Overall Case Outcomes
TDI Infrastructure Ltd. has been a significant player in the real estate market, especially in states like Haryana, Punjab, and the National Capital Territory of Delhi. However, the company has faced a considerable number of complaints and legal issues that potential buyers should be aware of before making a purchase.
The builder, TDI Infrastructure Ltd., has amassed a total of 961 complaints, of which it has won 108 cases and lost 853 cases. This data indicates a concerning trend for purchasers regarding the builder's accountability and customer satisfaction. The geographical scope of their projects includes Haryana, Punjab, and the National Capital Territory of Delhi.
A significant number of cases involve failure to deliver possession as per the agreed timeline, improper handing over of properties, and unjustified charges for increased super area among other issues.
Common factors in these cases include claims of delays in possession, disputes over payment demands, and accusations of increasing area or service costs without clear justification.
Winning cases often revolve around jurisdictional arguments, where the builder successfully claimed that the complaints fell outside the authority's purview or involved procedural errors on the complainant's side.
Notably, many of these wins appear to stem from disputes regarding compliance with payment terms rather than delivery issues.
The majority of cases that TDI Infrastructure Ltd. has lost reveal consistent issues:
The cases that TDI Infrastructure Ltd. has successfully navigated often hinge upon:
In conclusion, while TDI Infrastructure Ltd. has a notable presence in the real estate sector, the alarming number of complaints and high rate of lost cases presents potential buyers with a serious warning. Buyers should exercise caution and carry out extensive due diligence before engaging in any agreements with this builder.
By keeping these points in mind, buyers can make informed decisions and safeguard themselves from potential disputes with builders.
Yearly Trend for these Cases
Analysis of the cases filed against TDI Infrastructure Ltd. which it lost revealed significant insights into the builder's primary disputes. The cases can be broadly categorized into several themes, highlighting recurring issues faced by the complainants.
Many cases centered around delays in delivering possession of flats and shops. Complainants often sought refunds, citing the builder's failure to adhere to promised timelines. The authority frequently directed the builder to refund amounts paid, along with interest, emphasizing the need for timely possession.
A substantial number of cases involved disputes over refunds and compensation. Complainants sought refunds due to delays, non-delivery of possession, or dissatisfaction with the builder's actions. The authority typically ruled in favor of the complainants, ordering refunds and compensation for mental agony and harassment.
Several cases revolved around the builder's calculation of super area and associated charges. Complainants contested what they perceived as arbitrary increases in super area, leading to higher costs. The authority often directed the builder to recalculate the super area and charges, ensuring compliance with agreed-upon terms.
Some cases highlighted the builder's inability to deliver possession of plots or shops, despite receiving full payment. This led to multiple refund orders from the authority, stressing that the builder must fulfill its contractual obligations.
A few cases were withdrawn by the complainants, often with liberty to file fresh complaints. This might indicate a willingness to negotiate or reach a settlement outside the formal complaint process.
Common reasons for bringing cases to court included contesting delays, disputing project delays attributed to other parties, and disagreements over land classification or super area calculations. The builder's litigation often stemmed from an inability to meet deadlines, provide timely possession, or adhere to the terms of sale.
The builder lost these cases primarily due to insufficient evidence, non-compliance with legal or regulatory requirements, and a failure to follow interim directions. In several instances, the builder's calculations of super area and charges were deemed arbitrary, leading to a loss in court. The recurring themes of delays and refund disputes highlight significant operational and procedural shortcomings within the builder's practices.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
COMPLAINT NO. 799 O…COMPLAINT NO. 799 OF 2019 | HaryanaHaryana | Complainant sought refund of Rs. 31,40,376/- paid…Complainant sought refund of Rs. 31,40,376/- paid for a commercial plot, as the respondent changed the plot without her consent. The Authority held that the change of plot was illegal and granted refund with interest. | ["Refund for change…["Refund for changed plot"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent changed the plot from originally booked Plot No. KC-1/27 to Plot No. LC -2/35 without her consent and sought refund of Rs. 31,40,376/- paid, along with interest as per Rule 15 of the HRERA, Rules 2017.", "respondent_claim(in detail)": "The respondent claimed that the plot was changed with the consent of the complainant and a fresh allotment letter was issued. They also stated that the project has been developed and Part Completion Certificate has been granted.", "final_verdict(in detail)": "The Authority held that the change of plot was illegal without the consent of the complainant. Therefore, the letter of fresh allotment dated 24.05.2017 and offer letter dated 22.08.2017 were quashed. The Authority granted refund of Rs. 31,40,376/- paid by the complainant along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017 from the date of making payments up to the date of passing of this order.", "in_favor_of_respondent": "no"} | Smt. SheetalSmt. Sheetal | TDI InfrastructureTDI Infrastructure | Link |
123 & 124 of 2019123 & 124 of 2019 | HaryanaHaryana | Complainants sought refund of amount paid to resp…Complainants sought refund of amount paid to respondent for delayed possession of flats. Authority ordered respondent to pay interest for delay and make a legal offer of possession after obtaining Occupation Certificate. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent failed to deliver possession of flats despite payment of amount. They sought refund of amount paid with interest.", "respondent_claim": "Respondent claimed that construction of flats was complete and offered fit-out possession, but delivery of possession was delayed due to pending application for Occupation Certificate.", "final_verdict": "Authority ordered respondent to pay interest for delay and make a legal offer of possession after obtaining Occupation Certificate.", "in_favor_of_respondent": "no"} | Neena BansalNeena Bansal | TDI InfrastructureTDI Infrastructure | Link |
476/2018476/2018 | HaryanaHaryana | Complainant Rekha Talwar filed a complaint agains…Complainant Rekha Talwar filed a complaint against M/s TDI Infrastructure Pvt. Ltd. for not delivering a flat despite receiving payment. The Authority ordered the refund of the amount with interest. | ["Non-delivery of f…["Non-delivery of flat", "Refund of payment"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent did not deliver a flat despite receiving payment of Rs. 5,50,000/- and sought refund of the amount with 20% interest.", "respondent_claim": "The respondent claimed that the project was not registered under the Real Estate (Regulation and Development) Act, 2016 and that the Occupation Certificates were obtained before the commencement of the Act.", "final_verdict": "The Authority ordered the refund of the amount with interest calculated at the rate prescribed in Rule 15 of the Haryana Real Estate (Regulation and Development) Rules, 2017.", "in_favor_of_respondent": "no"} | Rekha TalwarRekha Talwar | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
RERA-PKL451/2018RERA-PKL451/2018 | HaryanaHaryana | The complainant, Manoj Suneja, filed a complaint …The complainant, Manoj Suneja, filed a complaint against TDI Infrastructure Pvt. Ltd. for delay in possession of a residential plot. The Authority directed the respondent to prepare a fresh statement of accounts and pay compensation for the delay. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the residential plot and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the project was not registerable with the Authority and that the complainant was not entitled to refund.", "final_verdict": "The Authority directed the respondent to prepare a fresh statement of accounts and pay compensation for the delay.", "in_favor_of_respondent": "no"} | Manoj SunejaManoj Suneja | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
361-2018361-2018 | HaryanaHaryana | Complainant booked apartment in TDI Infrastructur…Complainant booked apartment in TDI Infrastructure project, alleging delay in delivery, increase in area, and unauthorized changes. Authority directed compensation for delay and recalculation of charges. | ["Delay in delivery…["Delay in delivery", "Increase in area", "Unauthorized changes"] | {"appellant_claim": "Delay in delivery of apartme…{"appellant_claim": "Delay in delivery of apartment, increase in area without consent, and unauthorized changes to layout and construction.", "respondent_claim": "Delay due to pending applications, increase in area as per approved plans, and construction as per sanctioned plans.", "final_verdict": "Compensation for delay to be calculated and paid, recalculation of charges based on reduced super area, and validation of construction as per approved plans.", "in_favor_of_respondent": "no"} | Manoj KumarManoj Kumar | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
696 of 2018696 of 2018 | HaryanaHaryana | Complaint regarding dispute between Meena Kumari …Complaint regarding dispute between Meena Kumari Anand and TDI Infrastructure Pvt. Ltd. settled with terms of settlement incorporated in final order. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "The complainant, …{"appellant_claim(in detail)": "The complainant, Meena Kumari Anand, had a dispute with the respondent, TDI Infrastructure Pvt. Ltd.", "respondent_claim(in detail)": "The respondent agreed to waive off the club charges and levy maintenance charges w.e.f. 01.04.2019.", "final_verdict(in detail)": "The Authority directed the respondent to waive off the club charges and levy maintenance charges w.e.f. 01.04.2019 as promised to the complainant.", "in_favor_of_respondent": "no"} | Meena Kumari AnandMeena Kumari Anand | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1942 of 20191942 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant with liberty t…Complaint withdrawn by complainant with liberty to file fresh case. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Complainant withd…{"appellant_claim(in detail)": "Complainant withdrew the complaint with liberty to file fresh case.", "respondent_claim(in detail)": "Not applicable as respondent's claim is not mentioned in the order.", "final_verdict(in detail)": "Case disposed as withdrawn.", "in_favor_of_respondent": "no"} | Maninder SinghManinder Singh | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
2026 of 20192026 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant with liberty t…Complaint withdrawn by complainant with liberty to file fresh case. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Complainant withd…{"appellant_claim(in detail)": "Complainant withdrew the complaint with liberty to file fresh case.", "respondent_claim(in detail)": "Not applicable as respondent's claim is not mentioned in the order.", "final_verdict(in detail)": "Case disposed as withdrawn.", "in_favor_of_respondent": "no"} | Ashu GuptaAshu Gupta | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1816 of 20191816 of 2019 | HaryanaHaryana | Complaint withdrawn by the complainant with liber…Complaint withdrawn by the complainant with liberty to file a fresh complaint. The fee paid will be adjusted towards the fee payable for filing a fresh complaint. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant withdrew the complaint with liberty to file a fresh complaint.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The complaint is dismissed as withdrawn.", "in_favor_of_respondent": "no"} | Residents Welfare A…Residents Welfare Association | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Complaint No. 1499 …Complaint No. 1499 of 2019 | HaryanaHaryana | Complainant Parveen Gupta withdrew the complaint …Complainant Parveen Gupta withdrew the complaint as he transferred the flat. The complaint was disposed of as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that he wanted to withdraw the complaint as he had transferred the flat.", "respondent_claim(in detail)": "The respondent did not make any claim as the complaint was withdrawn.", "final_verdict(in detail)": "The complaint was disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Parveen GuptaParveen Gupta | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
587 of 2021587 of 2021 | HaryanaHaryana | Complainant Suresh Pal withdrew the complaint aga…Complainant Suresh Pal withdrew the complaint against TDI Infrastructure Pvt. Ltd. with liberty to file afresh and requested fee adjustment. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was disposed off as withdrawn.", "in_favor_of_respondent": "no"} | Suresh PalSuresh Pal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
730 of 2018730 of 2018 | HaryanaHaryana | Complaint for refund of paid amount along with in…Complaint for refund of paid amount along with interest. Authority upholds its previous order dated 15.01.2019. | ["Refund of paid am…["Refund of paid amount"] | {"appellant_claim(in detail)": "The appellant sou…{"appellant_claim(in detail)": "The appellant sought refund of the amount already paid to the respondent for purchase of unit in respondent\u2019s project under section 18 of The RERA Act, 2016.", "respondent_claim(in detail)": "The respondent did not provide any claim in detail.", "final_verdict(in detail)": "The Authority upholds its previous order dated 15.01.2019, directing the respondent to refund the amount already paid by the appellant along with interest at the rate stipulated under Rule 15 of HRERA, Rules 2017.", "in_favor_of_respondent": "no"} | Ritu AggarwalRitu Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1500 of 20191500 of 2019 | HaryanaHaryana | Complaint withdrawn by parties. Authority to proc…Complaint withdrawn by parties. Authority to proceed with adjudication after resolution. | ["Refund", "Jurisdi…["Refund", "Jurisdiction"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of the amount paid.", "respondent_claim(in detail)": "The respondent claimed that the Authority did not have jurisdiction to examine and grant refund of the amount and interest.", "final_verdict(in detail)": "The Authority decided to proceed further for adjudication of the complaint after a resolution was passed.", "in_favor_of_respondent": "no"} | Surinder SinghalSurinder Singhal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
3118 of 20193118 of 2019 | HaryanaHaryana | Complaint filed by Vijay Bhatia and Meenu Bhatia …Complaint filed by Vijay Bhatia and Meenu Bhatia against TDI Infrastructure Pvt. Ltd. for refund of amount paid. The complaint was disposed off as withdrawn after the parties settled the matter. | Refund of amount pa…Refund of amount paid | {"appellant_claim": "The complainants sought refu…{"appellant_claim": "The complainants sought refund of the amount paid to the respondent.", "respondent_claim": "The respondent did not provide any claim.", "final_verdict": "The complaint was disposed off as withdrawn after the parties settled the matter.", "in_favor_of_respondent": "no"} | Meenu BhatiaMeenu Bhatia | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
253 of 2018253 of 2018 | HaryanaHaryana | Complainant sought refund of paid amount along wi…Complainant sought refund of paid amount along with interest. Authority revived its original order dated 10.09.2018. | ["Refund of paid am…["Refund of paid amount"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund of paid amount along with interest.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Authority revived its original order dated 10.09.2018.", "in_favor_of_respondent": "no"} | Ravinder NandaRavinder Nanda | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
38 of 201838 of 2018 | HaryanaHaryana | Complainant sought refund of paid amount along wi…Complainant sought refund of paid amount along with interest. Authority revived its original order dated 21.11.2018. | ["Refund of paid am…["Refund of paid amount"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of the paid amount along with interest.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The Authority revived its original order dated 21.11.2018.", "in_favor_of_respondent": "no"} | Suresh AryaSuresh Arya | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
129 & 130 of 2019129 & 130 of 2019 | HaryanaHaryana | Complainants withdrew both complaints with libert…Complainants withdrew both complaints with liberty to file fresh complaints. | ["Withdrawal of com…["Withdrawal of complaints"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Both complaints were disposed off as withdrawn with liberty to file fresh complaints.", "in_favor_of_respondent": "no"} | Anurag AggarwalAnurag Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1142 & 1143 of 20201142 & 1143 of 2020 | HaryanaHaryana | Complainants sought refund for delayed possession…Complainants sought refund for delayed possession of shops in the 'Rodeo Drive-TDI City' project. The Authority ordered the respondent to pay interest for the delay and handover possession of the shops. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed possession of their shops by 13 years and sought refund of the amount paid.", "respondent_claim": "The respondent claimed that the project had been developed and that the complainants had not taken possession of their shops despite payment of outstanding amounts.", "final_verdict": "The Authority ordered the respondent to pay interest for the delay and handover possession of the shops to the complainants.", "in_favor_of_respondent": "no"} | Ritu AggarwalRitu Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
548 of 2020548 of 2020 | HaryanaHaryana | Complaint settled between Ashish Choudhary and TD…Complaint settled between Ashish Choudhary and TDI Infrastructure Pvt. Ltd. through a settlement deed. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as settled due to a settlement deed dated 13.06.2022.", "in_favor_of_respondent": "no"} | Ashish ChoudharyAshish Choudhary | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
39 of 201939 of 2019 | HaryanaHaryana | Complainant seeks refund for unpaid villa in TDI …Complainant seeks refund for unpaid villa in TDI City, Kundli, Sonepat. Authority orders refund with interest for failure to deliver possession after 17 years. | ["Refund for Undeli…["Refund for Undelivered Villa"] | {"appellant_claim": "Complainant seeks refund for…{"appellant_claim": "Complainant seeks refund for unpaid villa in TDI City, Kundli, Sonepat, as respondent failed to deliver possession after 17 years.", "respondent_claim": "Respondent claims the project has been developed and a Part Completion Certificate has been granted.", "final_verdict": "Authority orders refund with interest for failure to deliver possession after 17 years.", "in_favor_of_respondent": "no"} | Shelly Goyal JainShelly Goyal Jain | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1456-20201456-2020 | HaryanaHaryana | Complainant sought refund for non-development of …Complainant sought refund for non-development of plot and lack of possession. Authority ordered refund with interest. | ["Non-development o…["Non-development of plot", "Lack of possession"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in 2005 and paid Rs. 9,35,375/- but did not receive possession or development. He sought refund with interest.", "respondent_claim(in detail)": "The respondent claimed that the project was developed and Part Completion Certificates were granted. They stated that the allotment was cancelled due to non-payment of dues and that a cancellation letter was sent.", "final_verdict(in detail)": "The Authority found that the respondent failed to prove that any demand was raised after 10.02.2006 and that the cancellation of allotment was not proved. The Authority ordered the respondent to refund Rs. 24,63,689/- to the complainant.", "in_favor_of_respondent": "no"} | Amarprit SinghAmarprit Singh | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
COMPLAINT NO. 1000 …COMPLAINT NO. 1000 OF 2021 | HaryanaHaryana | Complainant seeks refund for incomplete project a…Complainant seeks refund for incomplete project and lack of valid builder-buyer agreement. Authority orders refund with interest. | ["Incomplete projec…["Incomplete project", "Invalid builder-buyer agreement"] | {"appellant_claim": "Complainant seeks refund for…{"appellant_claim": "Complainant seeks refund for incomplete project and lack of valid builder-buyer agreement.", "respondent_claim": "Respondent claims construction is ongoing and possession will be given soon.", "final_verdict": "Authority orders refund with interest.", "in_favor_of_respondent": "no"} | Ravi ChangraniRavi Changrani | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
713 of 2021713 of 2021 | HaryanaHaryana | Complainant sought refund for a commercial plot d…Complainant sought refund for a commercial plot due to lack of basic infrastructure. Authority ordered refund with interest. | ["Refund for lack o…["Refund for lack of infrastructure"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to provide basic infrastructure for the commercial plot, including roads, electricity, water, and sewerage connections.", "respondent_claim": "The respondent claimed that the project was complete and that the complainant was not entitled to a refund.", "final_verdict": "The Authority ordered the respondent to refund the amount paid by the complainant, along with interest, due to the lack of basic infrastructure.", "in_favor_of_respondent": "no"} | Ashu GuptaAshu Gupta | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Complaint No. 549 o…Complaint No. 549 of 2020 | HaryanaHaryana | Complainant sought refund for undelivered flat. A…Complainant sought refund for undelivered flat. Authority ordered refund with interest due to respondent's failure to deliver possession. | ["Undelivered flat"…["Undelivered flat", "Refund with interest"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a unit in the project named \u201cTuscan Floors\u201d of the respondent situated at Sonipat on 20.01.2011. At first a Flat No. T-180/GF was allotted to him vide Allotment letter dated 17.12.2013. Thereafter respondent unilaterally changed his allotted unit to T- 159/GF vide second allotment letter dated 24.03.2014. Respondent again changed the unit allotted to him without seeking his consent. Vide third allotment letter dated 17.11.2014, respondent finally allotted to the complainant Unit No. T-42/GF measuring 1164 sq. ft. Floor Buyer Agreement (hereinafter referred to as FBA) was executed between parties on 24.11.2014. As per FBA, delivery of the flat was to be made within 30 months from the date of agreement, thus deemed date of delivery was on 24.05.2017. Complainant has paid Rs. 20,26,194/- against basic sale consideration of Rs. 26,20,378/-.", "respondent_claim(in detail)": "Learned counsel for the respondent has admitted that construction of the tower as well as unit of the complainant could not be completed due to some unavoidable reasons. Therefore, they are unable to deliver possession of originally allotted unit to the complainant. Learned counsel for the respondent stated that respondent company is willing to allot alternate unit to the complainant. Learned counsel for the respondent while admitting the payments made by the complainant stated that respondent had applied for grant of Occupation Certificate on 09.05.2014 but same has not been granted by The Department of Town & Country Planning.", "final_verdict(in detail)": "Authority finds it to be a fit case for allowing refund of the amount paid by the complainant as respondent is not able to deliver originally allotted plot to the complainant and he has been using the amount deposited by complainant for the last eleven years without any reasonable justification. Therefore, the Authority directs the respondent to refund Rs. 20,26,194/- paid by the complainant along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017 from the date of making payments up to the date of passing of this order.", "in_favor_of_respondent": "no"} | Sanjeev KumarSanjeev Kumar | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
757 of 2022757 of 2022 | HaryanaHaryana | Complainant sought refund of paid amount along wi…Complainant sought refund of paid amount along with interest for delayed possession of flat. Authority directed refund with interest at 10.60%. | ["Delayed possessio…["Delayed possession", "Refund with interest"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of paid amount along with interest for delayed possession of flat.", "respondent_claim": "Respondent claimed that complainant was not entitled to relief as they had not come forward to choose an alternative unit offered in 2018.", "final_verdict": "Authority directed refund of paid amount along with interest at 10.60%.", "in_favor_of_respondent": "no"} | Swati A JainSwati A Jain | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
930 of 2022930 of 2022 | HaryanaHaryana | Complainant seeks refund of paid amount along wit…Complainant seeks refund of paid amount along with interest for non-delivery of possession of commercial unit by respondent. Authority directs respondent to refund the amount with interest. | ["Non-delivery of p…["Non-delivery of possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent did not deliver possession of the commercial unit despite payment of amount.", "respondent_claim": "Respondent claims that possession cannot be given due to force majeure conditions and that complainant defaulted on payment of instalments.", "final_verdict": "Authority directs respondent to refund the amount with interest.", "in_favor_of_respondent": "no"} | Ram Ditta AhujaRam Ditta Ahuja | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1081 of 20191081 of 2019 | HaryanaHaryana | Complaint against TDI Infrastructure Pvt. Ltd. fo…Complaint against TDI Infrastructure Pvt. Ltd. for delay in delivery of possession. Application for rectification of earlier order withdrawn. | ["Delay in possessi…["Delay in possession", "Rectification of order"] | {"appellant_claim": "Delay in delivery of possess…{"appellant_claim": "Delay in delivery of possession", "respondent_claim": "Wrong adjustment of payable and receivable amounts", "final_verdict": "Application for rectification withdrawn", "in_favor_of_respondent": "no"} | Pranabh AggarwalPranabh Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
2468 of 20222468 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount along w…Complainants sought refund of paid amount along with interest for delay in delivery of possession. Authority directed refund with interest. | ["Refund for delay …["Refund for delay in possession", "Interest for delayed payment"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought refund of paid amount along with interest for delay in delivery of possession.", "respondent_claim(in detail)": "Respondent claimed that complainants were not entitled to refund as they did not respond to offer of alternative plot.", "final_verdict(in detail)": "Authority directed refund of paid amount along with interest at the rate of SBI highest marginal cost of lending rate (MCLR)+ 2%.", "in_favor_of_respondent": "no"} | Jitesh AhujaJitesh Ahuja | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
3077 of 20223077 of 2022 | HaryanaHaryana | Complainant seeks possession of shop and compensa…Complainant seeks possession of shop and compensation for delay. Authority directs payment of delay interest and execution of conveyance deed. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "Complainant seeks possession…{"appellant_claim": "Complainant seeks possession of shop and compensation for delay.", "respondent_claim": "Respondent claims that possession was not possible due to incomplete project.", "final_verdict": "Authority directs payment of delay interest and execution of conveyance deed.", "in_favor_of_respondent": "no"} | Kamal BansalKamal Bansal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1867/20221867/2022 | HaryanaHaryana | Complainant sought refund of paid amount with int…Complainant sought refund of paid amount with interest for not being allotted a specific unit in respondent's project. Authority directed refund with interest. | ["Refund of paid am…["Refund of paid amount", "Interest"] | {"appellant_claim": "Complainant claimed refund o…{"appellant_claim": "Complainant claimed refund of paid amount with interest for not being allotted a specific unit in respondent's project.", "respondent_claim": "Respondent claimed that complainant was a speculative buyer and not entitled to protection of RERA Act.", "final_verdict": "Authority directed refund of paid amount with interest at the rate of 10.75%.", "in_favor_of_respondent": "no"} | Parmod KumarParmod Kumar | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Appeal No. 493 of 2…Appeal No. 493 of 2021 (O&M) | HaryanaHaryana | The appellant's complaint was not properly addres…The appellant's complaint was not properly addressed by the Haryana Real Estate Regulatory Authority, and the case was remitted for fresh decision. The Authority was advised to ensure that similar situations do not arise in future. | ["Real Estate Dispu…["Real Estate Dispute", "Authority's Decision"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the Authority did not properly address her complaint and decided on issues not raised by her.", "respondent_claim": "The respondent did not contest the appellant's contentions.", "final_verdict": "The case was remitted to the same Authority for fresh decision.", "in_favor_of_respondent": "no"} | Anju TyagiAnju Tyagi | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
