay in possession", "Interest and compensation"] | {"appellant_claim": "Complainants sought refund a…{"appellant_claim": "Complainants sought refund and compensation for delay in possession of flat.", "respondent_claim": "Respondents claimed that delay was due to beneficiary interest policy and that complainants were not entitled to refund or compensation.", "final_verdict": "Authority directed respondent to give possession and interest at 10.45% per month.", "in_favor_of_respondent": "no"} | Smt. Manvinder Kaur…Smt. Manvinder Kaur Sahni | Parsvnath Developer…Parsvnath Developers Limited | Link |
1571 of 20191571 of 2019 | HaryanaHaryana | Complaint withdrawn by learned counsel for compla…Complaint withdrawn by learned counsel for complainant with liberty to file again before Haryana Real Estate Regulatory Authority, Panchkula. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by learned counsel for complainant with liberty to file again before Haryana Real Estate Regulatory Authority, Panchkula.", "in_favor_of_respondent": "no"} | Suman Kumar SunejaSuman Kumar Suneja | Parsvnath Developer…Parsvnath Developers Limited | Link |
994 of 2019994 of 2019 | HaryanaHaryana | Complaint withdrawn by the complainant with liber…Complaint withdrawn by the complainant with liberty to file again before Adjudicating Officer. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by the complainant.", "in_favor_of_respondent": "no"} | Pankaj BansalPankaj Bansal | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 1123 …Complaint No. 1123 of 2019 | HaryanaHaryana | Complainant Ravi Khattar filed a complaint agains…Complainant Ravi Khattar filed a complaint against M/S Parsvnath Developers Ltd. for not discharging liability towards the bank. The Authority directed the respondent to clear all outstanding dues within 6 months. | ["Non-discharge of …["Non-discharge of liability", "Bank dues"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not discharge their liability towards the bank.", "respondent_claim": "The respondent claimed that they would discharge their liability towards the bank in six instalments.", "final_verdict": "The Authority directed the respondent to clear all outstanding dues towards the bank within 6 months and whatever interest has accrued or will accrue.", "in_favor_of_respondent": "no"} | Ravi KhattarRavi Khattar | Parsvnath Developer…Parsvnath Developers Limited | Link |
1021 of 20191021 of 2019 | HaryanaHaryana | Complaint withdrawn by the complainant with liber…Complaint withdrawn by the complainant with liberty to file a fresh complaint. | Complaint withdrawalComplaint withdrawal | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by the complainant with liberty to file a fresh complaint.", "in_favor_of_respondent": "no"} | Saroj GoyalSaroj Goyal | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 159 o…Complaint No. 159 of 2019 | HaryanaHaryana | Complainant sought refund for flat not delivered …Complainant sought refund for flat not delivered by respondent. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim(in detail)": "The complainant e…{"appellant_claim(in detail)": "The complainant entered into a flat buyer agreement with the respondent on 02.04.2013 for purchasing a pre-launch resale flat. The complainant paid a sum of Rs. 12,25,957/- till January 2014 against the basic sale price of Rs. 33,39,000/-. The respondent was required to hand over the possession within 36 months with a further grace period of 6 months. Since the period for delivery of possession had already been expired, the complainant did not get the offer of possession or refund of paid amount. The complainant prayed for refund of Rs. 12,25,957/- deposited by him along with interest @18% p.a.", "respondent_claim(in detail)": "The respondent admits the payment of Rs. 12,25,957/- by the complainant but contends that delay in completing the project is not intentional, rather it was due to various reasons beyond the control of respondent company. The respondent company has been putting its best endeavour to complete the project at earliest and accordingly hand over possession of flats to the respective buyers. The respondent is also willing to offer an alternate property to the complainant subject to mutual consent of both parties and availability of alternate flat.", "final_verdict(in detail)": "The Authority finds it to be a fit case to allow refund in favor of the complainant. The Authority directs the respondent to refund amount of Rs. 12,25,957/- along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017 i.e at the rate of SBI highest marginal cost of lending rate (MCLR)+ 2 % from the date amounts were paid till today. In view of above formula, total amount to be paid to the complainant is Rs.20,28,047/-.", "in_favor_of_respondent": "no"} | Antar Singh KohliAntar Singh Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
1923 of 20191923 of 2019 | HaryanaHaryana | Complainant withdrew the case and was given liber…Complainant withdrew the case and was given liberty to file a fresh complaint before RERA. The case was disposed of as withdrawn. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant prayed for p…{"appellant_claim": "The complainant prayed for possession along with compensation.", "respondent_claim": "Not provided", "final_verdict": "The complaint was disposed of as withdrawn, and the complainant was given liberty to file a fresh complaint before RERA.", "in_favor_of_respondent": "no"} | Inderjeet GargInderjeet Garg | Parsvnath Developer…Parsvnath Developers Limited | Link |
1551 of 20191551 of 2019 | HaryanaHaryana | Complainant Sanjeev Sirohi filed a complaint agai…Complainant Sanjeev Sirohi filed a complaint against M/S Parsvnath Developers Ltd. for delay in delivery of possession and compensation. The Authority directed the respondent to pay further compensation for the delay. | ["Delay in delivery…["Delay in delivery of possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the delivery of possession and not paid the correct compensation.", "respondent_claim": "The respondent claimed that they had offered possession of the plot to the complainant on 21.09.2017 and that the complainant was not entitled to further compensation.", "final_verdict": "The Authority directed the respondent to pay further compensation for the delay in the amount of Rs. 68,137/-.", "in_favor_of_respondent": "no"} | Sanjeev SirohiSanjeev Sirohi | Parsvnath Developer…Parsvnath Developers Limited | Link |
1113,1117,1118,1158…1113,1117,1118,1158,2356 of 2019 | HaryanaHaryana | Complainants booked plots in Parsvnath City, Sone…Complainants booked plots in Parsvnath City, Sonepat, but neither plot buyer agreement nor allotment was made. Authority ordered refund of paid amounts with interest. | ["Refund of paid am…["Refund of paid amounts", "Interest on paid amounts"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of paid amounts with interest for not receiving plot buyer agreement or allotment despite paying 50% of the total sale consideration.", "respondent_claim": "Respondent claimed that the project could not be completed due to government issues and offered alternative plots in other projects.", "final_verdict": "Authority ordered refund of paid amounts with interest as prescribed in Rule-15 of HRERA Rules, 2019.", "in_favor_of_respondent": "no"} | Pushpa Devi RastogiPushpa Devi Rastogi | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 1425 …Complaint No. 1425 of 2019 | HaryanaHaryana | Complainant sought refund and possession of flat …Complainant sought refund and possession of flat from respondent, but respondent failed to deliver. Authority ordered refund with interest. | ["Refund", "Possess…["Refund", "Possession of Flat"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and possession of flat from respondent, but respondent failed to deliver.", "respondent_claim": "Respondent claimed that they had refunded the deposited amount with interest and that the delay in completing the project was due to reasons beyond their control.", "final_verdict": "Authority ordered refund with interest to the complainant.", "in_favor_of_respondent": "no"} | Anand Kumar JollyAnand Kumar Jolly | Parsvnath Developer…Parsvnath Developers Limited | Link |
1042 of 20191042 of 2019 | HaryanaHaryana | Complaints against M/S Parsvnath Developers Ltd. …Complaints against M/S Parsvnath Developers Ltd. settled amicably. Parties bound by terms of settlement. | ["Settlement", "Ami…["Settlement", "Amicable Resolution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaints disposed of as compromised. Parties bound by terms of settlement.", "in_favor_of_respondent": "no"} | Mr. Mohammed RafiMr. Mohammed Rafi | Parsvnath Developer…Parsvnath Developers Limited | Link |
2215 of 20192215 of 2019 | HaryanaHaryana | Complainant booked a commercial unit in 2007 and …Complainant booked a commercial unit in 2007 and paid Rs. 10,25,500. Authority directed respondent to execute BBA and pay interest @9% p.a. Possession to be offered by 2022. | ["Building Agreemen…["Building Agreement", "Interest Payment"] | {"appellant_claim": "Possession of commercial uni…{"appellant_claim": "Possession of commercial unit and execution of BBA. Monthly assured returns till possession.", "respondent_claim": "Not entitled to monthly assured returns without specific agreement.", "final_verdict": "Respondent to execute BBA within a week and pay interest @9% p.a. Possession by 2022.", "in_favor_of_respondent": "no"} | V.P. BatraV.P. Batra | Parsvnath Developer…Parsvnath Developers Limited | Link |
1366 of 20191366 of 2019 | HaryanaHaryana | Complainant sought rectification of earlier order…Complainant sought rectification of earlier order reflecting refund amount. Authority allowed review and directed refund of corrected amount with interest. | ["Refund Amount Rec…["Refund Amount Rectification"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought rectification of earlier order reflecting refund amount of \u20b913,50,000 to \u20b923,21,440.", "respondent_claim(in detail)": "Respondent stated complainant paid \u20b921,89,700, not \u20b923,21,440. Authority observed rectification to reflect \u20b921,89,700 was justified.", "final_verdict(in detail)": "Authority allowed review, reflecting refund amount as \u20b921,89,700. Respondent directed to refund \u20b921,89,700 with interest.", "in_favor_of_respondent": "no"} | Sunil KumarSunil Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
723 of 2019723 of 2019 | HaryanaHaryana | Complainants sought allotment and possession of b…Complainants sought allotment and possession of booked plots in Parsvnath City, Sonipat. Authority directed respondent to allot and deliver possession of booked plots on payment of balance sale consideration. | ["Allotment of book…["Allotment of booked plots"] | {"appellant_claim": "Complainants sought allotmen…{"appellant_claim": "Complainants sought allotment and possession of booked plots in Parsvnath City, Sonipat.", "respondent_claim": "Respondent claimed that complainants were not entitled to allotment and possession of booked plots.", "final_verdict": "Authority directed respondent to allot and deliver possession of booked plots on payment of balance sale consideration.", "in_favor_of_respondent": "no"} | Nishant BansalNishant Bansal | Parsvnath Developer…Parsvnath Developers Limited | Link |
164 of 2020164 of 2020 | HaryanaHaryana | Complainant Ritu Uppal sought refund for a plot n…Complainant Ritu Uppal sought refund for a plot not allotted by Parsvnath Developers Ltd. after 16 years. The authority directed the respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Ritu Uppal, sought refund for a plot not allotted by Parsvnath Developers Ltd. after 16 years. She claimed that she had paid 50% of the total sale consideration and that the respondent had failed to deliver the plot despite repeated requests.", "respondent_claim(in detail)": "The respondent claimed that the complainant was bound by the conditions of the application form, which stated that in case the respondent failed to allot a plot, the complainant would not raise any other claim except for refund of the amount along with 10% interest. The respondent also claimed that the development of the township in Sonipat was ruined due to the acquisition of land by the Government and that they had undergone litigation with the Government for withdrawal of acquisition.", "final_verdict(in detail)": "The authority directed the respondent to refund the amount of Rs. 5,40,000/- along with simple interest @9% p.a. from the date of acceptance of nomination till the date amount is actually paid by the respondent. The respondent was further directed to pay 50% of the total amount payable to the complainant within 45 days and the remaining in next 45 days, failing which it would attract further penal interest.", "in_favor_of_respondent": "no"} | Ritu UppalRitu Uppal | Parsvnath Developer…Parsvnath Developers Limited | Link |
165 of 2020165 of 2020 | HaryanaHaryana | Complainant sought refund for a plot booked 16 ye…Complainant sought refund for a plot booked 16 years ago. Authority directed refund with interest as per RERA rules. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a 300 sq. yards plot in 2004 and paid Rs. 5,40,000. Despite multiple requests, the respondent failed to allot a plot or provide a refund.", "respondent_claim(in detail)": "The respondent claimed that the complainant was bound by the terms of the application form, which stated that only a refund with 10% simple interest would be provided in case of non-allotment.", "final_verdict(in detail)": "The Authority directed the respondent to refund the amount of Rs. 5,40,000 with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Madhukar KhoslaMadhukar Khosla | Parsvnath Developer…Parsvnath Developers Limited | Link |
581 of 2020581 of 2020 | HaryanaHaryana | Complaint withdrawn with liberty to file before a…Complaint withdrawn with liberty to file before appropriate forum. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn with liberty to file before appropriate forum.", "in_favor_of_respondent": "no"} | Sushil Kumar SinghalSushil Kumar Singhal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1307 of 20191307 of 2019 | HaryanaHaryana | Complainants sought possession of a plot in Parsv…Complainants sought possession of a plot in Parsvnath City, Sonipat, and the authority directed the respondent to deliver possession within 90 days. | ["Possession of plo…["Possession of plot", "Unfair trade practices"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent had not delivered possession of the plot despite payment of balance sale consideration.", "respondent_claim": "The respondent claimed that they had no available plot for offering to the complainants and sought to refund the already paid amount with interest.", "final_verdict": "The authority directed the respondent to deliver possession of the booked plot to the complainants within 90 days.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
COMPLAINT NO. 1080 …COMPLAINT NO. 1080 of 2020 | HaryanaHaryana | The complainant, HRERA, Panchkula, filed a suo-mo…The complainant, HRERA, Panchkula, filed a suo-motu complaint against Parsvnath Developers Ltd. regarding a residential plotted colony. The Authority discharged the notice and consigned the file to the record room. | ["Part completion c…["Part completion certificate", "Non-compliance by promoter"] | {"appellant_claim": "The Authority claimed that t…{"appellant_claim": "The Authority claimed that the promoter had applied for part completion way long back on 10.10.2017 and Chief Engineer had certified the part completion of the project by way of his report on 18.06.2019.", "respondent_claim": "The respondent claimed that some non-compliance were repeated by the promoter.", "final_verdict": "The Authority discharged the notice and consigned the file to the record room.", "in_favor_of_respondent": "no"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 262 o…Complaint No. 262 of 2020 | HaryanaHaryana | The case was referred for mediation and the parti…The case was referred for mediation and the parties arrived at a settlement. The respondent paid a sum of ₹2 lac to the complainant and agreed to pay the remaining amount in eight monthly instalments. | ["Mediation", "Sett…["Mediation", "Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case is disposed of in terms of the settlement arrived at between the parties.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
526 of 2020526 of 2020 | HaryanaHaryana | Complainants sought possession of flat and intere…Complainants sought possession of flat and interest for delay. Authority directed respondent to pay interest and monthly interest till possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought possession of flat and interest for delay.", "respondent_claim(in detail)": "Respondent claimed that fit out possession was offered on 30.09.2019 and sought to avoid payment of interest.", "final_verdict(in detail)": "Authority directed respondent to pay interest of %33,36,525/- within 45 days and monthly interest till handing over of possession.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
238 of 2020238 of 2020 | HaryanaHaryana | Complaint withdrawn by complainant due to settlem…Complaint withdrawn by complainant due to settlement between parties. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was disposed of as withdrawn due to settlement between the parties.", "in_favor_of_respondent": "no"} | Mr. Sumit BatraMr. Sumit Batra | Parsvnath Developer…Parsvnath Developers Limited | Link |
575 of 2020575 of 2020 | HaryanaHaryana | Complainant sought relief of possession of shop a…Complainant sought relief of possession of shop and delay interest. Authority directed respondent to pay delay interest and hand over possession. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "Complainant sought relief of…{"appellant_claim": "Complainant sought relief of possession of shop and delay interest.", "respondent_claim": "Respondent claimed that the complaint is premature and sought to offer an alternate property.", "final_verdict": "Authority directed respondent to pay delay interest and hand over possession.", "in_favor_of_respondent": "no"} | Daljit Singh DahiyaDaljit Singh Dahiya | Parsvnath Developer…Parsvnath Developers Limited | Link |
189 of 2020189 of 2020 | HaryanaHaryana | Complaint settled amicably between parties. Case …Complaint settled amicably between parties. Case disposed of with direction to remain bound by settlement terms. | ["Amicable Settleme…["Amicable Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case settled amicably between parties. Complainant and respondent bound by settlement terms.", "in_favor_of_respondent": "no"} | Raj Rajeshwari Mata…Raj Rajeshwari Mata Shree Estate Private Limited | Parsvnath Developer…Parsvnath Developers Limited | Link |
1172 of 20191172 of 2019 | HaryanaHaryana | Complainant Anand Paul Solkey filed execution pet…Complainant Anand Paul Solkey filed execution petition for refund of Rs. 9,80,444/- along with interest. Respondent Parsvnath Developers Ltd. deposited payment of Rs. 10,18,683/- and a demand draft of Rs. 49,656/-. | ["Refund of Payment…["Refund of Payment"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed execution petition for refund of Rs. 9,80,444/- along with interest as per the order dated 19.12.2018.", "respondent_claim(in detail)": "The respondent deposited payment of Rs. 10,18,683/- and a demand draft of Rs. 49,656/-.", "final_verdict(in detail)": "The Authority disposed of the execution petition as fully satisfied with a direction to the respondent to deposit the demand draft in the account of the complainant.", "in_favor_of_respondent": "no"} | Anand Paul SolkeyAnand Paul Solkey | Parsvnath Developer…Parsvnath Developers Limited | Link |
1915 of 20191915 of 2019 | HaryanaHaryana | Complaint for execution of order dated 10.04.2019…Complaint for execution of order dated 10.04.2019 passed in complaint no. 451 of 2019. Amount of Rs. 21,93,296.42 remains payable. | ["Execution of orde…["Execution of order", "Payment of amount"] | {"appellant_claim": "Complaint for execution of o…{"appellant_claim": "Complaint for execution of order dated 10.04.2019 passed in complaint no. 451 of 2019.", "respondent_claim": "Amount of Rs. 21,93,296.42 remains payable.", "final_verdict": "Amount of Rs. 1,00,889.45 remains to be paid by the respondent to the complainant.", "in_favor_of_respondent": "no"} | Parvinder Singh Cha…Parvinder Singh Chahal | Parsvnath Developer…Parsvnath Developers Limited | Link |
97, 98 of 202097, 98 of 2020 | HaryanaHaryana | Complainants sought delay compensation for delaye…Complainants sought delay compensation for delayed possession of plots. Authority dismissed complaints as maintainability was lost after execution of conveyance deeds. Later, Authority recalculated delay interest and directed respondent to pay. | ["Delay compensatio…["Delay compensation", "Maintainability"] | {"appellant_claim": "Complainants claimed delay c…{"appellant_claim": "Complainants claimed delay compensation for delayed possession of plots.", "respondent_claim": "Respondent claimed that complaints were not maintainable as conveyance deeds had been executed, and complainants had lost their right to claim delay compensation.", "final_verdict": "Authority dismissed complaints as maintainable, but later recalculated delay interest and directed respondent to pay.", "in_favor_of_respondent": "no"} | Ram Niwas GuptaRam Niwas Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
55 of 202155 of 2021 | HaryanaHaryana | Complainant Shri Krishan Malik vs M/S Parsvnath D…Complainant Shri Krishan Malik vs M/S Parsvnath Developers Ltd. - Amicable settlement arrived at between parties. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Amicable settlement arrived at between parties.", "in_favor_of_respondent": "no"} | Shri Krishan MalikShri Krishan Malik | Parsvnath Developer…Parsvnath Developers Limited | Link |
730 of 2020730 of 2020 | HaryanaHaryana | Complainant sought allotment of plot booked by pr…Complainant sought allotment of plot booked by predecessor in 2009. Authority directed respondent to return amount with interest and deliver possession after payment of balance sale consideration. | ["Allotment of plot…["Allotment of plot", "Return of amount with interest"] | {"appellant_claim": "Complainant sought allotment…{"appellant_claim": "Complainant sought allotment of plot booked by predecessor in 2009 and return of amount with interest.", "respondent_claim": "Respondent claimed that complainant was not an allottee and sought refund of amount with interest.", "final_verdict": "Authority directed respondent to return amount with interest and deliver possession after payment of balance sale consideration.", "in_favor_of_respondent": "no"} | Dr. Sukhvir Singh R…Dr. Sukhvir Singh Rathi | Parsvnath Developer…Parsvnath Developers Limited | Link |
07 of 202107 of 2021 | HaryanaHaryana | Complainants sought possession of booked shops al…Complainants sought possession of booked shops along with interest for delay caused by respondent in handing over possession. Authority directed respondent to pay upfront delay interest and monthly interest till valid possession is offered. | ["Delay in possessi…["Delay in possession", "RERA dispute"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of booked shops along with interest for delay caused by respondent in handing over possession.", "respondent_claim": "Respondent disputed the complainants' right to file the present complaint, citing a pending consumer complaint before the State Consumer Disputes Redressal Commission.", "final_verdict": "Authority directed respondent to pay upfront delay interest and monthly interest till valid possession is offered.", "in_favor_of_respondent": "no"} | Simranjit Singh Guj…Simranjit Singh Gujral | Parsvnath Developer…Parsvnath Developers Limited | Link |
1183 of 20201183 of 2020 | HaryanaHaryana | Complainants booked a flat in respondent's projec…Complainants booked a flat in respondent's project but did not accept fit-out possession due to various demands. Authority directed respondent to offer possession after obtaining occupation certificate and pay interest on already paid amount. | ["Delay in possessi…["Delay in possession", "Interest on paid amount"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent did not offer possession within the agreed-upon period and demanded additional amounts. They sought interest on the already paid amount and a valid possession.", "respondent_claim": "Respondent claimed that they offered fit-out possession but the complainants did not accept it due to various demands. They argued that the complainants were not entitled to interest at the rate prescribed in Rule 15 of the HRERA Rules.", "final_verdict": "Authority directed respondent to offer possession after obtaining occupation certificate and pay interest on already paid amount at the rate prescribed in Rule 15 of the HRERA Rules.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
229 of 2021229 of 2021 | HaryanaHaryana | Complainants sought possession of a flat and comp…Complainants sought possession of a flat and compensation for delay. Authority awarded delay interest and directed the respondent to pay. | ["Delay interest", …["Delay interest", "Possession"] | {"appellant_claim": "The complainants sought poss…{"appellant_claim": "The complainants sought possession of a flat and compensation for delay in receiving possession.", "respondent_claim": "The respondent claimed that the complainants had committed default in making payments and that the project was complete except for a few flats.", "final_verdict": "The Authority awarded delay interest to the complainants and directed the respondent to pay the amount within 90 days.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
