CIN | L45201KA1995PLC018475 |
---|---|
Year Established | Not Available |
Address | SOBHA, Sarjapur-Marathahalli Outer Ring Road (ORR) Devarabisanahalli, Bellandur Post, Bangalore KA 560103 IN |
Company Status | Public |
Overall Case Outcomes
SOBHA LIMITED, a prominent builder in India, has made a significant mark in the real estate sector, primarily across various states including Tamil Nadu, Karnataka, Haryana, and Kerala. However, like many builders, it faces its share of customer complaints and legal challenges. A detailed examination of the complaints against SOBHA LIMITED reveals patterns in the complaints and the outcomes of legal cases that provide insights into the company's operational practices and customer relations.
SOBHA LIMITED lost a total of 124 cases, which prominently featured the following patterns:
In contrast, SOBHA LIMITED won 63 of its cases, and several themes emerged:
Based on the data reviewed, SOBHA LIMITED displays a complex picture. The company has experienced numerous customer complaints and a significant loss rate in legal cases. However, their willingness to settle and document compliance suggests a proactive stance in rectifying grievances where possible.
This examination of SOBHA LIMITED serves as a window into the complexities of real estate transactions in India, emphasizing the importance of awareness and thoroughness for potential homebuyers.
Yearly Trend for these Cases
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
F944F944 | KarnatakaKarnataka | The complaint was settled out of court between th…The complaint was settled out of court between the parties, and the matter was closed as per the joint memo. | ["Settlement", "Out…["Settlement", "Out of court"] | {"appellant_claim": "The claim made in the compla…{"appellant_claim": "The claim made in the complaint has been fully satisfied.", "respondent_claim": "The respondent has agreed to the settlement.", "final_verdict": "The matter has been closed as per the joint memo.", "in_favor_of_respondent": "no"} | SOBHA LimitedSOBHA Limited | Link | |
CMP/190308/0002322CMP/190308/0002322 | KarnatakaKarnataka | Complainant sought refund for booking amount paid…Complainant sought refund for booking amount paid to Sobha Limited. Developer paid part of the amount with interest and costs. Complainant's complaint allowed with directions to pay interest and costs. | ["Refund for bookin…["Refund for booking amount", "Interest payment"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund for the booking amount paid to Sobha Limited, along with interest for the period the amount was with the developer.", "respondent_claim": "The developer claimed that the amount was forfeited towards statutory charges and earnest money.", "final_verdict": "The complaint was allowed, with directions to the developer to pay interest at 2% per annum above the SBI marginal rate of interest on the amount of Rs. 5,50,000 from 09/09/2018 to 04/09/2019, and to pay Rs. 5,000 as costs.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/01277/2023CMP/01277/2023 | KarnatakaKarnataka | The complainant and respondent jointly submitted …The complainant and respondent jointly submitted that the dispute was settled amicably before the Lok-Adalat. The complaint was disposed of as per the joint memo. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the dispute was settled amicably before the Lok-Adalat.", "respondent_claim": "The respondent claimed that the dispute was settled amicably before the Lok-Adalat.", "final_verdict": "The complaint was disposed of as per the joint memo.", "in_favor_of_respondent": "no"} | Anup Narayana EAnup Narayana E | Sobha LimitedSobha Limited | Link |
CMP/221226/0010531CMP/221226/0010531 | KarnatakaKarnataka | The complainant and respondent settled the disput…The complainant and respondent settled the dispute amicably before the Lok Adalat. The settlement is voluntary and legal. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed an u…{"appellant_claim": "The complainant claimed an unknown amount against the respondent.", "respondent_claim": "The respondent claimed that the dispute was settled amicably.", "final_verdict": "The settlement entered between the parties is voluntary and legal.", "in_favor_of_respondent": "no"} | Jagadeesan PJagadeesan P | Sobha LimitedSobha Limited | Link |
CMP/221128/0010407CMP/221128/0010407 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably before the National Adalat held on 28.12.2022. The complaint stands disposed of as per the joint memo. | ["Amicable settleme…["Amicable settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint stands disposed of as per the joint memo.", "in_favor_of_respondent": "no"} | Kumar Maruti Priyad…Kumar Maruti Priyadarshi | Sobha LimitedSobha Limited | Link |
CMP/221104/0010177CMP/221104/0010177 | KarnatakaKarnataka | The complaint between Ananda Jeevavasahan and Chr…The complaint between Ananda Jeevavasahan and Chris Jeevavasahan and Sobha Limited was referred to the Lok Adalat for determination. The parties compromised and settled the matter, and the settlement was accepted as a voluntary and legal one. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The parties compromised and settled the matter, and the settlement was accepted as a voluntary and legal one.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/221102/0010157CMP/221102/0010157 | KarnatakaKarnataka | The complainant and respondent jointly submitted …The complainant and respondent jointly submitted that the dispute was settled amicably before the Lok Adalat. The complaint was disposed of as per the joint memo. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the dispute was settled amicably before the Lok Adalat.", "respondent_claim": "The respondent claimed that the dispute was settled amicably before the Lok Adalat.", "final_verdict": "The complaint was disposed of as per the joint memo.", "in_favor_of_respondent": "no"} | B Sreenivasula ReddyB Sreenivasula Reddy | Sobha LimitedSobha Limited | Link |
CMP/220920/0010029CMP/220920/0010029 | KarnatakaKarnataka | The complaint between Ananda Jeevavasahan and Chr…The complaint between Ananda Jeevavasahan and Christy Jeevavasahan against Sobha Limited was referred to the Lok Adalat and the parties settled the matter voluntarily. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was settled voluntarily between the parties.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/220624/0009679CMP/220624/0009679 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably before the Lok Adalat. The complaint was disposed of in terms of the joint memo filed during the pre-Lok Adalat sitting. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not fulfilled their obligations regarding the subject matter of the complaint.", "respondent_claim": "The respondent claimed that they had fulfilled their obligations and that the complainant was not entitled to any further claims.", "final_verdict": "The complaint was disposed of in terms of the joint memo filed during the pre-Lok Adalat sitting, with the complainant receiving a cheque for Rs. 3,85,000 as full and final settlement.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/220523/0009506CMP/220523/0009506 | KarnatakaKarnataka | The complainant and respondent jointly submitted …The complainant and respondent jointly submitted that the dispute was amicably settled before the Lok Adalat. The Lok Adalat accepted the joint memo and disposed of the complaint as settled. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not fulfilled their obligations.", "respondent_claim": "The respondent claimed that the complainant had not fulfilled their obligations.", "final_verdict": "The Lok Adalat accepted the joint memo and disposed of the complaint as settled.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/220505/0009426CMP/220505/0009426 | KarnatakaKarnataka | The complaint was disposed off as amicably settle…The complaint was disposed off as amicably settled between the parties before the Lok Adalat. The dispute was referred for determination to the Lok-Adalat and the parties compromised/settled the matter in terms of a joint memo. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had failed to provide the necessary amenities and services as per the agreement.", "respondent_claim": "The respondent claimed that the appellant had failed to pay the dues as per the agreement.", "final_verdict": "The Lok Adalat accepted the joint memo filed by the parties and disposed off the complaint as amicably settled.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/210912/0008324CMP/210912/0008324 | KarnatakaKarnataka | Complaint filed against Sobha Limited for refund …Complaint filed against Sobha Limited for refund of booking amount. Case withdrawn by complainant after amicable settlement. | ["Refund of booking…["Refund of booking amount", "Amicable settlement"] | {"appellant_claim": "Refund of booking amount for…{"appellant_claim": "Refund of booking amount for Sobha Lake Gardens Phase 1 project.", "respondent_claim": "Not provided.", "final_verdict": "Case withdrawn by complainant after amicable settlement.", "in_favor_of_respondent": "no"} | Reshma KumariReshma Kumari | Sobha LimitedSobha Limited | Link |
CMP/210801/00081CMP/210801/00081 | KarnatakaKarnataka | The complainants, Mr. Mehul Satish Shah and Mrs. …The complainants, Mr. Mehul Satish Shah and Mrs. Sashikala Natarajan, settled their disputes amicably with Sobha Ltd. through negotiations and filed a joint memo, which was accepted by the Lok Adalat. | ["Real Estate Dispu…["Real Estate Dispute", "Settlement"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that Sobha Ltd. had not provided them with the necessary documents and certifications for their apartment unit.", "respondent_claim": "Sobha Ltd. claimed that they had provided the complainants with all the necessary documents and certifications.", "final_verdict": "The Lok Adalat accepted the joint memo filed by the parties, which stated that the disputes had been settled amicably through negotiations.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
816.2816.2 | Not providedNot provided | The complaint was settled between the parties in …The complaint was settled between the parties in terms of a joint memo, and the complaint was closed as same is settled. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was settled between the parties in terms of a joint memo, and the complaint was closed as same is settled.", "in_favor_of_respondent": "no"} | Sri.C.V.DeepakSri.C.V.Deepak | Sobha LimitedSobha Limited | Link |
CMP/210623/0008029CMP/210623/0008029 | KarnatakaKarnataka | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for not completing the project and handing over the possession of the flat as agreed. The authority allowed the complaint and directed the respondent to pay the amount with interest to the complainants. | ["Non-completion of…["Non-completion of project", "Non-handover of possession"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not complete the project and hand over the possession of the flat as agreed. They sought refund with interest.", "respondent_claim": "The respondent claimed that the unit was completed within the stipulated time and offered physical possession. They denied any fault in the delay.", "final_verdict": "The authority allowed the complaint and directed the respondent to pay the amount with interest to the complainants.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/210623/0008046CMP/210623/0008046 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably before the Lok Adalat. The settlement was accepted by the Lok Adalat, and the complaint was disposed of as per the joint memo. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not provided the original Agreement to Sell dated 21.06.2019 for unit number N- 9183 situated in Sobha Arena- The Square{ Block -4).", "respondent_claim": "The respondent claimed that the complainant had misinterpreted the original Agreement to Sell.", "final_verdict": "The Lok Adalat accepted the settlement entered between the parties and disposed of the complaint as per the joint memo.", "in_favor_of_respondent": "no"} | Kunal KunduKunal Kundu | Sobha LimitedSobha Limited | Link |
90-08-202190-08-2021 | KarnatakaKarnataka | The complainant and respondent settled the disput…The complainant and respondent settled the dispute through a joint memo, and the complaint was closed as it was settled in terms of the memo. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was closed as it was settled in terms of the joint memo.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/210107/0007414CMP/210107/0007414 | KarnatakaKarnataka | The complainant sought interest on delay period f…The complainant sought interest on delay period for possession of a flat. The respondent claimed they had completed the project on time but were unable to hand over possession due to external issues. The authority allowed the complaint and directed the respondent to pay interest. | ["Interest on delay…["Interest on delay period", "Possession of flat"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed handing over possession of the flat and sought interest on the delay period.", "respondent_claim": "The respondent claimed that they had completed the project on time but were unable to hand over possession due to external issues.", "final_verdict": "The authority allowed the complaint and directed the respondent to pay interest on the delay period.", "in_favor_of_respondent": "no"} | Arun Mala JanardhanArun Mala Janardhan | Sobha LimitedSobha Limited | Link |
