CMP/210627/0008062
CMP/210627/0008062
|
Karnataka
Karnataka
|
The complainant, Mr. Shambhu Nath Yadav, filed a …
The complainant, Mr. Shambhu Nath Yadav, filed a complaint against M/s. S.S. Builders and Developers for various issues related to their apartment project. The parties settled the dispute through a joint memo dated 12.11.2022, which was accepted by the Lok Adalat.
|
["Dispute settlemen…
["Dispute settlement", "Apartment project issues"]
|
{"appellant_claim": "The complainant claimed vari…
{"appellant_claim": "The complainant claimed various issues related to the apartment project, including lack of permanent electricity connection, temporary electricity charges, non-functional lifts, and lack of amenities.", "respondent_claim": "The respondent claimed that they had provided the necessary amenities and services, but the complainant was not satisfied.", "final_verdict": "The parties settled the dispute through a joint memo dated 12.11.2022, which was accepted by the Lok Adalat. The memo outlined the terms of the settlement, including the respondent's commitment to provide permanent electricity connection, functional lifts, and amenities, as well as the complainant's commitment to pay temporary electricity charges.", "in_favor_of_respondent": "no"}
|
Mr. Shambhu Nath Ya…
Mr. Shambhu Nath Yadav
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610563
|
CMP/210625/0008058
CMP/210625/0008058
|
Karnataka
Karnataka
|
The complainants and respondent settled the dispu…
The complainants and respondent settled the dispute amicably before the Lok Adalat in terms of a joint memo dated 12.11.2022. The respondent undertook to provide various amenities and services to the complainants.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide various amenities and services as promised in the agreement.", "respondent_claim": "The respondent claimed that they had provided all the amenities and services as promised and that the complainants were not entitled to any further relief.", "final_verdict": "The dispute was settled amicably between the parties in terms of a joint memo dated 12.11.2022. The respondent undertook to provide various amenities and services to the complainants, including a permanent electricity connection, functional lifts, and amenities such as a swimming pool and skating rink.", "in_favor_of_respondent": "no"}
|
Y Sridevi
Y Sridevi
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2627657
|
CMP/210628/0008063
CMP/210628/0008063
|
Karnataka
Karnataka
|
The complainant, Mr. Nesamani, filed a complaint …
The complainant, Mr. Nesamani, filed a complaint against M/s. S.S. Builders and Developers for various issues related to their apartment project. The parties settled the dispute amicably through a joint memo dated 12.11.2022.
|
["Apartment Project…
["Apartment Project Dispute"]
|
{"appellant_claim": "The complainant alleged vari…
{"appellant_claim": "The complainant alleged various issues with the apartment project, including delayed completion, poor quality of construction, and lack of amenities.", "respondent_claim": "The respondent claimed that they had completed the project to the best of their abilities and that the complainant was not entitled to any relief.", "final_verdict": "The parties settled the dispute amicably through a joint memo dated 12.11.2022, which outlined the terms of the settlement.", "in_favor_of_respondent": "no"}
|
Mr. Nesamani
Mr. Nesamani
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610677
|
CMP/210630/0008085
CMP/210630/0008085
|
Karnataka
Karnataka
|
The complainant, Mr. Brijesh Kumar Behera, filed …
The complainant, Mr. Brijesh Kumar Behera, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute amicably through the Lok Adalat.
|
["Apartment project…
["Apartment project issues"]
|
{"appellant_claim": "The complainant claimed issu…
{"appellant_claim": "The complainant claimed issues with the apartment project, including lack of electricity connection and amenities.", "respondent_claim": "The respondent claimed that they had provided the necessary amenities and connections, but the complainant was not satisfied.", "final_verdict": "The parties settled the dispute amicably through the Lok Adalat, with the respondent agreeing to provide a permanent electricity connection, install lifts, and provide amenities within a specified timeframe.", "in_favor_of_respondent": "no"}
|
Mr. Brijesh Kumar B…
Mr. Brijesh Kumar Behera
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610676
|
CMP/210623/0008053
CMP/210623/0008053
|
Karnataka
Karnataka
|
The complainants, Madupuri Thirumala Raghavendra …
The complainants, Madupuri Thirumala Raghavendra Prasad and Yammani Vijayalakshmi Prasanna, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute through a joint memo dated 12.11.2022.