716 of 2021716 of 2021 | HaryanaHaryana | Complainant sought possession of flat and delay i…Complainant sought possession of flat and delay interest for mishandling of project by respondent. Authority directed respondent to pay delay interest and monthly interest till possession is made. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of flat and delay interest for mishandling of project by respondent.", "respondent_claim": "Respondent claimed lack of jurisdiction to award delay interest and difficulty in completing the project.", "final_verdict": "Authority directed respondent to pay delay interest and monthly interest till possession is made.", "in_favor_of_respondent": "no"} | Puneet SharmaPuneet Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
2686 of 20192686 of 2019 | HaryanaHaryana | Complainant Sudesh Sharma filed a complaint again…Complainant Sudesh Sharma filed a complaint against M/S Parsvnath Developers Ltd. for delay in possession and payment of delay interest. The Authority awarded delay interest of %19,29,355/- to the complainant. | ["Delay in possessi…["Delay in possession", "Payment of delay interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she was entitled to payment of delay interest from 10.03.2018 till a proper and legal possession was handed over.", "respondent_claim": "The respondent claimed that the Authority did not have jurisdiction to award delay interest in view of the stay granted by Hon\u2019ble Supreme Court in SLP No. 13005 of 2020.", "final_verdict": "The Authority awarded delay interest of %19,29,355/- to the complainant and directed the respondent to pay the same within 90 days.", "in_favor_of_respondent": "no"} | Sudesh SharmaSudesh Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
766 of 2019766 of 2019 | HaryanaHaryana | The respondent sought to recall an earlier order …The respondent sought to recall an earlier order granting relief to the complainants. The Authority dismissed the application, finding that the respondent's grounds for recall were untenable and that the earlier order had already attained finality. | ["Recall of earlier…["Recall of earlier order"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent's grounds for recall were untenable and that the earlier order had already attained finality.", "respondent_claim": "The respondent claimed that the cases disposed of in the earlier order did not have similarity with the present cases.", "final_verdict": "The Authority dismissed the application, finding that the respondent's grounds for recall were untenable and that the earlier order had already attained finality.", "in_favor_of_respondent": "no"} | Pravin GoelPravin Goel | Parsvnath Developer…Parsvnath Developers Limited | Link |
1446 of 20191446 of 2019 | HaryanaHaryana | Complainant Mukesh Kohli filed execution petition…Complainant Mukesh Kohli filed execution petition for refund of Rs. 18,41,927/- with interest. Respondent Parsvnath Developers Ltd. paid the amount and the petition was disposed of as satisfied. | ["Refund of Amount"]["Refund of Amount"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed refund of Rs. 18,41,927/- with interest from the respondent.", "respondent_claim(in detail)": "The respondent claimed that they had paid the amount of Rs. 18,85,510/- to the complainant and that the entire liability of the respondent towards the complainant including interest stands discharged.", "final_verdict(in detail)": "The Authority disposed of the execution petition as fully satisfied with a direction to the respondent to deposit the amount of Rs. 28,000/- in the account of the complainant.", "in_favor_of_respondent": "no"} | Mukesh KohliMukesh Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
1312, 1313, 1246 of…1312, 1313, 1246 of 2020; 767 of 2021 | HaryanaHaryana | Complaints were disposed of in terms of the order…Complaints were disposed of in terms of the orders passed by the Authority in Complaint no. 723 of 2019. The respondent was directed to allot and deliver the possession of booked plots to the complainants. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had failed to deliver the possession of booked plots.", "respondent_claim": "The respondent claimed that the complainants had failed to pay the balance sale consideration.", "final_verdict": "The Authority directed the respondent to allot and deliver the possession of booked plots to the complainants.", "in_favor_of_respondent": "no"} | Amit VohraAmit Vohra | Parsvnath Developer…Parsvnath Developers Limited | Link |
779 of 2020779 of 2020 | HaryanaHaryana | The complainant, Bhim Singh Pawar, filed a compla…The complainant, Bhim Singh Pawar, filed a complaint against M/S Parsvnath Developers Ltd. for not allotting a plot despite paying the booking amount. The Authority held that the respondent had not made sincere efforts to allot the plot and directed the respondent to deliver possession of a plot to the complainant. | ["Non-allotment of …["Non-allotment of plot", "Sincere efforts"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid the booking amount for a plot in the Parsvnath City project, but the respondent had not allotted the plot despite several requests.", "respondent_claim": "The respondent claimed that the complainant was not an allottee of the project and that the claim was barred by limitation.", "final_verdict": "The Authority held that the respondent had not made sincere efforts to allot the plot and directed the respondent to deliver possession of a plot to the complainant.", "in_favor_of_respondent": "no"} | Bhim Singh PawarBhim Singh Pawar | Parsvnath Developer…Parsvnath Developers Limited | Link |
447 of 2021447 of 2021 | HaryanaHaryana | Complainant Dr. J.S. Yadav filed a complaint agai…Complainant Dr. J.S. Yadav filed a complaint against M/S Parsvnath Developers Ltd. for not allotting a plot despite paying the booking amount. The Authority directed the respondent to return the complainant's money with interest and to allot a plot to the complainant. | ["Real Estate", "Al…["Real Estate", "Allotment of Plot"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he paid the booking amount for a plot in the respondent's project but was not allotted a plot despite waiting for 11 years.", "respondent_claim": "The respondent claimed that the complainant was not an allottee of the project and that the claim was barred by limitation.", "final_verdict": "The Authority directed the respondent to return the complainant's money with interest and to allot a plot to the complainant.", "in_favor_of_respondent": "no"} | Dr. J.S. YadavDr. J.S. Yadav | Parsvnath Developer…Parsvnath Developers Limited | Link |
491 of 2021491 of 2021 | HaryanaHaryana | The complainant sought compensation for delayed p…The complainant sought compensation for delayed possession of a plot and harassment by the respondent. The Adjudicating Officer partly allowed the complaint and directed the respondent to pay Rs. 1,25,000 to the complainant. | ["Delayed possessio…["Delayed possession", "Harassment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed possession of the plot and harassed him.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that they had not harassed the complainant.", "final_verdict": "The Adjudicating Officer partly allowed the complaint and directed the respondent to pay Rs. 1,25,000 to the complainant.", "in_favor_of_respondent": "no"} | Rohit KhangwalRohit Khangwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1120 of 20201120 of 2020 | HaryanaHaryana | Complaint for execution of order dated 10.09.2019…Complaint for execution of order dated 10.09.2019 passed in complaint case no. 1123 of 2019. Remaining foreclosure amount of ₹3,35,437/- will be paid by respondent within two days. | ["Execution of Orde…["Execution of Order"] | {"appellant_claim": "Complaint for execution of o…{"appellant_claim": "Complaint for execution of order dated 10.09.2019 passed in complaint case no. 1123 of 2019.", "respondent_claim": "Remaining foreclosure amount of \u20b93,35,437/- will be paid by respondent within two days.", "final_verdict": "The present execution petition deserves to be disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Ravi KhattarRavi Khattar | Parsvnath Developer…Parsvnath Developers Limited | Link |
920 of 2018920 of 2018 | HaryanaHaryana | Complainant sought compensation for delayed posse…Complainant sought compensation for delayed possession of a plot in Parsvnath City, Rohtak. The Adjudicating Officer allowed partial compensation for harassment and mental agony. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought compensation for delayed possession of a plot in Parsvnath City, Rohtak. She claimed that she had paid the entire amount to purchase the plot and that the respondent had failed to deliver possession within the agreed-upon timeframe.", "respondent_claim(in detail)": "The respondent claimed that the delay in possession was due to various reasons, including changes in the layout plan and approvals from the authorities. They argued that the complainant was not entitled to compensation for the delay.", "final_verdict(in detail)": "The Adjudicating Officer allowed partial compensation to the complainant for harassment and mental agony. The respondent was directed to pay an amount of \u20b97,52,360/- to the complainant.", "in_favor_of_respondent": "no"} | Smt. Kusum LataSmt. Kusum Lata | Parsvnath Developer…Parsvnath Developers Limited | Link |
2615 of 20192615 of 2019 | HaryanaHaryana | Complainant sought possession of villa and intere…Complainant sought possession of villa and interest for delay. Respondent claimed villa came under road due to re-alignment. Authority found respondent committed fraud by allotting villa from frozen plot. | ["Fraud", "Delay in…["Fraud", "Delay in Possession"] | {"appellant_claim": "Seeking possession of villa …{"appellant_claim": "Seeking possession of villa and interest for delay.", "respondent_claim": "Villa came under road due to re-alignment.", "final_verdict": "Respondent committed fraud by allotting villa from frozen plot. Refund of amount deposited with interest.", "in_favor_of_respondent": "no"} | Kamlesh JainKamlesh Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1998 of 20191998 of 2019 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of flat. Authority directed respondent to refund amount with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed possession of flat.", "respondent_claim": "Respondent claimed that project was being developed in terms of statutory approvals and that possession would be given soon.", "final_verdict": "Authority directed respondent to refund amount with interest.", "in_favor_of_respondent": "no"} | Shilpa GuptaShilpa Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
2415 of 20192415 of 2019 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2013 due to delay in possession. Authority directed refund with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in 2013 and paid Rs. 18,28,918. Despite multiple requests, the respondent failed to hand over possession within the agreed-upon 18 months. The complainant sought a refund of Rs. 19,63,362 with interest.", "respondent_claim(in detail)": "The respondent claimed that the project was being developed as per statutory approvals and licenses. They stated that four towers were complete, and possession had been given for fit-out purposes. They argued that the delay was not intentional and due to reasons beyond their control. They referred to Clause 10(c) of the flat buyer agreement, which mentions compensation for delay due to force majeure conditions.", "final_verdict(in detail)": "The Authority directed the respondent to refund the complainant's entire amount of Rs. 19,63,362 along with interest at the rate of 9.30% from the date the amounts were paid till the date of the order. The total amount, including interest, worked out to Rs. 35,23,226. The respondent was given 90 days to make the payment.", "in_favor_of_respondent": "no"} | Sachin DhingraSachin Dhingra | Parsvnath Developer…Parsvnath Developers Limited | Link |
2184 of 20192184 of 2019 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2007, but the project was not completed. The Authority directed the respondent to refund the amount with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in 2007 and paid Rs. 4,69,965/- but the project was not completed. The complainant sought refund of the amount with interest.", "respondent_claim(in detail)": "The respondent argued that the project was being developed in terms of statutory approvals granted by competent authority and that the apartment of the complainant was located in an un-registered project.", "final_verdict(in detail)": "The Authority directed the respondent to refund the amount of Rs. 4,69,965/- with interest at the rate of SBI highest marginal cost of lending rate (MCLR)+ 2% from the date amounts were paid till today.", "in_favor_of_respondent": "no"} | Chamanjit SandhuChamanjit Sandhu | Parsvnath Developer…Parsvnath Developers Limited | Link |
2645 of 20192645 of 2019 | HaryanaHaryana | The complainants sought refund of the amount depo…The complainants sought refund of the amount deposited with the respondent along with permissible interest as per law and cost of legal expenses. The Authority directed the respondent to refund to the complainant paid amount of %9,25,000/- along with interest. | ["Refund", "Delay i…["Refund", "Delay in possession"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid a sum of %9,25,000/- to the respondent till 10.03.2008 against basic sale price of %35,89,425/-. They alleged that there has been delay of almost ten years from deemed date of possession, but respondent has failed to offer possession of the flat till date.", "respondent_claim": "The respondent admitted that complainants have made a payment of %9,25,000/- to the respondent till date. They claimed that original applicants executed the flat buyer agreement on 19.09.2008 after going through all stipulated terms and conditions.", "final_verdict": "The Authority directed the respondent to refund to the complainant paid amount of %9,25,000/- along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Madhu RaoMadhu Rao | Parsvnath Developer…Parsvnath Developers Limited | Link |
1278 of 20211278 of 2021 | HaryanaHaryana | Complainant booked a plot in 2009 but no allotmen…Complainant booked a plot in 2009 but no allotment was made. Authority directed refund of booking amount with interest. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Complainant claimed allotmen…{"appellant_claim": "Complainant claimed allotment of a plot and interest for delay in offering possession.", "respondent_claim": "Respondent claimed that complainant was not an allottee as no formal allotment was made and complainant was ready to accept refund.", "final_verdict": "Authority directed refund of booking amount with interest.", "in_favor_of_respondent": "no"} | Mr. Jagdeep KumarMr. Jagdeep Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
1306 of 20211306 of 2021 | HaryanaHaryana | Complainants sought interest on amount paid for a…Complainants sought interest on amount paid for a shop in a project developed by respondent. Authority directed respondent to pay interest at the rate of 9.30% from the date amounts were paid till 10.07.2021. | ["Interest on amoun…["Interest on amount paid", "RERA"] | {"appellant_claim": "Complainants sought interest…{"appellant_claim": "Complainants sought interest on amount paid for a shop in a project developed by respondent.", "respondent_claim": "Respondent claimed that since amount stands paid to the complainants, contract stands concluded.", "final_verdict": "Authority directed respondent to pay interest at the rate of 9.30% from the date amounts were paid till 10.07.2021.", "in_favor_of_respondent": "no"} | Rohit MalikRohit Malik | Parsvnath Developer…Parsvnath Developers Limited | Link |
191 of 2020191 of 2020 | HaryanaHaryana | Complainant sought refund for delayed real estate…Complainant sought refund for delayed real estate project. Authority directed respondent to refund amount with interest. | ["Real estate refun…["Real estate refund", "Delayed project"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants booked a flat in the respondent's project in 2013 and paid Rs. 17,09,280. The project was delayed by nearly seven years, and the complainants sought a refund of the amount deposited with the respondent, along with permissible interest as per law and cost of legal expenses.", "respondent_claim(in detail)": "The respondent admitted the booking made by the complainants in 2013. They claimed that the basic sale price of the flat was fixed at Rs. 51,66,175 after deducting a discount of Rs. 2,13,325. The respondent stated that the delay in handing over possession was not intentional and that they were making best efforts to streamline the project and complete it so that possession could be offered at the earliest.", "final_verdict(in detail)": "The Authority directed the respondent to refund the paid amount of Rs. 17,09,280 along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017. The total amount, including interest, worked out to Rs. 31,02,723.", "in_favor_of_respondent": "no"} | Mr. Ranbir SinghMr. Ranbir Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
941 of 2021941 of 2021 | HaryanaHaryana | Complainant sought compensation for delay in poss…Complainant sought compensation for delay in possession of commercial unit, litigation costs, and mental agony. Adjudicating Officer awarded compensation for delay and litigation costs. | ["Delay in possessi…["Delay in possession", "Litigation costs"] | {"appellant_claim": "Complainant sought compensat…{"appellant_claim": "Complainant sought compensation for delay in possession of commercial unit, litigation costs, and mental agony.", "respondent_claim": "Respondent claimed that the complainant had not read the remaining orders of Hon'ble Authority and that the builder buyer agreement could not be executed.", "final_verdict": "Adjudicating Officer awarded compensation for delay and litigation costs.", "in_favor_of_respondent": "no"} | V.P. BatraV.P. Batra | Parsvnath Developer…Parsvnath Developers Limited | Link |
1311 of 20211311 of 2021 | HaryanaHaryana | Complainant sought possession of plot with mandat…Complainant sought possession of plot with mandated infrastructure, delay interest, and directions not to charge GST. Authority directed respondent to pay delay interest and issue fresh statement of accounts without GST. | ["Delay in possessi…["Delay in possession", "GST charges"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of plot with mandated infrastructure, delay interest, and directions not to charge GST.", "respondent_claim": "Respondent claimed delay in possession was due to force majeure conditions and not liable to pay interest for the delay.", "final_verdict": "Authority directed respondent to pay delay interest and issue fresh statement of accounts without GST.", "in_favor_of_respondent": "no"} | Raj KumarRaj Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
911 of 2020911 of 2020 | HaryanaHaryana | Complainants sought refund of amounts deposited f…Complainants sought refund of amounts deposited for flats in an unfinished project. Authority directed refund with interest. | ["Refund for unfini…["Refund for unfinished project"] | {"appellant_claim": "Refund of amounts deposited …{"appellant_claim": "Refund of amounts deposited for flats in an unfinished project.", "respondent_claim": "Project is not unfinished, and refund is not due.", "final_verdict": "Refund with interest to be paid to complainants.", "in_favor_of_respondent": "no"} | Niku GuleriaNiku Guleria | Parsvnath Developer…Parsvnath Developers Limited | Link |
3027 and 3030 of 20…3027 and 3030 of 2019 | HaryanaHaryana | Complainants sought refund for apartment booked i…Complainants sought refund for apartment booked in an unregistered project. Authority directed refund with interest. | ["Refund for unregi…["Refund for unregistered project"] | {"appellant_claim": "The complainants sought refu…{"appellant_claim": "The complainants sought refund for the apartment booked in an unregistered project of the respondent.", "respondent_claim": "The respondent claimed that the project was not required to be registered as it was completed before the RERA Act came into effect.", "final_verdict": "The Authority directed the respondent to refund the complainants the amounts paid by them along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Mrs. SantoshMrs. Santosh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1199 of 20211199 of 2021 | HaryanaHaryana | Complainant sought refund for apartment booked in…Complainant sought refund for apartment booked in 2009 due to project delay. Authority directed refund with interest. | ["Project delay", "…["Project delay", "Refund"] | {"appellant_claim": "Seeking refund for apartment…{"appellant_claim": "Seeking refund for apartment booked in 2009 due to project delay.", "respondent_claim": "Project is being developed, delay due to reasons beyond control.", "final_verdict": "Authority directed refund with interest.", "in_favor_of_respondent": "no"} | Pankaj Kumar JainPankaj Kumar Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1160 of 20201160 of 2020 | HaryanaHaryana | Complainants sought possession of flat or refund …Complainants sought possession of flat or refund with interest for delay in handing over the project. Authority found respondent unable to complete the project and directed refund with interest. | ["Delay in handover…["Delay in handover of flat", "Refund with interest"] | {"appellant_claim": "Complainants claimed that no…{"appellant_claim": "Complainants claimed that no offer of possession has been made by respondent despite lapse of more than 10 years since the commencement of construction of project. They sought possession of the flat with interest or in alternative refund of the amount deposited with respondent along with interest @24% and compensation.", "respondent_claim": "Respondent admitted the fact of booking of the apartment, the agreed sales consideration, the area and location of the apartment as well as the payment of %5,41,941/- made by the complainants. However, they called the complainants defaulter in payment of overdue installments and stated that the project is being developed in terms of statutory approvals granted by competent authority.", "final_verdict": "Authority directed respondent to refund the complainants paid amount of %5,41,941/- along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Ritu GoyalRitu Goyal | Parsvnath Developer…Parsvnath Developers Limited | Link |
239 of 2019239 of 2019 | HaryanaHaryana | Complainant sought possession of flat with permis…Complainant sought possession of flat with permissible interest for delay in handing over the possession and reimbursement of amount paid towards rent and compensation. Respondent failed to complete the project and hand over possession of the booked flat to the complainant. | ["Delay in possessi…["Delay in possession", "Unfinished project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to complete the project and hand over possession of the booked flat to the complainant, despite receiving payment of Rs. 55,29,440/-.", "respondent_claim": "The respondent claimed that the delay in completion of the project was not intentional and that the project was being developed in nine towers, out of which three towers were complete and possession had been offered for fit-out purposes.", "final_verdict": "The Authority directed the respondent to pay upfront delay interest amounting to Rs. 30,18,202/- within 90 days of uploading of the order on the website of the Authority. The respondent's liability for paying monthly interest of Rs. 42,266/- will commence w.e.f. 05.06.2022 and it shall be paid on monthly basis till valid offer of possession is made to the complainant.", "in_favor_of_respondent": "no"} | Balraj Singh SihagBalraj Singh Sihag | Parsvnath Developer…Parsvnath Developers Limited | Link |
1010 of 20191010 of 2019 | HaryanaHaryana | Complaint withdrawn by parties, settled out of co…Complaint withdrawn by parties, settled out of court. | ["Settlement", "Wit…["Settlement", "Withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by parties, settled out of court.", "in_favor_of_respondent": "no"} | Rajesh Bhan RathiRajesh Bhan Rathi | Parsvnath Developer…Parsvnath Developers Limited | Link |
1031 of 20211031 of 2021 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2006, as the project was incomplete and abandoned. Authority directed refund with interest. | ["Refund for incomp…["Refund for incomplete project"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund for a flat booked in 2006, as the project was incomplete and abandoned.", "respondent_claim": "The respondent claimed that the project was registered and that the complainant was not entitled to a refund.", "final_verdict": "The Authority directed the respondent to refund the complainant the amounts paid, along with interest at the rate of 9.40%.", "in_favor_of_respondent": "no"} | Mayank JainMayank Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1015 of 20201015 of 2020 | HaryanaHaryana | Complainants sought refund of amounts deposited f…Complainants sought refund of amounts deposited for plots in respondent's project. Authority granted refund with interest. | ["Refund for undeli…["Refund for undelivered plots"] | {"appellant_claim": "Complainants sought refund o…{"appellant_claim": "Complainants sought refund of amounts deposited for plots in respondent's project.", "respondent_claim": "Respondent claimed that booking was made in a registered project and that complainants were not entitled to refund.", "final_verdict": "Authority granted refund with interest to complainants.", "in_favor_of_respondent": "no"} | Saroj AbrolSaroj Abrol | Parsvnath Developer…Parsvnath Developers Limited | Link |