CMP/201221/0007297CMP/201221/0007297 | KarnatakaKarnataka | The complainants sought refund with interest for …The complainants sought refund with interest for a flat in the Sobha Valley View project. The respondent was directed to pay a sum of Rs. 2,41,80,514 towards refund of amount including interest. | Refund with interes…Refund with interest for flat in Sobha Valley View project | {"appellant_claim": "The complainants claimed ref…{"appellant_claim": "The complainants claimed refund with interest for a flat in the Sobha Valley View project as the respondent failed to hand over possession of the flat as agreed.", "respondent_claim": "The respondent claimed that they had completed the project before the agreed completion date and obtained occupancy certificate on 03/10/2019.", "final_verdict": "The respondent was directed to pay a sum of Rs. 2,41,80,514 towards refund of amount including interest.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/201221/0007296CMP/201221/0007296 | KarnatakaKarnataka | The complainant sought refund with interest for a…The complainant sought refund with interest for a flat in the Sobha Valley View project developed by Sobha Limited. The authority allowed the complaint and directed the respondent to pay a sum of Rs. 2,33,43,883/- towards refund of amount including interest. | ["Refund with inter…["Refund with interest", "Sobha Valley View project"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund with interest for a flat in the Sobha Valley View project developed by Sobha Limited.", "respondent_claim": "The respondent claimed that they had completed the project before the agreed completion date and obtained OC on 03/10/2019.", "final_verdict": "The authority allowed the complaint and directed the respondent to pay a sum of Rs. 2,33,43,883/- towards refund of amount including interest.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/201222/0007295CMP/201222/0007295 | KarnatakaKarnataka | The complainants filed a complaint against the re…The complainants filed a complaint against the respondent for not handing over possession of a flat and for not providing a satisfactory clarification regarding additional terrace area. The respondent was directed to pay a sum of Rs. 2,58,16,235/- towards refund of amount including interest. | ["Refund of amount …["Refund of amount including interest"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent did not hand over possession of the flat and did not provide a satisfactory clarification regarding additional terrace area.", "respondent_claim": "The respondent claimed that they had completed the project before the agreed completion date and had obtained the occupancy certificate.", "final_verdict": "The respondent was directed to pay a sum of Rs. 2,58,16,235/- towards refund of amount including interest.", "in_favor_of_respondent": "no"} | Sri. Suhail Ahmed, …Sri. Suhail Ahmed, Advocate | Sobha LimitedSobha Limited | Link |
CMP : 5926CMP : 5926 | Not providedNot provided | The complainant and respondent Sobha Limited sett…The complainant and respondent Sobha Limited settled the complaint in terms of a joint memo. The complaint is closed as the settlement is just and proper. | ["Settlement", "Com…["Settlement", "Complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint is settled in terms of the joint memo.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/200824/0005826CMP/200824/0005826 | KarnatakaKarnataka | Complainant sought refund of booking amount for c…Complainant sought refund of booking amount for cancelled flat booking. Respondent paid partial amount with interest and costs. Case settled in Lok Adalat. | ["Refund for cancel…["Refund for cancelled flat booking"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount for cancelled flat booking.", "respondent_claim": "Respondent paid partial amount with interest and costs.", "final_verdict": "Case settled in Lok Adalat.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/191227/0005085CMP/191227/0005085 | KarnatakaKarnataka | The complainant, Praveen Kumar P, filed a complai…The complainant, Praveen Kumar P, filed a complaint against Sobha Limited for refund of Rs. 6 lakhs with interest. The authority allowed the complaint in part and directed Sobha Limited to pay simple interest on Rs. 5,50,000 @ 2% above MCLR of SBI from the date of payment till the date of its return. | ["Refund of advance…["Refund of advance payment", "Interest on delayed refund"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of Rs. 6 lakhs with interest for the advance payment made to Sobha Limited.", "respondent_claim": "Sobha Limited claimed that they had returned Rs. 5,50,000 by deducting Rs. 50,000 towards administrative charges.", "final_verdict": "The authority allowed the complaint in part and directed Sobha Limited to pay simple interest on Rs. 5,50,000 @ 2% above MCLR of SBI from the date of payment till the date of its return.", "in_favor_of_respondent": "no"} | Praveen Kumar PPraveen Kumar P | Sobha LimitedSobha Limited | Link |
CMP/UR/191118/00047…CMP/UR/191118/0004748 | KarnatakaKarnataka | Complaint filed for execution of order dated 17.0…Complaint filed for execution of order dated 17.08.2019 in complaint number CMP/190502/0002857. The complaint was dismissed with liberty to file petition/memo of calculation to execute the order. | ["Execution of orde…["Execution of order", "RERA Act"] | {"appellant_claim": "The complainant filed a comp…{"appellant_claim": "The complainant filed a complaint for execution of order dated 17.08.2019 in complaint number CMP/190502/0002857.", "respondent_claim": "The respondent did not appear in spite of service of notice.", "final_verdict": "The complaint was dismissed with liberty to file petition/memo of calculation to execute the order.", "in_favor_of_respondent": "no"} | Vyshyaraju Manikant…Vyshyaraju Manikanta Raju | Sobha LimitedSobha Limited | Link |
CMP/191006/0004376CMP/191006/0004376 | KarnatakaKarnataka | The complainant Association filed a complaint aga…The complainant Association filed a complaint against the respondent Sobha Ltd. for various issues related to the Sobha City project, including invalid occupancy certificates, incomplete property handover, and maintenance without conveyance. The Authority directed the respondent to take various steps to rectify the issues and comply with the RERA Act and Rules. | Invalid occupancy c…Invalid occupancy certificates, incomplete property handover, and maintenance without conveyance | {"appellant_claim": "The complainant Association …{"appellant_claim": "The complainant Association claimed that the respondent Sobha Ltd. had obtained invalid occupancy certificates for the Sobha City project, had not completed the property handover, and was collecting maintenance without conveyance.", "respondent_claim": "The respondent Sobha Ltd. claimed that the complainant Association was not a legally formed Association and that the occupancy certificates were valid.", "final_verdict": "The Authority directed the respondent to take various steps to rectify the issues and comply with the RERA Act and Rules.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190923/0004277CMP/190923/0004277 | KarnatakaKarnataka | Complainant Debabrata Pati filed a complaint agai…Complainant Debabrata Pati filed a complaint against Sobha Limited for refund of Rs. 1,50,000/- with interest. The complaint was allowed in part, and the developer was directed to pay interest from 1.7.2018 till 7.11.2019. | ["Refund with inter…["Refund with interest"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of Rs. 1,50,000/- with interest from the developer.", "respondent_claim": "The respondent claimed that the complainant had cancelled the booking within 15 days without any reasons and had deducted Rs. 50,000/- as per the booking form.", "final_verdict": "The complaint was allowed in part, and the developer was directed to pay interest from 1.7.2018 till 7.11.2019.", "in_favor_of_respondent": "no"} | Debabrata PatiDebabrata Pati | Sobha LimitedSobha Limited | Link |
CMP/190531/0003107CMP/190531/0003107 | KarnatakaKarnataka | Complainant sought refund with interest and compe…Complainant sought refund with interest and compensation for cancelled flat booking. Adjudicating Officer partly allowed the complaint, directing the developer to pay interest and costs. | ["Refund for cancel…["Refund for cancelled flat booking"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund with interest and compensation for cancelled flat booking.", "respondent_claim": "The developer claimed that they had returned the amount of Rs. 4,50,000/- to the complainant and deducted Rs. 50,000/- towards office expenses.", "final_verdict": "The Adjudicating Officer partly allowed the complaint, directing the developer to pay interest at the rate of 10.75% p.a. on Rs. 1,00,000/- and Rs. 4,00,000/- commencing from the date of respective payment till 16/07/2019, and also pay Rs. 5,000/- as cost of the petition.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190502/0002857CMP/190502/0002857 | KarnatakaKarnataka | Complainant sought refund of booking amount from …Complainant sought refund of booking amount from Sobha Limited. Adjudicating Officer directed developer to pay delay compensation and costs. | ["Refund of booking…["Refund of booking amount", "Delay compensation"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund of the booking amount paid to the developer.", "respondent_claim": "The developer claimed that the amount paid by the complainant was utilized and sought to forfeit Rs. 50,000 towards expenses.", "final_verdict": "The Adjudicating Officer directed the developer to pay delay compensation at the rate of 10.75% p.a. on Rs. 3,50,000 commencing from 30/07/2018 to 06/06/2019 and also pay Rs. 5000/- as cost of the petition.", "in_favor_of_respondent": "no"} | Vysyraju Manikantan…Vysyraju Manikantan Raju | Sobha LimitedSobha Limited | Link |
COP. 2530COP. 2530 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute through a joint memo, which was accepted by the Lok Adalat. The complaint was disposed off as closed. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that their claim had been fully satisfied and the complaint may be closed as settled out of court.", "respondent_claim": "The respondent claimed that the settlement arrived between them may be recorded before the Lok Adalat.", "final_verdict": "The Lok Adalat accepted the joint memo and settled the matter between the parties.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190225/0002263CMP/190225/0002263 | KarnatakaKarnataka | Shruthi SA filed a complaint against Sobha Limite…Shruthi SA filed a complaint against Sobha Limited for refund of Rs.18,90,000 with interest and damages. The complaint was allowed, and Sobha Limited was directed to pay interest and costs. | ["Refund", "Interes…["Refund", "Interest", "Damages"] | {"appellant_claim": "Shruthi SA claimed that Sobh…{"appellant_claim": "Shruthi SA claimed that Sobha Limited had not refunded the amount of Rs.18,90,000 despite cancelling the booking.", "respondent_claim": "Sobha Limited claimed that they had returned the amount of Rs.14,40,000 to Shruthi SA, but had deducted Rs.50,000 towards office expenses.", "final_verdict": "The complaint was allowed, and Sobha Limited was directed to pay interest at the rate of 10.75% pa on Rs.14,40,000 commencing from the date of payment till 02/05/2019. Sobha Limited was also directed to pay Rs.5000 as costs of the petition.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190315/0002219CMP/190315/0002219 | KarnatakaKarnataka | Complainant sought refund of booking amount for S…Complainant sought refund of booking amount for Sobha Dream ACRES project. Authority allowed complaint in part, directing developer to pay amount with interest. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount for Sobha Dream ACRES project, alleging delay in refund and deduction of unauthorized charges.", "respondent_claim": "Developer claimed deduction of administrative costs and bank charges as per terms and conditions.", "final_verdict": "Authority allowed complaint in part, directing developer to pay amount with interest calculated at 10.75% p.a. from date of payment.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190112/0001852CMP/190112/0001852 | KarnatakaKarnataka | The complainants sought relief for interest on de…The complainants sought relief for interest on delay period for not receiving possession of their flat from the respondent. The Authority allowed the complaint and directed the respondent to pay a sum of Rs.23,28,599/- towards delay period interest. | ["Interest on delay…["Interest on delay period"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they did not receive possession of their flat from the respondent within the agreed-upon time frame and sought interest on delay period.", "respondent_claim": "The respondent claimed that they had completed the construction of the flat and had obtained the necessary certificates, but the complainants were insisting on receiving the possession only upon receipt of the occupancy certificate.", "final_verdict": "The Authority allowed the complaint and directed the respondent to pay a sum of Rs.23,28,599/- towards delay period interest.", "in_favor_of_respondent": "no"} | Mrs. Rama PillaiMrs. Rama Pillai | Sobha LimitedSobha Limited | Link |