RERA-PKL-COMP.147/2…RERA-PKL-COMP.147/2018 | PunjabPunjab | Complaint against M/s TDI Infrastructure Ltd. for…Complaint against M/s TDI Infrastructure Ltd. for not delivering possession of a flat. The respondent gave an undertaking to deliver possession within 60 days and pay compensation for delays. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent did not deliver possession of the flat despite payment of the full amount.", "respondent_claim": "The respondent claimed that they would deliver possession within 60 days and pay compensation for delays.", "final_verdict": "The respondent was directed to deliver possession within 60 days and pay 10% of the total cost as compensation for every three months extension.", "in_favor_of_respondent": "no"} | Mam KaurMam Kaur | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-COMP. 1 44…RERA-PKL-COMP. 1 44/2018 | Not providedNot provided | Complaint against M/s TDI Infrastructure Ltd. for…Complaint against M/s TDI Infrastructure Ltd. for not delivering possession of a flat. The respondent gave an undertaking to deliver possession within 90 days and pay compensation for delays. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent did not deliver possession of the flat as per the agreement.", "respondent_claim": "The respondent claimed that they would deliver possession within 90 days and pay compensation for delays.", "final_verdict": "The respondent was directed to deliver possession within 90 days and pay compensation for delays.", "in_favor_of_respondent": "no"} | Sanju JainSanju Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
OMP. 37/2018OMP. 37/2018 | Not providedNot provided | Complaint regarding refund and compensation for a…Complaint regarding refund and compensation for a residential colony project. Complainant's relief regarding refund dismissed, and complaint disposed with direction to file claim for compensation before Adjudicating Officer. | ["Refund and Compen…["Refund and Compensation"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of the invested amount and various compensations for the residential colony project.", "respondent_claim(in detail)": "The respondent claimed that they had already invested the collected amount in the project and had obtained a part completion certificate from the Town and Country Planning Department.", "final_verdict(in detail)": "The complaint was disposed of with a direction that the complainant shall file a complaint before the Adjudicating Officer for all the compensations that he intends to claim from the respondent.", "in_favor_of_respondent": "no"} | Manju AryaManju Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-COMP. 36/2…RERA-PKL-COMP. 36/2018 | Not providedNot provided | Complaint against M/s TDI Infrastructure Limited …Complaint against M/s TDI Infrastructure Limited for refund and compensation. Case disposed with direction to file complaint before Adjudicating Officer for compensation. | ["Refund and Compen…["Refund and Compensation"] | {"appellant_claim(in detail)": "Refund of investe…{"appellant_claim(in detail)": "Refund of invested amount and compensation for various issues.", "respondent_claim(in detail)": "Ready to deliver possession and part completion certificate granted.", "final_verdict(in detail)": "Case disposed with direction to file complaint before Adjudicating Officer for compensation.", "in_favor_of_respondent": "no"} | Suresh AryaSuresh Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-COMP. 34/2…RERA-PKL-COMP. 34/2018 | Not providedNot provided | Complaint against M/s TDI Infrastructure Limited …Complaint against M/s TDI Infrastructure Limited for refund and compensation. Case disposed with direction to file complaint before Adjudicating Officer for compensation. | ["Refund and Compen…["Refund and Compensation"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund of the amount invested in the project and various compensations.", "respondent_claim(in detail)": "The respondent claimed that they had already invested the collected amount and had granted part completion certificate.", "final_verdict(in detail)": "The complaint was disposed with direction to file complaint before Adjudicating Officer for grant of compensations.", "in_favor_of_respondent": "no"} | Manju AryaManju Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-COMP. 263/…RERA-PKL-COMP. 263/2018 | HaryanaHaryana | Complainant Jarnail Singh booked a flat with resp…Complainant Jarnail Singh booked a flat with respondent M/s TDI Infrastructure Limited and was aggrieved by increased area and price of the flat, as well as delay in delivery of possession. | ["Increased area an…["Increased area and price of flat", "Delay in delivery of possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent increased the area of the flat without seeking revision of the original plan from the competent Authority and demanded additional charges. The complainant also claimed that the respondent delayed delivery of possession by 15 months.", "respondent_claim": "The respondent claimed that the increase in area was permissible under the buyer's agreement and that the increase was made only in accordance with the sanctioned revised plan. The respondent also claimed that the complainant had defaulted in timely payments of instalments and that this contributed to the delay in delivery of possession.", "final_verdict": "The Authority directed the respondent to clarify the circumstances that led to the increase in super area and to provide a detailed statement to the complainant furnishing information on the various components that constituted the original purchased super area and the present super area. The Authority also directed the respondent to offer possession to the complainant strictly in terms of the directions contained in the order.", "in_favor_of_respondent": "no"} | Jarnail SinghJarnail Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-347/2018RERA-PKL-347/2018 | HaryanaHaryana | Complainant booked flat in 2006, respondent shift…Complainant booked flat in 2006, respondent shifted project without consent. Authority ordered refund of Rs. 13,75,706 with interest. | ["Refund for Undeli…["Refund for Undelivered Flat"] | {"appellant_claim": "Refund of deposited amount a…{"appellant_claim": "Refund of deposited amount along with interest and compensation for undelivered flat.", "respondent_claim": "Admitted deposit of Rs. 13,75,706 but did not disclose status of project.", "final_verdict": "Refund of Rs. 13,75,706 with interest in accordance with Rule 15 of HRERA Rules.", "in_favor_of_respondent": "no"} | Smt. SumanSmt. Suman | TDI Infrastructure …TDI Infrastructure Limited | Link |
Complaint No. 274 o…Complaint No. 274 of 2018 | HaryanaHaryana | The complainants, Rajesh Kumar and Vinod Kumar, b…The complainants, Rajesh Kumar and Vinod Kumar, booked a residential flat in the 'Espania Height' colony, but the respondent, M/S TDI Infrastructure Ltd., cancelled the booking without proper notice or refund. The authority ordered the respondent to refund the amount with interest. | ["Refund of deposit…["Refund of deposit", "Cancellation of booking"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent cancelled the booking without proper notice or refund, and that they were entitled to a refund of the deposit with interest.", "respondent_claim": "The respondent claimed that the cancellation was legitimate and that the complainants had failed to make timely payments.", "final_verdict": "The authority ordered the respondent to refund the amount of Rs. 4,57,000 with interest, calculated from the date of cancellation to the date of actual payment.", "in_favor_of_respondent": "no"} | Vinod KumarVinod Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
327-2018327-2018 | HaryanaHaryana | Complainant sought refund for delayed delivery of…Complainant sought refund for delayed delivery of flat. Authority directed respondent to handover possession by July 2019 and pay compensation for delay. | ["Delayed delivery"…["Delayed delivery", "Compensation"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed delivery of flat.", "respondent_claim": "Respondent claimed that delivery was delayed due to pending application for Occupation Certificate.", "final_verdict": "Authority directed respondent to handover possession by July 2019 and pay compensation for delay.", "in_favor_of_respondent": "no"} | Ajay PalAjay Pal | TDI Infrastructure …TDI Infrastructure Limited | Link |
607-2018, 630-2018,…607-2018, 630-2018, 631-2018 | HaryanaHaryana | The complainant, Vivek Kadyan, filed a complaint …The complainant, Vivek Kadyan, filed a complaint against M/s TDI Infrastructure Ltd. for delay in delivery of possession of a flat and arbitrary increase in super area. The Authority directed the respondent to handover the possession of the flat to the complainant by July, 2019 and to recalculate the super area. | ["Delay in delivery…["Delay in delivery of possession", "Arbitrary increase in super area"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the delivery of possession of the flat by three years and had arbitrarily increased the super area by 284.81 sq.ft.", "respondent_claim": "The respondent claimed that the delay in delivery of possession was due to the pendency of the application for Occupation Certificate with the Director, Town & Country Planning department.", "final_verdict": "The Authority directed the respondent to handover the possession of the flat to the complainant by July, 2019 and to recalculate the super area.", "in_favor_of_respondent": "no"} | Vivek KadyanVivek Kadyan | TDI Infrastructure …TDI Infrastructure Limited | Link |
598-2018598-2018 | HaryanaHaryana | Complainant sought refund for delayed delivery of…Complainant sought refund for delayed delivery of flat. Authority ordered compensation for delay and quashed charges for car parking and club membership. | ["Delayed delivery"…["Delayed delivery", "Compensation", "Car parking", "Club membership"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed delivery of flat and claimed that respondent had charged for car parking and club membership without justification.", "respondent_claim": "Respondent claimed that delay was due to pending application for occupation certificate and that charges for car parking and club membership were as per agreement.", "final_verdict": "Authority ordered compensation for delay, quashed charges for car parking and club membership, and directed respondent to recalculate accounts and pay delay compensation.", "in_favor_of_respondent": "no"} | Satya Pal TyagiSatya Pal Tyagi | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-1397 of 20…RERA-PKL-1397 of 2018 | HaryanaHaryana | Complainant sought refund for delayed delivery of…Complainant sought refund for delayed delivery of flat. Authority directed respondent to handover possession by July 2019 or refund with interest. | ["Delayed delivery"…["Delayed delivery", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed delivery of flat.", "respondent_claim": "Respondent claimed delay in obtaining occupation certificate and promised delivery by July 2019.", "final_verdict": "Authority directed respondent to handover possession by July 2019 or refund with interest.", "in_favor_of_respondent": "no"} | Raj Kumar AggarwalRaj Kumar Aggarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
127 & 132 of 2019127 & 132 of 2019 | HaryanaHaryana | Complainants booked flats in TDI City project but…Complainants booked flats in TDI City project but no allotment was made despite payment of booking amounts. Authority ordered refund of amounts with interest. | ["Refund of booking…["Refund of booking amounts", "Interest"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that no allotment was made despite payment of booking amounts and sought refund of amounts with interest.", "respondent_claim": "The respondent claimed that the Authority did not have jurisdiction to adjudicate the complaint and that the nature of grievance was amenable to the jurisdiction of the Adjudicating Officer.", "final_verdict": "The Authority ordered refund of amounts with interest and directed the respondent to pay the amount in two instalments.", "in_favor_of_respondent": "no"} | Sunita MittalSunita Mittal | TDI Infrastructure …TDI Infrastructure Limited | Link |
368/2018, 1044-2018…368/2018, 1044-2018, 1401-2018 | HaryanaHaryana | Complainants booked flats in TDI Infrastructure L…Complainants booked flats in TDI Infrastructure Limited's project but faced delays in possession. The authority directed the respondent to hand over possession by July 2019 and pay compensation for the delay. | ["Delayed possessio…["Delayed possession", "Compensation"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed the possession of their flats and sought refund of the amount paid along with interest.", "respondent_claim": "The respondent claimed that the project was complete and that they would offer possession by July 2019.", "final_verdict": "The authority directed the respondent to hand over possession by July 2019 and pay compensation for the delay.", "in_favor_of_respondent": "no"} | Bhawna KaushikBhawna Kaushik | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL 1236/2018RERA-PKL 1236/2018 | HaryanaHaryana | Complainant Rakesh Kumar withdraws complaint agai…Complainant Rakesh Kumar withdraws complaint against M/s TDI Infrastructure Ltd. with liberty to file fresh complaint after withdrawal from consumer court. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint withdrawn with liberty to file fresh complaint", "in_favor_of_respondent": "no"} | Rakesh KumarRakesh Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
88-201888-2018 | HaryanaHaryana | Complainant sought refund for non-completion of r…Complainant sought refund for non-completion of residential plot project. Authority ordered refund with interest for failure to deliver possession. | ["Non-completion of…["Non-completion of project", "Failure to deliver possession"] | {"appellant_claim": "Seeking refund for non-compl…{"appellant_claim": "Seeking refund for non-completion of residential plot project and failure to deliver possession.", "respondent_claim": "Denied jurisdiction, claimed project was not registered with the Authority, and alleged complainant defaulted on payments.", "final_verdict": "Ordered refund of Rs. 10,00,000 with interest for failure to deliver possession within 60 days.", "in_favor_of_respondent": "no"} | Sakshi JainSakshi Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
1238-20181238-2018 | HaryanaHaryana | Complainant sought refund for delayed real estate…Complainant sought refund for delayed real estate project. Authority ordered refund with interest. | ["Delayed Real Esta…["Delayed Real Estate Project"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a second-floor apartment in the project 'Tuscan City' of the respondents in Kundli, Sonipat, on 25.12.2011. He paid Rs. 4,00,000/- as booking amount on 26.12.2011 and 02.01.2012. Thereafter, he kept paying installments towards the cost of the floor as per demands of the respondents till March, 2012. The complainant has paid Rs.9,69,770/- till date against the sale price of Rs. 31,50,000/-.", "respondent_claim(in detail)": "The respondents denied all the allegations and raised several objections, including that the complaint is premature because the project of the respondents is registered with HRERA vide registration no. 368 of 2017 in which due date of completion has been stipulated to be 31.07.2022.", "final_verdict(in detail)": "The Authority finds it to be a fit case for refund of the money paid and directs the respondents to refund Rs. 9,69,335/- already paid by the complainant along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Yogesh Pratap Singh…Yogesh Pratap Singh Chauhan | TDI Infrastructure …TDI Infrastructure Limited | Link |
22-2019, 23-2019, 4…22-2019, 23-2019, 44-2019, 87-2019, 125-2019, 299-2018, 734-2018, 735-2018, 736-2018, 737-2018, 738-2018 | HaryanaHaryana | The complainants filed cases against M/s TDI Infr…The complainants filed cases against M/s TDI Infrastructure Ltd. for various issues related to flat measurements, possession, and charges. The Authority disposed of the cases and provided directions to the respondent. | ["Flat measurements…["Flat measurements", "Possession", "Charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had increased the super area of their flats without justification and had charged them excess amounts.", "respondent_claim": "The respondent claimed that the increase in super area was justified and that the complainants had been charged correctly.", "final_verdict": "The Authority directed the respondent to recalculate the super area and charges for the complainants and to provide a fresh statement of accounts.", "in_favor_of_respondent": "no"} | Pavel GargPavel Garg | TDI Infrastructure …TDI Infrastructure Limited | Link |
RERA-PKL-598 of 2019RERA-PKL-598 of 2019 | HaryanaHaryana | Complainant Madhuri Arya filed a complaint agains…Complainant Madhuri Arya filed a complaint against TDI Infrastructure Ltd. for delay in delivery of possession of a flat and various other charges. The Haryana Real Estate Regulatory Authority (HRERA) passed an order directing the respondent to calculate and pay delay compensation and recalculate the amounts payable by the complainant. | ["Delay in delivery…["Delay in delivery of possession", "Various charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had delayed the delivery of possession of the flat and had charged various amounts without justification.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including the pending application for Occupation Certificate.", "final_verdict": "The HRERA directed the respondent to calculate and pay delay compensation and recalculate the amounts payable by the complainant.", "in_favor_of_respondent": "no"} | Madhuri AryaMadhuri Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
494/2019494/2019 | HaryanaHaryana | Complaint withdrawn by complainant. Case disposed…Complaint withdrawn by complainant. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case withdrawn by complainant", "in_favor_of_respondent": "no"} | Saroj GuptaSaroj Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
83 cf 201983 cf 2019 | HaryanaHaryana | Complainant sought relief against unilateral incr…Complainant sought relief against unilateral increase in super area, possession of unit, and compensation for delayed delivery of possession. Authority directed respondent to recalculate amounts payable and compensation. | ["Unilateral increa…["Unilateral increase in super area", "Delayed delivery of possession"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent had increased the super area without consent, causing a financial burden. Complainant also sought possession of the unit and compensation for delayed delivery of possession.", "respondent_claim": "Respondent claimed that the increase in super area was as per the agreement and that delivery of possession was delayed due to pending applications.", "final_verdict": "Authority directed respondent to recalculate amounts payable and compensation based on the principles laid down in Complaint No. 607 of 2018.", "in_favor_of_respondent": "no"} | Adesh VatsAdesh Vats | TDI Infrastructure …TDI Infrastructure Limited | Link |
684 of 2019684 of 2019 | HaryanaHaryana | Complainants sought refund for delayed possession…Complainants sought refund for delayed possession and increased super area. Authority directed recalculation of amounts payable and compensation. | ["Delayed possessio…["Delayed possession", "Increased super area"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for delayed possession and increased super area without consent.", "respondent_claim": "Respondent claimed that increase in super area was as per agreement and that possession was offered with delay due to pending OC application.", "final_verdict": "Authority directed recalculation of amounts payable and compensation based on revised super area calculation.", "in_favor_of_respondent": "no"} | Smt. ChitralekhaSmt. Chitralekha | TDI Infrastructure …TDI Infrastructure Limited | Link |
823 of 2019823 of 2019 | HaryanaHaryana | Complainants booked a shop in TDI Park Street Mal…Complainants booked a shop in TDI Park Street Mall, but the respondent failed to deliver possession within the agreed-upon timeframe. The authority directed the respondent to hand over possession and pay interest for the delay. | ["Delayed possessio…["Delayed possession", "Interest for delay"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid for the shop but the respondent failed to deliver possession within the agreed-upon timeframe.", "respondent_claim": "The respondent claimed that the project was 80% complete and that they intended to complete it by 2021.", "final_verdict": "The authority directed the respondent to hand over possession of the shop and pay interest to the complainants for the delay.", "in_favor_of_respondent": "no"} | Mrs. Paramjeet KaurMrs. Paramjeet Kaur | TDI Infrastructure …TDI Infrastructure Limited | Link |
131, 781 & 782 of 2…131, 781 & 782 of 2019 | HaryanaHaryana | Complainants sought refund for unpaid flats in TD…Complainants sought refund for unpaid flats in TDI City project. Authority held that cancellation of allotments was not proper and directed refund with interest. | ["Refund for unpaid…["Refund for unpaid flats", "Proper cancellation of allotments"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they had made part payments for flats in TDI City project but the respondent had not issued allotment letters or refunded their deposits.", "respondent_claim": "The respondent claimed that cancellation of allotments had been made in 2006 and that the complainants were not entitled to a refund.", "final_verdict": "The Authority held that cancellation of allotments was not proper and directed the respondent to refund the complainants' deposits with interest.", "in_favor_of_respondent": "no"} | Rama AggarwalRama Aggarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
Complaint No. 950 o…Complaint No. 950 of 2019 | HaryanaHaryana | Complaint withdrawn by learned counsel for the co…Complaint withdrawn by learned counsel for the complainant with liberty to file the case afresh before the Real Estate Regulatory Authority, Panchkula. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainant h…{"appellant_claim(in detail)": "The complainant had filed a complaint against the respondent, but the learned counsel for the complainant withdrew the complaint with liberty to file the case afresh.", "respondent_claim(in detail)": "Not applicable as the complaint was withdrawn.", "final_verdict(in detail)": "The complaint was disposed as withdrawn.", "in_favor_of_respondent": "no"} | Shilpa GuptaShilpa Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
290 of 2019290 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant with liberty t…Complaint withdrawn by complainant with liberty to file fresh case. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn by complainant with liberty to file fresh case.", "in_favor_of_respondent": "no"} | Dinesh Kumar JainDinesh Kumar Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
1558 of 20191558 of 2019 | HaryanaHaryana | Complaint withdrawn by complainant with liberty t…Complaint withdrawn by complainant with liberty to file fresh complaint. Fee paid will be adjusted towards fresh complaint. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Complainant withd…{"appellant_claim(in detail)": "Complainant withdrew the complaint with liberty to file a fresh complaint.", "respondent_claim(in detail)": "Not applicable as respondent's claim is not mentioned in the order.", "final_verdict(in detail)": "Complaint dismissed as withdrawn. Fee paid will be adjusted towards fresh complaint.", "in_favor_of_respondent": "no"} | AmitaAmita | TDI Infrastructure …TDI Infrastructure Limited | Link |
1333, 1334, 1336, 1…1333, 1334, 1336, 1337, 1092 of 2019 | HaryanaHaryana | Complainants sought refund for unpaid flats in TD…Complainants sought refund for unpaid flats in TDI City project. Authority ordered refund with interest. | ["Refund for unpaid…["Refund for unpaid flats", "TDI City project"] | {"appellant_claim": "Complainants claimed they ha…{"appellant_claim": "Complainants claimed they had paid for flats in the TDI City project but the respondent failed to deliver possession.", "respondent_claim": "The respondent claimed that the Authority had no jurisdiction to grant refunds and that the complainants were offered alternative units.", "final_verdict": "The Authority ordered the refund of the amounts paid by the complainants, along with interest, as the respondent was unable to deliver possession of the booked properties.", "in_favor_of_respondent": "no"} | Hans Raj MalikHans Raj Malik | TDI Infrastructure …TDI Infrastructure Limited | Link |
1042 of 20181042 of 2018 | HaryanaHaryana | Complaint dismissed in default due to non-appeara…Complaint dismissed in default due to non-appearance of complainant. Liberty given to file complaint afresh. | ["Non-appearance of…["Non-appearance of complainant"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed in default", "in_favor_of_respondent": "no"} | Pardeep KumarPardeep Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
2626 of 20192626 of 2019 | HaryanaHaryana | Complainant Nirmala filed a complaint against TDI…Complainant Nirmala filed a complaint against TDI Infrastructure Ltd. for extra demand raised on the pretext of increase in super area. The Authority directed both parties to carry out actual measurements and follow guidelines as laid down in earlier cases. | ["Increase in Super…["Increase in Super Area", "Delay in Possession"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent had raised an extra demand of Rs. 9,27,903/- on the pretext of increase in super area from 1499 sq. ft. to 1783.81 sq. ft.", "respondent_claim": "The respondent claimed that the increase in super area was as per the sanctioned plan and that the complainant had agreed to pay for the increased super area.", "final_verdict": "The Authority directed the respondent to handover the physical possession of the unit within 30 days and pay Rs. 96,660/- to the complainant within 90 days. The Authority also ordered that the complainant shall be entitled to a further amount of delay compensation which shall continue to accrue in favour of her till the date of grant of Occupation Certificate.", "in_favor_of_respondent": "no"} | NirmalaNirmala | TDI Infrastructure …TDI Infrastructure Limited | Link |
1111 of 20191111 of 2019 | HaryanaHaryana | Complainant sought refund and possession of flat …Complainant sought refund and possession of flat with compensation for delay. Authority directed respondent to handover possession and pay compensation. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "Seeking refund of amount pai…{"appellant_claim": "Seeking refund of amount paid with interest and alternative prayer of possession along with compensation for delayed delivery of possession.", "respondent_claim": "Denied allegations and raised objections that provisions of RERA Act are not applicable as agreement was executed prior to its coming into force.", "final_verdict": "Authority directed respondent to handover possession of flat within 30 days and pay compensation of Rs. 6,56,858/- within 90 days.", "in_favor_of_respondent": "no"} | Shalini MittalShalini Mittal | TDI Infrastructure …TDI Infrastructure Limited | Link |
368 of 2018368 of 2018 | HaryanaHaryana | Complainant Surjeet Singh withdraws complaint aga…Complainant Surjeet Singh withdraws complaint against TDI Infrastructure Ltd. with liberty to pursue legal remedy elsewhere. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant wanted to withdraw the complaint with liberty to avail appropriate legal remedy before an appropriate forum.", "respondent_claim(in detail)": "Not applicable as the complainant withdrew the complaint.", "final_verdict(in detail)": "The complaint was disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Surjeet SinghSurjeet Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
2593 of 20192593 of 2019 | HaryanaHaryana | Complainant sought early possession of apartment,…Complainant sought early possession of apartment, interest for delayed delivery of possession, and quashing of illegal demands. Authority directed respondent to recalculate super area, interest, and statement of accounts. | ["Real Estate", "Po…["Real Estate", "Possession", "Interest"] | {"appellant_claim": "Complainant sought early pos…{"appellant_claim": "Complainant sought early possession of apartment, interest for delayed delivery of possession, and quashing of illegal demands.", "respondent_claim": "Respondent claimed that possession was delayed due to pending application for Occupation Certificate and that demands were legitimate.", "final_verdict": "Authority directed respondent to recalculate super area, interest, and statement of accounts. Respondent to pay interest for delay in delivery of possession and make upfront payment of interest amount.", "in_favor_of_respondent": "no"} | Ashu GuptaAshu Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
445 of 2019445 of 2019 | HaryanaHaryana | Complainants booked a flat in 2011, but the respo…Complainants booked a flat in 2011, but the respondent failed to deliver possession. The authority directed the respondent to pay interest for the delay and adjust the super area charges. | ["Delay in possessi…["Delay in possession", "Super area charges"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent failed to deliver possession of the flat despite payment of the full amount.", "respondent_claim": "The respondent claimed that the delay was due to various reasons, including the need for an occupation certificate.", "final_verdict": "The authority directed the respondent to pay interest for the delay and adjust the super area charges.", "in_favor_of_respondent": "no"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