884 of 2019884 of 2019 | HaryanaHaryana | Complainant sought refund of down payment and com…Complainant sought refund of down payment and compensation for delayed possession of flat. Authority directed respondent to refund down payment with interest, outstanding loan, and EMIs paid by complainant. | ["Refund of down pa…["Refund of down payment", "Compensation for delayed possession"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of down payment of \u20b94,15,490/- and compensation for delayed possession of flat.", "respondent_claim": "Respondent claimed that project was being developed in terms of statutory approvals granted by competent authority and that delay was due to reasons beyond their control.", "final_verdict": "Authority directed respondent to refund down payment with interest, outstanding loan, and EMIs paid by complainant.", "in_favor_of_respondent": "no"} | Bhavna KasturiaBhavna Kasturia | Parsvnath Developer…Parsvnath Developers Limited | Link |
1138 of 20211138 of 2021 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent for undelivered flat. Authority directed respondent to refund amount with interest due to project delays and non-completion. | ["Refund for Undeli…["Refund for Undelivered Flat"] | {"appellant_claim": "Refund of amount paid to res…{"appellant_claim": "Refund of amount paid to respondent for undelivered flat with interest.", "respondent_claim": "Project is ongoing, and refund is not maintainable or barred by limitation.", "final_verdict": "Respondent directed to refund amount with interest due to project delays and non-completion.", "in_favor_of_respondent": "no"} | LT GEN A.P. SinghLT GEN A.P. Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1148 of 20201148 of 2020 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 due to inordinate delay in possession. Authority directed refund with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in 2008 and paid Rs. 5,88,706/- by 2008. Despite the due date of possession being 2011, the project is not complete, and the complainant seeks refund.", "respondent_claim(in detail)": "The respondent claims that the project is being developed as per statutory approvals and that the apartment is located in an unregistered project. They argue that the Authority does not have jurisdiction to entertain complaints relating to unregistered projects.", "final_verdict(in detail)": "The Authority rejects the respondent's argument and directs refund of Rs. 5,88,706/- with interest at 9.50% from the date amounts were paid till today, totaling Rs. 13,79,353/-.", "in_favor_of_respondent": "no"} | Akhil ChandraAkhil Chandra | Parsvnath Developer…Parsvnath Developers Limited | Link |
3023 of 20193023 of 2019 | HaryanaHaryana | Complainant sought possession of plot and delay i…Complainant sought possession of plot and delay interest. Authority directed respondent to handover possession, execute conveyance deeds, and pay delay interest. | ["Possession of plo…["Possession of plot", "Delay interest"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought possession of plot and delay interest due to inordinate delay of more than eight years in delivering possession.", "respondent_claim(in detail)": "Respondent claimed that complainant was not intending to pay maintenance charges and that the delay was due to revision of layout plan.", "final_verdict(in detail)": "Authority directed respondent to handover possession of plot to complainant along with delay interest. Respondent was also directed to execute conveyance deeds without further delay.", "in_favor_of_respondent": "no"} | Ram Niwas GuptaRam Niwas Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
1347 OF 20211347 OF 2021 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 due to non-completion of the project and non-provision of possession. Authority directed the respondent to refund the complainant's amount with interest. | ["Non-completion of…["Non-completion of project", "Non-provision of possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to complete the project and provide possession of the flat despite receiving payment.", "respondent_claim": "The respondent claimed that the project was delayed due to reasons beyond their control and that they were making efforts to complete the project.", "final_verdict": "The Authority directed the respondent to refund the complainant's amount with interest.", "in_favor_of_respondent": "no"} | Rakesh ChawlaRakesh Chawla | Parsvnath Developer…Parsvnath Developers Limited | Link |
763 of 2022763 of 2022 | HaryanaHaryana | Complainant booked a plot in respondent's project…Complainant booked a plot in respondent's project and paid Rs. 7,40,000/- but did not receive a plot or a builder-buyer agreement. The authority directed the respondent to refund the amount with interest. | ["Refund of amount …["Refund of amount paid for undelivered plot"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had paid Rs. 7,40,000/- for a plot in the respondent's project but did not receive a plot or a builder-buyer agreement. She sought a refund of the amount with interest.", "respondent_claim": "The respondent claimed that the complaint was not maintainable as the complainant was not an allottee of the respondent company. They admitted that the complainant had paid Rs. 7,40,000/- but stated that no agreement to sell had been executed between the parties.", "final_verdict": "The authority directed the respondent to refund the amount of Rs. 7,40,000/- with interest at the rate of 9.70% per annum from the date of payment till the date of disposal.", "in_favor_of_respondent": "no"} | Bhavika BatraBhavika Batra | Parsvnath Developer…Parsvnath Developers Limited | Link |
1087 of 20201087 of 2020 | HaryanaHaryana | Complainant sought refund for amount paid to resp…Complainant sought refund for amount paid to respondent for a plot that was not allotted. Authority directed respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant purchased the booking rights from Mr. Jai Lal and paid a total of %5,25,780/- to the respondent. Despite partial payment, the respondent did not allot any plot to the complainant. The complainant sought refund of the amount paid along with interest.", "respondent_claim(in detail)": "The respondent claimed that the complainant was not an allottee and that the booking was made in the 'present and future' scheme. The respondent argued that the complainant was bound by the terms and conditions of the Affidavit-cum-Undertaking and Indemnity signed by her.", "final_verdict(in detail)": "The Authority directed the respondent to refund the complainant the amount of %5,25,780/- along with interest at the rate of 9.80% from the date amounts were paid till today, which works out to %14,06,442/-.", "in_favor_of_respondent": "no"} | Mrs. Dilpreet SinghMrs. Dilpreet Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1198 of 20211198 of 2021 | HaryanaHaryana | Complainant sought refund for amount paid to resp…Complainant sought refund for amount paid to respondent for a plot in a project. Respondent agreed to refund and Authority directed respondent to refund with interest. | ["Refund for plot b…["Refund for plot booking"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for amount paid to respondent for a plot in a project.", "respondent_claim": "Respondent agreed to refund and stated that no agreement to sell was executed between the parties.", "final_verdict": "Authority directed respondent to refund the complainant the amount paid by him along with interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Mohinder Singh Agga…Mohinder Singh Aggarwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1030 of 20211030 of 2021 | HaryanaHaryana | Complainants sought refund for an undelivered apa…Complainants sought refund for an undelivered apartment. Authority directed the respondent to refund the amount with interest due to the project's abandonment and lack of progress. | ["Refund for undeli…["Refund for undelivered apartment"] | {"appellant_claim": "The complainants sought refu…{"appellant_claim": "The complainants sought refund for an undelivered apartment due to the project's abandonment and lack of progress.", "respondent_claim": "The respondent claimed that the project was still under development and that the complainants were not entitled to a refund.", "final_verdict": "The Authority directed the respondent to refund the amount with interest to the complainants.", "in_favor_of_respondent": "no"} | AnotherAnother | Parsvnath Developer…Parsvnath Developers Limited | Link |
76 of 202276 of 2022 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 due to delayed possession. Authority directed refund with interest and compensation. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in 2008 and paid Rs. 27,23,859/- in installments. Despite repeated requests, the respondent failed to provide possession of the flat or refund the amount. The complainant sought refund with interest and compensation.", "respondent_claim(in detail)": "The respondent claimed that the project was delayed due to reasons beyond their control and that they had paid Rs. 25,66,420/- as EMIs to the complainant. They argued that the complainant was not entitled to refund.", "final_verdict(in detail)": "The Authority directed the respondent to refund Rs. 10,34,361/- to the complainant, including interest and principal amount. They also ordered the respondent to pay the outstanding loan amount and refund the EMIs paid by the complainant.", "in_favor_of_respondent": "no"} | Anup SethiAnup Sethi | Parsvnath Developer…Parsvnath Developers Limited | Link |
424 of 2022424 of 2022 | HaryanaHaryana | Complainant sought refund of amount paid to respo…Complainant sought refund of amount paid to respondent for a plot, as respondent failed to deliver possession. Authority directed respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot from the respondent in 2004 and paid a total of Rs. 7,60,000. Despite numerous requests, the respondent failed to deliver possession of the plot or refund the amount. The complainant sought refund of the amount paid with interest.", "respondent_claim(in detail)": "The respondent claimed that the complainant was not an allottee and therefore not entitled to refund. They also claimed that the complainant had signed an affidavit undertaking to accept refund with interest if no plot was allotted.", "final_verdict(in detail)": "The Authority directed the respondent to refund the amount of Rs. 7,60,000 with interest at the rate of 9.80% per annum from the date of payment till the date of refund. The total amount payable was Rs. 20,22,517.", "in_favor_of_respondent": "no"} | Jasbir Kaur SuriJasbir Kaur Suri | Parsvnath Developer…Parsvnath Developers Limited | Link |
1976 of 20191976 of 2019 | HaryanaHaryana | Complaint filed by Association of allottees resid…Complaint filed by Association of allottees residing in 'Parsvnath City, Block A, Sonepat' against M/S Parsvnath Developers Ltd. for failing to provide amenities as agreed upon. | ["Non-provision of …["Non-provision of amenities", "Failure to comply with service plan estimates"] | {"appellant_claim": "The respondent failed to pro…{"appellant_claim": "The respondent failed to provide amenities as agreed upon, including installation of sub-stations, underground water tank, STP, and provision of club.", "respondent_claim": "The respondent claimed that they had provided certain amenities and that the complainant was not entitled to the benefits.", "final_verdict": "The Authority directed the respondent to provide all the amenities as were supposed to be provided in the approved service plan estimates of the project.", "in_favor_of_respondent": "no"} | Association of allo…Association of allottees | Parsvnath Developer…Parsvnath Developers Limited | Link |
1161 of 20211161 of 2021 | HaryanaHaryana | Complainant sought possession of plot and delay i…Complainant sought possession of plot and delay interest. Authority directed respondent to pay delay interest and possession was not stipulated in the agreement. | ["Delay Interest", …["Delay Interest", "Possession"] | {"appellant_claim": "The complainant sought posse…{"appellant_claim": "The complainant sought possession of the plot and delay interest.", "respondent_claim": "The respondent did not provide any claim.", "final_verdict": "The Authority directed the respondent to pay delay interest and possession was not stipulated in the agreement.", "in_favor_of_respondent": "no"} | Manoj Kumar JainManoj Kumar Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1113 of 20201113 of 2020 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 due to non-delivery of possession by the respondent. The Authority directed the respondent to refund the amount with interest. | ["Non-delivery of p…["Non-delivery of possession", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the flat despite receiving payment.", "respondent_claim": "The respondent claimed that the project was delayed due to reasons beyond their control.", "final_verdict": "The Authority directed the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Ram Niwas GuptaRam Niwas Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
534 of 2022534 of 2022 | HaryanaHaryana | Complainants sought refund of amount paid for a p…Complainants sought refund of amount paid for a plot in a real estate project. Authority directed respondent to refund the amount with interest. | ["Refund of amount …["Refund of amount paid for a plot"] | {"appellant_claim(in detail)": "Complainants purc…{"appellant_claim(in detail)": "Complainants purchased booking rights from original applicant Mr. Mukesh Wadhwa and paid a total of \u20b97,60,000/- to respondent. They claimed that respondent had not allotted them any plot despite partial payment and had not refunded the amount paid.", "respondent_claim(in detail)": "Respondent claimed that complainants were not allottees of respondent company and that the complaint was not maintainable. They admitted that original applicant Mr. Mukesh Wadhwa had applied for advance registration of a plot in respondent's project and that payment of \u20b97,60,000/- had been received from complainants and their predecessor-in-interest. They claimed that no agreement to sell had been executed between the parties and that complainants were bound by the terms and conditions of an Affidavit-cum-Undertaking and Indemnity signed by them.", "final_verdict(in detail)": "Authority directed respondent to refund the amount paid by complainants with interest at the rate of 9.80% from the date amounts were paid till today. The total amount payable to complainants including interest was calculated and depicted in a table.", "in_favor_of_respondent": "no"} | Ambika GargAmbika Garg | Parsvnath Developer…Parsvnath Developers Limited | Link |
456 of 2022456 of 2022 | HaryanaHaryana | Complainant sought refund for flat not delivered …Complainant sought refund for flat not delivered by respondent after 14 years. Authority directed refund with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund for flat not delivered by respondent after 14 years.", "respondent_claim(in detail)": "Respondent claimed project was being developed in terms of statutory approvals and that complainant's flat was relocated due to modifications in plans.", "final_verdict(in detail)": "Authority directed respondent to refund complainant's entire amount of \u20b95,04,158/- along with interest at the rate of 9.80% from the date amounts were paid till today, totaling \u20b912,09,625/-.", "in_favor_of_respondent": "no"} | Amrita AichAmrita Aich | Parsvnath Developer…Parsvnath Developers Limited | Link |
700 of 2020700 of 2020 | HaryanaHaryana | Complainant sought refund for a delayed real esta…Complainant sought refund for a delayed real estate project. Authority ordered the respondent to refund the amount with interest. | ["Delayed real esta…["Delayed real estate project", "Refund with interest"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent failed to complete the construction of the project and hand over possession of the shop within the agreed-upon time frame. The complainant sought a refund of the amount paid, along with interest.", "respondent_claim": "The respondent did not file a reply. The learned counsel for the respondent stated that the respondent is not in a position to hand over possession of the shop to the complainant.", "final_verdict": "The Authority ordered the respondent to refund the complainant's entire amount of \u20b96,50,000 along with interest at the rate of 10% from the date amounts were paid till today.", "in_favor_of_respondent": "no"} | C.L. VermaC.L. Verma | Parsvnath Developer…Parsvnath Developers Limited | Link |
1514 of 20201514 of 2020 | HaryanaHaryana | Complainant sought refund for a flat booked in 20…Complainant sought refund for a flat booked in 2008 due to non-completion of the project by the respondent. The Authority directed the respondent to refund the amount with interest. | ["Refund for non-co…["Refund for non-completion of project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to complete the project and hand over possession of the flat despite payment of Rs. 22,05,402/-.", "respondent_claim": "The respondent claimed that the project was being developed in terms of statutory approvals granted by competent authority and that the delay was due to reasons beyond their control.", "final_verdict": "The Authority directed the respondent to refund the amount of Rs. 22,05,402/- with interest at the rate of 10% per annum.", "in_favor_of_respondent": "no"} | Geeta AnandGeeta Anand | Parsvnath Developer…Parsvnath Developers Limited | Link |
654 of 2020654 of 2020 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties.", "in_favor_of_respondent": "no"} | Rajesh Kumar SharmaRajesh Kumar Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
231 of 2021231 of 2021 | HaryanaHaryana | Complainants sought refund for unpaid flat and EM…Complainants sought refund for unpaid flat and EMIs due to developer's failure to deliver possession. Authority ordered refund and compensation. | ["Refund for Undeli…["Refund for Undelivered Flat and EMIs"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for unpaid flat and EMIs due to developer's failure to deliver possession.", "respondent_claim": "Developer claimed the project was ongoing and not registered with RERA, seeking to avoid jurisdiction.", "final_verdict": "Authority ordered refund and compensation for unpaid flat and EMIs, finding the developer liable for failure to deliver possession.", "in_favor_of_respondent": "no"} | Pintu YadavPintu Yadav | Parsvnath Developer…Parsvnath Developers Limited | Link |
200, 201, 202, 203,…200, 201, 202, 203, 204, 205, 206, 207 of 2020 | HaryanaHaryana | Complainants sought refund for amounts paid to re…Complainants sought refund for amounts paid to respondent for a real estate project. Authority directed respondent to refund the amounts with interest. | ["Refund for real e…["Refund for real estate project"] | {"appellant_claim": "Complainants sought refund f…{"appellant_claim": "Complainants sought refund for amounts paid to respondent for a real estate project.", "respondent_claim": "Respondent claimed that the complainants had booked plots in the project and that the project was ongoing.", "final_verdict": "Authority directed respondent to refund the amounts paid by the complainants with interest.", "in_favor_of_respondent": "no"} | Suresh Kumar GuptaSuresh Kumar Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
649 of 2020649 of 2020 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties.", "in_favor_of_respondent": "no"} | Anr.Anr. | Parsvnath Developer…Parsvnath Developers Limited | Link |
1362 of 20201362 of 2020 | HaryanaHaryana | Complainant Neelam Rani sought possession of a re…Complainant Neelam Rani sought possession of a residential plot and delay interest from respondent M/S Parsvnath Developers Ltd. Authority directed respondent to offer fresh possession and pay delay interest. | ["Possession of res…["Possession of residential plot", "Delay interest"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of the plot and delay interest for the period of delay caused in handing over of possession.", "respondent_claim": "Respondent argued that previous allottees of the plot had defaulted in making payments and that offer of possession had already been made to the complainant.", "final_verdict": "Authority directed respondent to offer fresh possession of the plot to the complainant within 30 days and pay delay interest calculated at the rate of 10.00%.", "in_favor_of_respondent": "no"} | Neelam RaniNeelam Rani | Parsvnath Developer…Parsvnath Developers Limited | Link |
2956 of 20192956 of 2019 | HaryanaHaryana | Complainant booked a residential plot but did not…Complainant booked a residential plot but did not receive possession. Authority calculated delay interest and directed the respondent to offer possession within 30 days. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid Rs. 11,50,780/- but did not receive possession of the plot.", "respondent_claim": "The respondent claimed that the complainant was a defaulter in making timely payments.", "final_verdict": "The Authority calculated delay interest at the rate of 10% per annum and directed the respondent to offer possession within 30 days.", "in_favor_of_respondent": "no"} | Amit KumarAmit Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
1308 of 20201308 of 2020 | HaryanaHaryana | Complainant sought refund for a shop booked in an…Complainant sought refund for a shop booked in an unregistered project. Authority directed refund with interest. | ["Refund for unregi…["Refund for unregistered project"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for a shop booked in an unregistered project.", "respondent_claim": "Respondent claimed the project was abandoned due to market conditions and sought to avoid registration.", "final_verdict": "Authority directed refund with interest.", "in_favor_of_respondent": "no"} | Neelam KatyalNeelam Katyal | Parsvnath Developer…Parsvnath Developers Limited | Link |
844 of 2022844 of 2022 | HaryanaHaryana | Complainant Rohit Khanagwal withdrew the complain…Complainant Rohit Khanagwal withdrew the complaint against M/S Parsvnath Developers Ltd. due to ongoing settlement talks. | ["Settlement talks"]["Settlement talks"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complainant withdrew the complaint due to ongoing settlement talks.", "in_favor_of_respondent": "no"} | Rohit KhanagwalRohit Khanagwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
549 of 2022549 of 2022 | HaryanaHaryana | Complainant sought refund for amount paid to resp…Complainant sought refund for amount paid to respondent for a plot that was not allotted. Authority directed respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund for the amount paid to the respondent for a plot that was not allotted. The complainant alleged that the respondent did not allot any plot despite partial payment being made.", "respondent_claim(in detail)": "The respondent claimed that the complaint was not maintainable as the complainant was not an allottee of the respondent company. The respondent admitted that payment of Rs. 7,50,000/- had been received from the complainant and his predecessor-in-interest.", "final_verdict(in detail)": "The Authority directed the respondent to refund the complainant's paid amount of Rs. 7,50,000/- along with interest at the rate of 10% per annum from the date amounts were paid till today.", "in_favor_of_respondent": "no"} | Navneet AroraNavneet Arora | Parsvnath Developer…Parsvnath Developers Limited | Link |
1355, 1356, 1357, 1…1355, 1356, 1357, 1358, 1359, 1361, 1363, 1364, 1365, 1366, 1367 of 2020 | HaryanaHaryana | The complainants filed a complaint against M/S Pa…The complainants filed a complaint against M/S Parsvnath Developers Ltd. for delay in delivery of apartments and sought refund of the amount paid. The Authority allowed the prayer of complainants for refund of entire amount paid by the complainants to the respondents. | ["Delay in delivery…["Delay in delivery of apartments", "Refund of amount paid"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid the amount for the apartments but the respondent had delayed the delivery of the apartments and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the complainants had defaulted in making payments and that the delay in delivery of apartments was due to various reasons.", "final_verdict": "The Authority allowed the prayer of complainants for refund of entire amount paid by the complainants to the respondents.", "in_favor_of_respondent": "no"} | Raj KumariRaj Kumari | Parsvnath Developer…Parsvnath Developers Limited | Link |
1355 of 20201355 of 2020 | HaryanaHaryana | Complainants sought refund for delayed apartment …Complainants sought refund for delayed apartment delivery. Authority ordered refund with interest. | ["Delayed apartment…["Delayed apartment delivery", "Refund with interest"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for delayed apartment delivery and interest for the period.", "respondent_claim": "Respondent claimed that the complaint was time-barred and that fit-out possession had been offered to the complainants.", "final_verdict": "Authority ordered refund of the amount paid by the complainants with interest.", "in_favor_of_respondent": "no"} | Raj KumariRaj Kumari | Parsvnath Developer…Parsvnath Developers Limited | Link |
2067 of 20222067 of 2022 | HaryanaHaryana | Complainant sought refund for amount paid to resp…Complainant sought refund for amount paid to respondent for a plot that was not allotted despite partial payment. Authority directed respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant h…{"appellant_claim(in detail)": "The complainant had booked a plot measuring 400 sq. yards in the respondent's project under 'Present and Future Scheme' in the year 2004 by paying a booking amount of 22,16,000/-. The complainant had also made further payment of 5,04,000/- to the respondent in December 2005. Accordingly, the complainant has paid to the respondent a sum of 7,20,000/- till date. The complainant's grievance is that even after lapse of approximately 17 years from the date of booking, the respondent has not allotted him any plot till date. No builder-buyer agreement had been executed between the parties despite partial payment made by the complainant.", "respondent_claim(in detail)": "The respondent contended that this complaint is not maintainable for the reason that the complainant is not an allottee of the respondent company. Nevertheless, the respondent admitted the fact that the complainant had applied for advance registration of a plot in any of the new/upcoming project of respondent on 13.08.2004. The respondent also admits that a payment of 7,20,000/- has been received by him against said booking from the complainant. It has however been contended that there was no agreement executed between the parties. Neither location nor site of the project was confirmed at the time of registration.", "final_verdict(in detail)": "The Authority directed the respondent to refund the complainant his paid amount of 7,20,000/- apart from payment of interest at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017 i.e at the rate of SBI highest marginal cost of lending rate (MCLR)+ 2 % Which as on date works out to 10% (8.00% + 2.00%) from the date amounts were paid till today.", "in_favor_of_respondent": "no"} | NC DattaNC Datta | Parsvnath Developer…Parsvnath Developers Limited | Link |