CMP/180823/0001171CMP/180823/0001171 | KarnatakaKarnataka | The complainant, Suresh Kumar T.S, filed a compla…The complainant, Suresh Kumar T.S, filed a complaint against Sobha Limited for refund of Rs. 10 Lacs paid for a flat in the Sobha Indraprastha project. The RERA authority directed the developer to return the amount within 30 days. | ["Refund of advance…["Refund of advance payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the developer had modified the unit number and super built-up area without consent and had not refunded the amount as per the RERA Act.", "respondent_claim": "The developer claimed that the amount was forfeited as per the agreement and that the complainant had no right to claim the refund.", "final_verdict": "The RERA authority directed the developer to return the amount of Rs. 10 Lacs within 30 days and pay a cost of Rs. 5,000/-.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/180809/0001127CMP/180809/0001127 | KarnatakaKarnataka | Complainant Vipin Mothayil Surendran filed a comp…Complainant Vipin Mothayil Surendran filed a complaint against Sobha Limited for not refunding the booking amount of Rs. 5,00,000/- in full. The matter was settled between the parties and the complaint was closed. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid a booking amount of Rs. 5,00,000/- for an apartment in Sobha Avenue and had cancelled the booking within 10 days. He claimed that he was entitled to a full refund of the amount.", "respondent_claim": "The respondent claimed that they had deducted an administrative cost of Rs. 50,000/- from the refund amount and had not provided a clear date for the refund.", "final_verdict": "The complaint was closed on account of a memo of settlement sent by the parties, in which it was stated that the respondent had refunded the amount of Rs. 5,00,000/- to the complainant.", "in_favor_of_respondent": "no"} | Vipin Mothayil Sure…Vipin Mothayil Surendran | Sobha LimitedSobha Limited | Link |
CMP/181126/0001673CMP/181126/0001673 | KarnatakaKarnataka | Complaint filed by Smt. Jwalamalini Chandrakant a…Complaint filed by Smt. Jwalamalini Chandrakant against Sobha Limited for refund of booking amount. Case settled with payment of Rs. 1,00,000/- to the complainant. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Refund of booking amount of …{"appellant_claim": "Refund of booking amount of Rs. 1,00,000/-", "respondent_claim": "Payment of Rs. 1,00,000/- towards full and final settlement", "final_verdict": "Case settled with payment of Rs. 1,00,000/- to the complainant", "in_favor_of_respondent": "no"} | Smt. Jwalamalini Ch…Smt. Jwalamalini Chandrakant | Sobha LimitedSobha Limited | Link |
CMP/1808080001121CMP/1808080001121 | KamatakaKamataka | Complainant booked an apartment in Sobha Dreams A…Complainant booked an apartment in Sobha Dreams Acres, but had to cancel due to unforeseen reasons. Builder refused to refund the advance payment until the unit was resold to a new customer. Complainant filed a complaint with RERA, but later withdrew it after the builder refunded the amount. | ["Refund of advance…["Refund of advance payment", "RERA complaint"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the builder refused to refund the advance payment until the unit was resold to a new customer.", "respondent_claim": "The respondent claimed that the complainant had cancelled the booking due to unforeseen reasons and was not entitled to a refund.", "final_verdict": "The complaint was withdrawn by the complainant after the builder refunded the advance payment.", "in_favor_of_respondent": "no"} | Sarthak SaranSarthak Saran | Sobha LimitedSobha Limited | Link |
CMP/200604/0005959CMP/200604/0005959 | KarnatakaKarnataka | Complainant sought refund of booking amount and c…Complainant sought refund of booking amount and compensation for cancellation of flat booking due to financial difficulties. Adjudicating Officer directed respondent to refund booking amount without interest and pay cost of Rs. 5,000/-. | ["Refund of booking…["Refund of booking amount", "Compensation for cancellation of flat booking"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount of Rs. 4,00,000/- and compensation for cancellation of flat booking due to financial difficulties.", "respondent_claim": "Respondent claimed that complainant had cancelled the booking of flat on his own without default on the part of the respondent and was entitled to forfeit the booking amount.", "final_verdict": "Adjudicating Officer directed respondent to refund booking amount of Rs. 4,00,000/- without interest and pay cost of Rs. 5,000/-.", "in_favor_of_respondent": "no"} | Yograj ShindeYograj Shinde | Sobha LimitedSobha Limited | Link |
118-371118-371 | Not providedNot provided | The complaint was settled between the parties in …The complaint was settled between the parties in terms of a joint memo, and the complaint is closed as the settlement is just and proper. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was settled between the parties in terms of a joint memo, and the complaint is closed as the settlement is just and proper.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
75-1875-18 | Not providedNot provided | The complainant and respondent settled the disput…The complainant and respondent settled the dispute through a joint memo, and the complaint was closed as it was settled in terms of the joint memo. | ["Settlement", "Dis…["Settlement", "Dispute"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was closed as it was settled in terms of the joint memo.", "in_favor_of_respondent": "no"} | Sri.Vijaykumar S Ha…Sri.Vijaykumar S Harakuni | Sobha LimitedSobha Limited | Link |
CMP/210210/0007611CMP/210210/0007611 | KarnatakaKarnataka | The complainants, Mrs. Vidya Preethi and Mr. Rama…The complainants, Mrs. Vidya Preethi and Mr. Ramakrishna BK, filed a complaint against Sobha Limited for refund of booking amount for a flat they had booked. The Adjudicating Officer partly allowed the complaint and directed Sobha Limited to repay the balance booking amount. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had booked a flat in Sobha Limited's project and had paid a booking amount of Rs. 5,50,000. They claimed that they had cancelled the booking due to financial difficulties and sought refund of the booking amount.", "respondent_claim": "Sobha Limited claimed that the complainants had cancelled the booking without any fault on their part and that the booking amount was liable to be forfeited.", "final_verdict": "The Adjudicating Officer partly allowed the complaint and directed Sobha Limited to repay the balance booking amount of Rs. 95,389/- to the complainants.", "in_favor_of_respondent": "no"} | Mr. Ramakrishna BKMr. Ramakrishna BK | Sobha LimitedSobha Limited | Link |
CMP/201204/0007012CMP/201204/0007012 | KarnatakaKarnataka | Complainant sought refund of booking amount and c…Complainant sought refund of booking amount and compensation for delay in refund. Respondent paid partial amount and forfeited administrative charges. Adjudicating Officer directed respondent to pay balance amount without interest. | ["Refund of booking…["Refund of booking amount", "Compensation for delay"] | {"appellant_claim": "Complainant alleged that res…{"appellant_claim": "Complainant alleged that respondent failed to refund booking amount in a timely manner and sought compensation for the delay.", "respondent_claim": "Respondent claimed that complainant had cancelled the booking on their own and that the booking amount was liable to be forfeited as per the agreement.", "final_verdict": "Adjudicating Officer directed respondent to pay balance booking amount of Rs. 50,000 without interest and to pay Rs. 5,000 as costs to the complainant.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
63336333 | Not providedNot provided | The complaint was settled between the parties thr…The complaint was settled between the parties through a joint memo, and the case was closed as per the terms of the settlement. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was settled between the parties through a joint memo, and the case was closed as per the terms of the settlement.", "in_favor_of_respondent": "no"} | Not providedNot provided | Sobha LimitedSobha Limited | Link |
CMP/200920/0006620CMP/200920/0006620 | KarnatakaKarnataka | Complainant sought refund of booking amount with …Complainant sought refund of booking amount with interest and damages for delay and unfair trade practice. Respondent refunded the amount, and the Adjudicating Officer directed payment of interest and costs. | ["Refund of booking…["Refund of booking amount", "Interest and damages"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund of the booking amount of Rs. 5,00,000 with interest and damages for delay and unfair trade practice.", "respondent_claim": "The respondent claimed that they had refunded the booking amount in full and final settlement of the claim.", "final_verdict": "The Adjudicating Officer directed the respondent to pay interest on the booking amount at the rate of 2% above the MCLR of SBI from the date of receipt of the amount till payment of the entire amount. The respondent was also directed to pay Rs. 5,000 as costs of the petition.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/200823/0006406CMP/200823/0006406 | KarnatakaKarnataka | The complainant, Priyanka Sharma, filed a complai…The complainant, Priyanka Sharma, filed a complaint against Sobha Limited for delay in refund of the blocking amount. The Adjudicating Officer partly allowed the complaint and directed Sobha Limited to pay the balance booking amount and compensation. | ["Delay in refund",…["Delay in refund", "Booking amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that Sobha Limited delayed the refund of the blocking amount and sought compensation.", "respondent_claim": "Sobha Limited claimed that the complainant cancelled the booking on her own and not due to fault on their part.", "final_verdict": "The Adjudicating Officer partly allowed the complaint and directed Sobha Limited to pay the balance booking amount and compensation.", "in_favor_of_respondent": "no"} | Priyanka SharmaPriyanka Sharma | Sobha LimitedSobha Limited | Link |
CMP/200626/0006075CMP/200626/0006075 | KarnatakaKarnataka | Complaint filed against Sobha Limited for refund …Complaint filed against Sobha Limited for refund of booking amount. Case withdrawn by complainant after receiving refund. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount from Sobha Limited.", "respondent_claim": "Developer Sobha Limited filed objection statements.", "final_verdict": "Case withdrawn by complainant after receiving refund.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
00605/000595700605/0005957 | KarnatakaKarnataka | Complaint filed for refund, later withdrawn after…Complaint filed for refund, later withdrawn after settlement with the respondent. | ["Refund dispute"]["Refund dispute"] | {"appellant_claim": "Refund for the amount paid",…{"appellant_claim": "Refund for the amount paid", "respondent_claim": "Not provided", "final_verdict": "Complaint withdrawn after settlement", "in_favor_of_respondent": "no"} | Not providedNot provided | Sobha LimitedSobha Limited | Link |
055/2005055/2005 | Not providedNot provided | The plaintiffs filed a claim against Sobha Limite…The plaintiffs filed a claim against Sobha Limited for return of money. The case was terminated as the plaintiffs received full payment. | ["Return of money"]["Return of money"] | {"appellant_claim": "The plaintiffs claimed that …{"appellant_claim": "The plaintiffs claimed that the developer, Sobha Limited, had not returned their money.", "respondent_claim": "Not provided", "final_verdict": "The case was terminated as the plaintiffs received full payment.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/200812/0005714CMP/200812/0005714 | Not providedNot provided | The plaintiffs filed a case against Sobha Limited…The plaintiffs filed a case against Sobha Limited, and a compromise application was brought. The plaintiffs received a check of Rs.75,000/- and the money due to them in connection with the dispute was paid in full. | ["Compromise applic…["Compromise application", "Dispute settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The plaintiffs received a check of Rs.75,000/- and the money due to them in connection with the dispute was paid in full.", "in_favor_of_respondent": "no"} | Not providedNot provided | Sobha LimitedSobha Limited | Link |
CMP/200221/0005492CMP/200221/0005492 | KarnatakaKarnataka | Complainant sought refund of Rs. 14,50,000 from S…Complainant sought refund of Rs. 14,50,000 from Sobha Limited. Case was withdrawn by complainant through email on 10/10/2020. | ["Refund", "Withdra…["Refund", "Withdrawal"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of Rs. 14,50,000 from Sobha Limited.", "respondent_claim": "Developer agreed to pay refund of Rs. 14,50,000.", "final_verdict": "Case was withdrawn by complainant through email on 10/10/2020.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
45/08/200202/000534745/08/200202/0005347 | Not providedNot provided | The case was terminated due to a compromise betwe…The case was terminated due to a compromise between the plaintiff and the defendant. The plaintiff received the complete payment and the case was closed. | ["Compromise", "Pay…["Compromise", "Payment"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was terminated due to a compromise between the plaintiff and the defendant. The plaintiff received the complete payment and the case was closed.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/2002U1/0005342CMP/2002U1/0005342 | KarnatakaKarnataka | Complaint filed by Sangeeta Nalatwad seeking refu…Complaint filed by Sangeeta Nalatwad seeking refund of amount paid to Sobha Limited. Complaint withdrawn after refund received. | ["Refund of amount …["Refund of amount paid to developer"] | {"appellant_claim": "Sangeeta Nalatwad claimed re…{"appellant_claim": "Sangeeta Nalatwad claimed refund of amount paid to Sobha Limited.", "respondent_claim": "Sobha Limited did not respond to the claim.", "final_verdict": "Complaint withdrawn after refund received.", "in_favor_of_respondent": "no"} | Sangeeta NalatwadSangeeta Nalatwad | Sobha LimitedSobha Limited | Link |