|
["Apartment Project…
["Apartment Project Dispute"]
|
{"appellant_claim": "The complainants claimed iss…
{"appellant_claim": "The complainants claimed issues with their apartment project, including lack of permanent electricity connection, incomplete amenities, and pending work.", "respondent_claim": "The respondent claimed that the issues were being addressed and that the complainants were not cooperating.", "final_verdict": "The parties settled the dispute through a joint memo, which outlined the terms of the settlement, including the respondent's commitment to provide permanent electricity connection, complete amenities, and address pending work.", "in_favor_of_respondent": "no"}
|
Yammani Vijayalaksh…
Yammani Vijayalakshmi Prasanna
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610574
|
CMP/210623/0008031
CMP/210623/0008031
|
Karnataka
Karnataka
|
The complainant, Mr. Sujeet Kumar, filed a compla…
The complainant, Mr. Sujeet Kumar, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute amicably through the Lok Adalat, with a joint memo outlining the terms of the settlement.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainant claimed issu…
{"appellant_claim": "The complainant claimed issues with the apartment project, including lack of amenities and poor construction quality.", "respondent_claim": "The respondent claimed that the complainant was not paying the agreed-upon amount for the apartment and was causing delays in the project.", "final_verdict": "The parties settled the dispute amicably through the Lok Adalat, with a joint memo outlining the terms of the settlement. The respondent agreed to provide the complainant with a permanent individual electricity connection, complete the pending work, and provide the complainant with a sum of Rs. 50,000 if they breached any of the terms of the settlement.", "in_favor_of_respondent": "no"}
|
Mr. Sujeet Kumar
Mr. Sujeet Kumar
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610673
|
CMP/210622/0008025
CMP/210622/0008025
|
Karnataka
Karnataka
|
The complainants and respondent settled the dispu…
The complainants and respondent settled the dispute amicably before the Lok Adalat in terms of a joint memo dated 12.11.2022. The respondent undertook to provide various amenities and services to the complainants.
|
["Real Estate Dispu…
["Real Estate Dispute", "Settlement"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide various amenities and services, including a permanent electricity connection, functional lifts, and amenities such as a swimming pool and skating rink.", "respondent_claim": "The respondent claimed that the complainants had failed to pay the agreed-upon amount for the temporary electricity charges.", "final_verdict": "The dispute was settled amicably between the parties in terms of a joint memo dated 12.11.2022. The respondent undertook to provide various amenities and services to the complainants, including a permanent electricity connection, functional lifts, and amenities such as a swimming pool and skating rink.", "in_favor_of_respondent": "no"}
|
Aparna Prusty
Aparna Prusty
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610572
|
CMP/210623/0008052
CMP/210623/0008052
|
Karnataka
Karnataka
|
The complainant, Mr. Guruprasad Uddandam, filed a…
The complainant, Mr. Guruprasad Uddandam, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute amicably through a joint memo.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainant alleged issu…
{"appellant_claim": "The complainant alleged issues with the apartment project, including delayed completion and lack of amenities.", "respondent_claim": "The respondent claimed that the issues were due to unforeseen circumstances and that they were working to resolve the problems.", "final_verdict": "The parties settled the dispute amicably through a joint memo, which outlined the terms of the settlement.", "in_favor_of_respondent": "no"}
|
Mr. Guruprasad Udda…
Mr. Guruprasad Uddandam
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610570
|
CMP/210625/0008055
CMP/210625/0008055
|
Karnataka
Karnataka
|
The complainant, Smt. P Vijayalaxmi, and the resp…
The complainant, Smt. P Vijayalaxmi, and the respondent, M/s. S.S. Builders and Developers, settled their dispute amicably before the Lok Adalat. The joint memo dated 12.11.2022 outlines the terms of the settlement.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainant claimed that…
{"appellant_claim": "The complainant claimed that the respondent had failed to provide certain amenities and services as promised in the agreement.", "respondent_claim": "The respondent claimed that the complainant had failed to pay the agreed-upon amount on time.", "final_verdict": "The parties settled their dispute amicably before the Lok Adalat, with the respondent agreeing to provide certain amenities and services as promised in the agreement.", "in_favor_of_respondent": "no"}
|
Smt. P Vijayalaxmi
Smt. P Vijayalaxmi
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610568
|
CMP/210623/0008051
CMP/210623/0008051
|
Karnataka
Karnataka
|
The complainants, Mr. Lokesh Ayyala and Ms. Jyoth…
The complainants, Mr. Lokesh Ayyala and Ms. Jyothy Marri, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute through a joint memo dated 12.11.2022.