1253 of 20201253 of 2020 | HaryanaHaryana | Complainant Naresh Kumari filed a complaint again…Complainant Naresh Kumari filed a complaint against Parsvnath Developers Ltd. for delay in possession of a plot. The Authority held that the complainant is entitled to delay interest and directed the respondent to pay the same. | ["Delay in possessi…["Delay in possession", "Delay interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the plot and sought delay interest.", "respondent_claim": "The respondent claimed that the delay was due to force majeure conditions and not their fault.", "final_verdict": "The Authority held that the complainant is entitled to delay interest and directed the respondent to pay the same.", "in_favor_of_respondent": "no"} | Naresh KumariNaresh Kumari | Parsvnath Developer…Parsvnath Developers Limited | Link |
1301 of 20211301 of 2021 | HaryanaHaryana | Complainant sought possession of a plot and delay…Complainant sought possession of a plot and delay interest from respondent, who had offered possession ten years after booking. Authority held that offer of possession was invalid without proper installations of electricity poles and directed respondent to issue fresh offer of possession. | ["Invalid offer of …["Invalid offer of possession", "Delay interest"] | {"appellant_claim(in detail)": "Complainant alleg…{"appellant_claim(in detail)": "Complainant alleged that respondent had not given proper possession of the plot despite ten years of booking. Complainant sought possession of the plot and delay interest at the rate of 11% from the date of delay caused till the date of actual handing over the possession to the complainant.", "respondent_claim(in detail)": "Respondent stated that complaint is not maintainable for the reason that on 17.07.2021, the complainant has already been offered possession of his unit. Respondent admitted payment of 224,31,100/- till date and called complainant a chronic defaulter despite issuance of reminder letters from 2014 to 2017.", "final_verdict(in detail)": "Authority held that offer of possession was invalid without proper installations of electricity poles and directed respondent to issue fresh offer of possession within 45 days along with fresh statement of accounts incorporating therein delay interest accrued for delay in handing over the possession. Authority calculated delay interest from deemed date of possession i.e., 09.04.2014 till the date of passing the order i.e., 27.10.2022 at the rate prescribed in Rule 15 of Haryana Real Estate (Regulation and Development) Rules, 2017 i.e., at the rate of SBI highest marginal cost of lending rate (MCLR) + 2% which as on date works out to 10.25% (8.25%+2.00%).", "in_favor_of_respondent": "no"} | Surinder AroraSurinder Arora | Parsvnath Developer…Parsvnath Developers Limited | Link |
152 of 2021152 of 2021 | HaryanaHaryana | Complainant sought refund of entire money paid wi…Complainant sought refund of entire money paid with interest for delayed possession of flat. Authority allowed refund of amount paid with interest. | ["Delayed Possessio…["Delayed Possession", "Refund"] | {"appellant_claim": "Complainant claimed to have …{"appellant_claim": "Complainant claimed to have paid Rs. 57,47,987/- and sought refund of entire amount with interest for delayed possession of flat.", "respondent_claim": "Respondent claimed that complainant had defaulted in making timely payments and that the project was being developed as Group Housing Project (GHP).", "final_verdict": "Authority allowed refund of amount paid with interest.", "in_favor_of_respondent": "no"} | Joginder Singh RanaJoginder Singh Rana | Parsvnath Developer…Parsvnath Developers Limited | Link |
1265 of 20201265 of 2020 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties.", "in_favor_of_respondent": "no"} | Kusum LataKusum Lata | Parsvnath Developer…Parsvnath Developers Limited | Link |
1480 of 20221480 of 2022 | HaryanaHaryana | Complainant sought possession of plot booked in r…Complainant sought possession of plot booked in respondent's project, payment of interest for delay, and damages for mental agony. Respondent claimed complainant was not an allottee and the complaint was not maintainable. | ["Possession of plo…["Possession of plot", "Interest for delay", "Damages for mental agony"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought possession of plot booked in respondent's project, payment of interest for delay, and damages for mental agony.", "respondent_claim(in detail)": "Respondent claimed complainant was not an allottee and the complaint was not maintainable.", "final_verdict(in detail)": "Complainant was declared an allottee, and respondent was directed to allot and deliver possession of the booked plot to the complainant within 90 days.", "in_favor_of_respondent": "no"} | Kanta GroverKanta Grover | Parsvnath Developer…Parsvnath Developers Limited | Link |
1502 of 20221502 of 2022 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest due to delay in possession of flat. Authority directed refund with interest at 10.60%. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim(in detail)": "Complainant booke…{"appellant_claim(in detail)": "Complainant booked flat in 2009 and paid Rs. 6,76,689/- but possession was not given despite 12 years. Complainant sought refund with interest.", "respondent_claim(in detail)": "Respondent claimed that project was ongoing and possession would be given soon. Respondent also claimed that complainant was a chronic defaulter in payments.", "final_verdict(in detail)": "Authority directed refund of Rs. 6,76,689/- with interest at 10.60% from the date of payment till the date of refund, totaling Rs. 16,11,511/-.", "in_favor_of_respondent": "no"} | MS ManhasMS Manhas | Parsvnath Developer…Parsvnath Developers Limited | Link |
1428 of 20201428 of 2020 | HaryanaHaryana | Complaint re-opened for rectification of typograp…Complaint re-opened for rectification of typographical error in previous order. Corrected facts regarding plot allotted to complainant recorded in new order. | ["Rectification of …["Rectification of Typographical Error"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought rectification of typographical error in previous order regarding plot allotted to him.", "respondent_claim(in detail)": "Respondent did not make any claim in this rectification application.", "final_verdict(in detail)": "Rectification application allowed. Corrected facts regarding plot allotted to complainant recorded in new order.", "in_favor_of_respondent": "no"} | Pawan AroraPawan Arora | Parsvnath Developer…Parsvnath Developers Limited | Link |
82 of 202282 of 2022 | HaryanaHaryana | Complainants sought refund of amount deposited by…Complainants sought refund of amount deposited by them along with interest in terms of Section 18 of Act of 2016. Authority directed respondent to refund the entire amount of %72,93,852.50/- to the complainants. | ["Refund of amount …["Refund of amount deposited by complainants"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought refund of amount deposited by them along with interest in terms of Section 18 of Act of 2016.", "respondent_claim(in detail)": "Respondent claimed that project is being developed in terms of statutory approvals granted by competent authority and that there is no intentional delay on the part of respondent.", "final_verdict(in detail)": "Authority directed respondent to refund the entire amount of %72,93,852.50/- to the complainants.", "in_favor_of_respondent": "no"} | Mrs. Renu VermaMrs. Renu Verma | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 2504 …Complaint No. 2504 of 2022 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest for a plot in a real estate project. Authority directed refund with interest at prescribed rate. | ["Refund with Inter…["Refund with Interest"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of amount deposited with interest for a plot in a real estate project.", "respondent_claim": "Respondent claimed that complainant was not an allottee and that no agreement for sale had been executed.", "final_verdict": "Authority directed refund of amount deposited with interest at prescribed rate.", "in_favor_of_respondent": "no"} | Kishore Kumar JainKishore Kumar Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
2506 of 20222506 of 2022 | HaryanaHaryana | Complainant booked a plot in Parsvnath City, Sone…Complainant booked a plot in Parsvnath City, Sonepat, but no allotment was made. Authority directed the respondent to allot and deliver possession of the booked plot. | ["Real Estate", "Po…["Real Estate", "Possession of Plot"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that no allotment was made despite paying 50% of the total sale price.", "respondent_claim": "The respondent claimed that the complainant was not an allottee as there was no agreement for sale.", "final_verdict": "The Authority directed the respondent to allot and deliver possession of the booked plot to the complainant.", "in_favor_of_respondent": "no"} | Rakesh ChadhaRakesh Chadha | Parsvnath Developer…Parsvnath Developers Limited | Link |
2942 and 2943 of 20…2942 and 2943 of 2022 | HaryanaHaryana | Complainants sought refund for amounts paid to Pa…Complainants sought refund for amounts paid to Parsvnath Developers Ltd. for a plot in the 'Parsvnath City' project. The Authority directed the respondent to refund the amounts with interest. | ["Refund for amount…["Refund for amounts paid to developer"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid amounts to the respondent for a plot in the 'Parsvnath City' project, but the respondent had failed to deliver the possession of the plot. They sought refund for the amounts paid.", "respondent_claim": "The respondent claimed that the complainants were not entitled to refund as they were not allottees of the respondent company. They argued that the registration was mere an expression of interest towards the future project of the respondent.", "final_verdict": "The Authority directed the respondent to refund the amounts paid by the complainants with interest.", "in_favor_of_respondent": "no"} | Sushil Kumar AgrawalSushil Kumar Agrawal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1578 of 20221578 of 2022 | HaryanaHaryana | Complainants sought refund of paid money along wi…Complainants sought refund of paid money along with interest for delayed delivery of possession. Authority allowed refund and interest. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of paid money along with interest for delayed delivery of possession.", "respondent_claim": "Respondent claimed that the project was not abandoned and that they were trying to complete the remaining work.", "final_verdict": "Authority allowed refund of paid money along with interest at the rate of 10.60%.", "in_favor_of_respondent": "no"} | Vijainder SinghVijainder Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
72 of 202272 of 2022 | HaryanaHaryana | Complainant booked a plot in Parsvnath City, Sone…Complainant booked a plot in Parsvnath City, Sonepat, but did not receive possession. The Authority directed the respondent to allot and deliver possession of the plot, pay interest, and compensate the complainant for delay. | ["Possession of plo…["Possession of plot", "Interest payment", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he booked a plot in Parsvnath City, Sonepat, but did not receive possession despite paying 50% of the total sale price.", "respondent_claim": "The respondent claimed that the complainant was not an allottee as he did not have an agreement for sale, and that the complaint was barred by limitation.", "final_verdict": "The Authority directed the respondent to allot and deliver possession of the plot, pay interest at the rate of 10.70% per annum, and compensate the complainant for delay.", "in_favor_of_respondent": "no"} | Avineesh MattaAvineesh Matta | Parsvnath Developer…Parsvnath Developers Limited | Link |
768 of 2022768 of 2022 | HaryanaHaryana | Complainants sought possession of a plot and inte…Complainants sought possession of a plot and interest for delay, while the respondent argued they couldn't develop the project without approval. The authority ordered the respondent to pay interest and give possession. | ["Real Estate", "Po…["Real Estate", "Possession", "Interest"] | {"appellant_claim": "The complainants sought poss…{"appellant_claim": "The complainants sought possession of a plot and interest for delay in handing over the possession.", "respondent_claim": "The respondent argued that they couldn't develop the project without approval and therefore couldn't give possession.", "final_verdict": "The authority ordered the respondent to pay interest to the complainants and give them possession of the plot.", "in_favor_of_respondent": "no"} | Manish Kumar GoelManish Kumar Goel | Parsvnath Developer…Parsvnath Developers Limited | Link |
365 of 2020365 of 2020 | HaryanaHaryana | Complainant sought possession of flat, interest f…Complainant sought possession of flat, interest for delay, and compensation for mental harassment. Authority directed respondent to give possession, pay interest, and compensation. | ["Delay in possessi…["Delay in possession", "Interest for delay", "Compensation for mental harassment"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a residential unit in the Parsvnath Royale project and paid Rs. 25,00,000 as booking amount. The complainant alleged that the respondent delayed the completion of the work and did not provide possession of the flat despite repeated requests. The complainant sought possession of the flat, interest for the delay, and compensation for mental harassment.", "respondent_claim(in detail)": "The respondent claimed that the complainant was a chronic defaulter and had delayed payments, which led to the slow progress of the project. The respondent stated that the project was being developed in terms of statutory approvals granted by the competent authority.", "final_verdict(in detail)": "The Authority directed the respondent to give possession of the flat to the complainant after receiving the Occupation Certificate from the Competent Authority. The Authority also directed the respondent to pay upfront interest to the complainant, which works out to Rs. 39,45,504, and further pay monthly interest of Rs. 38,195 till handing over of possession after obtaining the occupation certificate.", "in_favor_of_respondent": "no"} | Anuradha AmarAnuradha Amar | Parsvnath Developer…Parsvnath Developers Limited | Link |
1009 of 20211009 of 2021 | HaryanaHaryana | Complainants sought refund and compensation for d…Complainants sought refund and compensation for delayed possession of a plot in a real estate project. The authority ordered refund of the amount paid with interest, but declined to award compensation for the delay. | ["Refund for delaye…["Refund for delayed possession", "Compensation for delay"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid for a plot in the respondent's project, but the respondent had failed to deliver possession of the plot despite repeated requests. They sought refund of the amount paid, compensation for the delay, and damages for the grievance, frustration, and ignorance caused by the delay.", "respondent_claim": "The respondent claimed that the complainants were not entitled to refund or compensation because they were not the original allottees of the plot. They argued that the complainants had purchased the booking rights from another person and that the respondent had not demanded any further payment from the complainants after 2007.", "final_verdict": "The authority ordered refund of the amount paid by the complainants, but declined to award compensation for the delay. The authority also rejected the complainants' claim for revocation of the registration of the respondent's project.", "in_favor_of_respondent": "no"} | Bhavya GuptaBhavya Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
1085 of 20221085 of 2022 | HaryanaHaryana | Complainant booked a plot in Parsvnath City, Sone…Complainant booked a plot in Parsvnath City, Sonepat, but the respondent failed to deliver possession. The Authority directed the respondent to allot and deliver possession of the plot to the complainant. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to deliver possession of the plot despite payment of full amount.", "respondent_claim": "The respondent claimed that the complainant was not an allottee and that the booking was only an expression of interest.", "final_verdict": "The Authority directed the respondent to allot and deliver possession of the plot to the complainant.", "in_favor_of_respondent": "no"} | Rama SatijaRama Satija | Parsvnath Developer…Parsvnath Developers Limited | Link |
1846 and 1847 of 20…1846 and 1847 of 2022 | HaryanaHaryana | Complainants booked plots in Parsvnath City, Sone…Complainants booked plots in Parsvnath City, Sonepat, but the respondent failed to allot the plots or provide possession. The Authority directed the respondent to allot and deliver possession of the booked plots and pay interest for the delay. | Failure to allot an…Failure to allot and deliver possession of booked plots | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they booked plots in Parsvnath City, Sonepat, but the respondent failed to allot the plots or provide possession.", "respondent_claim": "The respondent claimed that the complainants were not allottees and that the registration was mere an expression of interest.", "final_verdict": "The Authority directed the respondent to allot and deliver possession of the booked plots and pay interest for the delay.", "in_favor_of_respondent": "no"} | Sh. Sushil Kumar Go…Sh. Sushil Kumar Goel | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No. 3022 …Complaint No. 3022 of 2019 | HaryanaHaryana | Complainant booked a plot in Parsvnath City, Sone…Complainant booked a plot in Parsvnath City, Sonepat, but the respondent failed to allot the plot despite payment. The Authority directed the respondent to allot and deliver the possession of the booked plot to the complainant. | ["Plot Allotment", …["Plot Allotment", "Possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he booked a plot in Parsvnath City, Sonepat, but the respondent failed to allot the plot despite payment.", "respondent_claim": "The respondent claimed that the complainant was not a valid allottee and that the plot was not available for allotment.", "final_verdict": "The Authority directed the respondent to allot and deliver the possession of the booked plot to the complainant.", "in_favor_of_respondent": "no"} | Amit GuptaAmit Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
3036 of 20193036 of 2019 | HaryanaHaryana | The complainant sought refund for a delayed real …The complainant sought refund for a delayed real estate project. The Authority directed the respondent to refund the amount paid by the complainant with interest. | ["Refund for delaye…["Refund for delayed real estate project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the completion of the project and sought refund for the amount paid.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the project was still ongoing.", "final_verdict": "The Authority directed the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Nikhil KapoorNikhil Kapoor | Parsvnath Developer…Parsvnath Developers Limited | Link |
1212 of 20201212 of 2020 | HaryanaHaryana | The complainant, Sanjeev Khokhar, filed a complai…The complainant, Sanjeev Khokhar, filed a complaint against M/S Parsvnath Developers Ltd. for refund of the amount paid with interest. The Authority directed the respondent to refund the amount with interest. | ["Refund of amount …["Refund of amount paid with interest"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not completed the project and was not in a position to complete it in the foreseeable future. The complainant sought refund of the amount paid with interest.", "respondent_claim": "The respondent claimed that the complainant had filed a consumer complaint before the National Consumer Dispute Redressal Commission (NCDRC) and had obtained an order in their favour. The respondent sought modification of the order dated 30.03.2022.", "final_verdict": "The Authority directed the respondent to refund the amount with interest. The Authority rejected the application for modification of the order dated 30.03.2022.", "in_favor_of_respondent": "no"} | Sanjeev KhokharSanjeev Khokhar | Parsvnath Developer…Parsvnath Developers Limited | Link |
241 of 2020241 of 2020 | HaryanaHaryana | Complainants Ankita Sahni and Puneet Sahni filed …Complainants Ankita Sahni and Puneet Sahni filed a complaint against M/S Parsvnath Developers Ltd. for refund of amounts paid with interest. The Authority granted relief and directed the respondent to refund the amount with interest. | ["Refund of amounts…["Refund of amounts paid", "Interest"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid a sum of \u20b915,09,543/- to the respondent and sought refund of the amount with interest.", "respondent_claim": "The respondent claimed that the complainants had only paid a sum of \u20b913,09,543/- and denied the claim for refund.", "final_verdict": "The Authority granted relief to the complainants and directed the respondent to refund the amount of \u20b915,09,543/- with interest at the rate of 9.30%.", "in_favor_of_respondent": "no"} | Puneet SahniPuneet Sahni | Parsvnath Developer…Parsvnath Developers Limited | Link |
2549 of 20222549 of 2022 | HaryanaHaryana | Complainant booked a plot in present and future p…Complainant booked a plot in present and future project of respondent, paid fifty percent of total sale price, no allotment letter was issued nor any builder buyer agreement was executed between the parties and complainant is seeking possession of the plot booked by him. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant is seeking posse…{"appellant_claim": "Complainant is seeking possession of the plot booked by him and interest for delay in handing over the possession.", "respondent_claim": "Respondent claims that complainant is not an allottee and the complaint is not maintainable.", "final_verdict": "Authority directed respondent to allot and deliver the possession of booked plot to the complainant and pay interest for delay.", "in_favor_of_respondent": "no"} | Ankit GuptaAnkit Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
1397 of 20211397 of 2021 | HaryanaHaryana | Complainant seeks possession of plot and interest…Complainant seeks possession of plot and interest for delay in handing over possession. Authority directs respondent to deliver possession and pay interest. | Possession of plot …Possession of plot and interest for delay | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of plot and interest for delay in handing over possession.", "respondent_claim": "Respondent claims that complainant is not an allottee and that the complaint is barred by limitation.", "final_verdict": "Authority directs respondent to deliver possession and pay interest.", "in_favor_of_respondent": "no"} | Mrs. Lajwanti Vashi…Mrs. Lajwanti Vashisht | Parsvnath Developer…Parsvnath Developers Limited | Link |
11397 of 202111397 of 2021 | HaryanaHaryana | Complainant seeks possession of plot and interest…Complainant seeks possession of plot and interest for delay in handing over possession. Authority directs respondent to deliver possession and pay interest. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of plot and interest for delay in handing over possession.", "respondent_claim": "Respondent claims that complainant is not an allottee and that the complaint is barred by limitation.", "final_verdict": "Authority directs respondent to deliver possession and pay interest.", "in_favor_of_respondent": "no"} | Mrs. Lajwanti Vashi…Mrs. Lajwanti Vashisht | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 468 o…Execution No. 468 of 2020 | HaryanaHaryana | Complaint for remaining payment. Whole decretal a…Complaint for remaining payment. Whole decretal amount deposited, case disposed. | ["Remaining payment…["Remaining payment"] | {"appellant_claim(in detail)": "Complaint for rem…{"appellant_claim(in detail)": "Complaint for remaining payment.", "respondent_claim(in detail)": "Amount of 224,89,166/- has been paid to the complainant/decree holder till date.", "final_verdict(in detail)": "Whole decretal amount being deposited by respondent/judgment debtor, the present execution complaint stands disposed of being fully satisfied.", "in_favor_of_respondent": "no"} | Rakesh BhargavaRakesh Bhargava | Parsvnath Developer…Parsvnath Developers Limited | Link |
856 of 2020856 of 2020 | HaryanaHaryana | Complaint against Parsvnath Developers Ltd. for f…Complaint against Parsvnath Developers Ltd. for failure to deliver timely possession of units in the 'Parsvnath City, Rohtak' project. | ["Failure to delive…["Failure to deliver timely possession", "Unfair charges"] | {"appellant_claim": "The appellants claim that th…{"appellant_claim": "The appellants claim that the respondent failed to deliver timely possession of units in the 'Parsvnath City, Rohtak' project and charged unfair amounts for various services.", "respondent_claim": "The respondent claims that the delay in possession was due to unforeseen circumstances and that the charges were as per the agreement.", "final_verdict": "The Authority finds that the respondent failed to deliver timely possession and charged unfair amounts. The Authority directs the respondent to pay delay interest and refund excess amounts paid by the appellants.", "in_favor_of_respondent": "no"} | Mr. Hari OmMr. Hari Om | Parsvnath Developer…Parsvnath Developers Limited | Link |