1801 of 20191801 of 2019 | HaryanaHaryana | Complaint against TDI Infrastructure Ltd. for var…Complaint against TDI Infrastructure Ltd. for various charges and delays in possession. Authority quashed the amount charged for delay in payment of installments. | ["Delay in possessi…["Delay in possession", "Unfair charges"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent charged unfair amounts for various services and delayed the possession of the flat.", "respondent_claim": "The respondent claimed that the charges were as per the agreement and the delay in possession was due to unforeseen circumstances.", "final_verdict": "The Authority quashed the amount charged for delay in payment of installments and directed the respondent to provide a valid possession certificate.", "in_favor_of_respondent": "no"} | Sukhbir SinghSukhbir Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
Complaint No. 2907 …Complaint No. 2907 of 2019 | HaryanaHaryana | Complainant sought possession of a unit and inter…Complainant sought possession of a unit and interest for delay in handover. Authority directed payment of interest and monthly interest till valid handover. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of a unit and interest for delay in handover.", "respondent_claim": "Respondent claimed delay in handover due to pending Occupation Certificate application.", "final_verdict": "Authority directed payment of interest and monthly interest till valid handover.", "in_favor_of_respondent": "no"} | SunitaSunita | TDI Infrastructure …TDI Infrastructure Limited | Link |
1094 of 20201094 of 2020 | HaryanaHaryana | Complainant withdrew the complaint with liberty t…Complainant withdrew the complaint with liberty to file fresh before appropriate forum. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant wanted to withdraw the complaint with liberty to file fresh before appropriate forum.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The complaint was disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Rahul Singh MalikRahul Singh Malik | TDI Infrastructure …TDI Infrastructure Limited | Link |
1105, 1106, 1107, 2…1105, 1106, 1107, 2108, 2111, 2112, 2113, 2114, 2115, 2116, 2117 of 2019, 677 of 2020 | HaryanaHaryana | Complaints were withdrawn by the complainants wit…Complaints were withdrawn by the complainants with liberty to file them before appropriate Consumer Commission. | ["Withdrawal of com…["Withdrawal of complaints"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had filed complaints against the respondents for various reasons.", "respondent_claim": "The respondents did not make any claims.", "final_verdict": "The complaints were disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Baljinder ChadhaBaljinder Chadha | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
1137-2021 & Ors.1137-2021 & Ors. | HaryanaHaryana | The complainants, who are allottees of apartments…The complainants, who are allottees of apartments in the 'Kingsbury Apartments' project, filed complaints against the respondent, TDI Infrastructure Limited, for not executing conveyance deeds in their favor despite payment of outstanding amounts. | ["Conveyance Deed",…["Conveyance Deed", "Maintenance Dues"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that despite payment of outstanding amounts, the respondent failed to execute conveyance deeds in their favor.", "respondent_claim": "The respondent claimed that the complainants had not paid outstanding amounts and therefore, the conveyance deeds could not be executed.", "final_verdict": "The Authority held that the complainants were entitled to get conveyance deeds executed immediately and that the respondent could not make execution of agreement with the maintenance company a pre-condition for execution of conveyance deeds.", "in_favor_of_respondent": "no"} | Kamlesh RaniKamlesh Rani | TDI Infrastructure …TDI Infrastructure Limited | Link |
1335 of 20191335 of 2019 | HaryanaHaryana | Complainant sought possession of original plot an…Complainant sought possession of original plot and interest for delay. Authority directed respondent to offer alternate plots and pay interest for delay. | ["Possession of plo…["Possession of plot", "Delay in delivery"] | {"appellant_claim": "Complainant sought possessio…{"appellant_claim": "Complainant sought possession of original plot and interest for delay.", "respondent_claim": "Respondent claimed that original plot was not available due to land dispute and offered alternate plots.", "final_verdict": "Authority directed respondent to offer alternate plots and pay interest for delay.", "in_favor_of_respondent": "no"} | Praveen SinghPraveen Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
95 Of 202195 Of 2021 | HaryanaHaryana | Complainant sought delivery of possession of a fl…Complainant sought delivery of possession of a flat and interest for delay. Authority ordered payment of interest and directed respondent to follow principles for calculating super area. | ["Delay in possessi…["Delay in possession", "Super area calculation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that despite paying Rs. 37,10,526/-, the respondent failed to deliver possession of the flat within the promised time of 30 months.", "respondent_claim": "The respondent admitted payment of Rs. 37,10,526/- but stated that the delay was due to the non-issuance of Occupation Certificate by the Department of Town & Country Planning.", "final_verdict": "The Authority ordered the respondent to pay interest for the delay in possession and directed them to follow principles for calculating super area as per a previous complaint.", "in_favor_of_respondent": "no"} | Parveen KumarParveen Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
57 Of 202157 Of 2021 | HaryanaHaryana | Complainant filed grievances against TDI Infrastr…Complainant filed grievances against TDI Infrastructure Limited regarding fit out possession, increase in super area, and lack of infrastructural facilities. The Authority disposed of the case by directing the respondent to return excess amount, allot specified car parking space, and pay delay interest. | ["Fit out possessio…["Fit out possession", "Increase in super area", "Lack of infrastructural facilities"] | {"appellant_claim": "The complainant filed grieva…{"appellant_claim": "The complainant filed grievances against the respondent regarding fit out possession, increase in super area, and lack of infrastructural facilities.", "respondent_claim": "The respondent claimed that the increase in super area was justified, and the lack of infrastructural facilities was not their responsibility.", "final_verdict": "The Authority directed the respondent to return excess amount, allot specified car parking space, and pay delay interest.", "in_favor_of_respondent": "no"} | Prabhakar KumarPrabhakar Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
700 Of 2021700 Of 2021 | HaryanaHaryana | Complainant sought interest for delay in possessi…Complainant sought interest for delay in possession of flat. Authority ordered payment of interest and a valid offer of possession after Occupation Certificate. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "Complainant sought interest …{"appellant_claim": "Complainant sought interest for delay in possession of flat.", "respondent_claim": "Respondent claimed that Occupation Certificate was applied for but not granted, causing the delay.", "final_verdict": "Authority ordered payment of interest and a valid offer of possession after Occupation Certificate.", "in_favor_of_respondent": "no"} | Megha SharmaMegha Sharma | TDI Infrastructure …TDI Infrastructure Limited | Link |
Complaint No. 1270 …Complaint No. 1270 Of 2021 | HaryanaHaryana | Complainant sought possession of a plot in the TD…Complainant sought possession of a plot in the TDI City project, but the respondent was unable to deliver it due to a dispute over the land. The Authority directed the respondent to offer an alternate plot and pay interest for the delay. | ["Delay in possessi…["Delay in possession", "Alternate plot"] | {"appellant_claim": "The complainant sought posse…{"appellant_claim": "The complainant sought possession of the originally allotted plot, but the respondent was unable to deliver it due to a dispute over the land.", "respondent_claim": "The respondent claimed that the project had been developed, and they were willing to offer an alternate plot.", "final_verdict": "The Authority directed the respondent to offer an alternate plot and pay interest for the delay.", "in_favor_of_respondent": "no"} | Smt. SushmaSmt. Sushma | TDI Infrastructure …TDI Infrastructure Limited | Link |
1110, 2606, & 1539 …1110, 2606, & 1539 of 2019 | HaryanaHaryana | Complainants sought refund for unpaid shops in TD…Complainants sought refund for unpaid shops in TDI Infrastructure Ltd.'s project. Authority ordered refund with interest due to extraordinary delay in project completion. | ["Refund for unpaid…["Refund for unpaid shops", "Project delay"] | {"appellant_claim": "Complainants sought refund f…{"appellant_claim": "Complainants sought refund for unpaid shops in TDI Infrastructure Ltd.'s project due to extraordinary delay in project completion.", "respondent_claim": "Respondent claimed that construction was ongoing and possession would be given after completion with Occupation Certificate.", "final_verdict": "Authority ordered refund with interest for complainants due to extraordinary delay in project completion.", "in_favor_of_respondent": "no"} | Satish SardanaSatish Sardana | TDI Infrastructure …TDI Infrastructure Limited | Link |
2727 of 20192727 of 2019 | HaryanaHaryana | Complainant sought refund for incomplete flat. Au…Complainant sought refund for incomplete flat. Authority ordered refund with interest. | ["Refund for incomp…["Refund for incomplete flat"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund for incomplete flat and delay in delivery.", "respondent_claim(in detail)": "Respondent claimed that construction was incomplete due to lack of Occupation Certificate.", "final_verdict(in detail)": "Authority ordered refund of Rs. 52,36,941/- with interest for incomplete flat and delay in delivery.", "in_favor_of_respondent": "no"} | Nirmal KumarNirmal Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
626 of 2018626 of 2018 | HaryanaHaryana | Complaint for refund of paid amount along with in…Complaint for refund of paid amount along with interest. Original order dated 20.12.2018 stands revived. | ["Refund of paid am…["Refund of paid amount", "Interest"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought relief of refund of the amount already paid to the respondent for purchase of unit in respondent's project under section 18 of The RERA Act, 2016.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The original order dated 20.12.2018 passed by Authority stands revived. The Authority decides to dispose of the captioned complaint in terms of the same order dated 20.12.2018.", "in_favor_of_respondent": "no"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
505 of 2019505 of 2019 | HaryanaHaryana | Complainant sought refund for a plot not delivere…Complainant sought refund for a plot not delivered by respondent. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for a plot not delivered by the respondent.", "respondent_claim": "The respondent claimed that the original plot was not available due to unavoidable reasons and offered an alternate plot.", "final_verdict": "The Authority ordered the respondent to refund the amount paid by the complainant with interest.", "in_favor_of_respondent": "no"} | Vineet GuptaVineet Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
58, 74 & 86 of 202158, 74 & 86 of 2021 | HaryanaHaryana | Complainants sought refund of amount paid for sho…Complainants sought refund of amount paid for shops in respondent's project. Authority directed respondent to refund amount paid by complainants along with interest. | ["Refund of amount …["Refund of amount paid for shops", "Delay in delivery of possession"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they had paid amount for shops in respondent's project but respondent had failed to deliver possession of shops despite lapse of fifteen years.", "respondent_claim": "Respondent claimed that construction of shops was ongoing and would be completed within one year, and that respondent had not received Occupation Certificate from the Department of Town & Country Planning.", "final_verdict": "Authority directed respondent to refund amount paid by complainants along with interest.", "in_favor_of_respondent": "no"} | Gurbir Singh HundalGurbir Singh Hundal | TDI Infrastructure …TDI Infrastructure Limited | Link |
1338 of 20201338 of 2020 | HaryanaHaryana | Complainants sought interest for delay in possess…Complainants sought interest for delay in possession, quashing of illegal demands, and proper accounting. Authority ordered payment of delay interest, quashed illegal demands, and directed proper accounting. | ["Delay in possessi…["Delay in possession", "Illegal demands", "Accounting"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought interest for delay in possession, quashing of illegal demands, and proper accounting.", "respondent_claim(in detail)": "Respondent claimed that the delay in possession was due to non-receipt of Occupation Certificate and that the demands made were legitimate.", "final_verdict(in detail)": "Authority ordered payment of delay interest to the complainants, quashed the illegal demands made by the respondent, and directed the respondent to make a legal offer of possession after obtaining Occupation Certificate. The respondent was also directed to follow the principles laid down by the Authority in previous complaints regarding accounting.", "in_favor_of_respondent": "no"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
COMPLAINT NO. 755 O…COMPLAINT NO. 755 OF 2021 | HaryanaHaryana | Complainant sought refund for a plot not delivere…Complainant sought refund for a plot not delivered by the respondent. Authority directed refund with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in 2005 and paid Rs. 32,53,812/- against a total sale consideration of Rs. 32,36,187/-. Despite lapse of about seventeen years from the date of booking, the respondent failed to deliver possession of the plot to the complainant. The respondent vide its letter dated 05.06.2018 admitted that the original plot is not available due to unavoidable reasons and they are willing to offer an alternative plot to the complainant. The complainant does not wish to take delivery of any alternate plot. Therefore, the complainant is seeking refund of Rs. 32,53,812/- along with interest as per Rule 15 of the HRERA, Rules 2017.", "respondent_claim(in detail)": "The respondent stated that though the project has already been developed and Part Completion Certificate has been granted by the Department of Town & Country Planning, Haryana on 23.01.2008, 18.11.2013 and 22.09.2017, however, the plot originally allotted to the complainant is not available due to unavoidable circumstances. The respondent vide its letter dated 05.06.2018 had informed the complainant that he was unable to deliver originally allotted plot to him and they are willing to offer an alternative plot to the complainant. Vide said letter respondent had invited the complainant to visit his office to choose any alternate plot in the same or other project of the respondent but the complainant did not come forward to avail of the options offered to him.", "final_verdict(in detail)": "The Authority directed the respondent to refund Rs. 32,53,812/- paid by the complainant along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017 from the date of making payments up to the date of passing of this order. The Authority also directed the respondent to refund Rs. 78,35,289 /- to the complainant within 90 days of uploading this order on the web portal of the Authority.", "in_favor_of_respondent": "no"} | Sh Amit AgarwalSh Amit Agarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
1057 of 20191057 of 2019 | HaryanaHaryana | Complainant sought refund for a flat not delivere…Complainant sought refund for a flat not delivered by respondent after 17 years. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim(in detail)": "Complainant booke…{"appellant_claim(in detail)": "Complainant booked a flat in 2005, paid Rs. 8.93,750/-, and sought refund as the original flat was not delivered despite repeated requests.", "respondent_claim(in detail)": "Respondent claimed that the original flat was not available due to unavoidable reasons and offered an alternative flat, but the complainant refused to accept it.", "final_verdict(in detail)": "Authority ordered respondent to refund Rs. 22,33,590/- to the complainant, including interest, as the respondent failed to deliver the original flat within a reasonable period.", "in_favor_of_respondent": "no"} | Sadhna GuptaSadhna Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
560 of 2018560 of 2018 | HaryanaHaryana | Complainants sought refund of paid amount along w…Complainants sought refund of paid amount along with interest. Authority directed respondent to refund Rs. 56,90,620/-. | ["Refund of paid am…["Refund of paid amount"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought refund of paid amount along with interest.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Authority directed respondent to refund Rs. 56,90,620/-.", "in_favor_of_respondent": "no"} | Saroj Gupta & Ors.Saroj Gupta & Ors. | TDI Infrastructure …TDI Infrastructure Limited | Link |
2658 of 20192658 of 2019 | HaryanaHaryana | Complainant sought refund for flat not delivered …Complainant sought refund for flat not delivered on time. Authority ordered refund with interest due to respondent's failure to deliver possession and comply with regulations. | ["Flat delivery del…["Flat delivery delay", "Refund with interest"] | {"appellant_claim": "The complainant sought refun…{"appellant_claim": "The complainant sought refund for the flat not delivered on time, claiming that the purpose of the contract had been frustrated due to the respondent's failure to deliver possession within the agreed-upon time frame.", "respondent_claim": "The respondent claimed that they had filed an application for grant of occupation certificate on 12.09.2016, but it was dismissed by the Director, Town & Country Planning Department, Haryana. They also stated that a fresh application for grant of Occupation Certificate has been filed on 17.02.2022.", "final_verdict": "The Authority ordered the respondent to refund Rs. 47,33,922/- to the complainant, including interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Smt. Shilpa GuptaSmt. Shilpa Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
227 of 2020227 of 2020 | HaryanaHaryana | Complainant sought refund of Rs. 24,82,828/- alon…Complainant sought refund of Rs. 24,82,828/- along with interest as per Rule 15 of the HRERA, Rules 2017. Authority directed respondent to pay interest to the complainant on amount paid by him. | ["Refund of amount …["Refund of amount paid by complainant", "Payment of interest"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund of Rs. 24,82,828/- along with interest as per Rule 15 of the HRERA, Rules 2017.", "respondent_claim(in detail)": "Respondent claimed that they had paid full and final payments as per settlement between parties and no interest is due to the complainant against respondent.", "final_verdict(in detail)": "Authority directed respondent to pay interest to the complainant on amount paid by him at the rate stipulated under Rule 15 of the HRERA Rules, 2017 from the date of making payments up to 08.07.2019 i.c. date of last cheque issued by respondent.", "in_favor_of_respondent": "no"} | Baljeet SinghBaljeet Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
1317 Of 20201317 Of 2020 | HaryanaHaryana | Complainant sought refund for a plot booked in 20…Complainant sought refund for a plot booked in 2005. Authority directed refund with interest due to respondent's failure to deliver possession. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in 2005 and paid Rs. 23,28,375/- but the respondent failed to deliver possession. The complainant sought a refund of Rs. 23,28,375/- along with interest.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The Authority directed the respondent to refund Rs. 57,68,134/- to the complainant, including interest, within 90 days.", "in_favor_of_respondent": "no"} | Ramesh Kumar JainRamesh Kumar Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
1442 of 20201442 of 2020 | HaryanaHaryana | Complainant sought refund for a plot not delivere…Complainant sought refund for a plot not delivered by respondent after 17 years. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "Complainant booke…{"appellant_claim(in detail)": "Complainant booked a plot in 2005, paid Rs. 11,03,125, but respondent failed to deliver possession after 17 years. Complainant sought refund with interest.", "respondent_claim(in detail)": "Respondent claimed the project was developed, but the original plot was not available due to unavoidable circumstances. They offered an alternate plot but complainant refused.", "final_verdict(in detail)": "Authority ordered respondent to refund Rs. 27,70,248 to the complainant, including interest from the date of payment to the date of the order.", "in_favor_of_respondent": "no"} | Rajinder ThukralRajinder Thukral | TDI Infrastructure …TDI Infrastructure Limited | Link |
1431 of 20211431 of 2021 | HaryanaHaryana | Complainant sought quashing of additional charges…Complainant sought quashing of additional charges and compensation for delay in possession. Authority ordered payment of delay interest and a legal offer of possession. | ["Delay in possessi…["Delay in possession", "Additional charges"] | {"appellant_claim": "The complainant sought quash…{"appellant_claim": "The complainant sought quashing of additional charges and compensation for delay in possession.", "respondent_claim": "The respondent claimed that the additional charges were legitimate and that the delay in possession was due to unforeseen circumstances.", "final_verdict": "The Authority ordered payment of delay interest and a legal offer of possession.", "in_favor_of_respondent": "no"} | Parvin DeviParvin Devi | TDI Infrastructure …TDI Infrastructure Limited | Link |
1455 Of 20211455 Of 2021 | HaryanaHaryana | Complainant sought refund for a plot not delivere…Complainant sought refund for a plot not delivered by respondent. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund for a plot not delivered by the respondent. The complainant claimed that the respondent had failed to deliver possession of the original plot despite payment of Rs. 42,56,242/-.", "respondent_claim(in detail)": "The respondent claimed that the project had been developed and part completion certificates had been granted. However, the respondent admitted that the original plot was not available due to unforeseen reasons and offered an alternative plot.", "final_verdict(in detail)": "The Authority ordered the respondent to refund the amount paid by the complainant along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017. The respondent was directed to pay the entire amount within 90 days of uploading the order on the web portal of the Authority.", "in_favor_of_respondent": "no"} | Gaurav SuriGaurav Suri | TDI Infrastructure …TDI Infrastructure Limited | Link |
1284 of 20211284 of 2021 | HaryanaHaryana | Complainant sought refund for a plot not delivere…Complainant sought refund for a plot not delivered by respondent. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered plot"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a plot in the 'TDI City' project in 2005. Despite paying Rs. 37,68,750, the respondent failed to deliver possession of the plot within a reasonable period. The complainant sought a refund of the amount paid, along with interest.", "respondent_claim(in detail)": "The respondent claimed that the project had been developed, and a Part Completion Certificate had been granted. However, the originally allotted plot was not available due to unavoidable circumstances. The respondent offered an alternate plot to the complainant but stated that the complainant did not accept the offer.", "final_verdict(in detail)": "The Authority found that the respondent was not able to deliver the originally allotted plot to the complainant. The Authority directed the respondent to refund the amount paid by the complainant, along with interest, as per Rule 15 of the HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Anil DhamijaAnil Dhamija | TDI Infrastructure …TDI Infrastructure Limited | Link |
57 of 202257 of 2022 | HaryanaHaryana | Complainant Uma Dutt filed a complaint against TD…Complainant Uma Dutt filed a complaint against TDI Infrastructure Ltd. for charges related to a flat in the Tuscan Heights project. The authority directed the respondent to execute a conveyance deed in favor of the complainant. | ["Flat charges", "C…["Flat charges", "Conveyance deed"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that the respondent had charged excess amounts for various services, including electrical and fire fighting charges, miscellaneous expenses, increase in apartment area, club membership, and car parking. The complainant sought a refund of these charges and registration of the unit in their favor after completion of the tower.", "respondent_claim(in detail)": "The respondent claimed that the complainant had taken possession of the unit and signed an undertaking that no claims survived. The respondent argued that the complainant had not raised objections to the charges at the time of taking possession and that the complaint was not maintainable at the belated stage.", "final_verdict(in detail)": "The authority directed the respondent to execute a conveyance deed in favor of the complainant. The authority also granted liberty to the complainant to file a fresh complaint regarding lack of infrastructural facilities in the project.", "in_favor_of_respondent": "no"} | Uma DuttUma Dutt | TDI Infrastructure …TDI Infrastructure Limited | Link |
1109 of 20211109 of 2021 | HaryanaHaryana | Complainant sought refund for delayed flat delive…Complainant sought refund for delayed flat delivery. Authority ordered refund with interest due to lack of proper possession offer and excessive delay. | ["Delayed flat deli…["Delayed flat delivery", "Refund with interest"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a flat in 2011 and paid Rs. 27,07,444/- but did not receive proper possession until 2018, eleven years later, without an Occupation Certificate. The complainant sought a refund of Rs. 27,07,444/- with interest.", "respondent_claim(in detail)": "The respondent admitted payments but stated that an Occupation Certificate application was filed in 2014 and that the complainant did not take possession of the flat despite the offer in 2018.", "final_verdict(in detail)": "The Authority found that the respondent did not provide proper possession due to a lack of Occupation Certificate and that the eleven-year delay was inordinate. Therefore, the Authority ordered the respondent to refund Rs. 49,26,968/- to the complainant, including interest.", "in_favor_of_respondent": "no"} | Shashi SharmaShashi Sharma | TDI Infrastructure …TDI Infrastructure Limited | Link |
1187 Of 20211187 Of 2021 | HaryanaHaryana | Complainant sought delivery of possession of flat…Complainant sought delivery of possession of flat after delay of nine years. Authority directed respondent to offer possession after obtaining Occupation Certificate and pay interest for delay. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "Complainant sought delivery …{"appellant_claim": "Complainant sought delivery of possession of flat after delay of nine years.", "respondent_claim": "Respondent claimed that construction of original unit is complete, and complainant is willing to take possession of the originally allotted unit.", "final_verdict": "Authority directed respondent to offer possession after obtaining Occupation Certificate and pay interest for delay.", "in_favor_of_respondent": "no"} | SaritaSarita | TDI Infrastructure …TDI Infrastructure Limited | Link |
1468 of 20211468 of 2021 | HaryanaHaryana | Complainant sought refund and interest for delay …Complainant sought refund and interest for delay in possession of flat. Authority ordered payment of interest for delay and directed respondent to make legal offer of possession after obtaining Occupation Certificate. | ["Delay in possessi…["Delay in possession", "Interest for delay"] | {"appellant_claim": "Complainant sought refund an…{"appellant_claim": "Complainant sought refund and interest for delay in possession of flat.", "respondent_claim": "Respondent claimed that fit out possession was offered on 21.02.2022 and that a fresh application for grant of Occupation Certificate had been filed.", "final_verdict": "Authority ordered payment of interest for delay and directed respondent to make legal offer of possession after obtaining Occupation Certificate.", "in_favor_of_respondent": "no"} | Sandeep KumarSandeep Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
719, 1024 & 1201 of…719, 1024 & 1201 of 2019 | HaryanaHaryana | The complainants sought refund of amounts paid to…The complainants sought refund of amounts paid to the respondent for delayed delivery of flats. The Authority directed the respondent to refund the amounts with interest. | ["Delayed delivery …["Delayed delivery of flats", "Refund of amounts paid"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that the respondent had delayed delivery of flats and sought refund of amounts paid.", "respondent_claim": "The respondent claimed that the flats were ready for delivery and sought time to provide occupation certificates.", "final_verdict": "The Authority directed the respondent to refund the amounts paid by the complainants with interest.", "in_favor_of_respondent": "no"} | Mohit JaggiMohit Jaggi | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