|
["Real Estate Dispu…
["Real Estate Dispute", "Apartment Project Issues"]
|
{"appellant_claim": "The complainants claimed iss…
{"appellant_claim": "The complainants claimed issues with their apartment project, including temporary electricity connection, pending work, and lack of amenities.", "respondent_claim": "The respondent claimed that they had completed the work and provided the necessary amenities.", "final_verdict": "The parties settled the dispute through a joint memo dated 12.11.2022, which outlined the terms of the settlement.", "in_favor_of_respondent": "no"}
|
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610991
|
CMP/210623/0008049
CMP/210623/0008049
|
Karnataka
Karnataka
|
The complainants, Mr. Sandeep Reedy Mukkamalla an…
The complainants, Mr. Sandeep Reedy Mukkamalla and Mukkamalla Padmalatha, filed a complaint against M/s. S.S. Builders and Developers regarding issues with their apartment project. The parties settled the dispute amicably through the Lok Adalat, and the complaint was disposed of in terms of the joint memo dated 12.11.2022.
|
["Real Estate Dispu…
["Real Estate Dispute", "Apartment Project Issues"]
|
{"appellant_claim": "The complainants claimed iss…
{"appellant_claim": "The complainants claimed issues with their apartment project, including temporary electricity charges, non-functional lifts, and lack of amenities.", "respondent_claim": "The respondent, M/s. S.S. Builders and Developers, claimed that the complainants had not paid the agreed-upon amount for the temporary electricity charges.", "final_verdict": "The parties settled the dispute amicably through the Lok Adalat, and the complaint was disposed of in terms of the joint memo dated 12.11.2022. The respondent undertook to provide permanent electricity connection, install functional lifts, and provide amenities as agreed upon.", "in_favor_of_respondent": "no"}
|
Mukkamalla Padmalat…
Mukkamalla Padmalatha
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610566
|
CMP/210914/0008328
CMP/210914/0008328
|
Karnataka
Karnataka
|
The complainants, Mr. Sharana Kumar and Manasa KM…
The complainants, Mr. Sharana Kumar and Manasa KM, filed a complaint against M/s. S.S. Builders and Developers. The matter was settled in terms of a joint memo dated 12.11.2022, filed during the Lok Adalat held on the same date.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide them with certain amenities and services as promised in the agreement.", "respondent_claim": "The respondent claimed that they had provided the complainants with all the amenities and services as promised in the agreement.", "final_verdict": "The matter was settled in terms of a joint memo dated 12.11.2022, filed during the Lok Adalat held on the same date.", "in_favor_of_respondent": "no"}
|
Manasa KM
Manasa KM
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610482
|
CMP/210624/0008054
CMP/210624/0008054
|
Karnataka
Karnataka
|
The complainant, Mr. Hari Durgaprasad, filed a co…
The complainant, Mr. Hari Durgaprasad, filed a complaint against M/s. S.S. Builders and Developers for various issues related to the apartment project. The parties settled the dispute amicably through a joint memo.