Multiple cases (856…Multiple cases (856, 857, 1006, 1009, 1043, 1090, 1170, 1259 of 2020; 1147 of 2021) | HaryanaHaryana | The complainants filed cases against Parsvnath De…The complainants filed cases against Parsvnath Developers Ltd. for violation of the Real Estate (Regulation & Development) Act, 2016. The Authority held that the respondent is liable to pay delay interest to the complainants and directed the respondent to make fresh offers of possession and pay the calculated delay interest. | ["Delay in possessi…["Delay in possession", "Unfair charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver timely possession of their plots and charged unfair amounts.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and that the charges were as per the agreement.", "final_verdict": "The Authority held that the respondent is liable to pay delay interest to the complainants and directed the respondent to make fresh offers of possession and pay the calculated delay interest.", "in_favor_of_respondent": "no"} | Ms. SunitaMs. Sunita | Parsvnath Developer…Parsvnath Developers Limited | Link |
52 of 202252 of 2022 | HaryanaHaryana | Complainants sought refund of amount deposited by…Complainants sought refund of amount deposited by them and reimbursement of EMIs paid by them to bank, along with interest. Authority allowed the complaint and passed directions for refund and reimbursement. | ["Refund", "Reimbur…["Refund", "Reimbursement", "Interest"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of amount deposited by them and reimbursement of EMIs paid by them to bank, along with interest.", "respondent_claim": "Respondent claimed that the project was being developed in terms of statutory approvals granted by competent authority and that the complainants had not made timely payments.", "final_verdict": "Authority allowed the complaint and passed directions for refund and reimbursement.", "in_favor_of_respondent": "no"} | Pooja SapraPooja Sapra | Parsvnath Developer…Parsvnath Developers Limited | Link |
2947 of 2022 and 29…2947 of 2022 and 2949 of 2022 | HaryanaHaryana | The complainant sought refund of amount deposited…The complainant sought refund of amount deposited for a plot in a real estate project developed by Parsvnath Developers Ltd. The Authority directed the respondent to refund the amount with interest. | ["Refund of amount …["Refund of amount deposited", "Real estate project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had deposited an amount of Rs. 10,29,000/- and Rs. 9,06,500/- respectively for two plots in a real estate project developed by Parsvnath Developers Ltd. He claimed that the respondent had failed to deliver the possession of the plots and sought refund of the amount deposited.", "respondent_claim": "The respondent claimed that the complainant was not an allottee of the respondent company and that the registration was mere an expression of interest towards the future project of the respondent.", "final_verdict": "The Authority directed the respondent to refund the amount deposited by the complainant with interest at the rate of 10.70% per annum.", "in_favor_of_respondent": "no"} | Rajesh Kumar AgrawalRajesh Kumar Agrawal | Parsvnath Developer…Parsvnath Developers Limited | Link |
2910 of 20222910 of 2022 | HaryanaHaryana | Complainant sought refund of amount paid along wi…Complainant sought refund of amount paid along with interest for non-delivery of possession of plot by respondent. Authority directed respondent to refund amount with interest. | ["Refund for non-de…["Refund for non-delivery of possession"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of amount paid along with interest for non-delivery of possession of plot by respondent.", "respondent_claim": "Respondent claimed that complainant was not an allottee and the registration was merely an expression of interest.", "final_verdict": "Authority directed respondent to refund amount with interest.", "in_favor_of_respondent": "no"} | Vikram BansalVikram Bansal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1532 and 1545 of 20…1532 and 1545 of 2022 | HaryanaHaryana | Complainants sought possession of plots and delay…Complainants sought possession of plots and delay interest from respondent, Parsvnath Developers Ltd. Authority directed respondent to pay delay interest and comply with directions within 90 days. | ["Delay interest", …["Delay interest", "Possession of plots"] | {"appellant_claim": "Complainants sought possessi…{"appellant_claim": "Complainants sought possession of plots and delay interest from respondent.", "respondent_claim": "Respondent claimed that they had not received LOI for the project and were not in a position to develop the same and offer possession of the booked plot to the complainant.", "final_verdict": "Authority directed respondent to pay delay interest and comply with directions within 90 days.", "in_favor_of_respondent": "no"} | Rahul MehdudiaRahul Mehdudia | Parsvnath Developer…Parsvnath Developers Limited | Link |
3248 of 20223248 of 2022 | HaryanaHaryana | Complainants sought refund of deposited amount wi…Complainants sought refund of deposited amount with interest for delay in handing over possession of a villa. Authority directed refund with interest and compensation. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund of deposited amount with interest for delay in handing over possession of a villa.", "respondent_claim": "Respondent claimed that complainants had defaulted in making timely payments and that the project was delayed due to various reasons.", "final_verdict": "Authority directed refund of deposited amount with interest and compensation to the complainants.", "in_favor_of_respondent": "no"} | Mr Rahul AggarwalMr Rahul Aggarwal | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 3115 …Execution No. 3115 of 2022 | HaryanaHaryana | Decree holder withdrew execution as fully satisfi…Decree holder withdrew execution as fully satisfied. Execution complaint stands disposed of as fully satisfied. | ["Withdrawal of Exe…["Withdrawal of Execution"] | {"appellant_claim(in detail)": "Decree holder sta…{"appellant_claim(in detail)": "Decree holder stated that objections raised by him are satisfied and reply has been filed by the judgment debtor regarding fresh statement of accounts.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Execution complaint stands disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Ramesh MalikRamesh Malik | Parsvnath Developer…Parsvnath Developers Limited | Link |
3220 of 20223220 of 2022 | HaryanaHaryana | Complainant seeks refund of amount deposited with…Complainant seeks refund of amount deposited with interest for a plot in a real estate project. Authority directs refund with interest at prescribed rate. | ["Refund of amount …["Refund of amount deposited with interest"] | {"appellant_claim": "Complainant seeks refund of …{"appellant_claim": "Complainant seeks refund of amount deposited with interest for a plot in a real estate project.", "respondent_claim": "Respondent claims that complainant is not an allottee and the complaint is barred by limitation.", "final_verdict": "Authority directs refund of amount deposited with interest at prescribed rate.", "in_favor_of_respondent": "no"} | Monica Rathee ShahMonica Rathee Shah | Parsvnath Developer…Parsvnath Developers Limited | Link |
377 of 2021377 of 2021 | HaryanaHaryana | Complainants sought delayed possession charges fo…Complainants sought delayed possession charges for a plot in Sonipat. Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges. | ["Delayed possessio…["Delayed possession charges"] | {"appellant_claim": "Complainants sought delayed …{"appellant_claim": "Complainants sought delayed possession charges for a plot in Sonipat.", "respondent_claim": "Respondent claimed that execution of conveyance deed extinguishes the right to claim delay possession charges.", "final_verdict": "Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges.", "in_favor_of_respondent": "no"} | Tejinder Kaur KohliTejinder Kaur Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
368 of 2021368 of 2021 | HaryanaHaryana | Complainants sought delay possession interest for…Complainants sought delay possession interest for a plot in Sonipat. Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges. | ["Delay possession …["Delay possession interest", "Conveyance deed"] | {"appellant_claim": "Complainants sought delay po…{"appellant_claim": "Complainants sought delay possession interest for a plot in Sonipat.", "respondent_claim": "Respondent claimed that execution of conveyance deed extinguishes the right to claim delay possession charges.", "final_verdict": "Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges.", "in_favor_of_respondent": "no"} | Jaspreet Kaur KohliJaspreet Kaur Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
367 of 2021367 of 2021 | HaryanaHaryana | Complainants sought delayed possession interest f…Complainants sought delayed possession interest for a plot in Sonipat. Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges. | ["Delayed possessio…["Delayed possession interest", "Conveyance deed"] | {"appellant_claim": "Complainants sought delayed …{"appellant_claim": "Complainants sought delayed possession interest for a plot in Sonipat.", "respondent_claim": "Respondent claimed that execution of conveyance deed extinguishes the right to claim delay possession charges.", "final_verdict": "Authority held that execution of conveyance deed does not extinguish the right to claim delay possession charges.", "in_favor_of_respondent": "no"} | Tejinder KaurTejinder Kaur | Parsvnath Developer…Parsvnath Developers Limited | Link |
2482 of 20222482 of 2022 | HaryanaHaryana | Complainants sought refund for unpaid flat in Par…Complainants sought refund for unpaid flat in Parsvnath Elite Floors project. Authority directed refund with interest due to non-completion and lack of development. | ["Non-completion of…["Non-completion of flat", "Refund due"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants booked a flat in Parsvnath Elite Floors project and paid Rs. 5,67,385.91/- in 2010. Despite repeated requests, the respondent failed to complete the project and hand over possession. The complainants sought refund of the paid amount with interest.", "respondent_claim(in detail)": "The respondent claimed that the project was registered with DTCP and had obtained necessary approvals. They argued that the complainants were not entitled to refund as the project was not unregistered.", "final_verdict(in detail)": "The Authority directed the respondent to refund the paid amount of Rs. 5,67,385.91/- along with interest at the rate of 10.75% till the date of the order. The total refund amount worked out to Rs. 13,52,307.90/-.", "in_favor_of_respondent": "no"} | Neelima P. DeshpandeNeelima P. Deshpande | Parsvnath Developer…Parsvnath Developers Limited | Link |
2760 of 20222760 of 2022 | HaryanaHaryana | Complainant sought possession of plot booked in 2…Complainant sought possession of plot booked in 2005, compensation for delay, and refund of registration amount. Authority directed possession, delay compensation, and refund with interest. | ["Possession of boo…["Possession of booked plot", "Delay compensation", "Refund with interest"] | {"appellant_claim": "The complainant sought posse…{"appellant_claim": "The complainant sought possession of the plot booked in 2005, compensation for the delay in handing over the possession, and refund of the registration amount with interest.", "respondent_claim": "The respondent claimed that the complainant was not an allottee and that the registration was only an expression of interest. They also argued that the complaint was barred by limitation and that there was no agreement to sell.", "final_verdict": "The Authority directed the respondent to allot and deliver possession of the booked plot to the complainant, pay the complainant upfront delay interest of Rs. 14,31,684/-, and refund the registration amount with interest.", "in_favor_of_respondent": "no"} | Rajbir SinghRajbir Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution Complaint…Execution Complaint no. 912 of 2023 | HaryanaHaryana | The execution complaint was disposed of as withdr…The execution complaint was disposed of as withdrawn and fully settled due to a settlement arrived at between the parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The execution complaint was disposed of as withdrawn and fully settled due to a settlement arrived at between the parties.", "in_favor_of_respondent": "no"} | MS ManhasMS Manhas | Parsvnath Developer…Parsvnath Developers Limited | Link |
497 of 2023497 of 2023 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest for non-allotment of plot by respondent. Authority directed refund with interest at prescribed rate. | ["Refund for non-al…["Refund for non-allotment of plot"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of amount deposited with interest for non-allotment of plot by respondent.", "respondent_claim": "Respondent claimed that complainant was not an allottee and that the complaint was barred by limitation.", "final_verdict": "Authority directed refund of amount deposited with interest at prescribed rate.", "in_favor_of_respondent": "no"} | Vikas SatijaVikas Satija | Parsvnath Developer…Parsvnath Developers Limited | Link |
1170 of 20211170 of 2021 | HaryanaHaryana | Complaint filed by Resident Welfare Association a…Complaint filed by Resident Welfare Association against Parsvnath Developers for not providing basic facilities and amenities in the project. Authority directed the respondent to complete the common areas and services within 90 days. | ["Non-provision of …["Non-provision of basic facilities and amenities"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent did not provide basic facilities and amenities in the project, including STP, club/community centre, sector roads, parks, electricity infrastructure, water supply, sewerage, drainage system, and waste disposal.", "respondent_claim": "The respondent claimed that they had provided temporary arrangements for the facilities and amenities.", "final_verdict": "The Authority directed the respondent to complete the common areas and services within 90 days.", "in_favor_of_respondent": "no"} | President of Reside…President of Residents Welfare Association, B Block, Parsvnath City | Parsvnath Developer…Parsvnath Developers Limited | Link |
2662 of 20222662 of 2022 | HaryanaHaryana | Complainant seeks possession of plot booked in 20…Complainant seeks possession of plot booked in 2004, payment of delay interest, and compensation for mental agony. Authority directs respondent to allot possession, pay delay interest, and compensate for excess payment. | ["Possession of plo…["Possession of plot", "Delay interest", "Compensation"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent failed to deliver possession of plot booked in 2004, seeks payment of delay interest, and compensation for mental agony.", "respondent_claim": "Respondent claims that complainant is not an allottee, seeks refund of payment with interest, and argues that possession cannot be given due to non-availability of plots.", "final_verdict": "Authority directs respondent to allot possession of plot, pay delay interest, and compensate for excess payment made by complainant.", "in_favor_of_respondent": "no"} | Sunil KumarSunil Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
2796 of 20222796 of 2022 | HaryanaHaryana | Complainant seeks possession of plot booked in 20…Complainant seeks possession of plot booked in 2004, compensation for delay, and damages for mental harassment. Authority directs respondent to allot possession, pay delay interest, and compensate for excess payment. | ["Possession of plo…["Possession of plot", "Delay interest", "Compensation for mental harassment"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent failed to deliver possession of plot booked in 2004, causing delay and mental harassment.", "respondent_claim": "Respondent claims that complainant is not an allottee and that the plot was not allotted due to non-availability of land.", "final_verdict": "Authority directs respondent to allot possession of plot, pay delay interest, and compensate for excess payment.", "in_favor_of_respondent": "no"} | Guncha SachdevaGuncha Sachdeva | Parsvnath Developer…Parsvnath Developers Limited | Link |
900,902 of 2023900,902 of 2023 | HaryanaHaryana | Complainants sought refund and compensation for d…Complainants sought refund and compensation for delayed possession of flat. Authority directed refund with interest but advised to approach Adjudicating Officer for compensation and litigation expenses. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund and compensation for delayed possession of flat.", "respondent_claim": "Respondent claimed that agreement was executed before RERA Act came into force and that project was developed with necessary approvals.", "final_verdict": "Authority directed refund with interest but advised to approach Adjudicating Officer for compensation and litigation expenses.", "in_favor_of_respondent": "no"} | Sh Ravinder Pal Mar…Sh Ravinder Pal Marwah | Parsvnath Developer…Parsvnath Developers Limited | Link |
2859 of 20222859 of 2022 | HaryanaHaryana | Complainant sought possession of plot and interes…Complainant sought possession of plot and interest for delay. Authority directed payment of upfront interest and monthly interest till valid offer of possession. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of plot and interest for delay.", "respondent_claim": "Respondent claimed that project was not developed due to encroachments and lack of license.", "final_verdict": "Authority directed payment of upfront interest and monthly interest till valid offer of possession.", "in_favor_of_respondent": "no"} | Bimla DeviBimla Devi | Parsvnath Developer…Parsvnath Developers Limited | Link |
2887 of 20222887 of 2022 | HaryanaHaryana | Complainant sought possession of plot and interes…Complainant sought possession of plot and interest for delay. Authority directed payment of upfront interest and monthly interest till valid offer of possession. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of plot and interest for delay.", "respondent_claim": "Respondent claimed that project was not registered and they had not received LOI.", "final_verdict": "Authority directed payment of upfront interest and monthly interest till valid offer of possession.", "in_favor_of_respondent": "no"} | Anang Pal SinghAnang Pal Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
2855 of 20222855 of 2022 | HaryanaHaryana | Complainant seeks possession of plot and interest…Complainant seeks possession of plot and interest on delay. Authority directs payment of upfront interest and future interest for delay. | ["Possession of plo…["Possession of plot", "Interest on delay"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of plot and interest on delay.", "respondent_claim": "Respondent claims that project is not developed and cannot offer possession.", "final_verdict": "Authority directs payment of upfront interest and future interest for delay.", "in_favor_of_respondent": "no"} | Parvesh KumarParvesh Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
COMPLAINT NO. 3327 …COMPLAINT NO. 3327 OF 2022 | HaryanaHaryana | Complaints were withdrawn by the complainants aft…Complaints were withdrawn by the complainants after a settlement was arrived at between the parties. | ["Settlement betwee…["Settlement between parties"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaints were withdrawn by the complainants after a settlement was arrived at between the parties.", "in_favor_of_respondent": "no"} | Ashok KumarAshok Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
3359 of 20223359 of 2022 | HaryanaHaryana | Complainant seeks possession of plot booked in 20…Complainant seeks possession of plot booked in 2005 and interest for delay. Authority directs respondent to allot and deliver possession of plot and pay interest. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of plot booked in 2005 and interest for delay.", "respondent_claim": "Respondent claims that complainant is not an allottee and that the plot was not allotted to her.", "final_verdict": "Authority directs respondent to allot and deliver possession of plot and pay interest.", "in_favor_of_respondent": "no"} | Chander Kanta ChadhaChander Kanta Chadha | Parsvnath Developer…Parsvnath Developers Limited | Link |
1063 of 20221063 of 2022 | HaryanaHaryana | Complainant seeks possession of plot and interest…Complainant seeks possession of plot and interest for delay. Authority directs payment of upfront interest and monthly interest till valid offer of possession. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of plot and interest for delay.", "respondent_claim": "Respondent claims that complainant was aware of delay and should not press for possession.", "final_verdict": "Authority directs payment of upfront interest and monthly interest till valid offer of possession.", "in_favor_of_respondent": "no"} | Mrs. Sushila DeviMrs. Sushila Devi | Parsvnath Developer…Parsvnath Developers Limited | Link |
1059 of 20231059 of 2023 | HaryanaHaryana | Complainant sought possession of plot and interes…Complainant sought possession of plot and interest for delay. Authority directed payment of interest and registration of conveyance deed. | ["Possession of plo…["Possession of plot", "Interest for delay"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of plot and interest for delay.", "respondent_claim": "Respondent claimed that they did not have license to develop the project and could not offer possession.", "final_verdict": "Authority directed payment of interest and registration of conveyance deed.", "in_favor_of_respondent": "no"} | Atul MehtaAtul Mehta | Parsvnath Developer…Parsvnath Developers Limited | Link |
1067 of 20221067 of 2022 | HaryanaHaryana | Complainant sought possession of plot, interest, …Complainant sought possession of plot, interest, and compensation for delayed possession. Authority directed payment of upfront interest and compensation, but not possession, due to respondent's inability to develop the project. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to deliver possession of the plot despite payment of the full amount. The complainant sought compensation for the delay and interest on the amount paid.", "respondent_claim": "The respondent claimed that they were unable to develop the project due to various reasons, including encroachments by local farmers and lack of necessary approvals. The respondent argued that they were not in a position to deliver possession of the plot.", "final_verdict": "The Authority directed the respondent to pay the complainant upfront interest and compensation, but not possession, due to the respondent's inability to develop the project.", "in_favor_of_respondent": "no"} | Gurinder Pal SinghGurinder Pal Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1113 of 20231113 of 2023 | HaryanaHaryana | Complainants sought refund for delayed possession…Complainants sought refund for delayed possession of flat. Authority directed refund with interest. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainants sought refund f…{"appellant_claim": "Complainants sought refund for delayed possession of flat.", "respondent_claim": "Respondent claimed that delay was due to reasons beyond their control.", "final_verdict": "Authority directed refund with interest.", "in_favor_of_respondent": "no"} | Mrs. Suman SharmaMrs. Suman Sharma | Parsvnath Developer…Parsvnath Developers Limited | Link |
1056 of 20231056 of 2023 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of flat. Authority directed refund with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed possession of flat.", "respondent_claim": "Respondent claimed that refund would affect project completion.", "final_verdict": "Authority directed refund with interest.", "in_favor_of_respondent": "no"} | Surender SinghSurender Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 3114 …Execution No. 3114 of 2022 | HaryanaHaryana | Decree holder Ramesh Malik withdrew the execution…Decree holder Ramesh Malik withdrew the execution complaint as fully satisfied. The case was disposed of as withdrawn. | ["Withdrawal of Exe…["Withdrawal of Execution Complaint"] | {"appellant_claim(in detail)": "The decree holder…{"appellant_claim(in detail)": "The decree holder had objections that were to be replied to by the respondent.", "respondent_claim(in detail)": "Not applicable as the respondent was not present to claim anything.", "final_verdict(in detail)": "The case was disposed of as withdrawn as the decree holder stated that his objections were satisfied and he wanted to withdraw the execution complaint.", "in_favor_of_respondent": "no"} | Poonam MalikPoonam Malik | Parsvnath Developer…Parsvnath Developers Limited | Link |
1315 of 20231315 of 2023 | HaryanaHaryana | The case was disposed of as settled between the p…The case was disposed of as settled between the parties. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The case was disposed of as settled between the parties.", "in_favor_of_respondent": "no"} | Sunita NarangSunita Narang | Parsvnath Developer…Parsvnath Developers Limited | Link |