2950 of 20192950 of 2019 | HaryanaHaryana | Complainant sought refund of Rs. 9,72,000/- for i…Complainant sought refund of Rs. 9,72,000/- for illegal and unfair allotment of flat by respondent. Authority directed respondent to refund amount with interest. | ["Illegal allotment…["Illegal allotment", "Refund"] | {"appellant_claim(in detail)": "Complainant alleg…{"appellant_claim(in detail)": "Complainant alleged that respondent had allotted a flat to him in an illegal and unfair manner without conducting a draw of lots. He sought refund of Rs. 9,72,000/- with interest.", "respondent_claim(in detail)": "Respondent claimed that complainant had failed to pay further installments and that the allotment was made as per the company's policies.", "final_verdict(in detail)": "Authority directed respondent to refund Rs. 9,72,000/- paid by complainant along with interest of Rs. 9,60,635/-, totaling Rs. 19,32,635/-. The respondent was given 90 days to make the payment.", "in_favor_of_respondent": "no"} | Narender KumarNarender Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
673 of 2021673 of 2021 | HaryanaHaryana | Complainant sought refund for a cancelled flat bo…Complainant sought refund for a cancelled flat booking. Authority ordered refund with interest. | ["Refund for cancel…["Refund for cancelled flat booking"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for a cancelled flat booking and interest.", "respondent_claim": "Respondent claimed complainant defaulted on payments and the cancellation was legitimate.", "final_verdict": "Authority ordered refund of Rs. 16,03,396/- with interest.", "in_favor_of_respondent": "no"} | Mohit KapoorMohit Kapoor | TDI Infrastructure …TDI Infrastructure Limited | Link |
2834 of 20192834 of 2019 | HaryanaHaryana | Complainant Suresh Arya withdraws complaint again…Complainant Suresh Arya withdraws complaint against TDI Infrastructure Ltd. Case disposed as settled. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint is disposed of as settled upon the complainant's request to withdraw the complaint.", "in_favor_of_respondent": "no"} | Suresh AryaSuresh Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
907 & 908 of 2019907 & 908 of 2019 | HaryanaHaryana | Complainants sought refund for incomplete flats i…Complainants sought refund for incomplete flats in TDI City project. Authority ordered refund with interest, citing multiple defects. | ["Incomplete flats"…["Incomplete flats", "Refund with interest"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for incomplete flats and sought compensation for delay.", "respondent_claim": "Respondent claimed that flats were complete and offered fit-out possession.", "final_verdict": "Authority ordered refund with interest, citing multiple defects in the project.", "in_favor_of_respondent": "no"} | Joginder SinghJoginder Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
2889 CF 20192889 CF 2019 | HaryanaHaryana | Complainant sought refund for flat not delivered …Complainant sought refund for flat not delivered on time. Authority ordered refund with interest due to respondent's delay. | ["Flat delivery del…["Flat delivery delay", "Refund"] | {"appellant_claim": "The complainant booked a fla…{"appellant_claim": "The complainant booked a flat in 2009 but it was not delivered on time. He sought a refund of Rs. 19,77,174/- with interest.", "respondent_claim": "The respondent claimed that the flat was offered for possession in 2020 but the complainant did not take it.", "final_verdict": "The Authority ordered the respondent to refund Rs. 41,82,217/- to the complainant, including interest, due to the delay in delivery of the flat.", "in_favor_of_respondent": "no"} | Muneesh Kumar JetlyMuneesh Kumar Jetly | TDI Infrastructure …TDI Infrastructure Limited | Link |
1242 of 20181242 of 2018 | HaryanaHaryana | Complaint settled between complainant Suman Dua a…Complaint settled between complainant Suman Dua and respondent TDI Infrastructure Ltd. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint settled", "in_favor_of_respondent": "no"} | Suman DuaSuman Dua | TDI Infrastructure …TDI Infrastructure Limited | Link |
352 of 2020352 of 2020 | HaryanaHaryana | Complaints settled with complainants. Settlement …Complaints settled with complainants. Settlement deeds submitted and signed. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaints settled with complainants.", "in_favor_of_respondent": "no"} | Manisha MittalManisha Mittal | TDI Infrastructure …TDI Infrastructure Limited | Link |
1341 Of 20201341 Of 2020 | HaryanaHaryana | Complainant sought refund for delayed flat posses…Complainant sought refund for delayed flat possession. Authority ordered refund with interest due to respondent's failure to deliver possession despite 11-year delay. | ["Delayed possessio…["Delayed possession", "Refund"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed flat possession.", "respondent_claim": "Respondent claimed they had filed applications for occupation certificates but were dismissed.", "final_verdict": "Authority ordered refund with interest due to respondent's failure to deliver possession despite 11-year delay.", "in_favor_of_respondent": "no"} | SubhashSubhash | TDI Infrastructure …TDI Infrastructure Limited | Link |
647 of 2020647 of 2020 | HaryanaHaryana | Complainant sought refund for a commercial plot d…Complainant sought refund for a commercial plot due to non-development of infrastructure. Authority ordered payment of interest for delay in possession but denied refund. | ["Refund for Undeve…["Refund for Undeveloped Plot"] | {"appellant_claim(in detail)": "The complainant s…{"appellant_claim(in detail)": "The complainant sought refund for a commercial plot due to non-development of infrastructure and lack of possession despite payment of over 50% of the consideration.", "respondent_claim(in detail)": "The respondent claimed that the project was partially completed with Part Completion Certificates issued in 2008, 2013, and 2017, and that possession was offered in 2017.", "final_verdict(in detail)": "The Authority ordered payment of interest for delay in possession but denied refund, citing the project's partial completion and the need to avoid encouraging other allottees to withdraw and seek refund.", "in_favor_of_respondent": "no"} | Nikhil AsraniNikhil Asrani | TDI Infrastructure …TDI Infrastructure Limited | Link |
2597-20192597-2019 | HaryanaHaryana | Complainants sought refund for undelivered flats.…Complainants sought refund for undelivered flats. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered flats"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought refund for undelivered flats due to the respondent's failure to complete construction.", "respondent_claim(in detail)": "The respondent claimed that they were willing to offer alternate flats but the complainants refused.", "final_verdict(in detail)": "The Authority ordered the respondent to refund the complainants' money with interest, as the respondent was unable to deliver the original flats.", "in_favor_of_respondent": "no"} | Asha VashisthAsha Vashisth | TDI Infrastructure …TDI Infrastructure Limited | Link |
["2597-2019", "519-…["2597-2019", "519-2020", "1249-2021"] | HaryanaHaryana | Complainants sought refund for undelivered flats.…Complainants sought refund for undelivered flats. Authority ordered refund with interest. | ["Refund for undeli…["Refund for undelivered flats"] | {"appellant_claim(in detail)": "Complainants soug…{"appellant_claim(in detail)": "Complainants sought refund for undelivered flats.", "respondent_claim(in detail)": "Respondent offered alternate flats but failed to deliver original flats.", "final_verdict(in detail)": "Authority ordered refund with interest.", "in_favor_of_respondent": "no"} | Asha VashisthAsha Vashisth | TDI Infrastructure …TDI Infrastructure Limited | Link |
959 of 2021959 of 2021 | HaryanaHaryana | Complainant sought refund for delayed flat delive…Complainant sought refund for delayed flat delivery. Authority ordered refund with interest due to respondent's failure to provide possession and occupation certificate. | ["Delayed flat deli…["Delayed flat delivery", "Refund with interest"] | {"appellant_claim": "Complainant sought refund fo…{"appellant_claim": "Complainant sought refund for delayed flat delivery and lack of possession.", "respondent_claim": "Respondent claimed offer of fit-out possession was made but not accepted.", "final_verdict": "Authority ordered refund with interest due to respondent's failure to provide possession and occupation certificate.", "in_favor_of_respondent": "no"} | Vandana MathurVandana Mathur | TDI Infrastructure …TDI Infrastructure Limited | Link |
515-2022515-2022 | HaryanaHaryana | Complainant sought refund for illegal cancellatio…Complainant sought refund for illegal cancellation of shop allotment. Authority ordered refund with interest. | ["Refund for illega…["Refund for illegal cancellation"] | {"appellant_claim": "Complainant claimed refund f…{"appellant_claim": "Complainant claimed refund for illegal cancellation of shop allotment without demand or notice.", "respondent_claim": "Respondent claimed complainant was an investor, not a consumer, and the complaint was time-barred.", "final_verdict": "Authority ordered refund with interest, finding the cancellation illegal and unfair.", "in_favor_of_respondent": "no"} | Parvesh JainParvesh Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
["2719 of 2019", "2…["2719 of 2019", "2997 of 2019", "2187 of 2019"] | HaryanaHaryana | Complainants sought refund for delayed possession…Complainants sought refund for delayed possession of shops in TDI City project. Authority ordered payment of interest for delay and possession to be handed over. | ["Delayed possessio…["Delayed possession", "Interest payment"] | {"appellant_claim": "Complainants claimed refund …{"appellant_claim": "Complainants claimed refund for delayed possession of shops and sought compensation for the delay.", "respondent_claim": "Respondent claimed that the project was complete and that possession had been given to the complainants.", "final_verdict": "Authority ordered payment of interest for the delay and possession to be handed over to the complainants.", "in_favor_of_respondent": "no"} | Viksit JainViksit Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
1115, 1116, 1352 of…1115, 1116, 1352 of 2020 | HaryanaHaryana | The complainants sought refund for delayed posses…The complainants sought refund for delayed possession of flats in the Tuscan City project. The Authority held that the project was incomplete and not habitable, and directed the respondent to refund the amounts paid by the complainants with interest. | Delayed possession …Delayed possession of flats | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that they had paid for flats in the Tuscan City project, but the respondent had failed to deliver possession of the flats despite several years of delay.", "respondent_claim": "The respondent claimed that the construction of the flats was ongoing and that possession would be given soon.", "final_verdict": "The Authority held that the project was incomplete and not habitable, and directed the respondent to refund the amounts paid by the complainants with interest.", "in_favor_of_respondent": "no"} | Vikram GroverVikram Grover | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
608 of 2021608 of 2021 | HaryanaHaryana | Complainant sought refund for flat not delivered …Complainant sought refund for flat not delivered by respondent after 12 years. Authority ordered refund with interest. | ["Flat not delivere…["Flat not delivered", "Refund with interest"] | {"appellant_claim(in detail)": "Complainant booke…{"appellant_claim(in detail)": "Complainant booked a flat in 2010 and paid Rs. 24,18,074/- but respondent failed to deliver possession after 12 years. Complainant sought refund of Rs. 23,85,164/- with interest.", "respondent_claim(in detail)": "Respondent admitted payment of Rs. 24,18,073.87/- by the complainant but claimed construction was ongoing and flat would be delivered after completion.", "final_verdict(in detail)": "Authority ordered respondent to refund Rs. 43,00,824.87/- to the complainant, including interest, within 90 days.", "in_favor_of_respondent": "no"} | Patanjali BediPatanjali Bedi | TDI Infrastructure …TDI Infrastructure Limited | Link |
864 of 2022864 of 2022 | HaryanaHaryana | Complaint withdrawn with liberty to file afresh a…Complaint withdrawn with liberty to file afresh after necessary corrections. Case dismissed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "The complainants …{"appellant_claim(in detail)": "The complainants wanted to withdraw the present complaint with liberty to file afresh after necessary corrections.", "respondent_claim(in detail)": "The respondent claimed that the complaint was not maintainable because the name of the respondent company had been wrongly mentioned.", "final_verdict(in detail)": "The case was dismissed as withdrawn with liberty to file complaint afresh.", "in_favor_of_respondent": "no"} | Vibha KheraVibha Khera | TDI Infrastructure …TDI Infrastructure Limited | Link |
224 of 2021224 of 2021 | HaryanaHaryana | The complainant, Jitendra Arora, filed a complain…The complainant, Jitendra Arora, filed a complaint against M/s TDI Infrastructure Ltd. and Sh. Devki Nandan for not handing over possession of a flat and not refunding the amount paid. The adjudicating officer directed the respondent to pay a compensation of Rs. 7,26,161/- to the complainant. | ["Non-handover of p…["Non-handover of possession", "Non-refund of amount"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that he had paid a sum of Rs. 36,98,619/- to the respondent and that the respondent had not handed over possession of the flat and not refunded the amount.", "respondent_claim": "The respondent claimed that the complainant was not entitled to the refund and that the possession of the flat was not handed over due to various reasons.", "final_verdict": "The adjudicating officer directed the respondent to pay a compensation of Rs. 7,26,161/- to the complainant.", "in_favor_of_respondent": "no"} | Jitendra AroraJitendra Arora | TDI Infrastructure …TDI Infrastructure Limited | Link |
1470 of 20221470 of 2022 | HaryanaHaryana | The complainants, Patanjali Bedi and Ms. Manju Be…The complainants, Patanjali Bedi and Ms. Manju Bedi, filed a complaint against TDI Infrastructure Ltd. for not delivering possession of their flat despite paying 95% of the total sale consideration. The Adjudicating Officer partly allowed the complaint and directed the respondent to pay a compensation of ₹16,28,303/-. | ["Delay in possessi…["Delay in possession of flat", "Non-payment of compensation"] | {"appellant_claim": "The complainants claimed tha…{"appellant_claim": "The complainants claimed that despite paying 95% of the total sale consideration, the respondent failed to deliver possession of their flat. They sought compensation for the delay, mental harassment, and financial losses.", "respondent_claim": "The respondent claimed that the complainants were defaulters in making payments, and the delay in possession was due to various reasons, including force majeure conditions.", "final_verdict": "The Adjudicating Officer partly allowed the complaint and directed the respondent to pay a compensation of \u20b916,28,303/-.", "in_favor_of_respondent": "no"} | Manju BediManju Bedi | TDI Infrastructure …TDI Infrastructure Limited | Link |
469, 470, and 758 o…469, 470, and 758 of 2022 | HaryanaHaryana | Complainants sought relief for delay in possessio…Complainants sought relief for delay in possession of flats and increase in super area. Authority directed payment of delay interest and fresh offer of possession after Occupation Certificate. | ["Delay in possessi…["Delay in possession", "Increase in super area"] | {"appellant_claim": "Complainants claimed delay i…{"appellant_claim": "Complainants claimed delay in possession of flats and increase in super area without justification.", "respondent_claim": "Respondent claimed that the increase in super area was justified and possession was delayed due to unforeseen circumstances.", "final_verdict": "Authority directed payment of delay interest and fresh offer of possession after Occupation Certificate.", "in_favor_of_respondent": "no"} | Pooja RanaPooja Rana | TDI Infrastructure …TDI Infrastructure Limited | Link |
469 of 2022469 of 2022 | HaryanaHaryana | Complainants sought relief for delay in possessio…Complainants sought relief for delay in possession of flat and payment of delay interest. Authority directed payment of delay interest and fresh offer of possession after obtaining Occupation Certificate. | ["Delay in possessi…["Delay in possession", "Payment of delay interest"] | {"appellant_claim": "Complainants claimed delay i…{"appellant_claim": "Complainants claimed delay in possession of flat and sought payment of delay interest.", "respondent_claim": "Respondent claimed that possession was delayed due to various reasons and sought payment for increased area.", "final_verdict": "Authority directed payment of delay interest and fresh offer of possession after obtaining Occupation Certificate.", "in_favor_of_respondent": "no"} | Pooja RanaPooja Rana | TDI Infrastructure …TDI Infrastructure Limited | Link |
2302 of 20222302 of 2022 | HaryanaHaryana | Complainant seeks refund of amount deposited with…Complainant seeks refund of amount deposited with interest for delayed delivery of possession of commercial shop in unregistered project. Authority directs refund with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim": "Complainant booked a commerc…{"appellant_claim": "Complainant booked a commercial shop in 2007, paid Rs. 23,25,000, but respondent failed to allot a specific unit, develop the project, or deliver possession. Complainant seeks refund with interest.", "respondent_claim": "Not provided", "final_verdict": "Authority directs respondent to refund Rs. 8,77,710, including interest at 10.60%, within 90 days.", "in_favor_of_respondent": "no"} | Parmod JainParmod Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
1388 of 20211388 of 2021 | HaryanaHaryana | Complainant sought refund of paid amount along wi…Complainant sought refund of paid amount along with interest for delayed delivery of possession. Authority directed respondent to refund the amount with interest. | ["Delayed possessio…["Delayed possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claimed that res…{"appellant_claim": "Complainant claimed that respondent failed to deliver possession of the booked unit despite receiving the full payment.", "respondent_claim": "Respondent claimed that the project was complete and that the complainant had taken possession of the unit.", "final_verdict": "Authority directed respondent to refund the amount of \u20b91,00,23,595.21 to the complainant.", "in_favor_of_respondent": "no"} | Atul Hari BhatnagarAtul Hari Bhatnagar | TDI Infrastructure …TDI Infrastructure Limited | Link |
1131 of 20201131 of 2020 | HaryanaHaryana | Complainant Sneh Lata filed a complaint against T…Complainant Sneh Lata filed a complaint against TDI Infrastructure Limited for delay in delivery of possession. The Authority directed the respondent to pay interest and recalculate the super area. | ["Delay in possessi…["Delay in possession", "Super area calculation"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the delivery of possession and sought a recalculation of the super area.", "respondent_claim": "The respondent claimed that they had not delayed the delivery of possession and that the super area calculation was correct.", "final_verdict": "The Authority directed the respondent to pay interest for the delay in delivery of possession and to recalculate the super area based on the principles laid down in a previous complaint.", "in_favor_of_respondent": "no"} | Sneh LataSneh Lata | TDI Infrastructure …TDI Infrastructure Limited | Link |
3044 of 20193044 of 2019 | HaryanaHaryana | Complainant Raj Kumar sought relief for delay in …Complainant Raj Kumar sought relief for delay in possession of a unit by TDI Infrastructure Limited. The Authority ordered payment of delay interest and monthly interest until a valid offer of possession was made. | ["Delay in possessi…["Delay in possession", "RERA dispute"] | {"appellant_claim": "The complainant claimed dela…{"appellant_claim": "The complainant claimed delay in possession of a unit by the respondent and sought relief.", "respondent_claim": "The respondent claimed that the complainant had not paid outstanding dues.", "final_verdict": "The Authority ordered payment of delay interest and monthly interest until a valid offer of possession was made.", "in_favor_of_respondent": "no"} | Raj KumarRaj Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
2669 of 20192669 of 2019 | HaryanaHaryana | Complainant Amita filed a complaint against TDI I…Complainant Amita filed a complaint against TDI Infrastructure Limited for delay in possession. The Authority ordered payment of delay interest and option for possession. | ["Delay in Possessi…["Delay in Possession"] | {"appellant_claim": "Delay in possession of apart…{"appellant_claim": "Delay in possession of apartment", "respondent_claim": "Not provided", "final_verdict": "Payment of delay interest and option for possession", "in_favor_of_respondent": "no"} | AmitaAmita | TDI Infrastructure …TDI Infrastructure Limited | Link |
996 of 2021996 of 2021 | HaryanaHaryana | Complainant Sukhbir Singh filed a review applicat…Complainant Sukhbir Singh filed a review application against the order dated 03.02.2022 passed in Review application no. 996 of 2021. The Authority dismissed the review application. | ["Review of order",…["Review of order", "Amendment of substantive part of order"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the interest calculated by the office of the Authority on account of delay was wrong and that it should be recalculated.", "respondent_claim": "The respondent claimed that it was entitled to collect the outstanding dues from the complainant at the time of final settlement of receivable and payable amount.", "final_verdict": "The Authority dismissed the review application and rejected the application filed by the respondent for review of the order dated 03.02.2022.", "in_favor_of_respondent": "no"} | Sukhbir SinghSukhbir Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
718 of 2021718 of 2021 | HaryanaHaryana | Complainant Surender Singh filed a complaint agai…Complainant Surender Singh filed a complaint against TDI Infrastructure Limited for delay in handover of possession. The Haryana Real Estate Regulatory Authority (HRERA) ordered the respondent to pay delay interest and monthly interest until a legally valid offer of possession is made. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the handover of possession and sought payment of delay interest.", "respondent_claim": "The respondent claimed that they were not liable to pay delay interest on the amounts collected for passing over to other departments/authorities concerned.", "final_verdict": "The HRERA ordered the respondent to pay delay interest and monthly interest until a legally valid offer of possession is made.", "in_favor_of_respondent": "no"} | Surender SinghSurender Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
273, 294, 307 of 20…273, 294, 307 of 2021 | HaryanaHaryana | Complainants sought refund for failed real estate…Complainants sought refund for failed real estate project. Authority ordered refund with interest, but rejected review application for order amendment. | ["Real estate refun…["Real estate refund", "Project failure"] | {"appellant_claim": "Refund for failed real estat…{"appellant_claim": "Refund for failed real estate project", "respondent_claim": "Not specified", "final_verdict": "Refund ordered with interest", "in_favor_of_respondent": "no"} | AnotherAnother | TDI Infrastructure …TDI Infrastructure Limited | Link |
2875 of 20192875 of 2019 | HaryanaHaryana | Complaint regarding increase in area of booked un…Complaint regarding increase in area of booked unit. Case disposed of in accordance with principles laid down in earlier case. | ["Increase in area …["Increase in area of booked unit"] | {"appellant_claim": "Increase in area of booked u…{"appellant_claim": "Increase in area of booked unit from 1224 sq. ft to 1456.56 sq. ft", "respondent_claim": "Not provided", "final_verdict": "Case disposed of in accordance with principles laid down in earlier case. Respondent to recalculate super area accordingly", "in_favor_of_respondent": "no"} | Satish Kumar DahiyaSatish Kumar Dahiya | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 553 o…Execution No. 553 of 2022 | HaryanaHaryana | The judgement debtor, TDI Infrastructure Ltd., ma…The judgement debtor, TDI Infrastructure Ltd., made payment of the total decretal amount of ₹13,58,165/- to the decree holder, Prabhakar Kumar, thereby satisfying the order under execution. | ["Payment of decret…["Payment of decretal amount"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The judgement debtor made payment of the total decretal amount, thereby satisfying the order under execution.", "in_favor_of_respondent": "no"} | Prabhakar KumarPrabhakar Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
522 of 2022522 of 2022 | HaryanaHaryana | Complainant seeks refund of paid amount and inter…Complainant seeks refund of paid amount and interest for delayed delivery of possession by respondent. Authority directs refund of amount with interest. | ["Delayed possessio…["Delayed possession", "Refund of amount"] | {"appellant_claim": "Complainant claims refund of…{"appellant_claim": "Complainant claims refund of paid amount and interest for delayed delivery of possession by respondent.", "respondent_claim": "Respondent claims that project is complete and occupation certificate is pending.", "final_verdict": "Authority directs refund of amount with interest.", "in_favor_of_respondent": "no"} | Mrs. Anita Kishore …Mrs. Anita Kishore Thawani | TDI Infrastructure …TDI Infrastructure Limited | Link |
152 of 2022152 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount along w…Complainants sought refund of paid amount along with interest for delayed delivery of possession. Authority directed respondent to refund the amount with interest. | ["Delayed possessio…["Delayed possession", "Refund of payment"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent failed to deliver possession of the booked plot within the agreed-upon time frame and sought refund of the paid amount along with interest.", "respondent_claim": "Respondent claimed that the project was completed and that the complainants were given an alternative plot, but failed to provide evidence of the project's completion.", "final_verdict": "Authority directed respondent to refund the entire amount of \u20b964,08,639/- to the complainants.", "in_favor_of_respondent": "no"} | Inder KumarInder Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
1396 of 20211396 of 2021 | HaryanaHaryana | Complainant seeks refund of paid amount along wit…Complainant seeks refund of paid amount along with interest for non-delivery of possession by respondent. Authority directs respondent to refund the amount with interest. | ["Non-delivery of p…["Non-delivery of possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent failed to deliver possession of the flat despite receiving full payment.", "respondent_claim": "Respondent claims that the project is complete and possession was offered to the complainant, but the complainant failed to accept possession and make payment of outstanding dues.", "final_verdict": "Authority directs respondent to refund the entire amount of \u20b958,05,128/- to the complainant.", "in_favor_of_respondent": "no"} | Nidhi JainNidhi Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
3100 of 20223100 of 2022 | HaryanaHaryana | Complaint withdrawn by the complainant. Case disp…Complaint withdrawn by the complainant. Case disposed as withdrawn. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint withdrawn by the complainant.", "in_favor_of_respondent": "no"} | Arun GuptaArun Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
1078 of 20191078 of 2019 | HaryanaHaryana | Complainant sought refund of paid amount along wi…Complainant sought refund of paid amount along with interest for delayed delivery of possession. Authority directed refund of amount with interest. | ["Delayed possessio…["Delayed possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claimed refund o…{"appellant_claim": "Complainant claimed refund of paid amount along with interest for delayed delivery of possession.", "respondent_claim": "Respondent claimed that possession was given on 20.05.2019 and complainant had taken possession on 06.10.2020.", "final_verdict": "Authority directed refund of amount with interest.", "in_favor_of_respondent": "no"} | Purushottam Kumar B…Purushottam Kumar Bhardwaj | TDI Infrastructure …TDI Infrastructure Limited | Link |
1620 of 20221620 of 2022 | HaryanaHaryana | Complainants sought execution of conveyance deed …Complainants sought execution of conveyance deed for their apartments in the Kingsbury Flats project. The Authority directed the respondent to immediately execute the conveyance deed in favor of the complainants. | Execution of Convey…Execution of Conveyance Deed | {"appellant_claim": "The complainants sought exec…{"appellant_claim": "The complainants sought execution of conveyance deed for their apartments in the Kingsbury Flats project.", "respondent_claim": "The respondent claimed that the complainants had not paid their outstanding dues and therefore were not entitled to the conveyance deed.", "final_verdict": "The Authority directed the respondent to immediately execute the conveyance deed in favor of the complainants.", "in_favor_of_respondent": "no"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