CMP/200129/0005307CMP/200129/0005307 | KarnatakaKarnataka | Complainant sought refund of Rs. 1,00,000/- from …Complainant sought refund of Rs. 1,00,000/- from developer Sobha Limited for a project called 'Sobha Valley View Heritage'. The Adjudicating Officer allowed the complaint in part, directing the developer to pay simple interest on Rs. 75,000/-. | ["Refund of booking…["Refund of booking amount", "Interest on refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid Rs. 1,00,000/- as a blocking amount for a project called 'Sobha Valley View Heritage' developed by Sobha Limited, but the amount was not refunded despite several requests.", "respondent_claim": "The respondent claimed that the complainant had paid Rs. 1 Lakh as a blocking amount, but not a booking amount. They returned Rs. 75,000/- to the complainant after deducting Rs. 25,000/- as administrative charges.", "final_verdict": "The Adjudicating Officer allowed the complaint in part, directing the developer to pay simple interest on Rs. 75,000/- @ 2% above the MCLR of SBI from the date of payment till the date of its return.", "in_favor_of_respondent": "no"} | Parashar BiswasParashar Biswas | Sobha LimitedSobha Limited | Link |
043/191220/0005033043/191220/0005033 | Not providedNot provided | The case was settled through compromise between t…The case was settled through compromise between the plaintiff and the developer, Sobha Limited. The plaintiff received the full amount due to him. | ["Compromise", "Set…["Compromise", "Settlement"] | {"appellant_claim": "The plaintiff claimed that h…{"appellant_claim": "The plaintiff claimed that he had not received the full amount due to him from the developer.", "respondent_claim": "The developer claimed that the plaintiff had received the full amount due to him.", "final_verdict": "The case was settled through compromise, and the plaintiff received the full amount due to him.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/191221/0004974CMP/191221/0004974 | KarnatakaKarnataka | The complainant sought refund of booking amount a…The complainant sought refund of booking amount and compensation for cancellation of flat booking. The respondent refunded part of the booking amount but deducted administrative cost. The adjudicating officer directed the respondent to refund the balance amount without interest. | ["Refund of booking…["Refund of booking amount", "Administrative cost"] | {"appellant_claim": "The complainant claimed refu…{"appellant_claim": "The complainant claimed refund of booking amount of Rs.6,50,000/- and compensation for cancellation of flat booking.", "respondent_claim": "The respondent claimed that the booking amount was liable to be forfeited as per the agreement and deducted administrative cost of Rs.50,000/-.", "final_verdict": "The adjudicating officer directed the respondent to refund the balance amount of Rs.50,000/- without interest within 60 days.", "in_favor_of_respondent": "no"} | Anjaneyulu Gourishe…Anjaneyulu Gourishetty | Sobha LimitedSobha Limited | Link |
CMP/191126/0004810CMP/191126/0004810 | KarnatakaKarnataka | The plaintiff sought refund of booking amount wit…The plaintiff sought refund of booking amount with interest. The case was terminated due to settlement between the parties. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed refund…{"appellant_claim": "The plaintiff claimed refund of booking amount with interest.", "respondent_claim": "Not provided", "final_verdict": "The case was terminated due to settlement between the parties.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/191115/0004727CMP/191115/0004727 | KarnatakaKarnataka | Complainant Sudhanva S. Shetty filed a complaint …Complainant Sudhanva S. Shetty filed a complaint against Sobha Limited for not refunding the amount after canceling the booking. The authority allowed the complaint in part and directed the developer to pay simple interest on the amount. | ["Refund of booking…["Refund of booking amount", "Interest on delayed payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid Rs. 2 lakhs as advance amount, but the developer failed to refund the amount after he canceled the booking.", "respondent_claim": "The developer claimed that they had returned Rs. 1,50,000/- to the complainant, but deducted Rs. 50,000/- as penalty for canceling the booking.", "final_verdict": "The authority allowed the complaint in part and directed the developer to pay simple interest on Rs. 1,50,000/- from the date of payment till 22/01/2020.", "in_favor_of_respondent": "no"} | Sudhanva S. ShettySudhanva S. Shetty | Sobha LimitedSobha Limited | Link |
CMP/191114/0004719CMP/191114/0004719 | KarnatakaKarnataka | Complainant sought refund of booking amount for a…Complainant sought refund of booking amount for apartment in Sobha Royal Phase 2. Adjudicating Officer directed developer to return amount with 2% interest if not paid within 60 days. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount for apartment in Sobha Royal Phase 2 due to personal medical expenses.", "respondent_claim": "Developer claimed that they could forfeit the booking amount as per clause 7.5 of the booking form.", "final_verdict": "Adjudicating Officer directed developer to return amount of Rs. 5,45,000 within 60 days with 2% interest if not paid on time.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/191111/0004679CMP/191111/0004679 | KarnatakaKarnataka | Complainant seeks delay compensation for non-deli…Complainant seeks delay compensation for non-delivery of flat within agreed time. Developer alleges non-payment of balance amount and seeks direction for registration of sale deed. | ["Delay compensatio…["Delay compensation", "Non-delivery of flat"] | {"appellant_claim": "Complainant seeks delay comp…{"appellant_claim": "Complainant seeks delay compensation for non-delivery of flat within agreed time.", "respondent_claim": "Developer alleges non-payment of balance amount and seeks direction for registration of sale deed.", "final_verdict": "Developer directed to give delay compensation and hand over possession of flat within 30 days. Complainant to pay balance amount and cooperate in executing sale deed.", "in_favor_of_respondent": "no"} | Vinay Kankaria JainVinay Kankaria Jain | Sobha LimitedSobha Limited | Link |
CMP/191106/0004640CMP/191106/0004640 | KarnatakaKarnataka | Complainant sought refund for flat booking cancel…Complainant sought refund for flat booking cancellation. Developer returned partial amount with deduction for administrative charges. Authority ordered interest payment for the remaining amount. | ["Flat booking canc…["Flat booking cancellation", "Refund dispute"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for flat booking cancellation and claimed the developer failed to return the full amount.", "respondent_claim": "Developer returned partial amount with deduction for administrative charges and claimed the complainant cancelled the booking within the due date.", "final_verdict": "Authority ordered the developer to pay simple interest on the remaining amount from the date of payment to the developer till the return.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/191104/0004619CMP/191104/0004619 | KarnatakaKarnataka | Complainant Manjunath H filed a complaint against…Complainant Manjunath H filed a complaint against Sobha Limited for refund of Rs. 1 lakh. The authority directed Sobha Limited to pay simple interest on Rs. 1,00,000/- @ 2% above the MCLR of 05.11.2017 till 23.01.2020. | ["Refund", "Interes…["Refund", "Interest"] | {"appellant_claim": "The complainant claimed a re…{"appellant_claim": "The complainant claimed a refund of Rs. 1 lakh paid as advance for a flat in Sobha Arena-The Plaza (Block 3) developed by Sobha Limited.", "respondent_claim": "The respondent claimed that they had returned Rs. 80,000/- to the complainant and deducted Rs. 20,000/- as administrative charges.", "final_verdict": "The authority directed Sobha Limited to pay simple interest on Rs. 1,00,000/- @ 2% above the MCLR of 05.11.2017 till 23.01.2020.", "in_favor_of_respondent": "no"} | Manjunath HManjunath H | Sobha LimitedSobha Limited | Link |
CMP/191104/0004618CMP/191104/0004618 | KarnatakaKarnataka | Complainant Amarnath Jadagouda filed a complaint …Complainant Amarnath Jadagouda filed a complaint against Sobha Limited for refund of booking amount. RERA allowed the complaint in part, directing Sobha Limited to pay interest on the refund amount. | ["Refund of booking…["Refund of booking amount", "Interest on refund amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that Sobha Limited had not refunded the booking amount of Rs. 4 lakhs despite cancellation of the flat booking.", "respondent_claim": "Sobha Limited claimed that the complainant had not executed the sale agreement and had cancelled the booking without proper reason.", "final_verdict": "RERA allowed the complaint in part, directing Sobha Limited to pay interest on the refund amount of Rs. 3.5 lakhs from 04/10/2018 till the date of payment.", "in_favor_of_respondent": "no"} | Amarnath JadagoudaAmarnath Jadagouda | Sobha LimitedSobha Limited | Link |
0182/190901/00041070182/190901/0004107 | KarnatakaKarnataka | Debabrata Pati filed a complaint against Sobha Li…Debabrata Pati filed a complaint against Sobha Limited for non-receipt of refund amount. The complaint was withdrawn by the plaintiff due to defect in the plaint. | ["Refund dispute"]["Refund dispute"] | {"appellant_claim": "Non-receipt of refund amount…{"appellant_claim": "Non-receipt of refund amount of 2 Lacs", "respondent_claim": "Not provided", "final_verdict": "Complaint withdrawn due to defect in the plaint", "in_favor_of_respondent": "no"} | Debabrata PatiDebabrata Pati | Sobha LimitedSobha Limited | Link |
CMP/191120/0004014CMP/191120/0004014 | KarnatakaKarnataka | Complainant sought refund of Rs. 4,00,000 paid to…Complainant sought refund of Rs. 4,00,000 paid to Sobha Limited for apartment booking. Adjudicating Officer directed Sobha Limited to return the amount with 2% interest if not paid within 60 days. | ["Refund for apartm…["Refund for apartment booking"] | {"appellant_claim": "Complainant claimed refund o…{"appellant_claim": "Complainant claimed refund of Rs. 4,00,000 paid to Sobha Limited for apartment booking, citing non-fulfillment of promises and lack of response from the developer.", "respondent_claim": "Sobha Limited claimed that the complainant had cancelled the booking and that they could forfeit the booking amount as per their terms.", "final_verdict": "Adjudicating Officer directed Sobha Limited to return the refund of Rs. 4,00,000 to the complainant within 60 days, with 2% interest if not paid within the stipulated time.", "in_favor_of_respondent": "no"} | VinodVinod | Sobha LimitedSobha Limited | Link |
CMP/190715/0003580CMP/190715/0003580 | KarnatakaKarnataka | Plaintiff sought refund of booking amount for SOB…Plaintiff sought refund of booking amount for SOBHA PALM COURT. Case closed due to defect in complaint and plaintiff's memo to withdraw. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "Plaintiff sought refund of b…{"appellant_claim": "Plaintiff sought refund of booking amount for SOBHA PALM COURT.", "respondent_claim": "Not provided", "final_verdict": "Case closed due to defect in complaint and plaintiff's memo to withdraw.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190622/000336CMP/190622/000336 | KarnatakaKarnataka | The plaintiff filed a complaint against Sobha Lim…The plaintiff filed a complaint against Sobha Limited for not refunding the booking amount for a cancelled apartment. The authority ruled in favor of the plaintiff, ordering Sobha to pay interest on the refund. | ["Refund for cancel…["Refund for cancelled apartment", "Interest on refund"] | {"appellant_claim": "The plaintiff claimed that S…{"appellant_claim": "The plaintiff claimed that Sobha did not refund the booking amount for a cancelled apartment, and sought interest on the refund.", "respondent_claim": "Sobha claimed that they had refunded the booking amount, minus a deduction for administrative costs, and that the plaintiff had not paid the statutory charges.", "final_verdict": "The authority ruled in favor of the plaintiff, ordering Sobha to pay interest on the refund.", "in_favor_of_respondent": "no"} | ShuklaShukla | Sobha LimitedSobha Limited | Link |
CMP/190610/0002334CMP/190610/0002334 | KarnatakaKarnataka | The plaintiff, Arun Kumar Nechlani, filed a compl…The plaintiff, Arun Kumar Nechlani, filed a complaint against Sobha Limited for refund of the booking amount paid for a flat in the Sobha Silicon Oasis project. The case was settled between the parties through Lok Adalat. | ["Refund of booking…["Refund of booking amount", "Lok Adalat settlement"] | {"appellant_claim": "The plaintiff claimed that h…{"appellant_claim": "The plaintiff claimed that he had paid a booking amount of Rs. 6,50,000 for a flat in the Sobha Silicon Oasis project and sought refund of the amount.", "respondent_claim": "The respondent, Sobha Limited, claimed that the plaintiff had cancelled the booking and sought refund of Rs. 50,000 only.", "final_verdict": "The case was settled between the parties through Lok Adalat, and the execution proceedings were closed as settled between the parties.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190206/0002063CMP/190206/0002063 | KarnatakaKarnataka | The plaintiff sought return of his booking amount…The plaintiff sought return of his booking amount from the developer, but the developer claimed to have already refunded the amount after deducting cancellation charges. The authority ordered the developer to pay the remaining amount to the plaintiff. | ["Return of booking…["Return of booking amount", "Cancellation charges"] | {"appellant_claim": "The plaintiff claimed that h…{"appellant_claim": "The plaintiff claimed that he had paid Rs. 105,000/- as booking amount, but the developer had not returned the amount after he cancelled the booking.", "respondent_claim": "The developer claimed that they had already refunded Rs. 47,640/- to the plaintiff after deducting cancellation charges of Rs. 50,000/-.", "final_verdict": "The authority ordered the developer to pay the remaining amount of Rs. 32,360/- to the plaintiff.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/190119/0001911CMP/190119/0001911 | KarnatakaKarnataka | The plaintiff booked an apartment in Sobha Forest…The plaintiff booked an apartment in Sobha Forest Edge and canceled the booking due to personal reasons. The developer forfeited Rs. 50,000 as cancellation charges, and the plaintiff sought refund of the booking amount with interest. | ["Cancellation char…["Cancellation charges", "Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer forfeited Rs. 50,000 as cancellation charges without any reason and sought refund of the booking amount with interest.", "respondent_claim": "The developer claimed that the plaintiff canceled the booking without any reason and forfeited Rs. 50,000 as cancellation charges as per the agreement deed.", "final_verdict": "The authority awarded Rs. 25,000 to be returned by the developer to the plaintiff, failing which simple interest at 10.19% from the 1st day.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link | |