117 of 2022117 of 2022 | HaryanaHaryana | Appellant Neha Agrawal filed an appeal against th…Appellant Neha Agrawal filed an appeal against the order of Haryana Real Estate Regulatory Authority, which had dismissed her complaint for assured return and possession. The appellate tribunal directed the authority to expeditiously dispose of her complaint within two months. | ["Real Estate", "As…["Real Estate", "Assured Return", "Possession"] | {"appellant_claim": "The appellant claimed that h…{"appellant_claim": "The appellant claimed that her complaint for assured return and possession was dismissed by the Haryana Real Estate Regulatory Authority.", "respondent_claim": "The respondent did not make any claims in the appeal.", "final_verdict": "The appellate tribunal directed the Haryana Real Estate Regulatory Authority to expeditiously dispose of the appellant's complaint within two months.", "in_favor_of_respondent": "no"} | Neha AgrawalNeha Agrawal | Parsvnath Developer…Parsvnath Developers Limited | Link |
700 OF 2022700 OF 2022 | HaryanaHaryana | The appeal was allowed, and the case was remitted…The appeal was allowed, and the case was remitted to the same Authority for decision afresh. The Authority's earlier order was set aside. | ["Remand of case", …["Remand of case", "Setting aside of earlier order"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Authority's earlier order was not in accordance with the law.", "respondent_claim": "The respondent did not make any claims.", "final_verdict": "The appeal was allowed, and the case was remitted to the same Authority for decision afresh.", "in_favor_of_respondent": "no"} | Pawan Jeet KohliPawan Jeet Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
701 OF 2022701 OF 2022 | HaryanaHaryana | The appeal was allowed, and the case was remitted…The appeal was allowed, and the case was remitted to the same Authority for decision afresh. The Authority's earlier order was set aside. | ["Remand of case", …["Remand of case", "Setting aside of earlier order"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Authority's earlier order was not in accordance with the law.", "respondent_claim": "The respondent did not make any claims.", "final_verdict": "The appeal was allowed, and the case was remitted to the same Authority for decision afresh.", "in_favor_of_respondent": "no"} | Jaspreet Kaur KohliJaspreet Kaur Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
702 OF 2022702 OF 2022 | HaryanaHaryana | The appeal was allowed, and the case was remitted…The appeal was allowed, and the case was remitted to the same Authority for decision afresh. The Authority's earlier order was set aside. | ["Real Estate", "Ap…["Real Estate", "Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Authority's earlier order was not in accordance with the law.", "respondent_claim": "The respondent did not oppose the remand of the case.", "final_verdict": "The appeal was allowed, and the case was remitted to the same Authority for decision afresh.", "in_favor_of_respondent": "no"} | Gagan Deep Singh Ko…Gagan Deep Singh Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
Comp. No.61/2019Comp. No.61/2019 | National Capital Te…National Capital Territory of Delhi | The complainant, Amit Kumar Gupta, filed a compla…The complainant, Amit Kumar Gupta, filed a complaint against M/s Parsvnath Developers Limited for not refunding his deposit of Rs. 20 lakh for a real estate project. The Authority directed the respondent to return the amount with interest. | ["Refund of deposit…["Refund of deposit", "Real estate project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had deposited Rs. 20 lakh with the respondent for a real estate project, but the project was not started and the respondent did not refund the amount.", "respondent_claim": "The respondent claimed that the complaint was not maintainable as the complainant was not an allottee as defined in the Real Estate (Regulation and Development) Act, 2016.", "final_verdict": "The Authority directed the respondent to return the amount of Rs. 20 lakh with interest calculated at the rate of 9.30 percent per-annum.", "in_favor_of_respondent": "no"} | Amit Kumar GuptaAmit Kumar Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
Comp. No.41/2020Comp. No.41/2020 | National Capital Te…National Capital Territory of Delhi | Complaint dismissed with liberty to file afresh w…Complaint dismissed with liberty to file afresh with relevant documents. No agreement or project name provided. | ["Refund claim"]["Refund claim"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of monies deposited with the developer/promoter, but failed to provide necessary documents or details of the agreement.", "respondent_claim(in detail)": "Not applicable, as the respondent is the developer/promoter.", "final_verdict(in detail)": "The complaint was dismissed with liberty to file afresh along with relevant documents.", "in_favor_of_respondent": "no"} | Mrs. Ruchi GoyalMrs. Ruchi Goyal | Parsvnath Developer…Parsvnath Developers Limited | Link |
Comp. No.63/2021Comp. No.63/2021 | DelhiDelhi | The complainant, Sh. Manohar Lal Dhanrajani, file…The complainant, Sh. Manohar Lal Dhanrajani, filed a complaint against Parsvnath Developers Ltd. for refund of money deposited. The Authority ordered the respondents to refund the money with interest within 90 days. | ["Refund of Money"]["Refund of Money"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of money deposited with interest.", "respondent_claim": "The respondents did not provide any claim.", "final_verdict": "The Authority ordered the respondents to refund the money with interest within 90 days.", "in_favor_of_respondent": "no"} | Sh. Manohar Lal Dha…Sh. Manohar Lal Dhanrajani | Parsvnath Developer…Parsvnath Developers Limited | Link |
Complaint No.34 of …Complaint No.34 of 2017 | PunjabPunjab | Complaint withdrawn by agreement between parties.…Complaint withdrawn by agreement between parties. Case dismissed as withdrawn. | ["Withdrawn by agre…["Withdrawn by agreement"] | {"appellant_claim": "The complainant claims that …{"appellant_claim": "The complainant claims that he reached an agreement with the respondent and seeks withdrawal of the complaint.", "respondent_claim": "The respondent does not have a claim as the complainant is seeking withdrawal of the complaint.", "final_verdict": "The complaint is dismissed as withdrawn.", "in_favor_of_respondent": "no"} | Sh. V.K ChadhaSh. V.K Chadha | Parsavnath Develope…Parsavnath Developers Limited | Link |
950 of 2018950 of 2018 | HaryanaHaryana | Complainant Narender Singh filed a complaint agai…Complainant Narender Singh filed a complaint against M/s Parsavnath Developers Limited for not paying the amount of bounced cheques. The authority directed the respondent to refund the amount with interest. | ["Cheque Bounce", "…["Cheque Bounce", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that out of the seven post-dated cheques given to him by the respondent, six cheques were dishonoured. He prayed for refund of the amount of bounced cheques, along with penal interest.", "respondent_claim": "The respondent neither disputed the Memorandum of Understanding dated 16.01.2018 nor did they dispute the fact that the cheques delivered to the complainant had bounced.", "final_verdict": "The authority directed the respondent to refund the amount of Rs. 15,25,000/- to the complainant along with interest @ 18% per annum from the dates of the bouncing of each cheque till payment of the amount to the complainant.", "in_favor_of_respondent": "no"} | Narender SinghNarender Singh | Parsavnath Develope…Parsavnath Developers Limited | Link |
945/2018945/2018 | HaryanaHaryana | Complainants arrived at an amicable settlement wi…Complainants arrived at an amicable settlement with the respondent, Parsavnath Developers Ltd. The complaints are disposed of in terms of the settlement. | ["Amicable Settleme…["Amicable Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaints are disposed of in terms of the settlement arrived at between the parties.", "in_favor_of_respondent": "no"} | Ashok KumarAshok Kumar | Parsavnath Develope…Parsavnath Developers Limited | Link |
Complaint No. 451 o…Complaint No. 451 of 2019 | HaryanaHaryana | Complainant sought refund for flat not handed ove…Complainant sought refund for flat not handed over on due date. Authority granted refund with interest due to project delay. | ["Project delay", "…["Project delay", "Refund"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for the flat not handed over on the due date, along with interest.", "respondent_claim": "The respondent claimed that the project was nearly 40% complete and that the delay was not intentional.", "final_verdict": "The Authority granted refund of the paid amount with interest due to the project delay.", "in_favor_of_respondent": "no"} | Parvinder Singh Cha…Parvinder Singh Chahal | Parsavnath Develope…Parsavnath Developers Limited | Link |
Complaint No. 381 o…Complaint No. 381 of 2019 | HaryanaHaryana | Complainant Sanjeev Sirohi filed a complaint agai…Complainant Sanjeev Sirohi filed a complaint against M/s Parsavnath Developers Limited for not offering possession of a plot despite a previous settlement. The Haryana Real Estate Regulatory Authority directed the respondent to pay delay compensation. | ["Delay in possessi…["Delay in possession", "Non-registration of project"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that despite a previous settlement, the respondent had not offered possession of the plot and that the project was not registered.", "respondent_claim": "The respondent claimed that they had partially complied with the settlement and were bound by its terms.", "final_verdict": "The Authority directed the respondent to pay delay compensation from the date of settlement till the actual date of offer of possession at the rate of interest provided under Rule 15 of HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Sanjeev SirohiSanjeev Sirohi | Parsavnath Develope…Parsavnath Developers Limited | Link |
Appeal No.1390 of 2…Appeal No.1390 of 2019 | HaryanaHaryana | The appeal was dismissed as withdrawn. The appell…The appeal was dismissed as withdrawn. The appellant was given liberty to move an application for amendment of the complaint before the Ld. Adjudicating Officer. | ["Withdrawn Appeal"]["Withdrawn Appeal"] | {"appellant_claim": "The appellant wanted to move…{"appellant_claim": "The appellant wanted to move an application before the Ld. Adjudicating Officer for amendment of the complaint and to add certain more heads to claim the compensation.", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "no"} | Kanta MalhotraKanta Malhotra | Parsavnath Develope…Parsavnath Developers Limited | Link |
RAJRERA-C-2019-3053RAJRERA-C-2019-3053 | RajasthanRajasthan | Complainant seeks refund for commercial space not…Complainant seeks refund for commercial space not delivered by respondent after 13 years. Authority orders refund with interest. | ["Refund for undeli…["Refund for undelivered commercial space"] | {"appellant_claim": "The complainant claims to ha…{"appellant_claim": "The complainant claims to have paid Rs. 30,00,000/- within three years as per the demand of the respondent promoter and this has not been rebutted by the respondent. The proof of payment by the complainant to the respondent is on the file whereby a ledger receipt of the record of the respondent, clearly mentions that an amount of Rs. 30,00,192.50 has been received by the respondent promoter.", "respondent_claim": "The respondent stated that the complainant was asking for a rather high rate Of interest and was not agreeable to receiving the payments in instalments, as a result of which, no settlement has been reached and it would be proper if an appropriate order is passed by the Authority", "final_verdict": "The Authority orders the respondent to refund the entire amount of Rs. 30,00,192/- deposited by the complainant along with interest at SBI Highest MCLR (7.30%) + 2%, i.e., 9.30 percent per annum as provided in the Rajasthan Real Estate (Regulation and Development) Rules, 2017", "in_favor_of_respondent": "no"} | Shambhu Kumar GuptaShambhu Kumar Gupta | Parsvnath Developer…Parsvnath Developer Limited | Link |
RERA-PKL-COMP. 286/…RERA-PKL-COMP. 286/2018 | HaryanaHaryana | Complaint against M/s Parsvnath Developer Ltd. se…Complaint against M/s Parsvnath Developer Ltd. settled through discussion, but details not supplied in writing. Case disposed of as compromised. | ["Settlement disput…["Settlement dispute"] | {"appellant_claim": "Dispute with respondent not …{"appellant_claim": "Dispute with respondent not resolved despite agreement.", "respondent_claim": "Settlement discussion held, but written details not provided.", "final_verdict": "Case disposed of as compromised, respondent to supply written settlement within a week.", "in_favor_of_respondent": "no"} | Jagdish Rai GoyalJagdish Rai Goyal | Parsvnath Developer…Parsvnath Developer Limited | Link |
1329/20181329/2018 | HaryanaHaryana | Complainant seeks refund for a flat in Parsvnath …Complainant seeks refund for a flat in Parsvnath Pleasant with interest. Respondent agrees to refund with interest as per HRERA Rules. | ["Refund for Flat",…["Refund for Flat", "Interest"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant seeks refund of the amount paid for a flat in Parsvnath Pleasant along with interest.", "respondent_claim(in detail)": "The respondent agrees to refund the amount along with interest as per the HRERA Rules.", "final_verdict(in detail)": "The complaint is disposed of with the direction that the respondent shall refund the amount to the complainant along with interest as per the HRERA Rules.", "in_favor_of_respondent": "no"} | Neeraj Kumar JainNeeraj Kumar Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
Yearly Trend for these Cases
The analysis of the cases filed by the builder, Parsvnath Developers Limited, which it lost, reveals a troubling pattern of disputes primarily centered around regulatory non-compliance and issues regarding the allotment and possession of plots.
A significant number of cases focused on the builder's failure to adhere to statutory regulations, particularly those specified under the Real Estate (Regulation and Development) Act, 2016. The builder often contested decisions made by the Haryana Real Estate Regulatory Authority, arguing against their enforceability and validity. However, in multiple instances, the appeals were dismissed due to the builder's non-compliance with mandatory provisions, highlighting a critical oversight in their operational protocols.
Another recurring theme involves disputes over the entitlement of respondents to plots and their possession. The builder frequently asserted that the respondents were not entitled to allotments due to unpaid balances. However, the disputes often turned in favor of the respondents, indicating that they had indeed fulfilled their financial obligations. This pattern raises questions about the builder's adherence to financial agreements and its impact on customer relations.
Parsvnath Developers Limited consistently challenged the decisions made by regulatory authorities. The builder brought cases against orders, particularly in situations where the authority ruled against them for failing to comply with specific provisions. However, such challenges were routinely dismissed, suggesting a persistent misunderstanding or misapplication of the regulatory framework governing real estate transactions.
Many cases highlighted issues surrounding payment disputes, with the builder claiming that respondents failed to meet financial obligations. Yet, the courts noted that the respondents often produced evidence demonstrating compliance with their payment commitments. This points to potential inadequacies in the builder's record-keeping or challenges in their payment processing systems.
A prevalent reason for the builder's loss in these cases was a failure to comply with various orders and legal provisions, including those outlined in the RERA Act. The appeal dismissals were frequently based on the builder's failure to deposit requisite amounts or comply with interim directions, showing a pattern of oversight that undermined their legal standing.
In summary, the recurring themes from the lost cases of Parsvnath Developers Limited underscore a critical need for the builder to reassess its compliance mechanisms, financial transaction processes, and overall operational standards to mitigate legal disputes and foster a more positive relationship with customers and regulators alike.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
Appeal No.644 of 20…Appeal No.644 of 2019 | HaryanaHaryana | The appellants/promoters were directed to deposit…The appellants/promoters were directed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appellants did not comply with the mandatory provisions, and the appeal was dismissed. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that they had complied with the provisions of the Real Estate Act.", "respondent_claim": "The respondent claimed that the appellants had not complied with the mandatory provisions of the Act.", "final_verdict": "The appeal was dismissed as the appellants did not comply with the mandatory provisions of the Act.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Private Limited | Kish Exports LimitedKish Exports Limited | Link |
685 of 2021685 of 2021 | HaryanaHaryana | Complainant seeks recall of order dated 27.11.201…Complainant seeks recall of order dated 27.11.2018 passed in complaint no. 557 of 2018. Authority dismisses the complaint as not maintainable. | ["Recall of order",…["Recall of order", "Jurisdiction of Authority"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant seeks recall of the order dated 27.11.2018 passed in complaint no. 557 of 2018, claiming that the Authority did not have jurisdiction to pass the order and that the order was beyond the scope of the RERA Act, 2016.", "respondent_claim(in detail)": "The respondent claims that the matter has already been adjudicated by the Authority on 27.11.2018 and that the complainant could have preferred an appeal before the Haryana Real Estate Appellate Tribunal, Chandigarh within 60 days of the order.", "final_verdict(in detail)": "The Authority dismisses the complaint as not maintainable, stating that it cannot recall or review its orders that have already attained finality. The Authority observes that the complainant could have preferred an appeal against the original order within the period of limitation prescribed, but failed to do so.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Rajiv SahniRajiv Sahni | Link |
Appeal No.643 of 20…Appeal No.643 of 2019 | HaryanaHaryana | The appellants/promoters were directed to deposit…The appellants/promoters were directed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The appellants have not complied with the mandatory provisions, and the present appeal is dismissed. | ["Non-compliance of…["Non-compliance of provisions", "Dismissal of appeal"] | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondents claimed that the appellants have not complied with the mandatory provisions of proviso to section 43(5) of the Act.", "final_verdict": "The present appeal is dismissed as the appellants have not complied with the mandatory provisions of proviso to section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | anr.anr. | Link |
Appeal No.642 of 20…Appeal No.642 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellants/promot…The appeal was dismissed as the appellants/promoters failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate"] | {"appellant_claim": "The appellants/promoters cla…{"appellant_claim": "The appellants/promoters claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondents claimed that the appellants/promoters had not complied with the mandatory provisions of proviso to section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellants/promoters failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | and anr.and anr. | Link |
Appeal No.640 of 20…Appeal No.640 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellants/promot…The appeal was dismissed as the appellants/promoters failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate"] | {"appellant_claim": "The appellants/promoters cla…{"appellant_claim": "The appellants/promoters claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondents claimed that the appellants/promoters had not complied with the mandatory provisions of proviso to section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellants/promoters failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | and othersand others | Link |
Appeal No.1323 of 2…Appeal No.1323 of 2019 | HaryanaHaryana | The appeal filed by Parsvnath Developers Ltd. and…The appeal filed by Parsvnath Developers Ltd. and anr. was dismissed as they failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the appellants had not complied with the provisions of proviso to section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellants had not complied with the provisions of proviso to section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Mohit KhirbatMohit Khirbat | Link |
284 of 2021284 of 2021 | HaryanaHaryana | The appeal was dismissed as the appellant failed …The appeal was dismissed as the appellant failed to deposit the requisite amount with the Tribunal. The appeal was not entertained as the provisions of proviso to Section 43(5) of the Act are mandatory. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they needed more time to deposit the requisite amount.", "respondent_claim": "Not applicable", "final_verdict": "The appeal was dismissed as the appellant failed to deposit the requisite amount.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Balraj Singh SihagBalraj Singh Sihag | Link |
Appeal No. 479 of 2…Appeal No. 479 of 2021 | HaryanaHaryana | The appellant, Parsvnath Developers Limited, file…The appellant, Parsvnath Developers Limited, filed an appeal against the order of the Haryana Real Estate Regulatory Authority, which directed the appellant to pay interest to the respondents. The appeal was dismissed by the Haryana Real Estate Appellate Tribunal. | ["Real Estate", "Ap…["Real Estate", "Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the order of the Haryana Real Estate Regulatory Authority was incorrect and that the provisions of Section 63 of the Real Estate (Regulation and Development) Act, 2016 cannot be invoked in this case.", "respondent_claim": "The respondents claimed that the appellant had failed to comply with the order of the Haryana Real Estate Regulatory Authority and that the provisions of Section 63 of the Real Estate (Regulation and Development) Act, 2016 can be invoked in this case.", "final_verdict": "The Haryana Real Estate Appellate Tribunal dismissed the appeal and held that the provisions of Section 63 of the Real Estate (Regulation and Development) Act, 2016 can be invoked in this case.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Yudhbir SinghYudhbir Singh | Link |
298 of 2023 (O & M)298 of 2023 (O & M) | HaryanaHaryana | Appeal dismissed due to non-compliance with provi…Appeal dismissed due to non-compliance with proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016, and failure to remove objections raised by the Registry. | ["Non-compliance wi…["Non-compliance with proviso to Section 43(5)"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Appeal dismissed due to non-compliance with proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016, and failure to remove objections raised by the Registry.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Avineesh MattaAvineesh Matta | Link |
294 of 2023 (O & M)294 of 2023 (O & M) | HaryanaHaryana | Appeal dismissed due to non-compliance with provi…Appeal dismissed due to non-compliance with proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016 and failure to remove objections raised by the Registry. | ["Non-compliance wi…["Non-compliance with Act", "Failure to remove objections"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Appeal dismissed due to non-compliance with proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016 and failure to remove objections raised by the Registry.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Rekha ChaddaRekha Chadda | Link |
Yearly Trend for these Cases
An analysis of the cases filed by the builder, which it won, revealed the following information. The cases can be grouped into several common themes, reflecting the primary disputes encountered by Parsvnath Developers Limited. The most notable themes include 'Interest Rate Disputes', where the builder contested the applicability and justification of interest rates awarded by the RERA; 'Penalties and Appeals', where the builder sought restoration of appeals and the reconsideration of imposed penalties; and 'Withdrawals and Claims on Flat Specifications', related to resolutions allowing the withdrawal of claims and contentions over flat specifications.
The primary reasons for bringing these cases to court are often linked to contesting penalties adjudged by authorities, disputes over project delays attributed to factors outside the builder’s control, or disagreements regarding financial terms dictated by agreements and regulatory bodies. This suggests a proactive approach by Parsvnath Developers to address issues arising out of regulatory frameworks and maintain clarity on financial obligations, ensuring that their rights and interests are protected against potentially unfavorable decisions.
Upon examining the common reasons why the builder won these cases, it appears that a lack of substantial evidence from opposing parties, non-compliance with legal or regulatory requirements, as well as misunderstandings regarding land classification and project specifications played significant roles. The builder demonstrated an effective defense against claims, maintaining that many accusations may have stemmed from buyer misunderstandings or even false claims.
This analysis sheds light on the reputation of Parsvnath Developers Limited in the broader real estate market. It highlights the reality that while there are legitimate grievances in the industry, builders, including Parsvnath, often face baseless accusations leading to unnecessary legal disputes. This underscores the resilience of the builder in affirming its rightful position in the legal landscape.