2901 of 20222901 of 2022 | HaryanaHaryana | Complaint settled between parties, complaint with…Complaint settled between parties, complaint withdrawn. | ["Settlement", "Wit…["Settlement", "Withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn due to settlement between parties.", "in_favor_of_respondent": "no"} | Saloni MongaSaloni Monga | TDI Infrastructure …TDI Infrastructure Limited | Link |
1369 of 20221369 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount along w…Complainants sought refund of paid amount along with interest on account of inordinate delay caused in delivery of possession. Authority found it to be a fit case for allowing refund in favour of complainants. | ["Delay in possessi…["Delay in possession", "Refund of paid amount"] | {"appellant_claim": "Complainants claimed that po…{"appellant_claim": "Complainants claimed that possession of the apartment was supposed to be delivered by 2015, but the respondent failed to do so. They also claimed that the respondent had unilaterally increased the area of the apartment without justification and had raised a demand of Rs. 7,11,518/- from them.", "respondent_claim": "The respondent claimed that the project was complete and that they had applied for occupation certificate on 31.03.2017. They also claimed that the complainants had failed to pay the dues and that the allotment was cancelled accordingly.", "final_verdict": "The Authority found that the complainants were entitled to refund of the paid amount along with interest. The Authority directed the respondent to refund the amount of Rs. 49,67,717/- to the complainants.", "in_favor_of_respondent": "no"} | Harpreet KaurHarpreet Kaur | TDI Infrastructure …TDI Infrastructure Limited | Link |
1864 of 20221864 of 2022 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest due to delay in delivery of possession. Authority directed refund of amount with interest. | ["Refund of amount …["Refund of amount deposited", "Delay in delivery of possession"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of amount deposited with interest due to delay in delivery of possession.", "respondent_claim": "Respondent claimed that complainant had not made further payments and that the allotment was cancelled due to non-payment of dues.", "final_verdict": "Authority directed refund of amount with interest.", "in_favor_of_respondent": "no"} | Amrit Lal JainAmrit Lal Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
780 of 2021780 of 2021 | HaryanaHaryana | Complainant Sunita Dixit filed a complaint agains…Complainant Sunita Dixit filed a complaint against TDI Infrastructure Limited for delay in possession. The Authority ordered the payment of delay interest and a legal offer of possession. | ["Delay in possessi…["Delay in possession", "Interest payment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent delayed the possession of the flat and sought relief for the same.", "respondent_claim": "The respondent claimed that the delay was due to various reasons and sought to collect outstanding dues from the complainant.", "final_verdict": "The Authority ordered the payment of delay interest and a legal offer of possession. The respondent was directed to follow the principles laid down by the Authority in previous complaints.", "in_favor_of_respondent": "no"} | Sunita DixitSunita Dixit | TDI Infrastructure …TDI Infrastructure Limited | Link |
1863 of 20221863 of 2022 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest for delayed delivery of possession. Authority directed refund of amount with interest. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "The complainant b…{"appellant_claim(in detail)": "The complainant booked a commercial shop in the project of the respondent on 04.02.2007 by paying a booking amount of \u20b9 4,50,000/- against basic sale consideration of \u20b9 22,50,000/-. The complainant alleged that the respondent failed to allot a specific shop to the complainant and since no allotment was made, further payments were not payable by the complainant. The complainant sought refund of the amount deposited with interest for delayed delivery of possession.", "respondent_claim(in detail)": "The respondent submitted that the project in question already stands completed. The complainant had booked a commercial plot in the project on 04.02.2007 upon payment of \u20b9 4,50,000/- as booking amount. The respondent alleged that the complainant had stopped making further payments despite allotment of booked unit was issued. The allotment of the complainant was cancelled on 13.01.2012 on account of non-payment of dues.", "final_verdict(in detail)": "The Authority directed the respondent to refund the entire amount of \u20b9 12,30,690/- (till date of order i.e. 18.04.2023) to the complainant. A period of 90 days was given to the respondent to comply with the directions given in this order.", "in_favor_of_respondent": "no"} | Amrit Lal JainAmrit Lal Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
590 of 2022590 of 2022 | HaryanaHaryana | Complainant sought refund of amount deposited by …Complainant sought refund of amount deposited by him along with interest in terms of Section 18 of Act of 2016. Authority found it to be a fit case for allowing refund in favour of complainant along with interest on paid amount as per Rule 15 of HRERA Rules 2017. | ["Refund of amount …["Refund of amount deposited by complainant"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of amount deposited by him along with interest in terms of Section 18 of Act of 2016.", "respondent_claim": "Respondent claimed that the project in which the unit of the complainant is situated is not being constructed and that the respondent cannot ascertain any specific date for delivery of possession.", "final_verdict": "Authority found it to be a fit case for allowing refund in favour of complainant along with interest on paid amount as per Rule 15 of HRERA Rules 2017.", "in_favor_of_respondent": "no"} | R K KhuranaR K Khurana | TDI Infrastructure …TDI Infrastructure Limited | Link |
743 of 2021743 of 2021 | HaryanaHaryana | Complainants sought relief for delayed possession…Complainants sought relief for delayed possession, unjustified demands, and increase in super area. Authority directed respondent to issue fresh offer of possession, pay delay interest, and recalculate charges. | ["Delayed possessio…["Delayed possession", "Unjustified demands", "Increase in super area"] | {"appellant_claim": "Complainants claimed that re…{"appellant_claim": "Complainants claimed that respondent delayed possession, made unjustified demands, and increased the super area without justification.", "respondent_claim": "Respondent claimed that possession was given in 2015, and the increase in super area was justified.", "final_verdict": "Authority directed respondent to issue fresh offer of possession, pay delay interest, and recalculate charges.", "in_favor_of_respondent": "no"} | Kusum GaurKusum Gaur | TDI Infrastructure …TDI Infrastructure Limited | Link |
2683 of 20222683 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount along w…Complainants sought refund of paid amount along with interest for delay in possession of a real estate project. Authority directed refund with interest at the prescribed rate. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they had paid a total amount of \u20b941,20,234/- against a total sale consideration of \u20b967,75,000/- and that the respondent had failed to deliver possession of the booked unit despite a delay of more than 13 years.", "respondent_claim": "The respondent claimed that the complainants had defaulted on payment of dues and had failed to come forward to execute a builder-buyer agreement.", "final_verdict": "The Authority directed the respondent to refund the entire amount of \u20b984,00,610/- to the complainant along with interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Radha Rani GuptaRadha Rani Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
1744 of 20221744 of 2022 | HaryanaHaryana | Complainant seeks refund for delayed possession a…Complainant seeks refund for delayed possession and area reduction in a real estate project. Authority orders refund with interest. | ["Delayed possessio…["Delayed possession", "Area reduction"] | {"appellant_claim": "Complainant claims refund fo…{"appellant_claim": "Complainant claims refund for delayed possession and area reduction in a real estate project.", "respondent_claim": "Respondent claims that possession was offered in 2019 and area reduction was as per sanctioned plan.", "final_verdict": "Authority orders refund with interest for delayed possession and area reduction.", "in_favor_of_respondent": "no"} | Manish GargManish Garg | TDI Infrastructure …TDI Infrastructure Limited | Link |
2534/20222534/2022 | HaryanaHaryana | Complainant seeks possession of booked shop, dela…Complainant seeks possession of booked shop, delay interest, and compensation for harassment due to delay in possession and non-maintenance of project. Authority directs respondent to pay delay interest and conveyance deed, and advises complainant to approach Adjudicating Officer for litigation expenses. | ["Delay in possessi…["Delay in possession", "Non-maintenance of project"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent failed to deliver possession of booked shop despite payment of Rs. 22,41,826/- and seeks possession, delay interest, and compensation for harassment.", "respondent_claim": "Respondent claims that project is not registered with RERA, and that complainant is a speculative buyer who invested for monetary returns.", "final_verdict": "Authority directs respondent to pay delay interest of Rs. 21,95,336/- and conveyance deed within 90 days. Advises complainant to approach Adjudicating Officer for litigation expenses.", "in_favor_of_respondent": "no"} | Neelam GoelNeelam Goel | TDI Infrastructure …TDI Infrastructure Limited | Link |
2580/20222580/2022 | HaryanaHaryana | Complainant seeks refund of paid amount with inte…Complainant seeks refund of paid amount with interest for delayed delivery of possession in a real estate project. Authority directs refund with interest at the rate of 10.75%. | ["Delayed possessio…["Delayed possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claims refund of…{"appellant_claim": "Complainant claims refund of paid amount with interest for delayed delivery of possession in a real estate project.", "respondent_claim": "Respondent claims that the project is not registered with the Authority and therefore the Authority does not have jurisdiction to entertain the complaint.", "final_verdict": "Authority directs refund of paid amount with interest at the rate of 10.75%.", "in_favor_of_respondent": "no"} | Amit MahajanAmit Mahajan | TDI Infrastructure …TDI Infrastructure Limited | Link |
2607/20222607/2022 | HaryanaHaryana | Complainant seeks refund of paid amount with inte…Complainant seeks refund of paid amount with interest for delayed delivery of possession in a real estate project. Authority directs refund with interest at the prescribed rate. | ["Delayed possessio…["Delayed possession", "Refund with interest"] | {"appellant_claim": "Complainant claims refund of…{"appellant_claim": "Complainant claims refund of paid amount with interest for delayed delivery of possession in a real estate project.", "respondent_claim": "Respondent claims that possession could not be delivered due to unforeseen circumstances and offers an alternative plot.", "final_verdict": "Authority directs refund of paid amount with interest at the prescribed rate.", "in_favor_of_respondent": "no"} | Praveen BhasinPraveen Bhasin | TDI Infrastructure …TDI Infrastructure Limited | Link |
2346/20222346/2022 | HaryanaHaryana | Complainant sought refund of amount deposited wit…Complainant sought refund of amount deposited with interest for non-delivery of possession by respondent. Authority directed refund with interest after deduction of earnest money. | ["Non-delivery of p…["Non-delivery of possession", "Refund with interest"] | {"appellant_claim": "Complainant claimed refund o…{"appellant_claim": "Complainant claimed refund of amount deposited with interest for non-delivery of possession by respondent.", "respondent_claim": "Respondent claimed that complainant was an investor and not entitled to refund.", "final_verdict": "Authority directed refund of amount deposited with interest after deduction of earnest money.", "in_favor_of_respondent": "no"} | Chand RoopChand Roop | TDI Infrastructure …TDI Infrastructure Limited | Link |
2815 of 20222815 of 2022 | HaryanaHaryana | Complainants sought refund of paid amount with in…Complainants sought refund of paid amount with interest for delay in possession of flat. Authority directed refund with interest. | ["Delay in possessi…["Delay in possession", "Refund with interest"] | {"appellant_claim": "Complainants claimed delay i…{"appellant_claim": "Complainants claimed delay in possession of flat and sought refund with interest.", "respondent_claim": "Respondent claimed that possession was delayed due to force majeure conditions.", "final_verdict": "Authority directed refund with interest.", "in_favor_of_respondent": "no"} | AanchalAanchal | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 3038 …Execution No. 3038 of 2022 | HaryanaHaryana | Decree holder received full payment and withdrew …Decree holder received full payment and withdrew the case. Execution complaint stands disposed as fully satisfied. | ["Execution payment…["Execution payment received"] | {"appellant_claim(in detail)": "The decree holder…{"appellant_claim(in detail)": "The decree holder claimed payment for an executed decree.", "respondent_claim(in detail)": "The judgment debtor claimed no response.", "final_verdict(in detail)": "The execution complaint was disposed as fully satisfied due to the decree holder receiving the full payment.", "in_favor_of_respondent": "no"} | Sadhna GuptaSadhna Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
362/2023 & 363/2023362/2023 & 363/2023 | HaryanaHaryana | Complainant sought refund of paid amount with int…Complainant sought refund of paid amount with interest for delayed delivery of possession. Authority directed refund with interest at 10.75%. | ["Refund for delaye…["Refund for delayed possession"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought refund of paid amount with interest for delayed delivery of possession.", "respondent_claim(in detail)": "Respondent claimed that possession was delayed due to unforeseen circumstances and offered an alternative plot.", "final_verdict(in detail)": "Authority directed refund of paid amount with interest at 10.75%.", "in_favor_of_respondent": "no"} | Sudhir Kumar Aggarw…Sudhir Kumar Aggarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
454/2023454/2023 | HaryanaHaryana | Complainant seeks execution of conveyance deed fo…Complainant seeks execution of conveyance deed for apartment in Kingsbury Flats project. Authority directs respondent to execute conveyance deed within 30 days. | ["Conveyance Deed",…["Conveyance Deed", "Real Estate"] | {"appellant_claim": "Complainant seeks execution …{"appellant_claim": "Complainant seeks execution of conveyance deed for apartment in Kingsbury Flats project.", "respondent_claim": "Respondent claims that complainant has not paid outstanding dues and is therefore not entitled to conveyance deed.", "final_verdict": "Authority directs respondent to execute conveyance deed within 30 days.", "in_favor_of_respondent": "no"} | Ved ChaudharyVed Chaudhary | TDI Infrastructure …TDI Infrastructure Limited | Link |
977 of 2021977 of 2021 | HaryanaHaryana | Complainant sought possession of shop and interes…Complainant sought possession of shop and interest for delay. Authority ordered possession, interest, and refund of certain charges. | ["Possession", "Int…["Possession", "Interest", "Charges"] | {"appellant_claim(in detail)": "Complainant sough…{"appellant_claim(in detail)": "Complainant sought possession of shop and interest for delay. Complainant had booked a shop in 2006 and paid Rs. 22,00,000/- but respondent failed to deliver possession for 13 years. Complainant sought interest as per Rule 15 of HRERA, Rules 2017 and quashing of unreasonable additional demands.", "respondent_claim(in detail)": "Respondent denied allegations and stated that project was granted Part Completion Certificates by Department of Town & Country Planning, Haryana. Respondent offered fit out possession of the shop to the complainant on 20.03.2019 but with additional demands.", "final_verdict(in detail)": "Authority ordered possession of shop to be handed over to complainant. Authority ordered respondent to pay interest for delay in delivery of possession at the rate prescribed in Rule 15 of HRERA Rules, 2017. Authority quashed demand of Rs. 5,41,876/- as interest on delay in making payment of due instalments. Authority upheld demand of Rs. 23,100/- for VAT charges. Authority ordered refund of Rs. 10,000/- for miscellaneous expenses if complainant does not engage an advocate. Authority quashed demand of Rs. 93,918/- for GST charges.", "in_favor_of_respondent": "no"} | Urmila DeviUrmila Devi | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
999/2021999/2021 | HaryanaHaryana | Complainant sought quashing of demand for increas…Complainant sought quashing of demand for increased area and delay interest, but Authority found no justification for increased area and no delay in possession. | ["Increased area", …["Increased area", "Delay interest"] | {"appellant_claim": "Complainant sought quashing …{"appellant_claim": "Complainant sought quashing of demand for increased area and delay interest.", "respondent_claim": "Respondent claimed that increased area was as per agreement and delay interest was legitimate.", "final_verdict": "Authority found no justification for increased area and no delay in possession.", "in_favor_of_respondent": "no"} | Vinay SiwachVinay Siwach | TDI Infrastructure …TDI Infrastructure Limited | Link |
1117/20201117/2020 | HaryanaHaryana | Complainant sought relief regarding delay in poss…Complainant sought relief regarding delay in possession of flat and lack of infrastructural facilities. Complainant withdrew application for re-opening complaint regarding infrastructural facilities. | ["Delay in possessi…["Delay in possession", "Infrastructural facilities"] | {"appellant_claim": "Complainant sought relief re…{"appellant_claim": "Complainant sought relief regarding delay in possession of flat and lack of infrastructural facilities.", "respondent_claim": "Respondent claimed that complainant was not entitled to relief regarding delay in possession.", "final_verdict": "Complainant withdrew application for re-opening complaint regarding infrastructural facilities. Complainant was awarded delay interest of Rs. 11,98,497/-.", "in_favor_of_respondent": "no"} | Chander Prakash Pop…Chander Prakash Popli | TDI Infrastructure …TDI Infrastructure Limited | Link |
3020/2019 and 3021/…3020/2019 and 3021/2019 | HaryanaHaryana | Complainants sought refund of excess payment for …Complainants sought refund of excess payment for super area and car parking charges. Authority directed respondent to refund excess payment and provide specified car parking space. | ["Refund of excess …["Refund of excess payment", "Car parking charges"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they were charged excess for super area and car parking charges without proper justification.", "respondent_claim": "Respondent claimed that the charges were as per the agreement and that the complainants had been informed of the increase in super area.", "final_verdict": "Authority directed respondent to refund excess payment for super area and provide specified car parking space to the complainants.", "in_favor_of_respondent": "no"} | Sushil KumarSushil Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
908 of 2023908 of 2023 | HaryanaHaryana | The complainant booked a commercial shop in 'Rode…The complainant booked a commercial shop in 'Rodeo Drive Mall' project of the respondent on payment of %4,50,000/- as advance. The respondent failed to provide possession of the shop and the complainant suffered mental agony and harassment. | ["Failure to provid…["Failure to provide possession of commercial shop", "Mental agony and harassment"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent failed to provide possession of the commercial shop and suffered mental agony and harassment.", "respondent_claim": "The respondent claimed that the agreement between the parties was executed much prior to the coming into force of the RERA Act and that the provisions of the Act cannot be applied retrospectively.", "final_verdict": "The complainant was awarded compensation of %8,19,949/- for mental agony and harassment and %25,000/- towards cost of litigation.", "in_favor_of_respondent": "no"} | Rajendra Prasad Aga…Rajendra Prasad Agarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 2710 …Execution No. 2710 of 2022 | HaryanaHaryana | Decree holder Megha Sharma withdrew her case afte…Decree holder Megha Sharma withdrew her case after clearing all PDCs. The execution complaint was disposed of as fully satisfied. | ["Withdrawal of cas…["Withdrawal of case"] | {"appellant_claim(in detail)": "Megha Sharma clai…{"appellant_claim(in detail)": "Megha Sharma claimed that all PDCs have been cleared and she wants to withdraw her case.", "respondent_claim(in detail)": "TDI Infrastructure Ltd. did not make any claim in this case.", "final_verdict(in detail)": "The execution complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "no"} | Megha SharmaMegha Sharma | TDI Infrastructure …TDI Infrastructure Limited | Link |
308/2018308/2018 | HaryanaHaryana | Complainant sought refund of paid amount with int…Complainant sought refund of paid amount with interest due to delay in delivery of possession. Authority directed respondent to refund the amount with interest at the rate of 10.75%. | ["Delay in delivery…["Delay in delivery of possession", "Refund of paid amount"] | {"appellant_claim": "Complainant sought refund of…{"appellant_claim": "Complainant sought refund of paid amount with interest due to delay in delivery of possession.", "respondent_claim": "Respondent claimed that the project was not registered with the Authority and that the agreement was executed prior to the coming into force of the RERA Act, 2016.", "final_verdict": "Authority directed respondent to refund the amount with interest at the rate of 10.75%.", "in_favor_of_respondent": "no"} | Anju TyagiAnju Tyagi | TDI Infrastructure …TDI Infrastructure Limited | Link |
1567 of 20231567 of 2023 | HaryanaHaryana | Complaint withdrawn as dispute settled between pa…Complaint withdrawn as dispute settled between parties. | ["Dispute settlemen…["Dispute settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint withdrawn as dispute settled between parties.", "in_favor_of_respondent": "no"} | Ashu GuptaAshu Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
1172/20231172/2023 | HaryanaHaryana | Complainant Ankur Gupta withdrew the complaint ag…Complainant Ankur Gupta withdrew the complaint against TDI Infrastructure Ltd. The case was disposed of as withdrawn. | ["Withdrawal of com…["Withdrawal of complaint"] | {"appellant_claim(in detail)": "The complainant w…{"appellant_claim(in detail)": "The complainant withdrew the complaint.", "respondent_claim(in detail)": "The respondent did not make any claim.", "final_verdict(in detail)": "The case was disposed of as withdrawn.", "in_favor_of_respondent": "no"} | Ankur GuptaAnkur Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
3199 of 20223199 of 2022 | HaryanaHaryana | Complainant withdrew the case after filing two se…Complainant withdrew the case after filing two separate complaints for the same matter. The case was disposed of as withdrawn on instructions. | ["Withdrawal of cas…["Withdrawal of case"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed of as withdrawn on instructions.", "in_favor_of_respondent": "no"} | Jai Prakash Gupta d…Jai Prakash Gupta deceased through his legal heirs | TDI Infrastructure …TDI Infrastructure Limited | Link |
225/2019225/2019 | HaryanaHaryana | The appellant's appeal was allowed, and the impug…The appellant's appeal was allowed, and the impugned order was set aside. The complaint was transferred to the adjudicating officer for further adjudication. | ["Real Estate", "Re…["Real Estate", "Refund", "Compensation"] | {"appellant_claim": "The appellant claimed refund…{"appellant_claim": "The appellant claimed refund of the amount paid along with interest and compensation and penalty.", "respondent_claim": "The respondent claimed that the Real Estate Regulatory Authority was competent to grant the relief of refund along with interest including compensation.", "final_verdict": "The appeal was allowed, and the impugned order was set aside. The complaint was transferred to the adjudicating officer for further adjudication.", "in_favor_of_respondent": "no"} | Jarnail SinghJarnail Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.272,273 &…Appeal No.272,273 & 274 of 2019 | HaryanaHaryana | The appellants, Mrs. Manju Arya and Mr. Suresh Ar…The appellants, Mrs. Manju Arya and Mr. Suresh Arya, filed appeals against M/s TDI Infrastructure Ltd. for delay in delivery of possession of plots. The Haryana Real Estate Appellate Tribunal allowed the appeals and remanded the cases to the learned Adjudicating Officer for adjudging the compensation. | Delay in delivery o…Delay in delivery of possession | {"appellant_claim": "The appellants claimed that …{"appellant_claim": "The appellants claimed that the respondent delayed the delivery of possession of plots beyond the agreed-upon period of 24 months.", "respondent_claim": "The respondent claimed that the appellants failed to prove that they were assured that possession would be delivered within 24 months.", "final_verdict": "The Haryana Real Estate Appellate Tribunal allowed the appeals and remanded the cases to the learned Adjudicating Officer for adjudging the compensation.", "in_favor_of_respondent": "no"} | Mr. Suresh AryaMr. Suresh Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.329 of 20…Appeal No.329 of 2021 | HaryanaHaryana | The appeal has become infructuous and is dismisse…The appeal has become infructuous and is dismissed as such. | ["Infructuous appea…["Infructuous appeal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal is dismissed as infructuous.", "in_favor_of_respondent": "no"} | Manju AryaManju Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.308 of 20…Appeal No.308 of 2021 | HaryanaHaryana | The appeal has become infructuous and is dismisse…The appeal has become infructuous and is dismissed as such. | ["Infructuous appea…["Infructuous appeal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal is dismissed as infructuous.", "in_favor_of_respondent": "no"} | Suresh AryaSuresh Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.630 of 20…Appeal No.630 of 2019 | HaryanaHaryana | The appellant sought refund for a flat not delive…The appellant sought refund for a flat not delivered within the stipulated period. The tribunal allowed the appeal and directed the respondent to refund the amount with interest. | ["Refund for undeli…["Refund for undelivered flat"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed refund for a flat not delivered within the stipulated period of September 2016. The appellant argued that the respondent failed to deliver possession of the flat within the agreed-upon time frame and that neither the Occupation Certificate nor the Completion Certificate had been issued by the competent authority.", "respondent_claim(in detail)": "The respondent claimed that the delay in delivery of possession was due to non-payment of the remaining amount by the appellant in a timely manner. The respondent argued that the appellant had only made a payment of Rs. 18,68,072/- prior to the execution of the agreement and that the respondent had stated that the flat would be ready for delivery in all respects by July 2019.", "final_verdict(in detail)": "The tribunal allowed the appeal and directed the respondent to refund Rs. 18,68,072/- to the appellant along with the prescribed rate of interest from the date of respective deposit of each amount till the date of realisation.", "in_favor_of_respondent": "no"} | Sunil MorSunil Mor | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.629 of 20…Appeal No.629 of 2019 | HaryanaHaryana | The appellant, Jyoti Mor, filed an appeal against…The appellant, Jyoti Mor, filed an appeal against the order of the Haryana Real Estate Regulatory Authority, seeking refund of the amount deposited for a flat in the 'Espania Royale Floor' project. The appellate tribunal allowed the appeal and directed the respondent to refund the amount with interest. | ["Refund for Undeli…["Refund for Undelivered Flat"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent failed to deliver possession of the flat within the stipulated period and sought refund of the amount deposited.", "respondent_claim": "The respondent claimed that the delay in delivery of possession was due to non-payment of the remaining amount by the appellant and that the appellant was not entitled to refund.", "final_verdict": "The appellate tribunal allowed the appeal and directed the respondent to refund the amount with interest.", "in_favor_of_respondent": "no"} | Jyoti MorJyoti Mor | TDI Infrastructure …TDI Infrastructure Limited | Link |
1678 & 1679 of 20191678 & 1679 of 2019 | HaryanaHaryana | Complaints withdrawn by complainants with liberty…Complaints withdrawn by complainants with liberty to file fresh complaints. Original documents to be returned if desired. | ["Complaint withdra…["Complaint withdrawal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaints withdrawn by complainants with liberty to file fresh complaints. Original documents to be returned if desired.", "in_favor_of_respondent": "no"} | Ritu AggarwalRitu Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