CMP/180706/0001009CMP/180706/0001009 | KarnatakaKarnataka | The plaintiff, Avinash AS, filed a complaint agai…The plaintiff, Avinash AS, filed a complaint against Sobha Limited for not providing a promised flat unit and not refunding the booking amount. The case was settled by Sobha Limited paying the refund amount to the plaintiff. | ["Flat booking disp…["Flat booking dispute"] | {"appellant_claim": "The plaintiff claimed that S…{"appellant_claim": "The plaintiff claimed that Sobha Limited did not provide a promised flat unit and did not refund the booking amount despite several follow-up emails and reminders.", "respondent_claim": "The respondent claimed that they had appeared before the authority on 24.08.2018 and made the payment of the booking amount/earnest money of Rs. 6,00,000/- to the complainant by NEFT on 20.08.2018.", "final_verdict": "The case was settled by Sobha Limited paying the refund amount of Rs. 6,00,000/- to the plaintiff.", "in_favor_of_respondent": "no"} | Avinash ASAvinash AS | Sobha LimitedSobha Limited | Link |
3004 of 20193004 of 2019 | HaryanaHaryana | The complainant, Chander Shekhar Sachdeva, filed …The complainant, Chander Shekhar Sachdeva, filed a complaint against M/s Sobha Limited for delay in handing over possession of a residential plot. The Haryana Real Estate Regulatory Authority found that the respondent had failed to comply with the provisions of the Real Estate (Regulation and Development) Act, 2016, and ordered the respondent to pay interest at the prescribed rate for the delayed period. | ["Delay in possessi…["Delay in possession", "Non-compliance with RERA"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to hand over possession of the residential plot within the stipulated period and sought compensation for the delay.", "respondent_claim": "The respondent claimed that the delay was due to unforeseen circumstances and sought to justify the same.", "final_verdict": "The Haryana Real Estate Regulatory Authority found that the respondent had failed to comply with the provisions of the Real Estate (Regulation and Development) Act, 2016, and ordered the respondent to pay interest at the prescribed rate for the delayed period.", "in_favor_of_respondent": "no"} | Chander Shekhar Sac…Chander Shekhar Sachdeva | Sobha LimitedSobha Limited | Link |
CMP/180812/0001135CMP/180812/0001135 | KarnatakaKarnataka | Complaint filed for refund of amount payable to t…Complaint filed for refund of amount payable to the complainant. Developer paid the amount and the case was closed. | ["Refund of amount …["Refund of amount payable"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed a complaint for refund of the amount payable to him by the developer.", "respondent_claim(in detail)": "The developer paid the amount of Rs. 5,00,000 to the complainant and handed over a cheque.", "final_verdict(in detail)": "The case was closed as the dispute between the parties was resolved by returning the amount payable to the complainant.", "in_favor_of_respondent": "no"} | SOBHA LIMITEDSOBHA LIMITED | Link | |
804804 | Not providedNot provided | Mr. Keshav Murthy filed a case against SOBHA LIMI…Mr. Keshav Murthy filed a case against SOBHA LIMITED, but later settled for Rs. 4,00,000. The plaintiffs accepted the settlement subject to cashing a cheque. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The plaintiffs accepted the settlement of Rs. 4,00,000, subject to cashing a cheque.", "in_favor_of_respondent": "no"} | Mr. Keshav MurthyMr. Keshav Murthy | SOBHA LIMITEDSOBHA LIMITED | Link |
CMP/181110/0001620 …CMP/181110/0001620 and CMP/UR/190819/0003946 | KarnatakaKarnataka | The complainants filed complaints against Sobha D…The complainants filed complaints against Sobha Developers Ltd. for defects and deficiencies in the project 'Sobha City'. The Authority directed the respondent to register all blocks of the project under RERA, submit an application to BWSSB for providing water supply, and rectify the sale deed for one of the complainants. | Registration of pro…Registration of project under RERA, water supply, and rectification of sale deed | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had not registered the project under RERA, had not provided water supply, and had not rectified the defects in the project.", "respondent_claim": "The respondent claimed that the project was completed before RERA came into force and that they had provided all necessary facilities to the residents.", "final_verdict": "The Authority directed the respondent to register all blocks of the project under RERA, submit an application to BWSSB for providing water supply, and rectify the sale deed for one of the complainants.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Link |
Yearly Trend for these Cases
The analysis of the cases filed by SOBHA LIMITED that resulted in losses provides valuable insights into the primary disputes and legal challenges faced by the builder. A deeper look reveals several key themes under which these cases can be categorized.
Common triggers for litigation by SOBHA LIMITED appear to involve financial disputes, particularly concerning delays and refunds as well as delays in construction delivery attributed to external factors such as defaulters not making timely payments. Despite the builder often defending itself by claiming compliance and the fulfillment of terms, these cases collectively point toward a systematic pattern of disputes that could indicate underlying issues within project management and contract execution.
The common reasons leading to the builder's losses include insufficient evidence to substantiate claims, non-compliance with legal obligations, misunderstanding the contractual terms, and failures to follow through with interim requirements. Overall, these trends reveal not only the challenges faced by SOBHA LIMITED but also serve as cautionary tales for potential buyers and other stakeholders in the real estate market.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
618/2022618/2022 | KarnatakaKarnataka | The complaint was referred to Lok-Adalat for amic…The complaint was referred to Lok-Adalat for amicable settlement. The parties filed a joint memo stating that the matter had been settled between them. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "Not specified", "respondent_…{"appellant_claim": "Not specified", "respondent_claim": "Not specified", "final_verdict": "The complaint was disposed off in terms of the joint memo filed by the parties.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/191113/0004CMP/191113/0004 | KarnatakaKarnataka | Complaint filed by Babita Tomar against Sobha Lim…Complaint filed by Babita Tomar against Sobha Limited for refund of amount with interest. Case dismissed due to non-prosecution by the complainant. | ["Refund of amount …["Refund of amount with interest"] | {"appellant_claim": "Refund of entire amount with…{"appellant_claim": "Refund of entire amount with interest", "respondent_claim": "Not provided", "final_verdict": "Case dismissed due to non-prosecution by the complainant", "in_favor_of_respondent": "yes"} | Babita TomarBabita Tomar | Sobha LimitedSobha Limited | Link |
CMP/190718/0003635CMP/190718/0003635 | KarnatakaKarnataka | Arup Das filed a complaint against Sobha Limited …Arup Das filed a complaint against Sobha Limited for refund of earnest money and cancellation of flat booking. Sobha Limited refunded the amount after deducting administrative costs and claimed that Arup Das had not responded to their notice regarding breach of contract. | ["Refund of earnest…["Refund of earnest money", "Cancellation of flat booking"] | {"appellant_claim": "Arup Das claimed that he had…{"appellant_claim": "Arup Das claimed that he had booked a flat in Sobha Dream Acres and paid Rs. 4,00,000 as earnest money. He requested refund of the amount and cancellation of the booking due to personal reasons.", "respondent_claim": "Sobha Limited claimed that Arup Das had booked the flat and paid the earnest money as per the terms and conditions of the unit application. They refunded the amount after deducting administrative costs of Rs. 50,009.", "final_verdict": "The complaint was terminated as Arup Das had not responded to Sobha Limited's notice regarding breach of contract. Sobha Limited was found to have refunded the earnest money as per the terms and conditions of the unit application.", "in_favor_of_respondent": "yes"} | Arup DasArup Das | Sobha LimitedSobha Limited | Link |
CMP/190713/0003384CMP/190713/0003384 | KarnatakaKarnataka | The plaintiff RASHMI filed a complaint against th…The plaintiff RASHMI filed a complaint against the developer SOBHA HRC PRISTINE PHASE 1 BLOCK 1 seeking a refund of the booking amount. The complaint was dismissed due to an email sent by the plaintiff dated 07/01/2019. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer had not refunded the booking amount and sought the refund through the complaint.", "respondent_claim": "The respondent claimed that the plaintiff had already received the refund and therefore the complaint was not justified.", "final_verdict": "The complaint was dismissed due to the email sent by the plaintiff dated 07/01/2019, which stated that the plaintiff had received the refund and the complaint could be closed.", "in_favor_of_respondent": "yes"} | RASHMIRASHMI | Sobha LimitedSobha Limited | Link |
0110/190115/00018760110/190115/0001876 | KarnatakaKarnataka | Plaintiff VAIBHAV KOLHE filed a suit under Sectio…Plaintiff VAIBHAV KOLHE filed a suit under Section 31 of the RERA Act against Sobha Limited for return of advance money. The case was terminated amicably after Sobha Limited submitted a memo stating they had already paid the advance amount. | ["Return of advance…["Return of advance money"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that they had given Rs.1,00,000/- as advance money for a flat, but the developer had not returned the money.", "respondent_claim": "The developer claimed that they had already paid the advance amount due to the plaintiff.", "final_verdict": "The case was terminated amicably after Sobha Limited submitted a memo stating they had already paid the advance amount.", "in_favor_of_respondent": "yes"} | VAIBHAV KOLHEVAIBHAV KOLHE | Sobha LimitedSobha Limited | Link |
CMP/181025/0001493CMP/181025/0001493 | KarnatakaKarnataka | Complaint against developer Sobha Limited for not…Complaint against developer Sobha Limited for not refunding booking amount. Case settled as plaintiff consented to dismissal after developer made payment and provided memo. | ["Refund dispute"]["Refund dispute"] | {"appellant_claim": "Plaintiff claimed that Sobha…{"appellant_claim": "Plaintiff claimed that Sobha Limited did not refund the booking amount of Rs. 51,00,000.", "respondent_claim": "Sobha Limited claimed that they had made the payment and provided a memo.", "final_verdict": "The case was dismissed as the plaintiff consented to dismissal after Sobha Limited made the payment and provided a memo.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Plaintiff (not spec…Plaintiff (not specified by name) | Link |
Appeal No. 58 of 20…Appeal No. 58 of 2022 | HaryanaHaryana | The appellant, M/s Sobha Limited, filed an appeal…The appellant, M/s Sobha Limited, filed an appeal against the order of the Haryana Real Estate Regulatory Authority, seeking modification of the impugned order. The appeal was partly allowed, and the impugned order was modified accordingly. | ["Real Estate", "Ap…["Real Estate", "Appellate Tribunal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had sought compensation for delayed possession charges at the rate of Rs.10/- per sq. ft. amounting to Rs.6,63,698/- along with pendente lite and future interest @ 12% p.a. in accordance with the terms and conditions of the agreement.", "respondent_claim": "The respondent claimed that the appellant had delayed the possession of the flat and sought compensation for the same.", "final_verdict": "The appeal was partly allowed, and the impugned order was modified accordingly. The appellant was directed to deposit the amount of Rs.61,37,516/- with the tribunal, and the same was to be remitted to the learned Authority.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Mr. Arun Kumar Bala…Mr. Arun Kumar Balavachil | Link |
Yearly Trend for these Cases
An analysis of the cases filed by the builder, SOBHA LIMITED, which it won, revealed the following information. The disputes can be grouped into several key themes that highlight the primary areas of contention between SOBHA LIMITED and various respondents.