For potential buyers, this analysis serves as an important reminder to conduct thorough research and validate information before forming opinions about a builder's reputation. Many builders possess the legal acumen and resources to defend themselves against unjust claims. Therefore, balanced judgment is essential, and it is advisable for buyers to consult credible sources and engage in proactive communication with builders to understand the context behind any disputes. At the end of the day, informed decision-making can significantly mitigate risks in real estate transactions.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
336/2020336/2020 | Uttar PradeshUttar Pradesh | The appellant, Parsvnath Developers Ltd., challen…The appellant, Parsvnath Developers Ltd., challenged the order of the U.P. Real Estate Regulatory Authority, directing the appellant to refund the balance amount and pay interest at the rate of 12% per annum. | ["Rate of Interest"…["Rate of Interest", "Real Estate"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the rate of interest awarded by the RERA was not in accordance with the scheme of the Act and Rules of 2016.", "respondent_claim": "The respondent claimed that the rate of interest awarded by the RERA was justified and that the appellant was agreeable to the rate of interest at the rate of MCLR+1 percent.", "final_verdict": "The Tribunal allowed the appeal and modified the rate of interest from 12% to MCLR+1 percent.", "in_favor_of_respondent": "no"} | Parsvnath Developer…Parsvnath Developers Limited | Jatin AgarwalJatin Agarwal | Link |
Yearly Trend for these Cases
An analysis of the cases filed against the builder, Parsvnath Developers Limited, which the builder won, revealed the following information. The cases can be grouped into several common themes:
The reasons these cases were brought to court primarily revolved around claims of project delays, refund disputes, and accusations of non-compliance with municipal and state regulations. Most complaints highlighted a misunderstanding of the nuances surrounding the real estate transactions or the legality of specific claims.
The builder's successful defense typically stemmed from the opposing parties' inability to provide solid evidence, non-adherence to procedural norms, and sometimes from areas of miscommunication or misinterpretation regarding the projects. A key observation is that many buyers appear to lack adequate understanding of legal statutes or real estate agreements, leading to disputes that could arguably be characterized as unwarranted.
This analysis portrays that Parsvnath Developers Limited holds a robust reputation in defending against unjust claims, reflecting a generally positive standing in the competitive real estate market. It indicates that while legitimate disputes do occur, this builder has a track record of consistently managing and resolving such issues legally.
To potential buyers, it is crucial to ask the right questions and seek ample information before forming opinions. The real estate industry has its complexities, and while some claims are valid, a thorough understanding of the situation often helps in discerning the truth. Efforts should be made to gather reliable information about builders and their track record, avoiding hasty conclusions based on singular narratives. This diligence will lead to better-informed decisions in the realm of real estate investment.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
1204/20181204/2018 | HaryanaHaryana | Complaint against M/s Parsynath Developers was di…Complaint against M/s Parsynath Developers was disposed of as the respondent stated they had not sold any plots/apartments and had not launched the project. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was disposed of as the respondent stated they had not sold any plots/apartments and had not launched the project.", "in_favor_of_respondent": "yes"} | Parsynath DevelopersParsynath Developers | Link | |
354/2018354/2018 | HaryanaHaryana | Complainant Jitender Nandal purchased a plot from…Complainant Jitender Nandal purchased a plot from Parsvnath Developers Pvt. Ltd. but did not receive possession despite paying 90% of the sale consideration. The authority disposed of the matter based on an earlier order. | ["Delay in possessi…["Delay in possession", "RERA registration"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant paid 90% of the sale consideration but did not receive possession of the plot within the stipulated 2-year period. He claimed that the respondent was delaying the possession intentionally.", "respondent_claim(in detail)": "The respondent claimed that the project was delayed due to issues with the license renewal and that the land on which the plot was allotted had been acquired by HSIIDC. They stated that they had applied for registration under RERA and that possession would be handed over soon after approvals.", "final_verdict(in detail)": "The authority disposed of the matter based on an earlier order (Complaint no-304/2018) and did not provide a detailed verdict in this case.", "in_favor_of_respondent": "yes"} | Jitender NandalJitender Nandal | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
RERA-PKL-1086-2018RERA-PKL-1086-2018 | HaryanaHaryana | Complainant sought refund for delayed possession …Complainant sought refund for delayed possession of villa. Authority allowed 6 months for possession and delay compensation. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a villa in the 'Elite villas' project and paid Rs. 37,49,400/- against a total consideration of Rs. 44,10,000/-. He claimed that possession was not delivered within 24 months as per the agreement and sought a refund of the entire paid amount along with interest.", "respondent_claim(in detail)": "The respondent admitted the facts but stated that the delay was due to pending renewal of their license. They offered fit-out possession to some buyers in the same project and promised to deliver the villa in dispute within six months.", "final_verdict(in detail)": "The Authority denied the refund but allowed delay compensation as per Rule 15 of Haryana Real Estate (Regulation and Development) Rules. The respondent was given six months to complete the villa and offer possession, failing which the complainant could claim interest at 14% p.a.", "in_favor_of_respondent": "yes"} | Sunil TiwariSunil Tiwari | Parsvnath Developer…Parsvnath Developers Private Limited | Link |
1066 of 20191066 of 2019 | HaryanaHaryana | Complaint against Parsvnath Developers Pvt Ltd. D…Complaint against Parsvnath Developers Pvt Ltd. Dismissed as the respondent had already paid the imposed cost. | ["Dispute over paym…["Dispute over payment"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint is dismissed as the respondent had already paid the imposed cost.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Private Limited | Link | |
1210/20181210/2018 | HaryanaHaryana | Notice discharged and matter disposed of. Respond…Notice discharged and matter disposed of. Respondent/developer stated they have not sold any plots/apartments and have not launched the project. | ["Real Estate", "Li…["Real Estate", "License"] | {"appellant_claim": "", "respondent_claim": "Stat…{"appellant_claim": "", "respondent_claim": "Stated they have not sold any plots/apartments and have not launched the project.", "final_verdict": "Notice discharged and matter disposed of.", "in_favor_of_respondent": "yes"} | Parsvnath DevelopersParsvnath Developers | Link | |
Complaint No. 411 o…Complaint No. 411 of 2019 | HaryanaHaryana | Complaint against Parsvnath Developers for not re…Complaint against Parsvnath Developers for not registering a project. Project was surrendered and no further action required. | ["Project registrat…["Project registration", "Surrender of license"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "The respondent claimed that no sale consideration has taken place and the project was surrendered.", "final_verdict(in detail)": "The proceedings against the respondent were discharged and the matter was disposed off.", "in_favor_of_respondent": "yes"} | Parsvnath DevelopersParsvnath Developers | Link | |
2552 of 20192552 of 2019 | HaryanaHaryana | The case was disposed off as the respondent submi…The case was disposed off as the respondent submitted the required information and it was found to be in order. The file was consigned to the record room. | ["Online submission…["Online submission of A to H proforma"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The respondent submitted the required information and it was found to be in order.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath DevelopersParsvnath Developers | Link |
2551 of 20192551 of 2019 | HaryanaHaryana | Complaint against Parsvnath Developers for not su…Complaint against Parsvnath Developers for not submitting required information. Case disposed off as information was found to be in order. | ["Non-submission of…["Non-submission of information"] | {"appellant_claim(in detail)": "The appellant, HR…{"appellant_claim(in detail)": "The appellant, HRERA, Panchkula, claimed that the respondent, Parsvnath Developers, did not submit the required information in respect of the project bearing registration number 332 of 2017.", "respondent_claim(in detail)": "The respondent claimed that they submitted the requisite information by creating a temp id no. 384-2019.", "final_verdict(in detail)": "The case was disposed off as the information submitted by the respondent was found to be in order.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath DevelopersParsvnath Developers | Link |
2529 of 20192529 of 2019 | HaryanaHaryana | The respondent submitted the required information…The respondent submitted the required information for the project bearing registration number 141 of 2017, and the case was disposed off. | ["Project registrat…["Project registration"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the respondent had not submitted the required information for the project.", "respondent_claim(in detail)": "The respondent claimed that they had submitted the required information by creating a temp id no. 378-2018.", "final_verdict(in detail)": "The case was disposed off as the respondent had submitted the required information.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath DevelopersParsvnath Developers | Link |
1320/20181320/2018 | HaryanaHaryana | Complaint against M/s Parsynath Developers Ltd. f…Complaint against M/s Parsynath Developers Ltd. for payment dispute. Respondent paid the amount in court, and the case was disposed of. | ["Payment dispute"]["Payment dispute"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Ravi Khattar, claimed that the respondent, M/s Parsynath Developers Ltd., had not paid him the due amount.", "respondent_claim(in detail)": "The respondent claimed that they had paid the amount in court, and the complainant had accepted it.", "final_verdict(in detail)": "The case was disposed of as the respondent paid the amount in court, and the complainant accepted it.", "in_favor_of_respondent": "yes"} | Ravi KhattarRavi Khattar | Parsynath Developer…Parsynath Developers Limited | Link |
APPEAL-29/2019APPEAL-29/2019 | Uttar PradeshUttar Pradesh | The appellant's appeal was dismissed as the proje…The appellant's appeal was dismissed as the project was not registered with UPRERA. The appeal was not maintainable in view of the Supreme Court's judgment. | ["Project registrat…["Project registration", "RERA"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent was not providing possession of the flat in habitable condition and sought relief.", "respondent_claim": "The respondent claimed that the project was not registered with UPRERA and therefore the appeal was not maintainable.", "final_verdict": "The appeal was dismissed as the project was not registered with UPRERA.", "in_favor_of_respondent": "yes"} | NOMANISADUL HAQUENOMANISADUL HAQUE | PARSVNATH DEVELOPER…PARSVNATH DEVELOPERS Limited | Link |
APPEAL-604/2020APPEAL-604/2020 | Uttar PradeshUttar Pradesh | The appellant assailed the order of the Regulator…The appellant assailed the order of the Regulatory Authority passed on the complaint of the appellant dated 13.07.2018. The appeal is dismissed as not pressed. | ["Maintainability o…["Maintainability of appeal", "Regulatory Authority order"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Regulatory Authority granted interest from 04.07.2008 to 30.04.2018, whereas the interest ought to have been awarded from the date of deposit i.e. 05.07.2016.", "respondent_claim": "The respondent claimed that the project has been abandoned sometimes in the year 2017-18, the map was not sanctioned by the competent authority, therefore, the project was never registered with the Regulatory Authority under Section 3 of the Act 2016.", "final_verdict": "The appeal is dismissed as not pressed.", "in_favor_of_respondent": "yes"} | VANDANA JAMWALLVANDANA JAMWALL | PARSVNATH DEVELOPER…PARSVNATH DEVELOPERS Limited | Link |
2018-21192018-2119 | RajasthanRajasthan | The applicant withdrew their claim and counter cl…The applicant withdrew their claim and counter claim after reaching a compromise with the respondent on 02.05.2019. | ["Compromise"]["Compromise"] | {"appellant_claim(in detail)": "The applicant wit…{"appellant_claim(in detail)": "The applicant withdrew their claim after reaching a compromise with the respondent.", "respondent_claim(in detail)": "The respondent claimed that the parties had reached a compromise on 02.05.2019.", "final_verdict(in detail)": "The adjudicating officer allowed the joint application and disposed of the present application by way of compromise arrived at between both the parties on 02.05.2019.", "in_favor_of_respondent": "yes"} | Deepak MalpaniDeepak Malpani | Parsvnath Developer…Parsvnath Developers Limited | Link |
4-55742-20-0024-55742-20-002 | Madhya PradeshMadhya Pradesh | The applicant, Mr. Anil Malik, filed a complaint …The applicant, Mr. Anil Malik, filed a complaint against Parsvnath Developers Ltd. for not providing possession of a plot despite paying the full amount. The Authority rejected the application as it was filed 9 years after the sale deed was executed and the applicant failed to provide evidence of the non-existent infrastructure. | ["Non-provision of …["Non-provision of possession", "Infrastructure issues"] | {"appellant_claim": "The applicant claimed that d…{"appellant_claim": "The applicant claimed that despite paying the full amount, the respondent did not provide possession of the plot and the infrastructure was not built.", "respondent_claim": "The respondent claimed that the applicant had booked the plot in 2007 and the sale deed was executed in 2004, and the applicant had not provided evidence of the non-existent infrastructure.", "final_verdict": "The Authority rejected the application as it was filed 9 years after the sale deed was executed and the applicant failed to provide evidence of the non-existent infrastructure.", "in_favor_of_respondent": "yes"} | Mr. Anil MalikMr. Anil Malik | Parsvnath Developer…Parsvnath Developers Limited | Link |
1500/20181500/2018 | HaryanaHaryana | Complaint dismissed in default for non-appearance…Complaint dismissed in default for non-appearance of the complainant. Notice to be issued for violation of section 3(1) of the Real Estate (Regulation & Development) Act, 2016. | ["Non-appearance of…["Non-appearance of complainant", "Project not registered"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the project is not registered with the authority.", "respondent_claim(in detail)": "The respondent claimed that the project is not registered with the authority.", "final_verdict(in detail)": "The complaint was dismissed in default for non-appearance of the complainant. Notice to be issued for violation of section 3(1) of the Real Estate (Regulation & Development) Act, 2016.", "in_favor_of_respondent": "yes"} | otherother | Parsvnath Developer…Parsvnath Developers Limited | Link |
1146/20181146/2018 | HaryanaHaryana | Complaint against Parsvnath Developers Limited fo…Complaint against Parsvnath Developers Limited for not registering a project with the authority. Case dismissed as withdrawn due to a compromise between the parties. | ["Unregistered Proj…["Unregistered Project"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent's project was not registered with the authority, violating the Real Estate (Regulation & Development) Act, 2016.", "respondent_claim": "The respondent claimed that the project was not registered due to a compromise between the parties.", "final_verdict": "The case was dismissed as withdrawn due to a compromise between the parties.", "in_favor_of_respondent": "yes"} | Sudhir Chandra Mish…Sudhir Chandra Mishra | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-COMP-27-20…RERA-PKL-COMP-27-2018 | Not providedNot provided | The complainant withdrew the complaint, and the c…The complainant withdrew the complaint, and the case was dismissed. The complainant is free to file a new complaint if a new issue arises. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant withdrew the complaint.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was dismissed.", "in_favor_of_respondent": "yes"} | Daljit Singh DahiyaDaljit Singh Dahiya | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-COMP. 1 1/…RERA-PKL-COMP. 1 1/2018 | Not providedNot provided | Complainant withdrew the complaint as the parties…Complainant withdrew the complaint as the parties settled the dispute amicably. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was dismissed as the parties had settled the dispute amicably.", "in_favor_of_respondent": "yes"} | Group Captain Sanja…Group Captain Sanjay Sirohi | Parsvnath Developer…Parsvnath Developers Limited | Link |
RERA-PKL-COMP. 12/2…RERA-PKL-COMP. 12/2018 | Not providedNot provided | Complainant Sanjeev Sirohi filed a complaint agai…Complainant Sanjeev Sirohi filed a complaint against M/s Parsvnath Developers Limited, which was dismissed as the parties had settled the dispute amicably. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was dismissed as the parties had settled the dispute amicably.", "in_favor_of_respondent": "yes"} | Sanjeev SirohiSanjeev Sirohi | Parsvnath Developer…Parsvnath Developers Limited | Link |
450/2018450/2018 | HaryanaHaryana | Complainant sought refund for a plot in a real es…Complainant sought refund for a plot in a real estate project after not receiving possession despite paying 50% of the consideration. The respondent offered to settle by paying Rs. 11,41,144/- and the case was disposed of as settled. | ["Real estate dispu…["Real estate dispute", "Refund for undelivered possession"] | {"appellant_claim(in detail)": "The complainant p…{"appellant_claim(in detail)": "The complainant paid Rs. 5,25,000/- for a plot in the respondent's project but did not receive possession despite waiting for over 14 years. He sought a refund of the amount paid, along with interest.", "respondent_claim(in detail)": "The respondent offered to settle the matter by paying Rs. 11,41,144/-, which includes interest calculated at 9%.", "final_verdict(in detail)": "The case was disposed of as settled, with the respondent directed to pay the balance of Rs. 4,05,500/- within 60 days. The respondent was also liable to pay interest on the amount remaining unpaid after 60 days, at the rate prescribed in Rule 15 of HRERA Rules,2017.", "in_favor_of_respondent": "yes"} | Balwan SinghBalwan Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1697 of 20191697 of 2019 | HaryanaHaryana | The respondent, Parsvnath Developers Ltd., was is…The respondent, Parsvnath Developers Ltd., was issued a show cause notice for not registering their project in accordance with the RERA Act, 2016. The Authority found that the respondent had no liability for registration and the notice was discharged. | ["RERA registration…["RERA registration", "Project development"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "The respondent claimed that they had filed an application for part completion certificate in 2009 and had already been granted part completion certificate for 36.995 acres. They also claimed that the balance area of 10.58 acres was not registrable due to re-alignment of the sectoral road.", "final_verdict": "The Authority found that the respondent had no liability for registration of any piece of land. The notice was discharged without prejudice to the Authority's rights to recover any amount as may be payable by the respondent.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
1842 of 20191842 of 2019 | HaryanaHaryana | The complainant, HRERA, Panchkula, filed a compla…The complainant, HRERA, Panchkula, filed a complaint against Parsvnath Developers Ltd. for depositing the deficit registration fee. The case was disposed of after the respondent deposited the fee. | ["Deficit registrat…["Deficit registration fee"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had not deposited the deficit registration fee.", "respondent_claim": "The respondent claimed that they had deposited the fee.", "final_verdict": "The case was disposed of after the respondent deposited the fee.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath Developer…Parsvnath Developers Limited | Link |
1541 of 20191541 of 2019 | HaryanaHaryana | Complaint dismissed as withdrawn with liberty to …Complaint dismissed as withdrawn with liberty to file fresh before RERA, Panchkula. | ["Withdrawn complai…["Withdrawn complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint dismissed as withdrawn with liberty to file fresh before RERA, Panchkula.", "in_favor_of_respondent": "yes"} | Surender SinghSurender Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
2417 of 20192417 of 2019 | HaryanaHaryana | Complainant sought compensation for loss of faith…Complainant sought compensation for loss of faith in respondent due to misrepresentation and failure to provide requisite information. Complainant had previously filed complaints and appeals regarding non-allotment of plot and refund of amount. | ["Misrepresentation…["Misrepresentation", "Failure to provide information"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent had misrepresented about approvals and failed to provide requisite information, leading to loss of faith and compensation sought.", "respondent_claim": "Respondent claimed that complainant had already been compensated in the form of delayed possession interest and refund of amount, and that there was no justification for further compensation.", "final_verdict": "Complainant's relief for compensation of \u20b910 lacs was turned down. A sum of \u20b925,000 was allowed as cost of litigation.", "in_favor_of_respondent": "yes"} | Savita KathuriaSavita Kathuria | Parsvnath Developer…Parsvnath Developers Limited | Link |
594 of 2020594 of 2020 | HaryanaHaryana | The complaint was instituted suo motu for recover…The complaint was instituted suo motu for recovery of costs payable to the Authority and the complainant. The respondent informed that the costs have already been paid, making the complaint infructuous. | ["Recovery of costs…["Recovery of costs"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was disposed of as the respondent had already paid the costs.", "in_favor_of_respondent": "yes"} | Kanta MalhotraKanta Malhotra | Parsvnath Developer…Parsvnath Developers Limited | Link |
794 of 2020794 of 2020 | HaryanaHaryana | Complaint withdrawn by the complainant after rece…Complaint withdrawn by the complainant after receiving offer of possession from the respondent. Complaint disposed of as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by the complainant after receiving offer of possession from the respondent.", "in_favor_of_respondent": "yes"} | Sunil KumarSunil Kumar | Parsvnath Developer…Parsvnath Developers Limited | Link |
1798 of 20191798 of 2019 | HaryanaHaryana | The complainants, senior citizens, filed a compla…The complainants, senior citizens, filed a complaint against Parsvnath Developers Ltd. for various violations in the construction of their flat and the project. The complaint was dismissed as the complainants had previously settled their issues with the respondent and agreed not to raise any further claims. | ["Construction viol…["Construction violations", "Settlement agreement"] | {"appellant_claim": "The complainants alleged tha…{"appellant_claim": "The complainants alleged that the respondent had violated various statutory provisions and had not completed the project as promised. They sought compensation for the issues they faced.", "respondent_claim": "The respondent claimed that the complainants had previously settled their issues with them and had agreed not to raise any further claims. They argued that the complainants were not entitled to further compensation.", "final_verdict": "The complaint was dismissed as the complainants had previously settled their issues with the respondent and agreed not to raise any further claims.", "in_favor_of_respondent": "yes"} | anotheranother | Parsvnath Developer…Parsvnath Developers Limited | Link |
566 of 2019566 of 2019 | HaryanaHaryana | Complainants moved application seeking withdrawal…Complainants moved application seeking withdrawal of complaints, averring that parties have compromised the matter. Complaints are disposed of as withdrawn. | ["Withdrawal of Com…["Withdrawal of Complaints"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaints are disposed of as withdrawn.", "in_favor_of_respondent": "yes"} | Dr. Devinder GuptaDr. Devinder Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