666 of 2020666 of 2020 | HaryanaHaryana | Complainants withdrew their complaints with liber…Complainants withdrew their complaints with liberty to file afresh. Cases disposed off as withdrawn. | ["Withdrawal of com…["Withdrawal of complaints"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Cases disposed off as withdrawn.", "in_favor_of_respondent": "no"} | Amrit Lal JainAmrit Lal Jain | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution no. 695,6…Execution no. 695,696 & 697-2021 | HaryanaHaryana | The execution complaints were rendered infructuou…The execution complaints were rendered infructuous and dismissed as infructuous due to the order passed by Hon'ble Haryana Real Estate Appellate Tribunal. The cases were remanded to Hon'ble Authority for fresh decision. | ["Real Estate", "Ex…["Real Estate", "Execution", "Appeal"] | {"appellant_claim(in detail)": "The appellants cl…{"appellant_claim(in detail)": "The appellants claimed that the respondent had failed to comply with the order passed by the Authority.", "respondent_claim(in detail)": "The respondent claimed that the appellants had failed to comply with the terms of the agreement.", "final_verdict(in detail)": "The execution complaints were dismissed as infructuous due to the order passed by Hon'ble Haryana Real Estate Appellate Tribunal.", "in_favor_of_respondent": "no"} | Manju AryaManju Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
2718 of 20192718 of 2019 | HaryanaHaryana | Complaint settled between parties. Case disposed …Complaint settled between parties. Case disposed of as settled. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Case disposed of as settled due to settlement between parties.", "in_favor_of_respondent": "no"} | Nirmal KumarNirmal Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
513 of 2022513 of 2022 | HaryanaHaryana | Complainant seeks refund of paid amount along wit…Complainant seeks refund of paid amount along with interest for delayed delivery of possession. Authority directs respondent to refund the amount with interest. | ["Delayed possessio…["Delayed possession", "Refund of paid amount"] | {"appellant_claim": "Complainant claims that resp…{"appellant_claim": "Complainant claims that respondent failed to deliver possession of the booked unit despite receiving the full payment.", "respondent_claim": "Respondent claims that the project is still under construction and that the delay is not solely their fault.", "final_verdict": "Authority directs respondent to refund the entire amount of Rs. 70,93,235.32 to the complainant.", "in_favor_of_respondent": "no"} | Dharminder SinghDharminder Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
1828 of 20191828 of 2019 | HaryanaHaryana | Complainants sought refund of Rs. 9,74,400/- paid…Complainants sought refund of Rs. 9,74,400/- paid for a shop in respondent's project, citing delay of 15 years and unreasonable additional demand. Authority directed respondent to refund the amount with interest. | ["Refund for delaye…["Refund for delayed possession", "Unreasonable additional demand"] | {"appellant_claim": "Complainants claimed that th…{"appellant_claim": "Complainants claimed that they paid Rs. 9,74,400/- for a shop in respondent's project, but respondent delayed delivery of possession by 15 years and demanded an additional Rs. 39,04,218/-.", "respondent_claim": "Respondent claimed that the project was developed and completed, and that the additional demand was legitimate.", "final_verdict": "Authority directed respondent to refund Rs. 9,74,400/- paid by complainants, along with interest at the rate stipulated under Rule 15 of the HRERA Rules, 2017.", "in_favor_of_respondent": "no"} | Meenu BhatiaMeenu Bhatia | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Yearly Trend for these Cases
The analysis of the cases filed by the builder TDI Infrastructure Ltd., in which the builder lost, reveals several significant insights into their legal disputes and operational challenges. The cases can be broadly categorized into recurring themes, which highlight the primary areas of conflict between the builder and various parties involved.
In conclusion, the recurrent reasons that prompted TDI Infrastructure Ltd. to bring cases to court generally stemmed from contesting penalties, disputes over nuanced interpretations of regulatory compliance, and attempts to negotiate settlements without adequately addressing legal requirements. Ultimately, the builders lost these cases primarily due to non-compliance with necessary legal provisions and procedural expectations set forth by the regulatory authorities. The failure to clearly meet evidential requirements and misunderstandings regarding project obligations have further exacerbated their legal predicaments, marking these as significant areas of concern for potential buyers considering TDI Infrastructure Ltd. for their real estate needs.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
Suo moto complaint …Suo moto complaint no. 2203 of 2022 | HaryanaHaryana | The complainant, TDI Infrastructure Ltd., filed a…The complainant, TDI Infrastructure Ltd., filed a suo-motu complaint to refund the pre-deposit amount of Rs 12,30,780/- along with interest accrued. The authority disposed of the complaint with direction to disburse the amount to the respondent. | ["Refund of pre-dep…["Refund of pre-deposit amount"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the amount of Rs 12,30,780/- along with interest accrued deserves to be returned/disbursed to the appellant.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The authority disposed of the complaint with direction to disburse the amount of Rs 12,30,780/- along with interest accrued to the respondent.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
Suo Moto complaint …Suo Moto complaint no. 2202 of 2022 | HaryanaHaryana | TDI Infrastructure Ltd. filed a complaint to refu…TDI Infrastructure Ltd. filed a complaint to refund the pre-deposit amount of Rs 19,41,886/- along with interest accrued. The authority disposed of the complaint with direction to disburse the amount to the respondent. | ["Refund of pre-dep…["Refund of pre-deposit amount"] | {"appellant_claim(in detail)": "TDI Infrastructur…{"appellant_claim(in detail)": "TDI Infrastructure Ltd. claimed that the amount of Rs 19,41,886/- along with interest accrued deserves to be returned/disbursed to the appellant.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The authority disposed of the complaint with direction to disburse the amount of Rs 19,41,886/- along with interest accrued to the respondent.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
538/2019538/2019 | HaryanaHaryana | The appellant's appeal for waiver of pre-deposit …The appellant's appeal for waiver of pre-deposit was dismissed as they failed to comply with the mandatory provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance wi…["Non-compliance with mandatory provisions"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they should be granted waiver of pre-deposit.", "respondent_claim": "The respondent claimed that the appellant failed to comply with the mandatory provisions of proviso to Section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellant failed to comply with the mandatory provisions.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Manoj KumarManoj Kumar | Link |
511/2019511/2019 | HaryanaHaryana | The appellant's appeal for waiver of pre-deposit …The appellant's appeal for waiver of pre-deposit condition was dismissed as they failed to comply with the mandatory provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Real Estate", "Pr…["Real Estate", "Pre-deposit"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they should be exempted from paying the pre-deposit amount.", "respondent_claim": "The respondent claimed that the appellant should pay the pre-deposit amount as per the provisions of proviso to Section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellant failed to comply with the mandatory provisions of proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Parmeet SinghParmeet Singh | Link |
500/2019500/2019 | HaryanaHaryana | The appellant's appeal for waiver of pre-deposit …The appellant's appeal for waiver of pre-deposit was dismissed as they failed to comply with the mandatory provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance wi…["Non-compliance with mandatory provisions"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they should be granted waiver of pre-deposit.", "respondent_claim": "The respondent did not appear in the case.", "final_verdict": "The appeal was dismissed as the appellant failed to comply with the mandatory provisions of proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Pavel GargPavel Garg | Link |
497/2019497/2019 | HaryanaHaryana | The appellant's appeal for waiver of pre-deposit …The appellant's appeal for waiver of pre-deposit was dismissed as they failed to comply with the provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Real Estate", "Pr…["Real Estate", "Pre-deposit"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they should be exempted from paying the pre-deposit amount.", "respondent_claim": "Not provided", "final_verdict": "The appeal was dismissed as the appellant failed to comply with the provisions of proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Pavel GargPavel Garg | Link |
495/2019495/2019 | HaryanaHaryana | The appellant's appeal for waiver of pre-deposit …The appellant's appeal for waiver of pre-deposit condition was dismissed as they failed to comply with mandatory provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Real Estate", "Pr…["Real Estate", "Pre-deposit"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they should be exempted from paying the pre-deposit amount.", "respondent_claim": "Not mentioned", "final_verdict": "The appeal was dismissed as the appellant failed to comply with the mandatory provisions of proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Pavel GargPavel Garg | Link |
512 of 2019512 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellant/promote…The appeal was dismissed as the appellant/promoter failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the appellant had not complied with the mandatory provisions of proviso to section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellant/promoter failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
Appeal No.496 of 20…Appeal No.496 of 2019 | HaryanaHaryana | The appellant, M/s TDI Infrastructure Ltd., filed…The appellant, M/s TDI Infrastructure Ltd., filed an appeal but failed to deposit the requisite amount as per the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. Consequently, the appeal was dismissed. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "Not applicable", "final_verdict": "The appeal was dismissed as the appellant failed to deposit the requisite amount.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Pavel GargPavel Garg | Link |
Appeal No.475 of 20…Appeal No.475 of 2019 | HaryanaHaryana | The appeal was dismissed as the appellant/promote…The appeal was dismissed as the appellant/promoter failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of provisions"] | {"appellant_claim": "The appellant/promoter claim…{"appellant_claim": "The appellant/promoter claimed that they had complied with the provisions of proviso to section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the appellant/promoter had not complied with the provisions of proviso to section 43(5) of the Act.", "final_verdict": "The appeal was dismissed as the appellant/promoter failed to deposit the requisite amount to comply with the provisions of proviso to section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Suman DuaSuman Dua | Link |
CM No. 46 of 2022CM No. 46 of 2022 | HaryanaHaryana | The appellant has amicably settled the matter wit…The appellant has amicably settled the matter with the respondent and does not want to pursue the application for restoration of the appeal. The application is hereby dismissed as withdrawn. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "The appellant wan…{"appellant_claim(in detail)": "The appellant wanted to restore the appeal.", "respondent_claim(in detail)": "Not provided.", "final_verdict(in detail)": "The application is hereby dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Yogesh Pratap SinghYogesh Pratap Singh | Link |
Appeal No. 501 of 2…Appeal No. 501 of 2019 | HaryanaHaryana | The appellant, M/s TDI Infrastructure Ltd., amica…The appellant, M/s TDI Infrastructure Ltd., amicably settled the matter with the respondent, Shakshi Jain, and withdrew the application for restoration of the appeal. | ["Settlement", "Wit…["Settlement", "Withdrawal of Application"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that they wanted to restore the appeal.", "respondent_claim(in detail)": "The respondent did not make any claims.", "final_verdict(in detail)": "The application for restoration of the appeal was dismissed as withdrawn.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Shakshi JainShakshi Jain | Link |
Appeal No. 142 of 2…Appeal No. 142 of 2019 | HaryanaHaryana | The appellant amicably settled the matter with th…The appellant amicably settled the matter with the respondent and withdrew the application for restoration of the appeal. The deposited amount of Rs. 2,43,248/- was sent to the respondent-allottee. | ["Settlement", "Wit…["Settlement", "Withdrawal of Appeal"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that they had amicably settled the matter with the respondent and did not want to pursue the application for restoration of the appeal.", "respondent_claim(in detail)": "The respondent did not make any claims in this case.", "final_verdict(in detail)": "The application for restoration of the appeal was dismissed as withdrawn. The deposited amount was sent to the respondent-allottee.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Rajesh KumarRajesh Kumar | Link |
666 OF 2022666 OF 2022 | HaryanaHaryana | The appellant/promoter filed an appeal against th…The appellant/promoter filed an appeal against the impugned order passed by the Haryana Real Estate Regulatory Authority, whereby the complainant/respondent was allowed refund of the amount paid along with interest. The Appellate Tribunal dismissed the appeal and upheld the impugned order. | ["Refund of amount …["Refund of amount paid", "Possession of commercial shop"] | {"appellant_claim": "The appellant/promoter claim…{"appellant_claim": "The appellant/promoter claimed that the impugned order was incorrect and that the respondent/allottee was not entitled to refund of the amount paid.", "respondent_claim": "The respondent/allottee claimed that the appellant/promoter had failed to complete the unit by the due date of possession and that the offer of possession letter issued by the appellant was without obtaining the occupation certificate.", "final_verdict": "The Appellate Tribunal dismissed the appeal and upheld the impugned order, allowing the respondent/allottee to refund of the amount paid along with interest.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Faqir Chand GuptaFaqir Chand Gupta | Link |
C.M No. 542 of 2023C.M No. 542 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed an application for restoration of C.M. No.62 of 2022, which was dismissed by the Haryana Real Estate Appellate Tribunal for non-compliance of the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the required amount of Rs.8,65,483/-.", "final_verdict": "The application for restoration of C.M. No.62 of 2022 was dismissed by the Haryana Real Estate Appellate Tribunal for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Brijesh Kumar SinghBrijesh Kumar Singh | Link |
C.M No. 534 of 2023C.M No. 534 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal to im…The applicant/appellant preferred an appeal to impugn the order passed by Haryana Real Estate Regulatory Authority, but the appeal was dismissed for non-compliance of the provisions of proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they are ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant failed to deposit the entire amount which is required to be deposited in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The appeal was dismissed for non-compliance of the provisions of proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | BimlaBimla | Link |
C.M No. 541 of 2023C.M No. 541 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed a case against Raj Kumar Aggarwal, seeking restoration of an appeal that was dismissed for non-compliance with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance wi…["Non-compliance with proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they had deposited the required amount to comply with the proviso to Section 43(5) of the Act and sought restoration of the appeal.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the required amount and that the appeal was properly dismissed.", "final_verdict": "The Tribunal dismissed the application for restoration of the appeal, upholding the earlier decision that the appeal was properly dismissed for non-compliance with the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Raj Kumar AggarwalRaj Kumar Aggarwal | Link |
C.M No. 538 of 2023C.M No. 538 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed a case for restoration of appeal No.326 of 2019, which was dismissed for non-compliance of the proviso to Section 43(5) of the Act. The present application was also dismissed for the same reason. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the required amount of Rs.8,49,053/-.", "final_verdict": "The present application was dismissed for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Bhawna KaushikBhawna Kaushik | Link |
C.M No. 527 of 2023C.M No. 527 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal to re…The applicant/appellant preferred an appeal to revive a previous appeal that was dismissed for non-compliance with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. The application was dismissed for the same reason. | ["Non-compliance wi…["Non-compliance with proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they had deposited the required amount to comply with the proviso to Section 43(5) of the Act and sought revival of the previous appeal.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the entire amount required to be deposited in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The application was dismissed for non-compliance with the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Satya Pal TyagiSatya Pal Tyagi | Link |
C.M No. 539 of 2023C.M No. 539 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal No.32…The applicant/appellant preferred an appeal No.327 of 2019, to impugn the order dated 29.01.2019 passed by Haryana Real Estate Regulatory Authority, Panchkula (hereinafter called the ‘Authority), in Complaint No.630 of 2018, titled “Jyoti Mor vs. M/s TDI Infrastructure Ltd.” | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim(in detail)": "The applicant/app…{"appellant_claim(in detail)": "The applicant/appellant preferred an appeal No.327 of 2019, to impugn the order dated 29.01.2019 passed by Haryana Real Estate Regulatory Authority, Panchkula (hereinafter called the \u2018Authority), in Complaint No.630 of 2018, titled \u201cJyoti Mor vs. M/s TDI Infrastructure Ltd.\u201d", "respondent_claim(in detail)": "The respondent claimed that the applicant/appellant failed to comply with the mandatory provisions of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016 (hereinafter called \u2018the Act\u2019)", "final_verdict(in detail)": "The present application has no merits and deserves to be dismissed. The applicant/appellant failed to deposit the required amount of Rs.3,90,248/-- inspite of availing sufficient opportunities.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Jyoti MorJyoti Mor | Link |
C.M No. 533 of 2023C.M No. 533 of 2023 | HaryanaHaryana | The applicant/appellant preferred C.M. No. 533 of…The applicant/appellant preferred C.M. No. 533 of 2023 for restoration of application bearing C.M. No. 49 of 2022, filed by the applicant/appellant for revival of Appeal No. 329 of 2019. The application was dismissed by this Tribunal for non-compliance of the proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that in accordance with the order dated 13.05.2022 handed down by the Hon'ble Supreme Court in SLP (Cwil) No.13093 of 2020, the applicant/appellant is ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that the applicant/appellant has not deposited the requisite amount in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The application was dismissed by this Tribunal for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Jitendra AroraJitendra Arora | Link |
C.M No. 530 of 2023C.M No. 530 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal No.33…The applicant/appellant preferred an appeal No.332 of 2019, to impugn the order dated 29.01.2019 passed by Haryana Real Estate Regulatory Authority, Panchkula (hereinafter called the ‘Authority), in Complaint No.607 of 2018, titled “Vivek Kadyan vs. M/s TDI Infrastructure Ltd.” | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim(in detail)": "The applicant/app…{"appellant_claim(in detail)": "The applicant/appellant claimed that they had deposited the required amount to comply with the proviso to Section 43(5) of the Act.", "respondent_claim(in detail)": "The respondent claimed that the applicant/appellant had not deposited the required amount.", "final_verdict(in detail)": "The Tribunal dismissed the application for restoration of the appeal for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Vivek KadyanVivek Kadyan | Link |
C.M No. 536 of 2023C.M No. 536 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed a case for restoration of appeal No. 330 of 2019, which was dismissed for non-compliance of the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the required amount of Rs.6,87,528/--.", "final_verdict": "The application was dismissed for non-compliance of the proviso to Section 43(5) of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Meenu AggarwalMeenu Aggarwal | Link |
C.M No. 5370f 2023C.M No. 5370f 2023 | HaryanaHaryana | The applicant/appellant failed to deposit the req…The applicant/appellant failed to deposit the required amount of Rs.5,42,193/-- to comply with the proviso to Section 43(5) of the Act, despite availing sufficient opportunities. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant failed to deposit the required amount of Rs.5,42,193/--.", "final_verdict": "The application was dismissed for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Sunil MorSunil Mor | Link |
C.M No. 531 of 2023C.M No. 531 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed an application for restoration of an appeal that was dismissed for non-compliance with the provisions of the Real Estate (Regulation and Development) Act, 2016. The application was dismissed again for similar reasons. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the entire amount required to be deposited in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The application was dismissed for non-compliance with the provisions of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Madhuri AryaMadhuri Arya | Link |
C.M No. 528 of 2023C.M No. 528 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal to im…The applicant/appellant preferred an appeal to impugn the order passed by Haryana Real Estate Regulatory Authority, but the appeal was dismissed for non-compliance of the provisions of proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of provisions", "Real Estate"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they are ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant failed to deposit the deficit amount of Rs.9,81,704/-.", "final_verdict": "The present application has no merits and deserves to be dismissed.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Neena SethiNeena Sethi | Link |
C.M No. 540 of 2023C.M No. 540 of 2023 | HaryanaHaryana | The applicant/appellant preferred an appeal for r…The applicant/appellant preferred an appeal for revival of the case, but the Tribunal dismissed it for non-compliance of the proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they had deposited the required amount to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the required amount.", "final_verdict": "The Tribunal dismissed the application for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Asha JindalAsha Jindal | Link |
C.M No. 529 of 2023C.M No. 529 of 2023 | HaryanaHaryana | The applicant/appellant, TDI Infrastructure Ltd.,…The applicant/appellant, TDI Infrastructure Ltd., filed an application for restoration of an appeal that was dismissed for non-compliance with the provisions of the Real Estate (Regulation and Development) Act, 2016. The application was dismissed again for similar reasons. | ["Non-compliance wi…["Non-compliance with Real Estate Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the entire amount required to be deposited in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The application for restoration of the appeal was dismissed for non-compliance with the provisions of the Real Estate (Regulation and Development) Act, 2016.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Adesh VatsAdesh Vats | Link |
C.M No. 532 of 2023C.M No. 532 of 2023 | HaryanaHaryana | The applicant/appellant failed to deposit the req…The applicant/appellant failed to deposit the required amount of Rs.36,44,496/-, despite availing sufficient opportunities. The present application for restoration of C.M.No.65/2022 was dismissed for non-compliance of the proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they were ready to deposit the requisite amount in order to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant failed to deposit the required amount of Rs.36,44,496/-, despite availing sufficient opportunities.", "final_verdict": "The present application for restoration of C.M.No.65/2022 was dismissed for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Lokesh Kumar and an…Lokesh Kumar and another | Link |
C.M. No.535/2023 in…C.M. No.535/2023 in C.M.No.67/2022 | HaryanaHaryana | The applicant/appellant preferred C.M. No.535/202…The applicant/appellant preferred C.M. No.535/2023 for restoration of application bearing C.M. No.67 of 2022 for revival of Appeal No.331 of 2019. The application was dismissed by the Tribunal for non-compliance of the proviso to Section 43(5) of the Act. | ["Non-compliance of…["Non-compliance of proviso to Section 43(5) of the Act"] | {"appellant_claim": "The applicant/appellant clai…{"appellant_claim": "The applicant/appellant claimed that they had deposited the required amount to comply with the proviso to Section 43(5) of the Act.", "respondent_claim": "The respondent claimed that the applicant/appellant had not deposited the entire amount required to be deposited in accordance with the proviso to Section 43(5) of the Act.", "final_verdict": "The application was dismissed by the Tribunal for non-compliance of the proviso to Section 43(5) of the Act.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Ajay PalAjay Pal | Link |
875 of 2022875 of 2022 | HaryanaHaryana | Complainant booked a shop in the project 'Rodeo D…Complainant booked a shop in the project 'Rodeo Drive TDI City' but possession was not delivered. A settlement was arrived at between the parties, and possession was handed over. | ["Settlement", "Pos…["Settlement", "Possession"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that she had remitted an amount of Rs.27,50,000/- but possession had not been delivered.", "respondent_claim": "The respondent claimed that possession had been handed over and a settlement had been arrived at.", "final_verdict": "The appeal was dismissed as withdrawn, and the amount deposited by the appellant-promoter was to be remitted.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Urmila DeviUrmila Devi | Link |
276 of 2023276 of 2023 | HaryanaHaryana | The appeal was dismissed as withdrawn after the p…The appeal was dismissed as withdrawn after the parties arrived at a settlement. The appellant's advocate appeared in court and requested to withdraw the appeal. | ["Withdrawn Appeal"]["Withdrawn Appeal"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that they had a dispute with the respondent and sought relief through the appeal.", "respondent_claim(in detail)": "The respondent claimed that they had a settlement with the appellant and requested that the appeal be withdrawn.", "final_verdict(in detail)": "The appeal was dismissed as withdrawn after the parties arrived at a settlement.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Satish Kumar DahiyaSatish Kumar Dahiya | Link |
Yearly Trend for these Cases
An analysis of the cases filed by the builder, TDI Infrastructure Ltd., which it won, revealed the following information. The cases can be grouped into several common themes. First, there are multiple instances of 'Restoration of Appeals'. In these cases, the builder has sought the reinstatement of appeals, which indicates an emphasis on ensuring due process in legal matters. Second, 'Jurisdiction Challenges' arise where the builder contests the authority of adjudicating officers to make certain decisions. Third, the builder has made 'Claims for Return of Amounts', showcasing disputes surrounding financial transactions and refunds. Instances of 'Waiver of Pre-deposit Conditions' reveal the builder's attempts to alleviate financial burdens before a formal hearing. Lastly, 'Applications for Rectification of Orders' demonstrate the builder's proactive approach to rectify previous judicial decisions.