Common triggers for these litigations often stem from buyers' misunderstandings or misinterpretations of delivery schedules, regulatory requirements, and contractual obligations. This pattern suggests that many disputes may arise from a lack of information or transparency during the purchase process.
SOBHA LIMITED often won these cases due to several reasons, including insufficient evidence presented by the opposing parties, non-compliance with legal or regulatory requirements by the claimants, and the ambiguity or lack of clarity in the claims made by the homebuyers. The builder was adept in defending itself against exaggerated claims or false accusations, underscoring its strength in legal matters pertaining to real estate.
This analysis reflects positively on the builder's reputation within the broader real estate market. It illustrates the reality that buyers can sometimes make unfounded accusations against builders, which leads to necessary legal actions. However, SOBHA LIMITED has established a robust track record for effectively defending itself from such claims.
For potential buyers, this serves as a crucial reminder to conduct thorough research and make informed decisions. While legitimate disputes exist within the real estate sector, the experience of SOBHA LIMITED in successfully addressing and disputing accusations provides insight into the builder’s reliability. As consumers, it is essential to appreciate the complexities of such allegations and seek credible information when evaluating a builder's reputation.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
CMP/181110/0001620CMP/181110/0001620 | KarnatakaKarnataka | The complainant sought relief for defects and def…The complainant sought relief for defects and deficiencies in the project 'Sobha City' developed by 'Sobha Developers Ltd.' The authority partly allowed the complaint, directing the respondent to register all blocks of Sobha City under RERA and provide water supply for the entire project. | Registration of pro…Registration of project under RERA and provision of water supply | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to provide defects and deficiencies in the project, including registration under RERA.", "respondent_claim": "The respondent claimed that the project was completed before RERA came into force and therefore not required to be registered.", "final_verdict": "The authority partly allowed the complaint, directing the respondent to register all blocks of Sobha City under RERA and provide water supply for the entire project.", "in_favor_of_respondent": "no"} | Sri. Amrit ThomasSri. Amrit Thomas | Sobha LimitedSobha Limited | Link |
00203/202400203/2024 | KarnatakaKarnataka | The complaint was settled amicably between the pa…The complaint was settled amicably between the parties, and the Lok Adalat accepted the joint memo as the settlement agreement. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent had failed to provide a satisfactory solution to the dispute.", "respondent_claim": "The respondent claimed that the appellant had failed to provide sufficient information to resolve the dispute.", "final_verdict": "The Lok Adalat accepted the joint memo as the settlement agreement, and the complaint was disposed of accordingly.", "in_favor_of_respondent": "no"} | Sigma DasSigma Das | Sobha LimitedSobha Limited | Link |
CMP/200907/0006529CMP/200907/0006529 | Not providedNot provided | The plaintiff, Sobha Limited, received a check fo…The plaintiff, Sobha Limited, received a check for Rs. 12450,000/- and the case was terminated as the contract was paid in full. | ["Contract payment"]["Contract payment"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that they had not received the full amount due to them.", "respondent_claim": "The respondent claimed that the plaintiff had received the full amount.", "final_verdict": "The case was terminated as the contract was paid in full.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Not providedNot provided | Link |
Appeal No. 649 of 2…Appeal No. 649 of 2021 | HaryanaHaryana | The appellant, M/s Sobha Limited, filed an appeal…The appellant, M/s Sobha Limited, filed an appeal against the impugned order dated 16.09.2021 passed by the Haryana Real Estate Regulatory Authority, Gurugram. The appeal was partly allowed, and the impugned order was modified to the extent that the appellant shall pay delay possession interest w.e.f. 22.11.2016, the due date of delivery of possession, till 04.09.2017 i.e. two months after the copy of the occupation certificate was supplied to the respondent allottee. | ["Delay possession …["Delay possession interest"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent allottee had not taken possession of the unit within the agreed-upon time frame and that the respondent allottee was entitled to delay possession interest.", "respondent_claim": "The respondent allottee claimed that the appellant had not completed the construction of the unit within the agreed-upon time frame and that the respondent allottee was not entitled to delay possession interest.", "final_verdict": "The appeal was partly allowed, and the impugned order was modified to the extent that the appellant shall pay delay possession interest w.e.f. 22.11.2016, the due date of delivery of possession, till 04.09.2017 i.e. two months after the copy of the occupation certificate was supplied to the respondent allottee.", "in_favor_of_respondent": "no"} | Sobha LimitedSobha Limited | Chander Shekhar Sac…Chander Shekhar Sachdeva | Link |
Yearly Trend for these Cases
An analysis of the cases filed against SOBHA LIMITED, which the builder won, revealed the following information. The disputes can be grouped under several common themes, reflecting the nature of complaints often raised by buyers and the outcomes in favor of the builder.
The common reasons these cases were brought to court generally included contesting perceived penalties, misinterpretations of agreements, or requests for refunds that the plaintiffs felt were not honored. Patterns indicate that many misunderstandings or false expectations led to legal actions.
The builder's success in these cases stems from presenting strong defenses where evidence of adequate refunds, compliance with regulations, and procedural adherence by the builder was clear. In many situations, the opposing parties lacked sufficient documentation or failed to follow proper legal procedures.
This analysis speaks volumes about SOBHA LIMITED's reputation in the real estate market. It is evident that while buyers may have legitimate grievances, there are instances where claims are unfounded, leading to unnecessary legal conflicts. The builder has showcased a strong record in defending against unjust claims, highlighting a commitment to legal and professional standards.
In conclusion, potential buyers are advised to conduct thorough due diligence and seek reliable information before forming opinions about a builder's reputation. While disputes are a reality in the real estate market, cases like these illustrate that reputable builders such as SOBHA LIMITED often navigate these challenges effectively. Buyers should approach claims with a discerning eye to make informed decisions.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
180/2021180/2021 | KeralaKerala | The complainant, Kuriachan Vamattathil Kuriakose,…The complainant, Kuriachan Vamattathil Kuriakose, filed a complaint against Sobha Limited for delay in handing over possession of a villa and registration of the property. The Authority dismissed the complaint, finding that the respondent had completed and handed over possession of the villa within the prescribed period. | Delay in possession…Delay in possession and registration of property | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed handing over possession of the villa and registration of the property, and sought compensation for the same.", "respondent_claim": "The respondent claimed that they had completed and handed over possession of the villa within the prescribed period, and that the delay was caused by the complainant's own actions.", "final_verdict": "The Authority dismissed the complaint, finding that the respondent had completed and handed over possession of the villa within the prescribed period.", "in_favor_of_respondent": "yes"} | Kuriachan Vamattath…Kuriachan Vamattathil Kuriakose | Sobha LimitedSobha Limited | Link |
MP/00238/2024MP/00238/2024 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably before the Lok Adalat. The complainant received a total of Rs. 10,00,000 as full and final settlement. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed an u…{"appellant_claim": "The complainant claimed an unspecified amount for a dispute related to real estate.", "respondent_claim": "The respondent, Sobha Limited, claimed that the dispute was settled amicably and that the complainant received a total of Rs. 10,00,000 as full and final settlement.", "final_verdict": "The Lok Adalat accepted the settlement entered between the parties and disposed of the complaint as per the joint memo.", "in_favor_of_respondent": "yes"} | Muddu Prasad VMuddu Prasad V | Sobha LimitedSobha Limited | Link |
101 15 3/43101 15 3/43 | KarnatakaKarnataka | The complainants and respondent have settled the …The complainants and respondent have settled the dispute amicably. The complainants have agreed to pay Rs.97,14,269 to the respondent. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainants have claime…{"appellant_claim": "The complainants have claimed an amount against the respondent.", "respondent_claim": "The respondent has claimed that the complainants have not paid the amount due.", "final_verdict": "The complainants have agreed to pay Rs.97,14,269 to the respondent.", "in_favor_of_respondent": "yes"} | AnotherAnother | Sobha LimitedSobha Limited | Link |
00191/202300191/2023 | KarnatakaKarnataka | The complainants and respondent jointly settled t…The complainants and respondent jointly settled the complaint amicably before the Lok-Adalat. The complainants accepted a fresh car parking slot in favor of the respondent. | ["Car Parking Slot"]["Car Parking Slot"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had not allotted a car parking slot nearest to the lift as promised.", "respondent_claim": "The respondent claimed that the complainants had accepted a fresh car parking slot in favor of the respondent.", "final_verdict": "The complainants accepted a fresh car parking slot in favor of the respondent, and the complaint was settled amicably.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
00156/202300156/2023 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably in Lok-Adalat, with the complainant receiving Rs. 30,000 as full and final settlement. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed an u…{"appellant_claim": "The complainant claimed an unspecified amount for a dispute related to the subject matter of the complaint.", "respondent_claim": "The respondent claimed that the complainant's claim was being fully satisfied and that the complainant had no further claims against the respondent.", "final_verdict": "The Lok-Adalat disposed of the complaint as per the joint memo, with the complainant receiving Rs. 30,000 as full and final settlement.", "in_favor_of_respondent": "yes"} | Mrudula VijayendraMrudula Vijayendra | Sobha LimitedSobha Limited | Link |
CMP/221012/0010087CMP/221012/0010087 | KarnatakaKarnataka | Complaint filed against Sobha Limited for incorre…Complaint filed against Sobha Limited for incorrect UDS value in property description. Complainant later withdrew the complaint as the issue was resolved by the District Registrar. | ["Incorrect UDS val…["Incorrect UDS value"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had entered an incorrect UDS value in the property description.", "respondent_claim": "The respondent did not provide a claim in the judgment.", "final_verdict": "The complaint was closed as not pressed by the complainant.", "in_favor_of_respondent": "yes"} | Not providedNot provided | Sobha LimitedSobha Limited | Link |
CMP/220829/0009955CMP/220829/0009955 | KarnatakaKarnataka | The complainants and respondent settled their dis…The complainants and respondent settled their dispute amicably before the Lok Adalat. The complaint stands disposed of as per the joint memo. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainants claimed a d…{"appellant_claim": "The complainants claimed a dispute with the respondent regarding an issue related to real estate.", "respondent_claim": "The respondent claimed that the dispute had been settled amicably between the parties.", "final_verdict": "The complaint stands disposed of as per the joint memo and joint memo is ordered to be treated as part and partial of the award.", "in_favor_of_respondent": "yes"} | Abhishek Sudhir KiniAbhishek Sudhir Kini | Sobha LimitedSobha Limited | Link |
CMP/220512/0009454CMP/220512/0009454 | KarnatakaKarnataka | The complainant and respondent settled their disp…The complainant and respondent settled their dispute amicably before the Lok Adalat. The complaint was disposed of as per the joint memo filed by the parties. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant had a disput…{"appellant_claim": "The complainant had a dispute with the respondent regarding an issue related to the subject matter of the complaint.", "respondent_claim": "The respondent claimed that the complainant's dispute was settled amicably before the Lok Adalat.", "final_verdict": "The complaint was disposed of as per the joint memo filed by the parties.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