695 of 2020695 of 2020 | HaryanaHaryana | The complaint was registered for monitoring the p…The complaint was registered for monitoring the progress of the real estate project 'Parsynath Paliwal City Panipat'. The project is almost complete, and the promoter has already offered possession to all the plots falling in their share. | ["Real estate proje…["Real estate project progress"] | {"appellant_claim": "", "respondent_claim": "", "…{"appellant_claim": "", "respondent_claim": "", "final_verdict": "The notice is discharged, and the matter is disposed of.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
592 of 2020592 of 2020 | HaryanaHaryana | Suo motu complaint filed to recover cost of 310,0…Suo motu complaint filed to recover cost of 310,000/- imposed in complaint no. 1541 of 2019. Respondent claimed to have already paid the amount. | ["Recovery of cost"]["Recovery of cost"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the respondent had not paid the cost of 310,000/- imposed in complaint no. 1541 of 2019.", "respondent_claim(in detail)": "The respondent claimed that they had already paid the amount of 310,000/- vide demand draft no. 034868.", "final_verdict(in detail)": "The Authority disposed of the suo motu complaint as the respondent had already paid the amount.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
2402 of 20192402 of 2019 | HaryanaHaryana | The complainant, Savita Kathuria, filed an execut…The complainant, Savita Kathuria, filed an execution petition against M/S Parsvnath Developers Ltd. for refund of Rs. 5,77,500/- along with interest. The respondent paid the amount in full, and the execution petition was disposed of as fully satisfied. | ["Refund of payment…["Refund of payment"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed refund of Rs. 5,77,500/- along with interest from the respondent.", "respondent_claim(in detail)": "The respondent claimed that they had paid the amount in full and that the execution petition was not required.", "final_verdict(in detail)": "The Authority directed that the accounts attached vide order dated 03.02.2021 be released and that the respondent deposit the demand drafts in the account of the complainant.", "in_favor_of_respondent": "yes"} | Savita KathuriaSavita Kathuria | Parsvnath Developer…Parsvnath Developers Limited | Link |
786 of 2019786 of 2019 | HaryanaHaryana | Complainant sought execution of earlier order for…Complainant sought execution of earlier order for refund. Respondent claimed payment made. Case disposed as satisfied. | ["Execution of refu…["Execution of refund order"] | {"appellant_claim": "Seeking execution of earlier…{"appellant_claim": "Seeking execution of earlier order for refund", "respondent_claim": "Payment made to complainant", "final_verdict": "Case disposed as satisfied", "in_favor_of_respondent": "yes"} | Ramesh Kumar SinghRamesh Kumar Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
595 of 2020595 of 2020 | HaryanaHaryana | Suo motu complaint filed to recover cost of Rs. 1…Suo motu complaint filed to recover cost of Rs. 10,000 imposed for delay in filing reply. Cost paid, complaint disposed of. | ["Cost recovery"]["Cost recovery"] | {"appellant_claim": "Recovery of cost imposed for…{"appellant_claim": "Recovery of cost imposed for delay in filing reply", "respondent_claim": "Payment of cost", "final_verdict": "Complaint disposed of as cost paid", "in_favor_of_respondent": "yes"} | HRERA AHRERA A | Parsvnath Developer…Parsvnath Developers Limited | Link |
593 of 2020593 of 2020 | HaryanaHaryana | Suo motu complaint filed to recover cost of ₹10,0…Suo motu complaint filed to recover cost of ₹10,000 imposed for delay in filing reply. Cost paid, complaint disposed of. | ["Cost recovery"]["Cost recovery"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the respondent had delayed filing a reply, and therefore, a cost of \u20b910,000 was imposed.", "respondent_claim(in detail)": "The respondent claimed that the cost of \u20b910,000 had already been paid.", "final_verdict(in detail)": "The complaint was disposed of as the respondent had paid the cost of \u20b910,000.", "in_favor_of_respondent": "yes"} | HRERAHRERA | Parsvnath Developer…Parsvnath Developers Limited | Link |
1448 of 20191448 of 2019 | HaryanaHaryana | Complainants sought execution of earlier order fo…Complainants sought execution of earlier order for refund from respondent. Respondent claimed payment, and Authority verified. | ["Execution of earl…["Execution of earlier order", "Refund from respondent"] | {"appellant_claim": "Complainants sought executio…{"appellant_claim": "Complainants sought execution of earlier order for refund from respondent.", "respondent_claim": "Respondent claimed payment, and Authority verified.", "final_verdict": "The execution petition was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Mr. Sangeet JainMr. Sangeet Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
2159 of 20192159 of 2019 | HaryanaHaryana | Complaints disposed of with direction to parties …Complaints disposed of with direction to parties to remain bound by terms of settlement. Amicable settlement arrived at between parties. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaints disposed of with direction to parties to remain bound by terms of settlement.", "in_favor_of_respondent": "yes"} | Suman Kumar SunejaSuman Kumar Suneja | Parsvnath Developer…Parsvnath Developers Limited | Link |
1056-20201056-2020 | HaryanaHaryana | Complaint against Parsvnath Developers Ltd. for n…Complaint against Parsvnath Developers Ltd. for not seeking extension of registration of the real estate project. Authority discharged the notices and disposed off the matter. | ["Real Estate Proje…["Real Estate Project Registration"] | {"appellant_claim": "", "respondent_claim": "", "…{"appellant_claim": "", "respondent_claim": "", "final_verdict": "Authority discharged the notices and disposed off the matter.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
1963 of 20191963 of 2019 | HaryanaHaryana | Complainant Balwan Singh filed execution petition…Complainant Balwan Singh filed execution petition for refund of Rs. 7,73,144/- along with interest from Parsvnath Developers Ltd. The petition was disposed of as fully satisfied. | ["Refund of payment…["Refund of payment"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed an execution petition for refund of Rs. 7,73,144/- along with interest from the respondent.", "respondent_claim(in detail)": "The respondent stated that a payment of Rs. 11,73,306/- has already been made to the complainant till date.", "final_verdict(in detail)": "The execution petition was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Balwan SinghBalwan Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
1961 of 20191961 of 2019 | HaryanaHaryana | Complaint for execution of orders dated 08.01.201…Complaint for execution of orders dated 08.01.2019 passed in complaint no. 779 of 2018. Payment of Rs. 18,56,321/- has been made to the complainant. | ["Execution of orde…["Execution of orders", "Payment"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution petition deserves to be disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Bimla DeviBimla Devi | Parsvnath Developer…Parsvnath Developers Limited | Link |
1962 of 20191962 of 2019 | HaryanaHaryana | Complainant Narender Singh filed execution petiti…Complainant Narender Singh filed execution petition for refund of Rs. 31,25,000 along with interest from Parsvnath Developers Ltd. The petition was disposed of as fully satisfied as the respondent had already paid Rs. 20,31,776 to the complainant. | ["Refund of payment…["Refund of payment"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed an execution petition for refund of Rs. 31,25,000 along with interest from the respondent.", "respondent_claim(in detail)": "The respondent stated that a payment of Rs. 20,31,776 has already been made to the complainant till date.", "final_verdict(in detail)": "The execution petition was disposed of as fully satisfied as the respondent had already paid Rs. 20,31,776 to the complainant.", "in_favor_of_respondent": "yes"} | Narender SinghNarender Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
904 of 2019904 of 2019 | HaryanaHaryana | Complainant Vineet Yadav filed a complaint agains…Complainant Vineet Yadav filed a complaint against Parsvnath Developers Ltd. for refund of Rs. 5,00,000 with interest. The authority directed the respondent to pay the amount with interest, and the complainant has now filed an execution petition. | ["Refund of amount …["Refund of amount with interest"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent had failed to refund the amount of Rs. 5,00,000 with interest as per the earlier order.", "respondent_claim(in detail)": "The respondent claimed that the amount had been paid in full, including the interest accrued during the pendency of the execution.", "final_verdict(in detail)": "The authority held that the respondent had paid the amount in full, including the interest accrued during the pendency of the execution, and therefore, the execution petition was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Vineet YadavVineet Yadav | Parsvnath Developer…Parsvnath Developers Limited | Link |
1607 of 20191607 of 2019 | HaryanaHaryana | Complainant sought possession of plot or refund w…Complainant sought possession of plot or refund with interest, compensation, and litigation charges. Authority disposed of the matter as conveyance deed had been executed between parties. | ["Refund for Undeli…["Refund for Undelivered Plot"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought possession of the plot or refund of the amount deposited, along with interest, compensation, and litigation charges. The complainant had paid the entire sale consideration, including EDC and IDC, as demanded by the respondent, but the respondent failed to complete the project and hand over possession.", "respondent_claim(in detail)": "The respondent claimed that the Authority had no jurisdiction to deal with the prayer of refund made in the complaint. The respondent also stated that possession had been handed over to the complainant and the conveyance deed had been executed between the parties on 06.09.2020.", "final_verdict(in detail)": "The Authority disposed of the matter as the conveyance deed had been executed between the parties. The complainant was at liberty to file a fresh complaint if any grievance survived after the disposal of the present complaint.", "in_favor_of_respondent": "yes"} | Vidhya DahiyaVidhya Dahiya | Parsvnath Developer…Parsvnath Developers Limited | Link |
3025, 3028, 3032, 3…3025, 3028, 3032, 3037, 3039 of 2019 | HaryanaHaryana | Complaints filed seeking refund for amounts depos…Complaints filed seeking refund for amounts deposited in projects. Authority dismissed complaints as barred by res judicata due to previous decree from NCDRC. | ["Refund for incomp…["Refund for incomplete project", "Res judicata"] | {"appellant_claim": "Seeking refund for amounts d…{"appellant_claim": "Seeking refund for amounts deposited in projects due to incomplete development.", "respondent_claim": "Previous decree from NCDRC for same cause of action bars current complaints.", "final_verdict": "Complaints dismissed as barred by res judicata.", "in_favor_of_respondent": "yes"} | Mrs. Chanchal KapoorMrs. Chanchal Kapoor | Parsvnath Developer…Parsvnath Developers Limited | Link |
958 of 2021958 of 2021 | HaryanaHaryana | Complainant Mona Jain filed a complaint against M…Complainant Mona Jain filed a complaint against M/S Parsvnath Developers Ltd. for non-payment of refund. The respondent paid the remaining amount, and the execution petition was disposed of as fully satisfied. | ["Non-payment of re…["Non-payment of refund"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent failed to pay the refund amount as per the previous orders.", "respondent_claim(in detail)": "The respondent claimed that they had paid the complainant a sum of Rs. 15,80,059/- and that the entire liability towards the complainant, including interest, stands discharged.", "final_verdict(in detail)": "The Authority disposed of the execution petition as fully satisfied, as the respondent had paid the remaining amount of Rs. 2,60,447/- and the entire decretal amount, including interest, had been paid to the complainant.", "in_favor_of_respondent": "yes"} | Mona JainMona Jain | Parsvnath Developer…Parsvnath Developers Limited | Link |
1881 of 20191881 of 2019 | HaryanaHaryana | Complaint for execution of orders dated 17.10.201…Complaint for execution of orders dated 17.10.2018 passed in complaint case no. 355 of 2018. Entire decretal amount has been paid to the complainant. | ["Execution of Orde…["Execution of Orders"] | {"appellant_claim": "Execution of orders dated 17…{"appellant_claim": "Execution of orders dated 17.10.2018 passed in complaint case no. 355 of 2018.", "respondent_claim": "Entire decretal amount has been paid to the complainant.", "final_verdict": "The complaint is disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Pravesh NarangPravesh Narang | Parsvnath Developer…Parsvnath Developers Limited | Link |
1964 of 20191964 of 2019 | HaryanaHaryana | Complaint for execution of orders dated 27.02.201…Complaint for execution of orders dated 27.02.2019 passed in complaint no. 300 of 2018. Payment already made to the complainant. | ["Execution of orde…["Execution of orders"] | {"appellant_claim": "Execution of orders dated 27…{"appellant_claim": "Execution of orders dated 27.02.2019 passed in complaint no. 300 of 2018.", "respondent_claim": "Payment already made to the complainant.", "final_verdict": "Complaint disposed of as satisfied. File be consigned to record room and order be uploaded on the website of the Authority.", "in_favor_of_respondent": "yes"} | Vinod Kumar GuptaVinod Kumar Gupta | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution Complaint…Execution Complaint No. 818 of 2021 | HaryanaHaryana | The complainant, Ritu Uppal, filed an execution c…The complainant, Ritu Uppal, filed an execution complaint against M/S Parsvnath Developers Ltd. for remaining payment. The respondent deposited the full amount, and the complaint was disposed of as fully satisfied. | ["Remaining payment…["Remaining payment"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed the remaining payment from the respondent.", "respondent_claim(in detail)": "The respondent claimed that the full amount had been deposited.", "final_verdict(in detail)": "The complaint was disposed of as fully satisfied since the respondent deposited the full amount.", "in_favor_of_respondent": "yes"} | Ritu UppalRitu Uppal | Parsvnath Developer…Parsvnath Developers Limited | Link |
1959 of 20221959 of 2022 | HaryanaHaryana | Suo-motu complaint against Parsvnath Developers L…Suo-motu complaint against Parsvnath Developers Ltd. for not uploading quarterly progress reports. Complaint discharged as progress reports uploaded up to September 2022. | ["Non-uploaded prog…["Non-uploaded progress reports"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint discharged as progress reports uploaded up to September 2022.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
1991 of 20221991 of 2022 | HaryanaHaryana | Suo-motu complaint against Parsvnath Developers L…Suo-motu complaint against Parsvnath Developers Ltd. for not uploading quarterly progress reports. Complaint discharged as progress reports uploaded up to September 2022. | ["Non-uploaded prog…["Non-uploaded progress reports"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint discharged as progress reports uploaded up to September 2022.", "in_favor_of_respondent": "yes"} | Parsvnath Developer…Parsvnath Developers Limited | Link | |
1763 of 20221763 of 2022 | HaryanaHaryana | The complainant, HRERA, Panchkula, filed a suo-mo…The complainant, HRERA, Panchkula, filed a suo-motu complaint against Parsvnath Developers Ltd. for not uploading quarterly progress reports of the project 'Parsvnath City Karnal'. The case was disposed off after the respondent submitted that the reports had been uploaded. | ["Non-uploading of …["Non-uploading of quarterly progress reports"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent was not uploading quarterly progress reports of the project 'Parsvnath City Karnal' as required by law.", "respondent_claim": "The respondent claimed that the reports had been uploaded by the respondent till 30.09.2022.", "final_verdict": "The case was disposed off after the respondent submitted that the reports had been uploaded.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath Developer…Parsvnath Developers Limited | Link |
783 of 2020783 of 2020 | HaryanaHaryana | Complaint dismissed as matter is already sub judi…Complaint dismissed as matter is already sub judice before the National Consumer Dispute Redressal Commission. Complainant had filed a previous consumer complaint which was decided by the State Consumer Dispute Redressal Commission. | ["Dispute over prev…["Dispute over previous consumer complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "The respondent claimed that the complainant had filed a previous consumer complaint which was decided by the State Consumer Dispute Redressal Commission, and that the current complaint is in clear violation of law.", "final_verdict": "The complaint was dismissed as the matter is already sub judice before the National Consumer Dispute Redressal Commission.", "in_favor_of_respondent": "yes"} | Atul SundraAtul Sundra | Parsvnath Developer…Parsvnath Developers Limited | Link |
819 of 2021819 of 2021 | HaryanaHaryana | Complaint for remaining payment. Amount deposited…Complaint for remaining payment. Amount deposited by respondent, complaint disposed of as fully satisfied. | ["Remaining payment…["Remaining payment"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the respondent had not paid the remaining amount.", "respondent_claim(in detail)": "The respondent claimed that the amount had been deposited.", "final_verdict(in detail)": "The complaint was disposed of as fully satisfied as the whole decretal amount was deposited.", "in_favor_of_respondent": "yes"} | Madhukar KhoslaMadhukar Khosla | Parsvnath Developer…Parsvnath Developers Limited | Link |
11 of 202111 of 2021 | HaryanaHaryana | Complainant sought rectification of order dated 1…Complainant sought rectification of order dated 13.10.2021, but application was dismissed as relief sought was already granted in absence of complainant. | ["Rectification of …["Rectification of Order"] | {"appellant_claim": "Complainant sought rectifica…{"appellant_claim": "Complainant sought rectification of order dated 13.10.2021, stating that till date complainant has not got actual legal possession of the plot and few other issues pertaining to this matter are remaining discussion before this Authority.", "respondent_claim": "Respondent did not make any claim in this application.", "final_verdict": "Application for rectification filed by complainant is dismissed. Complainant is at liberty to avail other remedies available as per law.", "in_favor_of_respondent": "yes"} | Kashmiri Lal NarangKashmiri Lal Narang | Parsvnath Developer…Parsvnath Developers Limited | Link |
742 of 2020742 of 2020 | HaryanaHaryana | Suo-motu complaint for monitoring the progress of…Suo-motu complaint for monitoring the progress of the project 'Parsavnath Royale (Pocket B)' was discharged as the application for third extension of registration has already been filed by the respondents. | ["Project Extension…["Project Extension", "Monitoring"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent/promoter had not monitored the progress of the project 'Parsavnath Royale (Pocket B)' and had not provided any updates.", "respondent_claim": "The respondent claimed that they had already applied for third extension of registration of the project which is pending before the Authority.", "final_verdict": "The Authority discharged the suo-motu complaint as the application for third extension of registration has already been filed by the respondents.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 336 o…Execution No. 336 of 2020 | HaryanaHaryana | Complaint was disposed of as fully satisfied sinc…Complaint was disposed of as fully satisfied since the complainant/decretee holder did not appear for the last two hearings. The respondent/judgment debtor had already paid the decretal amount. | ["Execution complai…["Execution complaint", "Payment of decretal amount"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied since the complainant/decretee holder did not appear for the last two hearings.", "in_favor_of_respondent": "yes"} | Antar Singh KohliAntar Singh Kohli | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 184 o…Execution No. 184 of 2023 | HaryanaHaryana | Settlement arrived at between parties. Execution …Settlement arrived at between parties. Execution complaint withdrawn as fully satisfied. | ["Settlement", "Wit…["Settlement", "Withdrawal of Execution"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Execution complaint withdrawn as fully satisfied", "in_favor_of_respondent": "yes"} | Raj Pal SinghRaj Pal Singh | Parsvnath Developer…Parsvnath Developers Limited | Link |
Execution No. 91 of…Execution No. 91 of 2020 | HaryanaHaryana | Complaint against Parsvnath Developers Ltd. for n…Complaint against Parsvnath Developers Ltd. for non-payment of decretal amount and costs. Case disposed as complainant did not appear for confirmation. | ["Non-payment of de…["Non-payment of decretal amount and costs"] | {"appellant_claim(in detail)": "Complainant claim…{"appellant_claim(in detail)": "Complainant claimed non-payment of decretal amount and costs by respondent.", "respondent_claim(in detail)": "Respondent claimed that complainant had not paid the costs and decretal amount.", "final_verdict(in detail)": "Case disposed as complainant did not appear for confirmation. Complainant is at liberty to reopen the present execution complaint after moving an application.", "in_favor_of_respondent": "yes"} | Anand Kumar JollyAnand Kumar Jolly | Parsvnath Developer…Parsvnath Developers Limited | Link |
319 of 2021319 of 2021 | HaryanaHaryana | Smt. Kanta Malhotra filed an appeal against the o…Smt. Kanta Malhotra filed an appeal against the order of Haryana Real Estate Regulatory Authority, seeking refund of amount with interest. The appeal was dismissed with costs. | ["Refund of amount …["Refund of amount with interest"] | {"appellant_claim": "The appellant claimed that s…{"appellant_claim": "The appellant claimed that she was entitled to refund of amount with interest as per the order of Haryana Real Estate Regulatory Authority.", "respondent_claim": "The respondents claimed that the appellant was not entitled to refund of amount with interest as per the order of Haryana Real Estate Regulatory Authority.", "final_verdict": "The appeal was dismissed with costs.", "in_favor_of_respondent": "yes"} | Smt. Kanta MalhotraSmt. Kanta Malhotra | Parsvnath Developer…Parsvnath Developers Limited | Link |
Appeal No. 298 of 2…Appeal No. 298 of 2021 | HaryanaHaryana | The appeal became infructuous after the order dat…The appeal became infructuous after the order dated 16.11.2021, and the appellant did not want to proceed further. | ["Infructuous appea…["Infructuous appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the appeal was not infructuous.", "respondent_claim": "The respondent claimed that the appeal was infructuous.", "final_verdict": "The appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | Kanta MalhotraKanta Malhotra | Parsvnath Developer…Parsvnath Developers Limited | Link |
Appeal No.50 of 2021Appeal No.50 of 2021 | HaryanaHaryana | Kanta Malhotra appealed against the order of the …Kanta Malhotra appealed against the order of the Ld. Adjudicating Officer, Panchkula, which dismissed her application for amendment of the title and partly allowed her application for amendment of the prayer/relief clause. The Appellate Tribunal held that there was no illegality or irregularity in the impugned order and dismissed the appeal. | ["Real Estate", "Ap…["Real Estate", "Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Ld. Adjudicating Officer had not properly evaluated the documents and pleadings and had wrongly dismissed her application for amendment of the title and declined some of the amendments in the relief clause.", "respondent_claim": "The respondent claimed that the Ld. Adjudicating Officer had properly evaluated the documents and pleadings and had rightly disposed of the applications.", "final_verdict": "The Appellate Tribunal held that there was no illegality or irregularity in the impugned order and dismissed the appeal.", "in_favor_of_respondent": "yes"} | Kanta MalhotraKanta Malhotra | Parsvnath Developer…Parsvnath Developers Limited | Link |
256/2019256/2019 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed as withdrawn.", "in_favor_of_respondent": "yes"} | Pawan Kumar RanaPawan Kumar Rana | Parsavnath Develope…Parsavnath Developers Limited | Link |
645 of 2019645 of 2019 | HaryanaHaryana | Complaint filed for review of previous order. Aut…Complaint filed for review of previous order. Authority does not have power to review its own orders unless there is a factual error. Complaint disposed of as dismissed. | ["Review of previou…["Review of previous order"] | {"appellant_claim": "The complainant sought revie…{"appellant_claim": "The complainant sought review of the order passed in complaint no. 919 of 2018.", "respondent_claim": "The respondent did not make any claims in this complaint.", "final_verdict": "The Authority disposed of the complaint as dismissed.", "in_favor_of_respondent": "yes"} | Kusum LataKusum Lata | Parsavnath Develope…Parsavnath Developers Limited | Link |
No reviews for this builder yet. Be the first one to share your thoughts!
All data on this website is derived from RERA sources and processed using AI. Read full disclaimer. All data on this website is derived from RERA sources and processed using AI. Read full disclaimer.