Reviewing the reasons for these legal actions, it is evident that TDI Infrastructure Ltd. frequently contests claims that impose unfair penalties, as well as disputes over project delays that are often attributed to other parties. The builder appears to take a strong stance against rulings they believe are unwarranted, particularly in issues surrounding jurisdiction and regulatory compliance. Patterns show that litigation often arises from misunderstandings or misinterpretations of legal obligations or project classifications.
The success of the builder in these cases can largely be attributed to several factors. Commonly, insufficient evidence provided by the opposition has played a crucial role in the builder's victories. Furthermore, it appears that non-compliance with procedural or regulatory standards by competing parties has enabled TDI Infrastructure Ltd. to effectively defend its position. In situations where claims may have stemmed from exaggerated narratives or misunderstandings on the part of complainants, the builder has been able to demonstrate its commitment to lawful practices.
These insights into the builder's legal experiences inform us about its reputation within the broader real estate market. It is essential to note that legal disputes do not always stem from merit; rather, they can sometimes arise from unfounded claims made against builders. This underscores the importance of due diligence, both for builders and buyers alike. TDI Infrastructure Ltd.'s track record of successfully countering unjust claims reflects a robust defense capability in the face of potential litigation.
In conclusion, potential buyers should approach the real estate market with care and informed judgment. The analysis of the cases involving TDI Infrastructure Ltd. reveals that while legitimate disputes exist, builders are sometimes the targets of unfounded allegations. Prospective buyers are advised to seek thorough information and not to make hasty judgments about a builder's reliability based solely on complaints or litigation. Understanding the legal context is key to forming a balanced view on any builder’s reputation.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
Appeal No. 570 of 2…Appeal No. 570 of 2021 | HaryanaHaryana | The appellant was required to deposit an amount a…The appellant was required to deposit an amount as calculated by the office of the Tribunal. The appeal was allowed to be withdrawn with liberty to file again as per law. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that they had moved an application for rectification of the impugned order dated 06.07.2021 passed by the ld. Authority.", "respondent_claim": "Not provided", "final_verdict": "The appeal was allowed to be withdrawn with liberty to file again as per law.", "in_favor_of_respondent": "no"} | TDI InfrastructureTDI Infrastructure | Satish Kumar DahiyaSatish Kumar Dahiya | Link |
Appeal No. 567 of 2…Appeal No. 567 of 2021 | HaryanaHaryana | Appellant TDI Infrastructure filed an appeal agai…Appellant TDI Infrastructure filed an appeal against Sneh Lata. The appeal was allowed to be withdrawn with liberty to file again as per law. | ["Real Estate Appea…["Real Estate Appeal"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that they had moved an application under Section 39 of the Act before the Id. Authority for rectification of the impugned order dated 08.04.2021 passed by the Id. Authority.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The appeal was allowed to be withdrawn with liberty to file the same as per law.", "in_favor_of_respondent": "no"} | TDI InfrastructureTDI Infrastructure | Sneh LataSneh Lata | Link |
Appeal No. 474 of 2…Appeal No. 474 of 2019 | HaryanaHaryana | The appeal is allowed, and the case is sent back …The appeal is allowed, and the case is sent back to the Adjudicating Officer, Panchkula for deciding the complaint afresh. The impugned order is set aside. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim": "The appellant claims that th…{"appellant_claim": "The appellant claims that the respondents have no objection to allow the application for waiver of the condition of pre-deposit.", "respondent_claim": "The respondents claim that they have sought the relief of refund and have no objection to the appeal.", "final_verdict": "The appeal is allowed, and the case is sent back to the Adjudicating Officer, Panchkula for deciding the complaint afresh.", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Private Limited | Ritu AggarwalRitu Aggarwal | Link |
Suo moto complaint …Suo moto complaint no. 2201 of 2022 | HaryanaHaryana | The complainant, TDI Infrastructure Ltd., filed a…The complainant, TDI Infrastructure Ltd., filed a suo-moto complaint to refund the pre-deposit amount of Rs 13,05,193/- along with interest accrued. The authority disposed of the complaint with direction to disburse the amount to the respondent. | ["Refund of pre-dep…["Refund of pre-deposit amount"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that the amount of Rs 13,05,193/- along with interest accrued deserves to be returned/disbursed to the appellant.", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The authority disposed of the complaint with direction to disburse the amount of Rs 13,05,193/- along with interest accrued to the respondent.", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
452 of 2021452 of 2021 | HaryanaHaryana | The appeal was allowed, and the impugned order wa…The appeal was allowed, and the impugned order was set aside. The case was remitted to the learned Authority for fresh decision of the complaint in accordance with law. | ["Real Estate", "Ap…["Real Estate", "Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the learned Adjudicating Officer had no jurisdiction to entertain the complaint and pass the impugned order.", "respondent_claim": "The respondent conceded the legal position and stated that the impugned order cannot be sustained in the eyes of law.", "final_verdict": "The appeal was allowed, and the impugned order was set aside. The case was remitted to the learned Authority for fresh decision of the complaint in accordance with law.", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Manju AryaManju Arya | Link |
454 of 2021454 of 2021 | HaryanaHaryana | The appeal was allowed, and the impugned order wa…The appeal was allowed, and the impugned order was set aside. The case was remitted to the learned Authority for fresh decision of the complaint in accordance with law. | ["Real Estate", "Ap…["Real Estate", "Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the learned Adjudicating Officer had no jurisdiction to entertain the complaint and pass the impugned order.", "respondent_claim": "The respondent conceded the legal position and stated that the impugned order cannot be sustained in the eyes of law.", "final_verdict": "The appeal was allowed, and the impugned order was set aside. The case was remitted to the learned Authority for fresh decision of the complaint in accordance with law.", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Suresh AryaSuresh Arya | Link |
Appeal No. 506 of 2…Appeal No. 506 of 2019 | HaryanaHaryana | The appellant amicably settled the matter with th…The appellant amicably settled the matter with the respondent and withdrew the application for restoration of the appeal. | ["Settlement", "Wit…["Settlement", "Withdrawal of Application"] | {"appellant_claim(in detail)": "The appellant cla…{"appellant_claim(in detail)": "The appellant claimed that they wanted to restore the appeal.", "respondent_claim(in detail)": "The respondent claimed that they had no objection to the appeal being restored.", "final_verdict(in detail)": "The application for restoration of the appeal was dismissed as withdrawn.", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Ram Pal TondonRam Pal Tondon | Link |
CM No. 109 of 2023CM No. 109 of 2023 | HaryanaHaryana | Application for restoration of appeal withdrawn b…Application for restoration of appeal withdrawn by appellant. Case dismissed as withdrawn with liberty to file afresh. | ["Appeal Restoratio…["Appeal Restoration"] | {"appellant_claim": "Application for restoration …{"appellant_claim": "Application for restoration of appeal", "respondent_claim": "None", "final_verdict": "Case dismissed as withdrawn with liberty to file afresh", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Pawan KumarPawan Kumar | Link |
CM No. 116 of 2023CM No. 116 of 2023 | HaryanaHaryana | Application for restoration of appeal withdrawn w…Application for restoration of appeal withdrawn with liberty to file afresh. Case dismissed as withdrawn. | ["Appeal Restoratio…["Appeal Restoration"] | {"appellant_claim(in detail)": "Application for r…{"appellant_claim(in detail)": "Application for restoration of appeal", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "Case dismissed as withdrawn with liberty to file afresh", "in_favor_of_respondent": "no"} | TDI Infrastructure …TDI Infrastructure Limited | Sunita MittalSunita Mittal | Link |
Yearly Trend for these Cases
An analysis of the cases filed against TDI Infrastructure Ltd., which the builder won, revealed the following information.
The cases brought against the builder can be categorized into several recurring themes. First, there were numerous claims related to Delayed Possession, with several complainants alleging that possession was not delivered within the agreed periods. However, most of these claims were dismissed as the contractual relationship was deemed to have ended with the execution of conveyance deeds or due to the complainants' lack of evidence.
Another significant theme observed was Non-compliance with Regulatory Authorities. In many instances, the builder successfully argued that the complaints were not maintainable as they were filed in the wrong jurisdiction or that the complainants failed to fulfill their obligations under the contract, such as making timely payments, which contributed to the delays.
Disputes over Land Titles and Ownership also surfaced, where complainants claimed defects in title or failure to deliver property. In these cases, the builder effectively presented evidence showing that titles were clear and that possession had been appropriately transferred.
Additionally, numerous cases centered around Contractual and Financial Disputes, particularly concerning penalties and fees. Complainants often sought compensation for delays in service or additional costs imposed by the builder, yet these claims were dispelled when evidence showed that the buyers had either failed to comply with contractual obligations or that the builder had adhered to necessary regulations.
Moreover, a number of cases ended with the Settlement of Complaints. Many times, the parties reached amicable agreements, which highlights the builder's willingness to resolve disputes outside the court system when appropriate.
It is noteworthy that numerous cases were dismissed for Lack of Prosecution or Merit. Complaints were often brought forward without sufficient evidence or were withdrawn by the complainants, indicating a lack of substantiation in their claims against the builder. This was particularly true in cases where no appearances were made, suggesting that many claims may have been hastily filed without adequate legal reasoning.
Overall, the analysis suggests a strong reputation for TDI Infrastructure Ltd. in defending against claims brought by buyers or regulatory bodies. The outcomes illustrate that buyers sometimes move forward with accusations that lack merit, highlighting a broader need for due diligence in the real estate market. Such a landscape emphasizes the importance of reputation and legal compliance for builders, where companies like TDI Infrastructure Ltd. are shown to effectively counter unjustified claims.
In conclusion, potential buyers are advised to approach claims against builders carefully and to base their perceptions on reliable information. While the real estate industry does present legitimate disputes, the findings from these cases reinforce that builders can successfully defend themselves in many circumstances. Therefore, buyers should ensure informed decision-making, recognizing the nuances of the legal landscape in which they operate.
This table provides details of individual cases contributing to the summary above. Click rows to expand content. Use "Show More/Less" buttons below.
Case No. | State | Summary | Topic | Detailed Summary | Appellant | Respondent | Source |
---|---|---|---|---|---|---|---|
717/2018717/2018 | Not providedNot provided | Complaint dismissed as not maintainable. Complain…Complaint dismissed as not maintainable. Complainant can file fresh complaint before Real Estate Regulatory Authority. | ["Real Estate Dispu…["Real Estate Dispute"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the demands made by the promoter were illegal and void, and that the promoter had not discharged his liability for timely delivery of possession.", "respondent_claim(in detail)": "The respondent claimed that the complaint was not maintainable before the adjudicating officer and that the complainant should file a fresh complaint before the Real Estate Regulatory Authority.", "final_verdict(in detail)": "The complaint was dismissed as not maintainable. The complainant was given liberty to file a fresh complaint before the Real Estate Regulatory Authority.", "in_favor_of_respondent": "yes"} | Manju AryaManju Arya | TDI InfrastructureTDI Infrastructure | Link |
1225/20181225/2018 | HaryanaHaryana | The case is about a small piece of land measuring…The case is about a small piece of land measuring 0.76 acre. The authority discharged the notice as the license was likely granted for extension of an existing colony. | ["Land Development"]["Land Development"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the respondent developed an independent colony on a small piece of land measuring 0.76 acre.", "respondent_claim": "The respondent claimed that the license was granted for extension of an existing colony.", "final_verdict": "The authority discharged the notice as the license was likely granted for extension of an existing colony.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | TDI InfrastructureTDI Infrastructure | Link |
2573 of 20192573 of 2019 | HaryanaHaryana | The case was disposed off as the respondent submi…The case was disposed off as the respondent submitted the required information and it was found to be in order. | ["Project Registrat…["Project Registration"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was disposed off as the respondent submitted the required information and it was found to be in order.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | TDI InfrastructureTDI Infrastructure | Link |
3174 of 20223174 of 2022 | HaryanaHaryana | Complainant sought review/rectification of earlie…Complainant sought review/rectification of earlier orders regarding refund and interest. Authority rejected the complaint as it cannot review its own orders. | ["Review of earlier…["Review of earlier orders"] | {"appellant_claim": "The complainant sought amend…{"appellant_claim": "The complainant sought amendment of substantive parts of earlier orders regarding refund and interest.", "respondent_claim": "The respondent did not make any claims in this complaint.", "final_verdict": "The Authority rejected the complaint as it cannot review its own orders.", "in_favor_of_respondent": "yes"} | Suman GuptaSuman Gupta | TDI InfrastructureTDI Infrastructure | Link |
3208 of 20223208 of 2022 | HaryanaHaryana | Complainant sought review/rectification of earlie…Complainant sought review/rectification of earlier orders regarding refund and interest payment. Authority rejected the complaint as it cannot review its own orders. | ["Review of earlier…["Review of earlier orders"] | {"appellant_claim": "The complainant sought revie…{"appellant_claim": "The complainant sought review/rectification of earlier orders regarding refund and interest payment.", "respondent_claim": "The respondent did not make any claims in this complaint.", "final_verdict": "The Authority rejected the complaint as it cannot review its own orders.", "in_favor_of_respondent": "yes"} | Dr. Ajay Gupta dece…Dr. Ajay Gupta deceased through Lrs | TDI InfrastructureTDI Infrastructure | Link |
1202 of 20201202 of 2020 | HaryanaHaryana | The complainant was against the respondent for im…The complainant was against the respondent for imposing a penalty under section 59 of the RERA Act. The respondent withdrew their application and the authority decided to discharge the notice. | ["RERA Act", "Proje…["RERA Act", "Project Registration"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "The respondent claimed that they had withdrawn their application and were not intending to develop the remaining 171.15 acres of the project.", "final_verdict": "The authority decided to discharge the notice and prohibit the sale of the said area until the project is registered.", "in_favor_of_respondent": "yes"} | Tdi Infrastructure …Tdi Infrastructure Limited | Link | |
RERA-PKL-COMP-68-20…RERA-PKL-COMP-68-2018 | Not providedNot provided | Complaint dismissed due to non-revised format. Co…Complaint dismissed due to non-revised format. Complainant given liberty to file fresh complaint. | ["Complaint format"]["Complaint format"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed due to non-revised format.", "in_favor_of_respondent": "yes"} | Sanjay KumarSanjay Kumar | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
RERA-PKL 716/2018RERA-PKL 716/2018 | HaryanaHaryana | The complainant, Darshan Devi Gupta, filed a comp…The complainant, Darshan Devi Gupta, filed a complaint against TDI Infrastructure Pvt. Ltd. regarding a notice dated 20.04.2018, which advised allottees to get the sale deed executed by 31.03.2018 and pay extension/holding charges. | ["RERA", "Sale Deed…["RERA", "Sale Deed", "Extension/Holding Charges"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent did not have Occupation Certificate/Part Completion Certificate at the time of offer of possession and did not supply information regarding sanction plans, layout plans, and other approvals.", "respondent_claim": "The respondent claimed that the sale deed had already been executed between the parties on 04.05.2010, and the title had been duly transferred to the complainant.", "final_verdict": "The Authority disposed of the case, granting liberty to the complainant to file matters afresh as and when the cause of action arises.", "in_favor_of_respondent": "yes"} | Darshan Devi GuptaDarshan Devi Gupta | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Complaint No. 734 o…Complaint No. 734 of 2019 | HaryanaHaryana | Complaint dismissed for non-prosecution as the co…Complaint dismissed for non-prosecution as the complainant failed to appear or provide a valid reason for their absence. | ["Non-prosecution",…["Non-prosecution", "Dismissal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was dismissed for non-prosecution as the complainant failed to appear or provide a valid reason for their absence.", "in_favor_of_respondent": "yes"} | Shashi SharmaShashi Sharma | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
2722 of 20192722 of 2019 | HaryanaHaryana | Complaint filed for execution of an order passed …Complaint filed for execution of an order passed by Real Estate Regulatory Authority. Case dismissed as per settled law. | ["Execution of orde…["Execution of order", "Real Estate Regulatory Authority"] | {"appellant_claim": "Execution of an order passed…{"appellant_claim": "Execution of an order passed by Real Estate Regulatory Authority", "respondent_claim": "Not provided", "final_verdict": "Case dismissed as per settled law", "in_favor_of_respondent": "yes"} | Yogesh Pratap Singh…Yogesh Pratap Singh Chauhan | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
557 of 2019557 of 2019 | HaryanaHaryana | Complaint dismissed for non-prosecution as the co…Complaint dismissed for non-prosecution as the complainant failed to appear in last four hearings. | Non-prosecution of …Non-prosecution of complaint | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed for non-prosecution", "in_favor_of_respondent": "yes"} | Saurabh KapoorSaurabh Kapoor | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Complaint No. 171 o…Complaint No. 171 of 2020 | HaryanaHaryana | Complainant seeking possession and compensation f…Complainant seeking possession and compensation for delay in handover. Complaint dismissed as maintainable as another complaint is pending before Adjudicating Officer. | ["Maintainability o…["Maintainability of complaint", "Delay in handover"] | {"appellant_claim": "Seeking possession of the un…{"appellant_claim": "Seeking possession of the unit along with compensation for delay in handover.", "respondent_claim": "The complaint is not maintainable as another complaint is pending before the Adjudicating Officer.", "final_verdict": "The complaint is dismissed as maintainable.", "in_favor_of_respondent": "yes"} | Suman Deep SinghSuman Deep Singh | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Suo Moto Complaint …Suo Moto Complaint No. 1350 of 2020 | HaryanaHaryana | The complainant sought refund of pre-deposit amou…The complainant sought refund of pre-deposit amount of Rs. 23,30,004/- filed by the respondent promoter. The amount was credited to the account of TDI Infrastructure Ltd. and the application filed by the respondent promoter for return of said amount has become infructuous. | ["Refund of pre-dep…["Refund of pre-deposit amount"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "The respondent promoter filed an application for refund of pre-deposit amount of Rs. 23,30,004/-.", "final_verdict(in detail)": "The amount of Rs. 23,30,004/- was credited to the account of TDI Infrastructure Ltd. and the application filed by the respondent promoter for return of said amount has become infructuous.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Private Limited | Link | |
Suo Moto Complaint …Suo Moto Complaint No. 804 of 2020 | HaryanaHaryana | The respondent promoter filed an application seek…The respondent promoter filed an application seeking refund of pre-deposit amount of Rs. 15,07,910/-, which was ordered to be returned/refunded to the applicant-promoter as per rules. | ["Refund of pre-dep…["Refund of pre-deposit amount"] | {"appellant_claim(in detail)": "The respondent pr…{"appellant_claim(in detail)": "The respondent promoter claimed that the amount deposited by the appellant-promoter had already been remitted to the Ld. Authority and sought refund of the pre-deposit amount of Rs. 15,07,910/-.", "respondent_claim(in detail)": "The respondent promoter claimed that the amount deposited by the appellant-promoter had already been remitted to the Ld. Authority and sought refund of the pre-deposit amount of Rs. 15,07,910/-.", "final_verdict(in detail)": "The Hon'ble Appellate Tribunal vide order dated 05.11.2020 passed in the CM No. 63 of 2020 in Appeal No. 143 of 2019 ordered that the amount of pre-deposit i.e. Rs. 15,07,910/- is ordered to be returned/refunded to the applicant as per rules.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Private Limited | Link | |
959 of 2019959 of 2019 | HaryanaHaryana | Complaint settled between parties. File consigned…Complaint settled between parties. File consigned to record room. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint settled between parties.", "in_favor_of_respondent": "yes"} | Y. P SinghY. P Singh | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
661 of 2020661 of 2020 | HaryanaHaryana | Complaint settled between complainant Manish Agga…Complaint settled between complainant Manish Aggarwal and respondent TDI Infrastructure Pvt. Ltd. through a settlement deed dated 27.10.2021. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The complaint was disposed of as settled due to a settlement deed dated 27.10.2021.", "in_favor_of_respondent": "yes"} | Manish AggarwalManish Aggarwal | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
461 of 2021461 of 2021 | HaryanaHaryana | Complaint dismissed for non-prosecution as the co…Complaint dismissed for non-prosecution as the complainant failed to appear for the sixth hearing despite being given a last opportunity. | ["Non-prosecution",…["Non-prosecution", "Dismissal of complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was dismissed for non-prosecution as the complainant failed to appear for the sixth hearing despite being given a last opportunity.", "in_favor_of_respondent": "yes"} | Mamta GuptaMamta Gupta | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
3319 of 20223319 of 2022 | HaryanaHaryana | The complainant, Parvesh Jain, booked a commercia…The complainant, Parvesh Jain, booked a commercial unit with TDI Infrastructure Pvt. Ltd. in 2006 and paid ₹14,50,000. He sought compensation for mental agony and harassment due to delay in possession and default by the respondent. | ["Delay in possessi…["Delay in possession", "Default by respondent"] | {"appellant_claim": "The complainant claimed comp…{"appellant_claim": "The complainant claimed compensation for mental agony and harassment due to delay in possession and default by the respondent.", "respondent_claim": "The respondent claimed that the complainant was an investor and not a consumer, and therefore not entitled to compensation.", "final_verdict": "The complaint was dismissed with no order as costs.", "in_favor_of_respondent": "yes"} | Parvesh JainParvesh Jain | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