0 A. 82320 A. 8232 | Not providedNot provided | The complaint was settled out of court between th…The complaint was settled out of court between the parties. The respondent paid the complainant Rs. 12,72,964/- as full and final settlement of the claim amount. | ["Settlement"]["Settlement"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had not paid the full amount of the claim.", "respondent_claim": "The respondent claimed that the amount paid was full and final settlement of the claim.", "final_verdict": "The Lok Adalat accepted the joint memo filed by both parties and settled the matter as per the terms of the memo.", "in_favor_of_respondent": "yes"} | Jajit MenonJajit Menon | Sobha LimitedSobha Limited | Link |
CMP/200901/0006489CMP/200901/0006489 | KarnatakaKarnataka | Complainant alleged fraudulent practice by respon…Complainant alleged fraudulent practice by respondent for not providing discount as promised. Respondent claimed the discount was already given and the complainant owed additional payment. | ["Discount dispute"…["Discount dispute", "Payment dispute"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent had promised a discount of 5% on the total consideration, but only provided a discount of 1%. The complainant claimed that they had paid 93% of the total consideration and therefore owed no further payment.", "respondent_claim": "The respondent claimed that the discount of 1% was already given and that the complainant owed an additional payment of Rs. 4,45,732.55 due to an error in the software accounting programme.", "final_verdict": "The Authority concluded that the complainant was not entitled to any relief and the complaint was dismissed.", "in_favor_of_respondent": "yes"} | Sri Kuzhivelli Thom…Sri Kuzhivelli Thomas Mathew | Sobha LimitedSobha Limited | Link |
CMP/191121/0004781CMP/191121/0004781 | KarnatakaKarnataka | The complainant and respondent jointly submitted …The complainant and respondent jointly submitted that the dispute was settled amicably before the Lok Adalat. The Lok Adalat accepted the settlement and disposed of the complaint. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the dispute was not settled amicably.", "respondent_claim": "The respondent claimed that the dispute was settled amicably.", "final_verdict": "The Lok Adalat accepted the settlement entered between the parties and disposed of the complaint.", "in_favor_of_respondent": "yes"} | Durga Prasad KhuntiaDurga Prasad Khuntia | Sobha LimitedSobha Limited | Link |
CMP/190820/0003833CMP/190820/0003833 | KarnatakaKarnataka | Complainant Hemalatha Vhavale Jaganath filed a co…Complainant Hemalatha Vhavale Jaganath filed a complaint against Sobha Limited for refund of Rs. 5,60,000 paid as booking amount. The complaint was dismissed as the complainant had received a cheque for Rs. 5,10,000. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had paid Rs. 5,60,000 as booking amount for a flat in Sobha Palm Court, but the developer had not refunded the amount despite her cancellation of the booking.", "respondent_claim": "The developer claimed that the complainant had booked the flat and then shifted to a different unit, and that the complainant had not executed the fresh unit application form. The developer stated that they had returned Rs. 5,10,000 to the complainant through a cheque.", "final_verdict": "The complaint was dismissed as the complainant had received a cheque for Rs. 5,10,000.", "in_favor_of_respondent": "yes"} | Hemalatha Vhavale J…Hemalatha Vhavale Jaganath | Sobha LimitedSobha Limited | Link |
CMP/190712/0003552CMP/190712/0003552 | KarnatakaKarnataka | Complaint filed against Sobha Limited for refund …Complaint filed against Sobha Limited for refund of booking amount. Complainant continuously absent for hearings, complaint dismissed. | ["Refund of booking…["Refund of booking amount", "Complainant absence"] | {"appellant_claim": "Refund of booking amount for…{"appellant_claim": "Refund of booking amount for Sobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 447", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed for continuous absence of complainant", "in_favor_of_respondent": "yes"} | Majid AhmedMajid Ahmed | Sobha LimitedSobha Limited | Link |
CMP/190605/0003240CMP/190605/0003240 | KarnatakaKarnataka | Complainant filed complaint against Sobha Limited…Complainant filed complaint against Sobha Limited for not providing open car parking as promised in brochure. Adjudicating Officer dismissed complaint as not maintainable. | ["Open car parking"…["Open car parking", "RERA complaint"] | {"appellant_claim": "Complainant claimed that Sob…{"appellant_claim": "Complainant claimed that Sobha Limited did not provide open car parking as promised in brochure and sought compensation.", "respondent_claim": "Sobha Limited claimed that complainant had already satisfied his concerns in previous complaint and that Wing 12 was not covered by RERA Act.", "final_verdict": "Adjudicating Officer dismissed complaint as not maintainable.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/180914/0001272CMP/180914/0001272 | KarnatakaKarnataka | Complainant Saumitra Bhaumik booked an apartment …Complainant Saumitra Bhaumik booked an apartment in Sobha Dream Acres but had to cancel the booking. He sought refund from the developer, which was eventually provided. | ["Refund dispute"]["Refund dispute"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had booked an apartment in Sobha Dream Acres and paid a booking advance of Rs. 1 lakh. He later had to cancel the booking and sought refund from the developer.", "respondent_claim": "The developer claimed that they had provided the complainant with a cheque for the refund amount of Rs. 1 lakh.", "final_verdict": "The complaint was closed as the complainant had received the full amount from the developer and the matter was settled.", "in_favor_of_respondent": "yes"} | Saumitra BhaumikSaumitra Bhaumik | Sobha LimitedSobha Limited | Link |
CMP/180913/0001265CMP/180913/0001265 | KarnatakaKarnataka | Complaint filed by Samineni Ramesh against Sobha …Complaint filed by Samineni Ramesh against Sobha Limited for non-refund of cancelled flat. Developer claimed refund was made, and parties settled the dispute. | ["Refund for cancel…["Refund for cancelled flat"] | {"appellant_claim": "Not received refund for canc…{"appellant_claim": "Not received refund for cancelled flat despite multiple follow-ups.", "respondent_claim": "Refund was made on 04 October 2018, and evidence provided.", "final_verdict": "Complaint closed due to settlement between parties.", "in_favor_of_respondent": "yes"} | Samineni RameshSamineni Ramesh | Sobha LimitedSobha Limited | Link |
CMP/180423/0000771CMP/180423/0000771 | KarnatakaKarnataka | The complainant sought various reliefs, including…The complainant sought various reliefs, including interest on delay period, completion certificate, execution of sale deed, and reimbursement of expenses. The authority dismissed the complaint, finding that the complainant was not entitled to any of the reliefs claimed. | ["Real Estate", "RE…["Real Estate", "RERA"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the execution of the sale deed and sought various reliefs, including interest on delay period, completion certificate, execution of sale deed, and reimbursement of expenses.", "respondent_claim": "The respondent claimed that the complainant was not entitled to any of the reliefs claimed and that the delay in execution of the sale deed was due to the complainant's own convenience.", "final_verdict": "The authority dismissed the complaint, finding that the complainant was not entitled to any of the reliefs claimed.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
Ano.cmp/ 190904 /00…Ano.cmp/ 190904 /0004121 | KarnatakaKarnataka | The complainant sought refund for a false promise…The complainant sought refund for a false promise made by the developer regarding the construction of a club house. The authority dismissed the complaint as the complainant had already taken the sale deed and was enjoying the club house. | ["False promise", "…["False promise", "Refund"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the developer made a false promise regarding the construction of a club house and sought refund for the amount paid.", "respondent_claim": "The developer claimed that the complainant was a habitual litigant and was misusing the object and purpose of RERA Act and Rules.", "final_verdict": "The authority dismissed the complaint as the complainant had already taken the sale deed and was enjoying the club house.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/201022/0006120CMP/201022/0006120 | KarnatakaKarnataka | Complainant sought refund of booking amount and c…Complainant sought refund of booking amount and compensation for delay in refund. Case dismissed as complainant received full and final settlement of Rs. 9,50,000/-. | ["Refund of booking…["Refund of booking amount", "Compensation for delay"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of booking amount of Rs. 10,00,000/- and compensation for delay in refund.", "respondent_claim": "Respondent claimed that complainant cancelled booking voluntarily without fault and was entitled to forfeit booking amount.", "final_verdict": "Case dismissed as complainant received full and final settlement of Rs. 9,50,000/-.", "in_favor_of_respondent": "yes"} | Mr. Bijoy PMr. Bijoy P | Sobha LimitedSobha Limited | Link |
CMP/200202/0005352CMP/200202/0005352 | KarnatakaKarnataka | Complainant sought refund of Rs. 3 lakh paid to d…Complainant sought refund of Rs. 3 lakh paid to developer for flat booking. Developer returned Rs. 2.5 lakh after complaint filed. Complainant did not appear for hearing despite being called. | ["Refund for flat b…["Refund for flat booking"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of Rs. 3 lakh paid to developer for flat booking.", "respondent_claim": "Developer claimed that complainant had accepted the refund of Rs. 2.5 lakh and did not appear for hearing.", "final_verdict": "Complaint dismissed for non-prosecution.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
14, Nelamajada, Sal…14, Nelamajada, Salbar Jubilee COAL Banga 3rd Cas, Mission Road, Bangalore-160827 | KarnatakaKarnataka | The plaintiff filed a complaint against the devel…The plaintiff filed a complaint against the developer Sobha Limited for refund of payment. The developer refunded the amount in full and final settlement, and the complaint was dismissed. | ["Refund of payment…["Refund of payment"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer had not refunded the payment despite several requests.", "respondent_claim": "The developer claimed that the payment had been refunded in full and final settlement.", "final_verdict": "The complaint was dismissed as the developer had refunded the amount in full and final settlement.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/200103/0005135CMP/200103/0005135 | KarnatakaKarnataka | The complainant filed a complaint against Sobha L…The complainant filed a complaint against Sobha Limited for refund of remaining booking amount. The complaint was dismissed as it was legally not maintainable. | ["Refund of remaini…["Refund of remaining booking amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had paid Rs. 1 lakh as advance amount and wanted refund of remaining booking amount.", "respondent_claim": "The respondent claimed that the complainant had cancelled the unit without assigning proper reason and that the cancellation was not valid.", "final_verdict": "The complaint was dismissed as it was legally not maintainable.", "in_favor_of_respondent": "yes"} | Ruhee SinghRuhee Singh | Sobha LimitedSobha Limited | Link |
CMP/191128/0004823CMP/191128/0004823 | KarnatakaKarnataka | Complaint filed against Sobha Limited for interes…Complaint filed against Sobha Limited for interest on delay period. Case dismissed for non-prosecution as complainant and counsel remained absent on multiple hearing dates. | ["Non-prosecution",…["Non-prosecution", "Real Estate"] | {"appellant_claim": "Interest on delay period for…{"appellant_claim": "Interest on delay period for Sobha City - Casa Paradiso Block-4 project", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed for non-prosecution", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/191031/0004584CMP/191031/0004584 | KarnatakaKarnataka | The plaintiff filed a complaint seeking refund of…The plaintiff filed a complaint seeking refund of booking amount for a property developed by Sobha Limited. The complaint was dismissed as the plaintiff had received the refund amount. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed that h…{"appellant_claim": "The plaintiff claimed that he had not received the refund amount for the booking cancellation of the property.", "respondent_claim": "The respondent claimed that the plaintiff had received the refund amount and the complaint was dismissed.", "final_verdict": "The complaint was dismissed as the plaintiff had received the refund amount.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/191019/0004512CMP/191019/0004512 | KarnatakaKarnataka | The complainant, VINAY KANKARIA JAIN, filed a com…The complainant, VINAY KANKARIA JAIN, filed a complaint against the developer for delay compensation, but later withdrew the complaint due to a technical error in the respondent's name. | ["Delay Compensatio…["Delay Compensation"] | {"appellant_claim": "The complainant claimed dela…{"appellant_claim": "The complainant claimed delay compensation for the delay in the development of the flat.", "respondent_claim": "The respondent claimed that the complainant had withdrawn the complaint due to a technical error in the respondent's name.", "final_verdict": "The complaint was dismissed due to the withdrawal of the complainant.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