|
["Apartment project…
["Apartment project issues"]
|
{"appellant_claim": "The complainant claimed vari…
{"appellant_claim": "The complainant claimed various issues related to the apartment project, including temporary electricity connection, permanent electricity connection, lifts, amenities, and occupancy certificate.", "respondent_claim": "The respondent claimed that they had provided the necessary connections and amenities, but the complainant was not satisfied.", "final_verdict": "The parties settled the dispute amicably through a joint memo, which included various terms and conditions, including the provision of permanent electricity connection, installation of lifts, provision of amenities, and payment of Rs. 50,000 to the complainant.", "in_favor_of_respondent": "no"}
|
Mr. Hari Durgaprasad
Mr. Hari Durgaprasad
|
S.S. Builders and D…
S.S. Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610561
|
CMP/UR/221112/00102…
CMP/UR/221112/0010263
|
Karnataka
Karnataka
|
The complainants and respondent settled their dis…
The complainants and respondent settled their dispute amicably before the Lok Adalat. The parties agreed to various terms, including the provision of permanent electricity connection, installation of lifts, and provision of amenities.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide various amenities and services as promised in the agreement.", "respondent_claim": "The respondent claimed that the complainants had failed to pay the agreed-upon amounts and had not complied with the terms of the agreement.", "final_verdict": "The parties settled their dispute amicably and agreed to various terms, including the provision of permanent electricity connection, installation of lifts, and provision of amenities.", "in_favor_of_respondent": "no"}
|
Gurram Ushodaya
Gurram Ushodaya
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2611002
|
CMP/211206/0008686
CMP/211206/0008686
|
Karnataka
Karnataka
|
The complainant, Mr. Malay Kumar K, filed a compl…
The complainant, Mr. Malay Kumar K, filed a complaint against M/s. S.S.Builders and Developers for various issues related to the apartment, including electricity connection, lifts, and amenities. The parties reached an amicable settlement during the Lok Adalat.
|
["Apartment issues"…
["Apartment issues", "Settlement"]
|
{"appellant_claim": "The complainant claimed that…
{"appellant_claim": "The complainant claimed that the respondent had not provided a permanent electricity connection, functional lifts, and amenities as promised.", "respondent_claim": "The respondent claimed that they had provided the necessary connections and amenities, but the complainant had not paid the agreed-upon amount.", "final_verdict": "The parties reached an amicable settlement during the Lok Adalat, with the respondent agreeing to provide a permanent electricity connection, functional lifts, and amenities within a specified timeframe.", "in_favor_of_respondent": "no"}
|
Mr. Malay Kumar K
Mr. Malay Kumar K
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610565
|
CMP/210628/0008066
CMP/210628/0008066
|
Karnataka
Karnataka
|
The complainants, Mr. Aravind Venkatakrishnan and…
The complainants, Mr. Aravind Venkatakrishnan and Susila Venkatakrishnan, filed a complaint against M/s. S.S.Builders and Developers. The dispute was referred to the Lok Adalat and the parties compromised/settled the matter in terms of a joint memo dated:12.11.2022.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide them with a permanent electricity connection, functional lifts, and amenities such as a swimming pool and skating rink.", "respondent_claim": "The respondent claimed that they had provided the complainants with a temporary electricity connection and were working on providing the permanent connection and other amenities.", "final_verdict": "The Lok Adalat accepted the joint memo dated:12.11.2022 and the complainants and respondent compromised/settled the matter. The respondent agreed to provide a permanent electricity connection, functional lifts, and other amenities within a stipulated period.", "in_favor_of_respondent": "no"}
|
Susila Venkatakrish…
Susila Venkatakrishnan
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610660
|
CMP/210628/0008065
CMP/210628/0008065
|
Karnataka
Karnataka
|
The complainant, MSV A Pradeep, filed a complaint…
The complainant, MSV A Pradeep, filed a complaint against M/s. S.S.Builders and Developers for various issues related to the apartment project. The parties settled the dispute amicably through a joint memo dated 12.11.2022.