3318 of 20223318 of 2022 | HaryanaHaryana | The complainant booked a commercial unit with the…The complainant booked a commercial unit with the respondent company in 2006 and paid ₹7,80,000. The respondent company cancelled the allotment in 2008 and the complainant sought compensation for mental agony and harassment. | ["Compensation for …["Compensation for mental agony and harassment"] | {"appellant_claim": "The complainant claimed comp…{"appellant_claim": "The complainant claimed compensation for mental agony and harassment due to the respondent company's actions.", "respondent_claim": "The respondent company claimed that the complainant was an investor and not a consumer, and therefore not entitled to compensation.", "final_verdict": "The complaint was dismissed with no order as to costs.", "in_favor_of_respondent": "yes"} | Parvesh JainParvesh Jain | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
Execution No. 2902 …Execution No. 2902 of 2022 | HaryanaHaryana | Decree holder withdrew execution as fully satisfi…Decree holder withdrew execution as fully satisfied after judgment debtor provided post-dated cheques. Order of attachment recalled. | ["Execution", "Sati…["Execution", "Satisfaction"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Execution withdrawn as fully satisfied. Order of attachment recalled.", "in_favor_of_respondent": "yes"} | Suman Deep SinghSuman Deep Singh | TDI Infrastructure …TDI Infrastructure Private Limited | Link |
263-2019263-2019 | HaryanaHaryana | Complainant Rekha Talwar accepted demand draft fr…Complainant Rekha Talwar accepted demand draft from respondent M/s TDI Infrastructure Ltd. for Rs.12,18,546/-, satisfying the execution. | ["Payment Dispute"]["Payment Dispute"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that the respondent had not made payment as per the earlier order.", "respondent_claim(in detail)": "The respondent claimed that they had offered a cheque to the complainant, which was refused. They then brought a demand draft for the amount.", "final_verdict(in detail)": "The execution was satisfied as the complainant accepted the demand draft.", "in_favor_of_respondent": "yes"} | Rekha TalwarRekha Talwar | TDI Infrastructure …TDI Infrastructure Limited | Link |
1056 of 20181056 of 2018 | HaryanaHaryana | Complaint against TDI Infrastructure Ltd. for not…Complaint against TDI Infrastructure Ltd. for not registering their project. Notice was issued and later discharged as they are filing online registration. | ["Project Registrat…["Project Registration"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Notice was discharged as the respondent is filing online registration for their project.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
Complaint No. 917 o…Complaint No. 917 of 2019 | HaryanaHaryana | Complaint dismissed as not maintainable with libe…Complaint dismissed as not maintainable with liberty to file fresh execution petition. Matter disposed of. | ["Execution of orde…["Execution of order", "Maintainability of complaint"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaint dismissed as not maintainable", "in_favor_of_respondent": "yes"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
1008 of 2019 (Execu…1008 of 2019 (Execution) | HaryanaHaryana | The execution was rendered infructuous due to the…The execution was rendered infructuous due to the Appellate Tribunal's order granting extension of time to the respondent. The matter was disposed of as rendered infructuous. | ["Execution rendere…["Execution rendered infructuous"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The execution was rendered infructuous due to the Appellate Tribunal's order granting extension of time to the respondent.", "in_favor_of_respondent": "yes"} | Manoj SunejaManoj Suneja | TDI Infrastructure …TDI Infrastructure Limited | Link |
2696 of 20192696 of 2019 | HaryanaHaryana | Complaint against TDI Infrastructure Ltd. for not…Complaint against TDI Infrastructure Ltd. for not executing the conveyance deed. The deed was later found to be executed, making the complaint infructuous. | ["Conveyance deed e…["Conveyance deed execution"] | {"appellant_claim(in detail)": "The complainant a…{"appellant_claim(in detail)": "The complainant alleged that the respondent did not execute the conveyance deed.", "respondent_claim(in detail)": "The respondent claimed that the conveyance deed had been executed in favor of the complainant.", "final_verdict(in detail)": "The complaint was disposed of as infructuous since the conveyance deed was found to be executed.", "in_favor_of_respondent": "yes"} | Dheeraj KumarDheeraj Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
COMPLAINT NO. 2544 …COMPLAINT NO. 2544 of 2019 | HaryanaHaryana | The complainant filed a complaint against TDI Inf…The complainant filed a complaint against TDI Infrastructure Ltd. for not developing a plotted colony named 'Tuscan City-Phase III'. The authority exempted the respondent from filing certain documents and directed them to cancel the registration. | ["Exemption from fi…["Exemption from filing documents", "Cancellation of registration"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent was not developing the plotted colony named 'Tuscan City-Phase III'.", "respondent_claim": "The respondent claimed that they were not intending to develop the colony and wished to withdraw the registration.", "final_verdict": "The authority exempted the respondent from filing certain documents and directed them to cancel the registration.", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | TDI Infrastructure …TDI Infrastructure Limited | Link |
1406 of 20191406 of 2019 | HaryanaHaryana | Complaints settled with complainants. Files consi…Complaints settled with complainants. Files consigned to record room. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Complaints settled with complainants.", "in_favor_of_respondent": "yes"} | Parmeet SinghParmeet Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
140 of 2021140 of 2021 | HaryanaHaryana | The complainant's review application was dismisse…The complainant's review application was dismissed as it was not maintainable. The complainant was trying to re-open the entire case by filing a review petition through a new counsel who did not argue before the Court. | ["Review applicatio…["Review application", "Maintainability"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the Authority had failed to adjudicate on the issue of possession and interest on delay in delivery of possession as per Rule 15 of HRERA, Rules 2017.", "respondent_claim": "The respondent claimed that the review application was not maintainable as it was filed beyond limitation and that the complainant was trying to re-open the entire case.", "final_verdict": "The review application was dismissed as it was not maintainable.", "in_favor_of_respondent": "yes"} | Anju TyagiAnju Tyagi | TDI Infrastructure …TDI Infrastructure Limited | Link |
Complaint No. 746 o…Complaint No. 746 of 2021 | HaryanaHaryana | Complainant filed review application for correcti…Complainant filed review application for correction in name. Case dismissed as withdrawn with liberty to file review application/complaint after necessary correction. | ["Review Applicatio…["Review Application", "Correction in Name"] | {"appellant_claim(in detail)": "Complainant filed…{"appellant_claim(in detail)": "Complainant filed review application for correction in name.", "respondent_claim(in detail)": "Learned counsel for the respondent stated that present complaint is not maintainable because name of the complainant in the complaint of which review is sought differs from the name of the complainant in present review application/complaint.", "final_verdict(in detail)": "Case dismissed as withdrawn with liberty to file review application/complaint after necessary correction.", "in_favor_of_respondent": "yes"} | Vikrant DabasVikrant Dabas | TDI Infrastructure …TDI Infrastructure Limited | Link |
1914 of 20191914 of 2019 | HaryanaHaryana | Complaint dismissed for non-prosecution as the co…Complaint dismissed for non-prosecution as the complainant failed to appear or provide clear relief demands despite multiple opportunities. | ["Non-prosecution",…["Non-prosecution", "Dismissal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The complaint was dismissed for non-prosecution as the complainant failed to appear or provide clear relief demands despite multiple opportunities.", "in_favor_of_respondent": "yes"} | Anil ChahalAnil Chahal | TDI Infrastructure …TDI Infrastructure Limited | Link |
315 of 2021315 of 2021 | HaryanaHaryana | Complaint dismissed due to maintainability issues…Complaint dismissed due to maintainability issues. Complainant cannot seek reliefs in piecemeals from two different fora simultaneously. | ["Maintainability",…["Maintainability", "Split cause of action"] | {"appellant_claim": "Complainant sought reliefs i…{"appellant_claim": "Complainant sought reliefs in the present complaint which are similar to reliefs sought before Ld. District Consumer Disputes Redressal Forum, Sonepat.", "respondent_claim": "Respondent objected to grant of further time to complainant to file rejoinder and copy of record pertaining to complaint pending before Ld. District Consumer Disputes Redressal Forum, Sonepat.", "final_verdict": "The present complaint is dismissed with a liberty to file afresh, incase complainant withdraws his complaint from Ld. District Consumer Disputes Redressal Forum, Sonipat.", "in_favor_of_respondent": "yes"} | Sat Narain VatsSat Narain Vats | TDI Infrastructure …TDI Infrastructure Limited | Link |
78 of 202078 of 2020 | HaryanaHaryana | Suo-motu complaint against TDI Infrastructure Ltd…Suo-motu complaint against TDI Infrastructure Ltd. for not filing online proforma A-H. Case discharged as occupation certificate granted for part of the project. | ["Non-filing of onl…["Non-filing of online proforma", "Occupation certificate"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case discharged as occupation certificate granted for part of the project.", "in_favor_of_respondent": "yes"} | TDI Infrastructure …TDI Infrastructure Limited | Link | |
44 of 202044 of 2020 | HaryanaHaryana | Complainant Brij Mohan Gupta filed a complaint ag…Complainant Brij Mohan Gupta filed a complaint against TDI Infrastructure Ltd. for non-refund of Rs. 4,50,000 with 9% interest. The respondent paid Rs. 11,27,598 in 6 post-dated cheques. | ["Non-refund of mon…["Non-refund of money"] | {"appellant_claim(in detail)": "The complainant c…{"appellant_claim(in detail)": "The complainant claimed that the respondent did not refund Rs. 4,50,000 with 9% interest as per the order dated 24.09.2019 in complaint no. 131 of 2019.", "respondent_claim(in detail)": "The respondent claimed that they paid Rs. 11,27,598 in 6 post-dated cheques towards satisfaction of the order.", "final_verdict(in detail)": "The complaint was disposed of as fully satisfied. The respondent's payment of Rs. 11,27,598 was accepted as satisfaction of the earlier order.", "in_favor_of_respondent": "yes"} | Brij Mohan GuptaBrij Mohan Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
45 of 202045 of 2020 | HaryanaHaryana | Complainant Ashok Kumar filed execution petition …Complainant Ashok Kumar filed execution petition for refund of Rs. 4,00,000 with 9% interest from respondent TDI Infrastructure Ltd. Respondent paid Rs. 9,93,680 in 6 post-dated cheques. | ["Refund of Money"]["Refund of Money"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant filed an execution petition for refund of Rs. 4,00,000 with 9% interest from the respondent.", "respondent_claim(in detail)": "The respondent paid Rs. 9,93,680 in 6 post-dated cheques towards satisfaction of the order dated 24.09.2019.", "final_verdict(in detail)": "The execution petition was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Ashok KumarAshok Kumar | TDI Infrastructure …TDI Infrastructure Limited | Link |
47 of 202047 of 2020 | HaryanaHaryana | Complainant Rama Aggarwal filed a complaint for e…Complainant Rama Aggarwal filed a complaint for execution of a previous order dated 24.09.2019. The respondent, M/s TDI Infrastructure Ltd., submitted post-dated cheques worth Rs. 9,93,680/- as satisfaction. | ["Execution of prev…["Execution of previous order"] | {"appellant_claim": "The complainant sought execu…{"appellant_claim": "The complainant sought execution of the previous order dated 24.09.2019.", "respondent_claim": "The respondent submitted post-dated cheques worth Rs. 9,93,680/- as satisfaction.", "final_verdict": "The complaint was disposed of as fully satisfied.", "in_favor_of_respondent": "yes"} | Rama AggarwalRama Aggarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
1516 of 20201516 of 2020 | HaryanaHaryana | Complaint dismissed for non-prosecution as the co…Complaint dismissed for non-prosecution as the complainant failed to appear for the hearing. | ["Non-prosecution"]["Non-prosecution"] | {"appellant_claim(in detail)": "The complainant f…{"appellant_claim(in detail)": "The complainant failed to appear for the hearing, resulting in the complaint being dismissed for non-prosecution.", "respondent_claim(in detail)": "Not applicable", "final_verdict(in detail)": "The complaint was dismissed for non-prosecution.", "in_favor_of_respondent": "yes"} | Jogender SinghJogender Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
1144 of 20211144 of 2021 | HaryanaHaryana | Complaint against TDI Infrastructure Limited for …Complaint against TDI Infrastructure Limited for selling car parking spaces in front of lift lobby in violation of sanctioned plan. Case disposed of as respondent stated they had not allotted additional car parking in front of lift lobby. | ["Car parking space…["Car parking space violation"] | {"appellant_claim": "Complainant alleged that res…{"appellant_claim": "Complainant alleged that respondent had sold car parking spaces in front of lift lobby in violation of sanctioned plan.", "respondent_claim": "Respondent stated that they had not allotted additional car parking in front of lift lobby in S1, S2, S3, and S4 and that car parking spaces had only been allotted as per sanctioned plan.", "final_verdict": "Case disposed of as respondent stated they had not allotted additional car parking in front of lift lobby.", "in_favor_of_respondent": "yes"} | S Block Kingsbury R…S Block Kingsbury RWA Regd. | TDI Infrastructure …TDI Infrastructure Limited | Link |
718, 721, 723 of 20…718, 721, 723 of 2021 | HaryanaHaryana | Complainants sought statutory compensation for de…Complainants sought statutory compensation for delay in delivery of possession of plots in TDI City project. Authority dismissed the complaints as contractual obligations between parties stood discharged with execution of conveyance deeds. | ["Delay in possessi…["Delay in possession", "Compensation"] | {"appellant_claim": "Complainants sought statutor…{"appellant_claim": "Complainants sought statutory compensation for delay in delivery of possession of plots in TDI City project.", "respondent_claim": "Respondent claimed that contractual obligations between parties stood discharged with execution of conveyance deeds.", "final_verdict": "Authority dismissed the complaints.", "in_favor_of_respondent": "yes"} | Suresh AryaSuresh Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution no. 1114 …Execution no. 1114 of 2020 | HaryanaHaryana | The case was settled amicably between the parties…The case was settled amicably between the parties, making the complaint infructuous. The case is disposed of. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The case was settled amicably between the parties, making the complaint infructuous.", "in_favor_of_respondent": "yes"} | Pranabh AggarwalPranabh Aggarwal | TDI Infrastructure …TDI Infrastructure Limited | Link |
849 of 2021849 of 2021 | HaryanaHaryana | Complaint became infructuous after settlement dee…Complaint became infructuous after settlement deed was executed between parties. Case disposed of. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Complaint became infructuous after settlement deed was executed between parties.", "in_favor_of_respondent": "yes"} | Anr.Anr. | TDI Infrastructure …TDI Infrastructure Limited | Link |
2272 of 20222272 of 2022 | HaryanaHaryana | Complaint dismissed for incorrect project name. L…Complaint dismissed for incorrect project name. Liberty to file fresh complaint with correct facts. | ["Maintainability o…["Maintainability of complaint"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "The respondent claimed that the project mentioned in the complaint is different from the project where the appellant's unit is situated.", "final_verdict(in detail)": "The complaint was dismissed for incorrect project name. The appellant was given liberty to file a fresh complaint with correct facts.", "in_favor_of_respondent": "yes"} | Suman SharmaSuman Sharma | TDI Infrastructure …TDI Infrastructure Limited | Link |
620 of 2020620 of 2020 | HaryanaHaryana | Complaint against TDI Infrastructure Ltd. for lat…Complaint against TDI Infrastructure Ltd. for late fee payment. Authority discharged notice and disposed of complaint after payment. | ["Late fee payment"]["Late fee payment"] | {"appellant_claim": "Payment of late fee", "respo…{"appellant_claim": "Payment of late fee", "respondent_claim": "Payment of late fee", "final_verdict": "Complaint disposed of after payment of late fee", "in_favor_of_respondent": "yes"} | Haryana Real Estate…Haryana Real Estate Regulatory Authority | TDI Infrastructure …TDI Infrastructure Limited | Link |
3040 of 20223040 of 2022 | HaryanaHaryana | The complainant booked a plot in TDI City, Kundli…The complainant booked a plot in TDI City, Kundli, Sonepat in the project of respondent. The complainant alleged that the respondent failed to hand over the physical possession of the plot and the title of the land was defective. | ["Failure to hand o…["Failure to hand over possession", "Defective title"] | {"appellant_claim": "The complainant alleged that…{"appellant_claim": "The complainant alleged that the respondent failed to hand over the physical possession of the plot and the title of the land was defective.", "respondent_claim": "The respondent denied that the title of the land was defective and alleged that the complainant failed to pay the non-construction penalty amount.", "final_verdict": "The complaint was dismissed as devoid of any merit.", "in_favor_of_respondent": "yes"} | Gaurav SuriGaurav Suri | TDI Infrastructure …TDI Infrastructure Limited | Link |
973/2021973/2021 | HaryanaHaryana | Complainant withdrew relief pertaining to infrast…Complainant withdrew relief pertaining to infrastructural facilities with liberty to file afresh. Case disposed of. | ["Infrastructural f…["Infrastructural facilities", "Unit area increase"] | {"appellant_claim": "Complainant sought return of…{"appellant_claim": "Complainant sought return of additional amounts charged for increase in apartment area and club membership, registration of unit, and provision of infrastructural facilities.", "respondent_claim": "Respondent claimed that complainant had taken possession of the unit and signed an undertaking that no claims survived, and that Occupation Certificate was pending.", "final_verdict": "Complainant withdrew relief pertaining to infrastructural facilities. Complainant not entitled to relief on account of delay in possession or area increase. Conveyance deed to be executed. Case disposed of.", "in_favor_of_respondent": "yes"} | Kuldeep SinghKuldeep Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
2325 of 20222325 of 2022 | HaryanaHaryana | Complainant Rachna Gupta filed a complaint agains…Complainant Rachna Gupta filed a complaint against TDI Infrastructure Limited for refund and possession of a unit. The case was dismissed in default for non-prosecution by the complainant. | ["Default dismissal…["Default dismissal"] | {"appellant_claim": "Refund of Rs 34,49,085/- and…{"appellant_claim": "Refund of Rs 34,49,085/- and physical possession of the unit", "respondent_claim": "Not mentioned", "final_verdict": "Dismissed in default for non-prosecution by the complainant", "in_favor_of_respondent": "yes"} | Rachna GuptaRachna Gupta | TDI Infrastructure …TDI Infrastructure Limited | Link |
EXECUTION NO. 790 O…EXECUTION NO. 790 OF 2021 | HaryanaHaryana | Settlement arrived between parties. Execution com…Settlement arrived between parties. Execution complaint disposed as fully satisfied. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "Settlement arrived between parties. Execution complaint disposed as fully satisfied.", "in_favor_of_respondent": "yes"} | DECREE HOLDERDECREE HOLDER | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 1565 …Execution No. 1565 of 2019 | HaryanaHaryana | The execution petition was disposed of as fully s…The execution petition was disposed of as fully settled due to a settlement deed being placed on record. The decree holder is at liberty to re-open the case if any issue remains pending. | ["Settlement"]["Settlement"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The execution petition was disposed of as fully settled due to a settlement deed being placed on record.", "in_favor_of_respondent": "yes"} | Adesh VatsAdesh Vats | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 3029 …Execution No. 3029 of 2022 | HaryanaHaryana | Decree holder did not appear for the hearing. Jud…Decree holder did not appear for the hearing. Judgment debtor stated that all post-dated cheques for the full decree amount had been given to the decree holder. | ["Execution complai…["Execution complaint satisfaction"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint was disposed of as fully satisfied since the judgment debtor stated that all post-dated cheques for the full decree amount had been given to the decree holder.", "in_favor_of_respondent": "yes"} | Asha VashisthAsha Vashisth | TDI Infrastructure …TDI Infrastructure Limited | Link |
Execution No. 2909 …Execution No. 2909 of 2022 | HaryanaHaryana | Decree holder failed to appear for verification o…Decree holder failed to appear for verification of realization of cheques. Judgment debtor stated that whole decretal amount has been paid. | ["Realization of ch…["Realization of cheques", "Payment of decretal amount"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The execution complaint stands disposed of as fully satisfied since whole of decretal amount has been paid.", "in_favor_of_respondent": "yes"} | Pooja SharmaPooja Sharma | TDI Infrastructure …TDI Infrastructure Limited | Link |
1613 of 20221613 of 2022 | HaryanaHaryana | Complaint settled between parties. Settlement dee…Complaint settled between parties. Settlement deed to be submitted to the Authority. | ["Settlement"]["Settlement"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "Case disposed of as settled", "in_favor_of_respondent": "yes"} | Karun BansalKarun Bansal | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.271 of 20…Appeal No.271 of 2020 | HaryanaHaryana | The appeal was dismissed as withdrawn with libert…The appeal was dismissed as withdrawn with liberty to the appellant to avail appropriate remedy before the Hon'ble High Court. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim(in detail)": "Not provided", "r…{"appellant_claim(in detail)": "Not provided", "respondent_claim(in detail)": "Not provided", "final_verdict(in detail)": "The appeal was dismissed as withdrawn with liberty to the appellant to avail appropriate remedy before the Hon'ble High Court.", "in_favor_of_respondent": "yes"} | Jitendra AroraJitendra Arora | TDI Infrastructure …TDI Infrastructure Limited | Link |
Appeal No.330 of 20…Appeal No.330 of 2021 | HaryanaHaryana | The appeal has become infructuous and is dismisse…The appeal has become infructuous and is dismissed as such. | ["Infructuous appea…["Infructuous appeal"] | {"appellant_claim": "Not provided", "respondent_c…{"appellant_claim": "Not provided", "respondent_claim": "Not provided", "final_verdict": "The appeal is dismissed as infructuous.", "in_favor_of_respondent": "yes"} | Manju AryaManju Arya | TDI Infrastructure …TDI Infrastructure Limited | Link |
108 of 2022108 of 2022 | HaryanaHaryana | The appeal was withdrawn by the appellant and the…The appeal was withdrawn by the appellant and the case was disposed of as per the Memorandum of Understanding between the parties. | ["Withdrawal of App…["Withdrawal of Appeal"] | {"appellant_claim": "The appellant claimed that t…{"appellant_claim": "The appellant claimed that the appeal be disposed of as withdrawn.", "respondent_claim": "The respondent claimed that the appeal be disposed of as per the Memorandum of Understanding between the parties.", "final_verdict": "The appeal was disposed of as withdrawn.", "in_favor_of_respondent": "yes"} | Praveen SinghPraveen Singh | TDI Infrastructure …TDI Infrastructure Limited | Link |
Comp. No. 142/2021Comp. No. 142/2021 | National Capital Te…National Capital Territory of Delhi | The complaint was dismissed due to lack of jurisd…The complaint was dismissed due to lack of jurisdiction. The complainant will be allowed to file a fresh complaint before the Real Estate Regulatory Authority, Panchkula, Haryana. | ["Jurisdiction", "M…["Jurisdiction", "Maintainability"] | {"appellant_claim": "The complainant claimed that…{"appellant_claim": "The complainant claimed that the respondent had failed to comply with the provisions of the Real Estate (Regulation and Development) Act, 2016.", "respondent_claim": "The respondent claimed that the complaint was not maintainable before the Authority as the project was located in Sonipat, which falls under the jurisdiction of the Real Estate Regulatory Authority, Panchkula, Haryana.", "final_verdict": "The complaint was dismissed due to lack of jurisdiction. The complainant will be allowed to file a fresh complaint before the Real Estate Regulatory Authority, Panchkula, Haryana.", "in_favor_of_respondent": "yes"} | Sh. Ravish MishraSh. Ravish Mishra | TDI Infrastructure …TDI Infrastructure Limited | Link |
No reviews for this builder yet. Be the first one to share your thoughts!