00041920004192 | KarnatakaKarnataka | Vinod Gomatam filed a complaint against Sobha Lim…Vinod Gomatam filed a complaint against Sobha Limited for not returning the booking amount. The complaint was dismissed as it was not properly filled out. | Dispute over bookin…Dispute over booking amount | {"appellant_claim": "Vinod Gomatam claimed that S…{"appellant_claim": "Vinod Gomatam claimed that Sobha Limited did not return the booking amount of one lakh rupees.", "respondent_claim": "Sobha Limited claimed that the complaint was not properly filled out.", "final_verdict": "The complaint was dismissed as it was not properly filled out.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190906/0004135CMP/190906/0004135 | KarnatakaKarnataka | The plaintiff filed a complaint against the devel…The plaintiff filed a complaint against the developer for refund with interest. The complaint was dismissed as the plaintiff received the amount of unit cancellation and signed a memo in favor of the developer. | ["Refund with inter…["Refund with interest"] | {"appellant_claim": "The plaintiff claimed refund…{"appellant_claim": "The plaintiff claimed refund with interest for the unit cancellation.", "respondent_claim": "The developer claimed that the plaintiff had received the amount of unit cancellation and signed a memo in favor of the developer.", "final_verdict": "The complaint was dismissed as the plaintiff received the amount of unit cancellation and signed a memo in favor of the developer.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190714/0003487 …CMP/190714/0003487 & CMP/191015/0004178 | KarnatakaKarnataka | The complainant, Ruhie Singh, filed a complaint a…The complainant, Ruhie Singh, filed a complaint against the developer, Sobha Limited, seeking a refund of the full booking amount plus interest. However, the complaint was dismissed due to a withdrawal letter submitted by the plaintiff. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The complainant sought a ref…{"appellant_claim": "The complainant sought a refund of the full booking amount plus interest.", "respondent_claim": "Not applicable, as the complaint was dismissed due to a withdrawal letter.", "final_verdict": "The complaint was dismissed due to a withdrawal letter submitted by the plaintiff.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190510/0002975CMP/190510/0002975 | KarnatakaKarnataka | The complaint was registered by JOHN LAL against …The complaint was registered by JOHN LAL against Sobha Limited for refund of booking amount. The case was disposed of due to withdrawal letter signed by the developer and settlement letter sent by the plaintiff. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The appellant claimed that h…{"appellant_claim": "The appellant claimed that he had paid the booking amount and sought refund.", "respondent_claim": "The respondent claimed that the appellant had received the refund and sought closure of the complaint.", "final_verdict": "The case was disposed of due to withdrawal letter signed by the developer and settlement letter sent by the plaintiff.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190530/0002953CMP/190530/0002953 | KarnatakaKarnataka | The plaintiff sought refund of Rs. 5,00,000 from …The plaintiff sought refund of Rs. 5,00,000 from Sobha Limited, which was refunded after deducting Rs. 50,000. The complaint was settled as per the memo submitted by the developer. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed refund…{"appellant_claim": "The plaintiff claimed refund of Rs. 5,00,000 from Sobha Limited.", "respondent_claim": "The respondent claimed that the plaintiff had received refund of Rs. 4,50,000 after deducting Rs. 50,000.", "final_verdict": "The complaint was settled as per the memo submitted by the developer.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190428/0002799CMP/190428/0002799 | KarnatakaKarnataka | The plaintiff, Rahul Vennapusa, filed a complaint…The plaintiff, Rahul Vennapusa, filed a complaint against the developer, Sobha Limited, seeking a refund of his booking amount. The developer refunded the amount after deducting administrative costs. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer had not refunded his booking amount despite his request for cancellation.", "respondent_claim": "The developer claimed that they had refunded the amount after deducting administrative costs as per the agreement.", "final_verdict": "The authority closed the complaint as the developer had refunded the amount after deducting administrative costs.", "in_favor_of_respondent": "yes"} | Rahul VennapusaRahul Vennapusa | Sobha LimitedSobha Limited | Link |
CMP/190424/0002750CMP/190424/0002750 | KarnatakaKarnataka | The complainant filed a complaint against the dev…The complainant filed a complaint against the developer for not refunding the booking amount. The complaint was dismissed as the complainant later withdrew the complaint and stated that the issue was settled between the parties. | ["Refund of booking…["Refund of booking amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the developer did not refund the booking amount of 3.5 lakhs.", "respondent_claim": "The developer claimed that the complainant had received the refund amount and the issue was settled between the parties.", "final_verdict": "The complaint was dismissed as the complainant later withdrew the complaint and stated that the issue was settled between the parties.", "in_favor_of_respondent": "yes"} | K. PalakshappaK. Palakshappa | Sobha LimitedSobha Limited | Link |
0112/290701/00027250112/290701/0002725 | KarnatakaKarnataka | The petitioner filed a complaint against the deve…The petitioner filed a complaint against the developer under RERA Act 2016 for not returning the booking amount. The developer refunded the amount and the complaint was closed. | ["RERA", "Refund"]["RERA", "Refund"] | {"appellant_claim": "The petitioner claimed that …{"appellant_claim": "The petitioner claimed that the developer did not return the booking amount of Rs. 3,50,000 despite his request to cancel the booking.", "respondent_claim": "The developer claimed that they refunded the amount of Rs. 3,00,000 to the petitioner on 07.08.2019 and that the complaint was filed with false and baseless allegations.", "final_verdict": "The complaint was closed as the developer refunded the amount to the petitioner.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190401/0002556CMP/190401/0002556 | KarnatakaKarnataka | The plaintiff filed a complaint against the devel…The plaintiff filed a complaint against the developer for refund of 1100, but later withdrew the complaint. The complaint was disposed of as per the withdrawal letter and email sent by the plaintiff. | ["Refund", "Withdra…["Refund", "Withdrawal"] | {"appellant_claim": "The plaintiff claimed a refu…{"appellant_claim": "The plaintiff claimed a refund of 1100 from the developer.", "respondent_claim": "The respondent claimed that the plaintiff had withdrawn the complaint and requested to close the case.", "final_verdict": "The complaint was disposed of as per the withdrawal letter and email sent by the plaintiff.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
0117/150217/00021750117/150217/0002175 | KarnatakaKarnataka | The plaintiff Biju Jose filed a complaint against…The plaintiff Biju Jose filed a complaint against Sobha Limited for not providing a flat in the project Sobha City - Casa Paradiso Block 4. The complaint was dismissed as the plaintiff did not respond to the notice sent by mail. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The plaintiff claimed that h…{"appellant_claim": "The plaintiff claimed that he had booked a flat in the project Sobha City - Casa Paradiso Block 4 developed by Sobha Limited, but the defendant did not provide the flat.", "respondent_claim": "The respondent claimed that the plaintiff did not respond to the notice sent by mail and therefore the complaint was dismissed.", "final_verdict": "The complaint was dismissed as the plaintiff did not respond to the notice sent by mail.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190211/0002088CMP/190211/0002088 | KarnatakaKarnataka | The plaintiff filed a complaint against the devel…The plaintiff filed a complaint against the developer for refund of Rs 7 lakhs. The complaint was dismissed as the plaintiff and developer settled the refund outside of the complaint process. | ["Refund Dispute"]["Refund Dispute"] | {"appellant_claim(in detail)": "The plaintiff cla…{"appellant_claim(in detail)": "The plaintiff claimed a refund of Rs 7 lakhs from the developer.", "respondent_claim(in detail)": "The respondent claimed that the plaintiff and developer had settled the refund outside of the complaint process.", "final_verdict(in detail)": "The complaint was dismissed as the plaintiff and developer had settled the refund outside of the complaint process.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/190115/0001875CMP/190115/0001875 | KarnatakaKarnataka | The plaintiff, Shubham Parmar, filed a complaint …The plaintiff, Shubham Parmar, filed a complaint against the developer, Sobha Limited, for not returning the advance payment of Rs. 1,00,000/- for a flat. The case was settled amicably. | Advance payment dis…Advance payment dispute | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer did not return the advance payment of Rs. 1,00,000/- for a flat.", "respondent_claim": "The respondent claimed that the plaintiff had already paid the advance money and the dispute was settled amicably.", "final_verdict": "The case was settled amicably, and the plaintiff and the defendant were informed of this order.", "in_favor_of_respondent": "yes"} | Shubham ParmarShubham Parmar | Sobha LimitedSobha Limited | Link |
CMP/190110/0001848CMP/190110/0001848 | KarnatakaKarnataka | The plaintiff, Mohan Rao Bhontha, sought a refund…The plaintiff, Mohan Rao Bhontha, sought a refund from the developer, Sobha Limited, for a booking amount paid for a property. The case was closed after the plaintiff withdrew the complaint. | ["Refund for proper…["Refund for property booking"] | {"appellant_claim": "The plaintiff claimed a refu…{"appellant_claim": "The plaintiff claimed a refund for the booking amount paid for a property.", "respondent_claim": "The respondent claimed that the plaintiff had withdrawn the complaint and requested the authority to dismiss the case.", "final_verdict": "The case was closed in favor of the respondent, Sobha Limited.", "in_favor_of_respondent": "yes"} | Sobha LimitedSobha Limited | Link | |
CMP/181213/0001755CMP/181213/0001755 | KarnatakaKarnataka | The plaintiff claimed a refund from the responden…The plaintiff claimed a refund from the respondent, Sobha Limited, but the respondent claimed to have already paid the refund. The case was dismissed as not maintainable. | ["Refund dispute"]["Refund dispute"] | {"appellant_claim": "The plaintiff claimed a refu…{"appellant_claim": "The plaintiff claimed a refund of Rs. 1,00,000/- from the respondent.", "respondent_claim": "The respondent claimed to have already paid the refund of Rs. 1,00,000/- to the plaintiff.", "final_verdict": "The case was dismissed as not maintainable in the interest of justice.", "in_favor_of_respondent": "yes"} | Not providedNot provided | Sobha LimitedSobha Limited | Link |
0801180315/00005820801180315/0000582 | KarnatakaKarnataka | The plaintiff filed a complaint against the devel…The plaintiff filed a complaint against the developer for canceling the contract and returning the money. The complaint was withdrawn by the plaintiff, and the suit was closed. | ["Cancel contract",…["Cancel contract", "Return money"] | {"appellant_claim": "The plaintiff claimed that t…{"appellant_claim": "The plaintiff claimed that the developer canceled the contract and refused to return the money.", "respondent_claim": "The developer claimed that the plaintiff withdrew the complaint and the suit was closed.", "final_verdict": "The suit was closed, and the complaint was withdrawn by the plaintiff.", "in_favor_of_respondent": "yes"} | PlaintiffPlaintiff | Sobha LimitedSobha Limited | Link |
CMP/190129/0002002CMP/190129/0002002 | KarnatakaKarnataka | The plaintiff SUBIR PATRA filed a case against th…The plaintiff SUBIR PATRA filed a case against the developer SOBHA LIMITED for compensation, but later withdrew the complaint after receiving clarification from the concerned team. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim": "The plaintiff sought compens…{"appellant_claim": "The plaintiff sought compensation of Rs. 58260/-", "respondent_claim": "The respondent claimed that the plaintiff had received the required clarification from the concerned team", "final_verdict": "The complaint was disposed of as per the Letter signed by the petitioner dated 34/05/2019", "in_favor_of_respondent": "yes"} | SUBIR PATRASUBIR PATRA | SOBHA LIMITEDSOBHA LIMITED | Link |