|
["Apartment project…
["Apartment project issues"]
|
{"appellant_claim": "The complainant claimed vari…
{"appellant_claim": "The complainant claimed various issues related to the apartment project, including temporary electricity connection, permanent individual electricity connection, functional lifts, amenities, and completion of pending work.", "respondent_claim": "The respondent claimed that they had undertaken to provide the necessary connections and amenities, but the complainant was not satisfied with the progress.", "final_verdict": "The parties settled the dispute amicably through a joint memo dated 12.11.2022, which outlined the terms of the settlement, including the respondent's undertakings to provide the necessary connections and amenities within a specified timeframe.", "in_favor_of_respondent": "no"}
|
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610480
|
CMP/210625/0008057
CMP/210625/0008057
|
Karnataka
Karnataka
|
The complainant, Mr. kola avinash, and the respon…
The complainant, Mr. kola avinash, and the respondent, M/s. S.S.Builders and Developers, settled their dispute through a joint memo dated 12.11.2022, which was filed during the Lok Adalat held on the same date.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainant claimed that…
{"appellant_claim": "The complainant claimed that the respondent had not provided certain amenities and services as promised in the agreement.", "respondent_claim": "The respondent claimed that they had provided all the necessary amenities and services as per the agreement.", "final_verdict": "The dispute was settled through a joint memo dated 12.11.2022, which outlined the terms of the settlement.", "in_favor_of_respondent": "no"}
|
Mr. kola avinash
Mr. kola avinash
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610545
|
CMP/210623/0008050
CMP/210623/0008050
|
Karnataka
Karnataka
|
The complainants, Mr. Satyapriya Tarania and Mani…
The complainants, Mr. Satyapriya Tarania and Manisha Das, filed a complaint against M/s. S.S.Builders and Developers for various issues related to their apartment project. The dispute was settled through a joint memo dated 12.11.2022, which was accepted as the award by the Lok Adalat.
|
["Apartment project…
["Apartment project issues", "Dispute settlement"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide various amenities and services as promised in the agreement, including electricity connection, lifts, and sewage treatment plant.", "respondent_claim": "The respondent claimed that the complainants had not paid the agreed-upon amount for the temporary electricity charges and had not cooperated in the completion of the pending work.", "final_verdict": "The dispute was settled through a joint memo dated 12.11.2022, which outlined the terms of the settlement, including the respondent's commitment to provide various amenities and services, and the complainants' agreement to pay the agreed-upon amount for the temporary electricity charges.", "in_favor_of_respondent": "no"}
|
Manisha Das
Manisha Das
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2611000
|
CMP/210623/0008028
CMP/210623/0008028
|
Karnataka
Karnataka
|
The complainants, Mr. Samarth Saxena and Hansa Gu…
The complainants, Mr. Samarth Saxena and Hansa Gupta, filed a complaint against M/s. S.S.Builders and Developers. The dispute was settled amicably before the Lok Adalat, and the terms of the settlement are outlined in the joint memo dated: 12.11.2022.
|
["Real Estate Dispu…
["Real Estate Dispute"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide them with a permanent electricity connection, functional lifts, and amenities such as a swimming pool and skating rink.", "respondent_claim": "The respondent claimed that they had provided the complainants with a temporary electricity connection and were working on providing the permanent connection.", "final_verdict": "The dispute was settled amicably before the Lok Adalat, and the terms of the settlement are outlined in the joint memo dated: 12.11.2022.", "in_favor_of_respondent": "no"}
|
Hansa Gupta
Hansa Gupta
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610567
|
CMP/21062: 1048
CMP/21062: 1048
|
Karnataka
Karnataka
|
The complainants, Mr. Shakti Prasanna Pattnayak a…
The complainants, Mr. Shakti Prasanna Pattnayak and Madhusmita Pattanaik, filed a complaint against M/s. S.S.Builders and Developers for various issues related to their apartment project. The parties settled the dispute amicably in the Lok Adalat and filed a joint memo outlining the terms of the settlement.
|
["Real Estate Dispu…
["Real Estate Dispute", "Apartment Project Issues"]
|
{"appellant_claim": "The complainants claimed tha…
{"appellant_claim": "The complainants claimed that the respondent had failed to provide various amenities and services as promised in the agreement, including permanent electricity connection, functional lifts, and amenities like swimming pool and skating rink.", "respondent_claim": "The respondent claimed that they had provided all the necessary amenities and services as promised in the agreement.", "final_verdict": "The parties settled the dispute amicably in the Lok Adalat and filed a joint memo outlining the terms of the settlement, which included the respondent providing permanent electricity connection, functional lifts, and various amenities within a specified timeframe.", "in_favor_of_respondent": "no"}
|
Madhusmita Pattanaik
Madhusmita Pattanaik
|
S.S.Builders and De…
S.S.Builders and Developers
|
https://rera.karnataka.gov.in/reraDocument?DOC=2610571
|